ANNUAL REPORT: 2016-2017

(For internal Circulation)

KG-BASIN PROJECT

Kakinada, Andhra Pradesh, India

BLOCK: KG-ONN-2004/1

2

C O N T E N T S Page

1) PREAMBLE 3

2) STATUS OF THE BLOCK KG-ONN-2004/1 (Operator) 4

3 G& G ACTIVITIES 5

4) DRILLING OPERATIONS 6

5) STATUS OF LAND ACQUISITION & CIVIL WORKS 8

6) CONTRACTS & PURCHASE 10

A) ACTIVITIES CARRIED OUT DURING THE YEAR 10

B) MAJOR CONTRACTS & ORDERS 10

C) NUMBER OF STOCK ITEMS 10

7) PRODUCTION ACTIVITY 10

8) ENVIRONMENTAL CLEARANCE 11

9) STATUS OF THE BLOCK KG-OSN-2009/4 (Non-Operator) 12

10) CONSULTANCY SERVICES 13

11) COST SAVING MEASURES 13

12) ENERGY CONSERVATION MEASURES 13

13) PERSONNEL/STAFF 14

14) TRANSFERS/JOINING 14

15) SEPERATIONS 15

16) SIGNIFICANT MEETINGS ORGANISED 15

17) EXPENDITURE INCURRED IN THE BLOCK 15

18) TECHNICAL TRAINING, WORKSHOP & WORK ASSOCIATION 15

19) OVERTIME 18

20) CSR ACTIVITY 18

21) ACKNOWLEDGEMENT 19

3

REVIEW OF ACTIVITY OF KG-BASIN PROJECT DURING 2016-2017 1) PREAMBLE

OIL INDIA LIMITED (OIL) operates the NELP-VI Block KG-ONN-2004/1 located in

Krishna-Godavari (KG) Basin), constituting a total Petroleum Exploration License (PEL)

area of 549 Sq Km (511 Sq Km in East Godavari District of Andhra Pradesh and 38 Sq Km

in the District of Yanam in Puducherry Union Territory). OIL started operating in the Krishna

Godavari Basin Project on 01.12.2009 with the establishment of its office at Kakinada, East

Godavari District, Andhra Pradesh. The production sharing contract was signed between OIL

& Geo Global Resources Inc., Barbados (GGR) and Government of India on 02.03.2007. In

this joint venture project, OIL has 90% participating interest (Operator) and the remaining 10

% share is held by GGR. The PEL for the area in Andhra Pradesh was granted w.e.f.

16.02.2008 while the PEL area under Yanam, Puducherry was granted subsequently on

14.06.2010. The Block KG-ONN-2004/1 lies in the north-eastern part of the Krishna-

Godavari basin in onshore coastal Andhra Pradesh (Figure-1). It is in the southeast of

Rajahmundry, south of Kakinada and with the town of Yanam approximately at its

geographic centre. The block is bisected east-west by the northernmost distributary channel,

Gouthami-Godavari River.

Fig: 1-OPERATIONAL AREA UNDER KG-BASIN PROJECT

4

2) STATUS OF THE BLOCK KG-ONN-2004/1

The original Minimum Work Programme (MWP) of Phase-I includes i) Reprocessing of

existing 2D seismic data of 564 LKM, ii) API of 3D seismic of 548 Sq. Km, iii) GM survey

of 2500 stations, iv) Geochemical Survey of 500 samples and v) Drilling of 12 exploratory

wells. Additionally, there is a mandatory commitment of 2D seismic in a grid of 4 km x 4 km

covering the whole block. The effective date of the block is 16.02.2008 considering the grant

of PEL of A.P. Govt. A small portion of PEL is in the Puducherry was granted on 14.06.2010.

The Phase-I exploration period was for 4 years but after four times of extension granted on

account of excusable delay, now the Phase-I is valid till 03.06.2018.

Out of the total area of 549 Sq. Km of the block, about 195 Sq. Km is falling under reserve

forests, Coringa wildlife sanctuary, pipelines & installations of RIL & GSPC, etc. Therefore,

the effective area for exploration in the block is reduced to 353.5 Sq. Km. Due to reduction of

area, the MWP was also proportionately reduced by DGH.

The revised MWP is shown below:

TABLE-1

WP MWP

ORIGINAL MWP

REVISED

ACTUAL

Phase- I

(16.02.2008

to

03.06.2018)

2D Seismic

Reprocessing, LKM

564 ------- 591

Gravity Magnetic API 2500 ------- 2532

Geochemical 500 322 510

3D Seismic API Sq. Km. 548 353 407.37

2D seismic (4x4 km grid) GLKM 320 206 300.16

Exploratory

Well

12 8 4

(Well: DNG#1,

BST#1, TLK#1,

GLK#1)

Drilling of

exploratory HPHT

well YLK#1 is in

progress.

5

3) G&G ACTIVITIES:

Previous Work:

I. Interpretation of 407.37 Sq. Km 3D seismic and 300.16 LKM 2D seismic data has

resulted in identification of 10 locations and few leads for hydrocarbon exploration in

the block KG-ONN-2004/1 in both structural and stratigraphic plays.

II. After the discovery of the first well Dangeru#1, an integrated seismic review was

carried out using available Dangeru#1 well data for establishing the areal extent of the

reservoir, understanding the entrapment mechanism, for the estimation of initial gas in

place and for the placement of appraisal locations. The Kommugudem coal shale

sequence in discovery area is divided into two litho units and mapped as Unit-I &

Unit-II. The gas resources in the Dangeru#1 prospect have been estimated by

volumetric method.

In order to appraise and delineate the reservoir limit and to make a realistic resources

estimates in Dangeru prospect, two appraisal wells have been proposed, one in firm

category and the second in ‘to mature’ category vide KGB EGN-10. After drilling and

testing of the first appraisal well, the geological model will be upgraded and

requirement of drilling the second appraisal (to mature category) well will be

reviewed.

Work done during current year (2016-17):

I. Drilling of first HPHT well TLK#1 was completed with T.D.- 5203 m. Well TLK#1

has shown good hydrocarbon potential of about 200 m possible gas pay sands

encountered in Early Cretaceous Gollapalli Formation from drilling evidences and log

interpretation. Additionally, one stratigraphic sand of about 5 m within

Raghavapuram has proven presence of gas. The gas was flared during well control

operation.

The production testing of the well has been planned during 2017-18 by deploying a

Testing Rig.

II. Drilling of shallow well GLK#1 was completed (T.D.- 2716 m) with no evidence of

hydrocarbon in drill cuttings & logs. The well was abandoned by putting cement

plugs.

III. The second HPHT well YLK#1 (T.D.- 5300 m) was spudded in on 04.12.2016 and

currently under drilling.

IV. Location 6 (original) was released to drill as third HPHT exploratory well. However,

due to non-availability of land, the location 6 was revised (2nd Rev) with T.D.-5700m.

Position of the location 6 (2nd Rev) is structurally down dip than the location 6

6

(original) as proposed vide KGB EGL-6. Considering HPHT drilling challenges for

5700m depth of location 6 (2nd Rev) and expecting higher temperature regime

~430°F, it may cause complicacy during drilling, logging and production testing. In

view of this a review was made with an objective to find out an alternate shallower

HPHT location near to TLK#1. Location 10 located at same fault corridor of

TLK#1with similar geological setting was found to be suitable for drilling.

Structurally the location 10 lies at up-thrown block of well TLK#1. The seismic data

indicate presence of similar seismic package at location 10 area as found in TLK#1.

Subsurface position of location 10 falls near one canal. It was suggested to shift the

location by 255m towards south east, which was re-examined in seismic volume and

found to be suitable for drilling a vertical hole at the revised position. Location 10

(Rev) was released as Exploratory/ Appraisal well vide letter OIL/E&D/2.2 dated

21.03.2017.

Presently, civil preparation of the plinth is in progress.

V. Drilling of first appraisal well Dangeru#2 with T.D.- 4080 m MD (3600 m TVD) is in

progress. The production testing has been planned in 2017-18.

4). DRILLING OPERATIONS:

Previous work:

The second exploratory well Balusitippa-1 (BST#1) was spudded on 09.02.2015 and the well

was drilled as directional J-profile well with a horizontal drift of 1364.44 m in79.220 at 3244

m MD. The well BST#1 was drilled down to 3275m MD (2926m TVD) and terminated

within Chintanapalli shale formation of Upper Cretaceous .No significant hydrocarbon shows

have been reported while drilling .MDT survey of 27 pre –tests carried out between 2884 m

2772.5 m suggests an impervious zone , in view of the resulted ‘Dry Test’ or ‘Lost seal’ at all

depths. Based on the observation of drill cutting samples, log interpretation as well a MDT

results, it was opined that no zone merits testing in this well and the was declared “Dry&

Abandoned”

FIRST HPHT WELLAT LOC: THANE LANKA#1

The first HPHT well Thanelanka#1 was spudded on 12.01.2016.The planned TD of the

well is 5200mTVD/BMT .This well will help in exploring the Gollapalli formation of Early

Cretaceous Synrift sediments. Currently the well is under drilling and drilled down to 3020

m.

7

WORK DONE DURING CURRENT YEAR (2016-17):

DRILLING OPERATION FOR THE FY 2016-17:

First HPHT exploratory well Location 9A (TLK#1) which was spudded on

12.01.2016 have been successfully completed to a target depth of 5203m and hermetical

testing was carried out on 05.10.2017. This well has encountered Gollapalli Sanstone

reservoir with number of objects identified for testing by a different rig. Thereafter, the rig

was moved to 2nd Well location 16 (YLK#1) and spudded on 04.12.2016. Currently, the well

is under drilling and drilled down to 3362m.

The third shallow exploratory well location 12 (GLK#1) was spudded on 08.10.2016

and drilled down to a target depth of 2716m by second rig. Since, no hydrocarbon was

discovered during logging, the well was permanently abandoned after placing 3 cement

plugs. The rig was then forward appraisal location DNG-A1 (DNG#2) and the well was

spudded on 07.03.2017. The well was drilled down to 1140m and presently drilling is in

progress.

8

TABLE-3

Target vs. Achievement:

Wells Target 2016-2017 (RE) (Meters)

Achievement (Meters)

HPHT

Loc. 9A(TLK-1) 2183 2183

Loc. 16 (YLK-1) 4000 3362 (4862m with C Hole)

Shallow

Loc. 12 (GLK-1) 2700 2716

DNG –A1 1000 1140

Total 9883 9401 (10901m with C Hole)

MVT Training: Mines Vocational Training programme was conducted for the personnel of

Rig (M/s ESSAR and other service providers at Loc: GLK#1) in three batches.

First Batch: 33 nos personnel, Date: 10th to 15th August, 2016

Second Batch: 17 nos personnel, Date: 2nd to 8th September, 2016

Third Batch: 13 nos personnel, Date: 28th to 30th October, 2016

All are issued valid certificates.

5). STATUS OF LAND ACQUISITION & CIVIL WORKS

Land acquisition in this block is a challenging issue as the area is fertile from agriculture

point of view. The status of land acquisition and civil engineering jobs are as follows (Tables

4 & 5):

TABLE 4: STATUS OF LAND ACQUISITION:

Location No. Land Acquisition Date Remarks

Location –6

Under progress through

Govt. of A.P.

Final Requisition submitted to the District

Collector for acquisition of lands under

L.A. Act.on 09.02.2015.

Land has acquired on lease at a deviation

of 435.0 from the original well centre. But

priority lowered because of upliftment of

Loc-10, Gedellanka.

Location -12

01.04.2015

(i) Plinth area has been taken on lease

basis.

(ii) Land for widening of approach road

purchased.

Location – 16

(Prospect-‘G’) 01.05.2015

Plinth area has been taken on lease basis.

Approach road available.

Location – 15

(Prospect-‘D&I’) 01.09.2015

Plinth area has been taken on lease basis.

Approach road available but to be

developed.

9

Location – 13

01.07.2016

Plinth area has been taken on lease basis.

Approach road available but to be

developed.

Location – 10 Acquisition process completed.

TABLE 5: STATUS OF CIVIL ENGINEERING JOBS AT DIFFERENT LOCATIONS:

Civil Jobs Status Remarks

Loc 11

(Well

DNG2)

Construction of rig

foundation, extension of

plinth, repairing of approach

road etc.

Job completed Well is under drilling.

Loc 12

Existing approach road Job Completed

Drilling Completed. Finally abandoned on

.

New approach road Job Completed

Plinth Job Completed

Foundations Contract

completed

Loc 16

Existing approach road

Road is in good

condition, PR to be

raised on demand

Well is under drilling. New approach road Job Completed

Plinth Job Completed

Foundations Job Completed

Loc 15

Existing approach road Job is under

progress.

Soil investigation completed. Design of

Rig foundation is under progress

New approach road Nil

Plinth Job completed

Foundations Contract finalized.

Loc 13

Existing approach road Job completed.

Soil investigation and design of rig

foundation completed.

New approach road Job Completed.

Plinth Job completed

Foundations Contract finalized.

Loc 10

Existing approach road Job under progress.

Being a forward location to Nabor’s rig No

503, priority increased because of

temporary suspension of Loc-6.

New approach road Nil.

Plinth Contract under

finalization stage.

Foundations Under tender.

10

6). CONTRACTS & PURCHASE:

A) ACTIVITIES CARRIED OUT DURING THE YEAR:

(i) No. of PRs received : 125

(ii) No. of Tenders floated : 85

(iii) No. of Orders placed : 43

(iv) No. of Contracts awarded : 45

(v) No. of Spot POs : 37

B) MAJOR CONTRACTS & ORDERS FINALIZED DURING THE YEAR:

Sl.

No. Service/Material Name of the Party

Estimated Value

(Rs. Crores)

1 Hiring of DST & SPT services

for HPHT drilling M/s. SCHLUMBERGER ASIA

SERVICES LTD. 47.16

2

Hiring of cementing service M/s.BJ SERVICES COMPANY MIDDLE EAST LTD.

11.07

3

Construction of plinth at

Loc-15 M/s. T.V.CHALAPATHI RAO 4.29

4 Constructions of plinth Loc-

13 Chinna Bapanapall M/s. DEVI ENGINEERING AND

CONSTRUCTIONS 3.33

C) NUMBER OF STOCK ITEMS: 536 Nos.

7). PRODUCTION ACTIVITY

1. Well completion and Production Testing equipment’s and consumables procurement

process completed and materials arrived. The purchased equipment will be sufficient

to cater the need for testing of non-HPHT category wells planned in the first phase of

the Drilling program.

2. Necessity to review the testing program of HPHT wells were felt during discussion

in-house. The testing plan was then later reviewed in consultation with ONGC HPHT

testing expert. It was suggested to incorporate “Silenced Flare Stack” as standard

equipment for flaring of expected high volume of gas from HPHT wells during

testing. Tender for Silenced Flare stack were floated and global experienced service

providers participated in the bidding process. The tendering process is in final stage.

3. Expression of Interest no OIL/KGB/EOI-34 was published for Hiring of Integrated

DST-TCP-SPT service for testing of Shallow wells of KG Basin. All total 8 parties

participated in the EOI process. However, later it was decided to carry out the testing

of non-HPHT wells with the contract which was in place for testing of HPHT wells.

Fresh negotiation was started with Schlumberger for integration of HPHT and Non-

11

HPHT well testing in the same contract to get maximum cost advantage. After many

rounds of discussion, Schlumberger have agreed to give substantial discount in the

overall contract cost in terms of

a) 40% discount on the rental cost of the Equipment’s

b) 5% discount on operational cost.

c) No mobilisation charge for mobilisation of 2nd set of equipment in the event of

mobilisation of 2nd set of equipment for testing of two wells at the same time.

d) Provision of stack rate which was not in the original contract- this will reduce

the rental charge in case of idling of the equipment for long time.

e) Additional tools and equipment’s like MCV, Packers etc which was not in the

provision of the original contract will be supplied as package for testing of

shallow wells without any additional cost to OIL.

Clubbing of the testing operation is expected to bring down the overall testing cost

considerably.

4. Explosives for testing of HPHT wells mobilised form Houston, USA. For the purpose

explosive license from PESO were obtained for landing of explosive and DGCA

licences to fly the explosives to India were obtained. All the official and legal

formalities as well as physical movement of the explosives was undertaken in a time

bound schedule which was accomplished successfully.

5. Planning for Testing of HPHT wells in consultation with Technical Consultant- M/s

RPS Energy Service is undertaken on regular basis. Bridging activity to bring all the

service provider in the same platform for compatibility of respective service tools and

equipment’s were initiated and done accordingly.

6. Production Testing of the Appraisal well DNG-2 is expected to be undertaken during

June-July’2017 and production testing of HPHT well TLK-1 is expected on July-

Aug’2017.

7. Hydro-fracturing of KG Basin Wells: Initiated preliminary discussion on Hydro-

fracturing of wells and its design philosophy with experienced service providers like

Baker Hughes, Schlumberger and Halliburton. Subsequently discussions were also

carried out with Executive Director ONGC-Rajahmundry Asset and his team. HF

Design, tools and equipment’s requirement were identified and freeze.

8. Monitoring of the Drilled Well, DNG-1 and TLK-1 on regular basis.

8) ENVIRONMENT CLEARANCE

Environment Clearance was applied for 18 locations after eliminating five (05) locations

which are falling in Coastal Regulation Zone and Reserve Forest area. The same was rejected

by EAC, MOEF&CC due to expiry of TOR validity (TOR valid up to 24.11.2014 only).

Applied for fresh TOR on 24.7.2016 to MOEF&CC seeking exemption from Public Hearing

12

and preparation of EIA report under 7(ii) of the EIA notification 2006. During EAC meeting

on 26.9.2016, advised to authenticate the 18 EC proposed locations from State Forest

Department and to prepare Environmental Impact Assessment report without public hearing.

Floated a tender on 24.12.2016 for carrying out EIA/EMP study and M?s Bhagavathi Labs,

Hyderabad got the contract. Completed Mobilization on 19.3.2017 and started EIA study

from 21.3.2017 and will complete by 31.5.2017.

9). STATUS OF THE BLOCK KG-OSN-2009/4 (Non-Operator)

The shallow water block KG-OSN-2009/4 with an area of 835 sq. km was awarded during

the year 2010 under NELP-VIII round to the JV Consortium of ONGC (Operator with 50 %

PI), OIL(30 % PI), NTPC (10 % PI) and A.P.G.I.C with 10% PI. The effective date of the

block is 02.08.2010. The Phase-I exploration period was for 4 years but after extension

granted on account of excusable delays and additional time for acquisition of FTG data, etc.

Phase-I is valid till 30.04.2017.

Due to non-availability of MoD clearance, GOI cleared only 317 sq.km area for exploration

in two Geographically separated parts of 184 sq.km and 133 sq.km with intervening No-Go

and High-Risk area. Due to reduction of area, the MWP was also proportionately reduced by

DGH.

The revised Minimum Work Programme vis a vis achievement is shown in the table below:

Initial Exploration

Period (Phase-I)

(02.08.2010 to

30.04.2017)

WP Original

MWP

Revised

MWP

Actuals

2D (API) LKM 1550 589 371

3D(API) SQM 835 317 317

Exploratory

wells (4600m)

4 1.52 1.52

Airborne FTG - 704 In progress

As per the current understanding of G&G data including the drilled well data, the block is

rated as high risk low reward block. Further, the block is severely constrained by

MoD/DRDO regulations. The operator informed DGH through mail on 31.3.2017 to

relinquish the block after completion of FTG data acquisition without entering in to the

second phase of Exploration.

13

10). CONSULTANCY SERVICES

11). COST SAVING MEASURES:

1) All the services and consultancy works awarded to various parties by KG-Basin

project are monitored properly to ensure that the jobs are finished in time thereby

reducing cost. Drilling operation is monitored /supervised closely, problems discussed

in the operation meeting on daily basis for quick resolution.

2) Expenditure towards hiring vehicles for operational reasons has been reduced by 19%

in comparison to the previous years. 12). ENERGY CONSERVATION MEASURES: The KG-basin project remains committed and have exercised stringent energy conservation

measures especially in power consumption for various electrical gadgets and judicious

utilization of sanctioned kilo meterage of vehicles while taking care not to hamper project

works in general and field works in particular.

SL

No DEPARTMENT

CONSULTANT &

DATE OF JOINING REMARKS

2

CIVIL Shri. A. Ravi Teja

16.05.2015

Engaged on contract basis for Civil

Engineering jobs at Locations.

3 LAND Shri K.V.Ramakrishna Rao

01.06.2014

To assist the project in land acquisition and

liaison jobs, a well experienced Revenue

officer having good knowledge and

understanding of Land acquisition and public

relations have been engaged.

4 HSE/FIRE /

ELECTRICAL

Shri. E. Vijay Sekhar

01.08.2015 Engaged on contract basis for HSE & Fire,

Electrical officer’s jobs. Shri Kolla Karan Kumar

12.10.2016

14

13). PERSONNEL/STAFF:

The total number of executives and work persons in KG-Basin project during 2016-17 is as

follows (status as on 31.03.2017):

14). TRANSFERS/JOINING:

PROMOTIONS:

Category Strength

Executives 21

SR Executives 1

Workmen 5

Name Designation Date of joining

KGB Project

Transfer date

Shri Swadesh Dey Executive Director (KGB

&BEP) 11.03.2017 --

Shri M.V.V.S. Murthy DGM – C&P 04.04.2016 --

Shri P. Krishna Murty SSO 19.12.2016 --

Shri B.K.Barua CE- Drilling 17.02.2017

Shri P.L.Gogoi Suptg. Geologist 10.06.2016 --

Shri Amalendu Das DGM – Drilling -- 11.02.2017

Shri Rakesh Kumar DGM- (C&P) -- 10.06.2016

Shri D. Ramesh Dy. Suptg. Geophysicist -- 06.08.2016

Shri Sarfraz Nawaz Suptg. Geologist -- 24.06.2016

Shri B.Brahma Sr. Stores Officer -- 24.06.2016

Shri A.J.Heera Sr. Stores Officer 17.5.2016

Shri A.Baruah Dy.Manager-(C&P) 01.6.2016

Name Promoted as

Shri A.Sarma General Manager (Geoscience)

Shri. Prasanta Borkakoti General Manager (A&ER).

15

15). SEPERATIONS:

16). SIGNIFICANT MEETINGS ORGANISED:

SL.

No.

Name of the VIP Date of Visit Remarks

1. Shri Utpal Bora, CMD 02.02.2017 Project & Wellsite visit

2. Shri. S.Mahapatra

D(E&D)

02.02.2017 Project & wellsite visit

09.03.2017 Project & wellsite visit

17). EXPENDITURE INCURRED IN THE BLOCK:

The expenditure incurred in the block during the year 2016-17 is Rs.469, 36,78,422 with a

cumulative expenditure of Rs.995,25,00,000 cores.

18). TECHNICAL TRAINING, WORKSHOP & WORK ASSOCIATION:

Shri Datta Gupta Dy. General Manager (Chemical)

Shri Amalendu Das Dy. General Manager (Drilling)

Shri K.M.Rao Dy. Chief Engineer – Drilling

Shri P.L.Gogoi Suptg. Geologist

Shri B.S.Rao Sr. Admin Officer

Shri J.Bala Chennaiah Sr. Chemist

Name Designation Date of joining Superannuation date

Shri. Shri K.K.Khuntia General Manager (WL). ------- Superannuation on

31.10.2016

NAME/

Designation PROGRAMME DATE PLACE

Shri. Dipak

Barkakati,

ED (KGB & BEP)

12th International Oil & Gas Conference and

Exhibition Petrotech -2016

04.12.20

16 to

07.12.20

16

IOCL, New Delhi

In house training programme 'Disha - A new

Journey post retirement'

13.02.20

17 to

14.02.20

17

OIL, L&D

Shri Prasanta 4 Day Workshop on Project Management 27.04.20 OIL, L&D

16

Borkakoti,

GM(A&ER)

leading to Globaly recognized IPMA level D

Certification

16 to

30.04.20

16

Strategic Workforce Planning and Analytics &

Talent Management Metrics

22.02.20

17 to

24.02.20

17

Goldman

Communication,

Mumbai

Shri. Pradip Das

DGM-Drilling

Training Programme on "Leadership from

Inside Out”

13.09.20

16 to

14.09.20

16

Noida

Shri.S. Datta Gupta.

DGM-Chemical

Training on Online RTI

05.10.20

16 to

05.10.20

16

MTDC, Duliajan

Nomination of Speaker for Executive

Development Program (EDP)

13.12.20

16 to

13.12.20

16

OIL, L&D

Shri. N.K.Medhi,

Chief Engineer

(Drilling)

Nominations for Workshop on Hydraulic

Fracturing of High Pressure High Temperature

(HPHT) Oil, Gas, Shale Oil & Shale Gas Wells

23.12.20

16 to

24.12.20

16

International

Business

Conferences,

Mumbai

Shri. Rahul Das

Dy. CE (PO)

Nominations for Workshop on Hydraulic

Fracturing of High Pressure High Temperature

(HPHT) Oil, Gas, Shale Oil & Shale Gas Wells

23.12.20

16 to

24.12.20

16

International

Business

Conferences,

Mumbai

Shri. K.Sreenu

SM (F&A)

Advanced FIDIC Contract Conditions of

Projects

22.09.20

16 to

23.09.20

16

Global Landmark

Media, Mumbai

1 Day Workshop on Transformational

Leadership under Project UDAAN.

08.11.20

16 to

08.11.20

16

OIL, L&D, Noida

Shri.D.C.Bharali,

Dy. CE (Civil)

Two Day Programme on "Motivation &

communication"

04.05.20

16 to

05.05.20

16

MTDC, L&D

Project Management and IPMA Level D

Certification

06.02.20

17 to

10.02.20

MTDC, L&D

17

19). OVERTIME:

Total over time incurred during the year for five (5) regular staff members is NIL hours.

17

Shri Shri B.C.

Doley, CE- Civil

Workshop on Cost Estimation, Art of

Evaluation & Nagotiation Skills in Tendering &

Contract Process

22.03.20

17 to

23.03.20

17

ICW Group,

Mumbai

Shri. Abhishek

Baruah

Manager (Materials)

2-day Advanced Fidic Contract Conditions for

Projects on 22nd & 23rd September 2016 in

Mumbai

22.09.20

16 to

23.09.20

16

Global Landmark

Media, Mumbai

Shri P.L.Gogoi,

Suptg. Geologist

Nominations for Workshop on Hydraulic

Fracturing of High Pressure High Temperature

(HPHT) Oil, Gas, Shale Oil & Shale Gas Wells

23.12.20

16 to

24.12.20

16

International

Business

Conferences,

Mumbai

12th International Oil & Gas Conference and

Exhibition Petrotech -2016

04.12.20

16 to

07.12.20

16

IOCL, New Delhi

Workshop for OIL's Project Work on Upper

Assam

29.03.20

17 to

30.03.20

17

Blackgold

Management

services, ONGC,

Ahmedabad

Shri K.M.Rao,

Dy. CE- Drilling

1 Day Workshop on Transformational

Leadership under Project UDAAN.

08.11.20

16 to

08.11.20

16

OIL, L&D

12th International Oil & Gas Conference and

Exhibition Petrotech -2016

04.12.20

16 to

07.12.20

16

IOCL, New Delhi

Shri B.S.Rao,

Sr. Admin Officer

One day workshop on Legal Compliances for

Administrators

27.06.20

16 to

27.06.20

16

OIL, L&D, Noida,

Shri. J. Bala

Chennaiah, Sr.

Chemist

12th International Oil & Gas Conference and

Exhibition Petrotech -2016

04.12.20

16 to

07.12.20

16

IOCL, New Delhi

18

20). CSR ACTIVITY:

Project has endeavored to carry out CSR activities at KG Basin Project as per internal policy

followed in other operational areas of the company. CSR activities supported/carried out in

collaboration with district authorities of East Godavari district by KG Basin project during

2015-16 have been listed below.

SL.

No. Purpose

Amount

1. Publishing of book 'Parisubhrata Mana Badyata, Swachha Bharat Rs. 2,00,000.00

2. Financial Assistance under CSR Funds of OIL for the Public

Infrastructure Development Works in Thanelanka Village in

Mummidivaram Constituency in Kakinada

Rs. 1,99,00,000.00

3. Financial Assistance under CSR fund towards Development works

in Yedurlanka Village, I.Polavaram Mandal.

Rs. 43,00,000.00

4. Financial Assistance for the works proposed in Pulletikurru village

to develop as Model Gram Panchayat under SAGY

Rs. 12,40,000.00

5. National Seminar on Innovatice Trends and Global Advancements

in Technology, Industry Banking and Finance

Rs. 20,000.00

6. Requesting for sponsorship for conducting GMC Balayogi 1st State

Level Basket Ball Champioship tournament from 26.10.2016 to

28.10.2016 at Mummidivaram village

Rs. 2,00,000.00

7. Request for CSR works in OIL’s Area of Operation in KGB Project,

Karrivanirevu, Gadilanka village

Rs. 43,00,000.00

8. Request of Sponsorship from United Journalists Association Rs. 25,000.00

9. Requesting for Advertisement support towards Special Book of

Eevela, an Evening Daily Newspaper to be published from

Kakinada, EG District

Rs. 40,000.00

10. Financial Assistance for providing Steps to Dr. B.R. Ambedkar

Statue

Rs. 30,0000.00

11. Financial Assistance for Nimmakalayala Venkata Rangayyaa

Volleyball Association.” Gollavilli

Rs. 2,00,000.00

12. Financial Assistance for Indhan-JNTUK, Kakinada. Rs. 1,00,000.00

Total : Rs. 3,82,05,000.00

19

21). ACKNOWLEDGEMENT:

The efforts put by Project team in overcoming the challenges posed by local villagers during

drilling operation of the First HPHT well at Thane Lanka and the successful drilling

completion of first HPHT well in OIL’ s history is commendable.The progress achieved till

date have been due to consistent and dedicated team effort of the project team. Director

(E&D)’s constant encouragement, inspiring support and guidance from CMD, D(F),

D(HR&BD) and D(O) have been the main driving force all throughout. Team KGB would

like to place on record the cooperation, support and guidance received primarily from

Resident Chief Executive (RCE), Field Head Quarters as well as from other spheres and

acknowledge the same.

(Swadesh Dey) Executive Director (KGB&BEP)