A staircase, escalator and a lift to be provided at Fuk Tsun Street A staircase, escalator and a lift to be provided at Fuk Tsun Street A staircase, escalator and a lift to be provided at Fuk Tsun Street We are launching a series of public consultation activities in 2017, including consultation with District Council, focus group meetings, roving exhibitions, distribution of leaflets and community forums. Details of the community forums are as follows: Date: 10 September 2017 (Sunday) and 16 September 2017 (Saturday) Time: 2:00pm - 4:30pm (Registration will start at 1:30pm) Venue: Mong Kok Kai Fong Association Limited Chan Hing Social Service Centre, 1/F (Hall), 45 Fuk Tsun Street, Tai Kok Tsui, Kowloon For registration please call 2972 1773 or email to [email protected] Stage 1 : The section along Argyle Street from Tong Mi Road to Fa Yuen Street, including the landing near Fa Yuen Street; and along Tong Mi Road from Fuk Tsun Street to Argyle Street. Stage 2**: The section along Argyle Street from Fa Yuen Street to Hak Po Street; and the landing near Tung Choi Street. Construction Arrangement Temporary Traffic Arrangement During Construction To reduce the impact on traffic and pedestrians during construction of the pedestrian footbridge, temporary rerouting of footpaths and carriageways will be implemented in stages, and the works areas will be confined. Besides, the pedestrian footbridge will be constructed in stages to shorten the duration of the closure of footpaths / carriageways. The proposed mitigation measures include: l Temporary narrowing of existing footpaths (a section of the southern footpath along Argyle Street between Nathan Road and Sai Yeung Choi Street South, and a section of the northern footpath along Argyle Street between Sai Yeung Choi Street South and Tung Choi Street) for conversion to provisional carriageways l Temporary adjustment to the timing of traffic lights to optimize the green time utilization for pedestrians and vehicular phases at critical junctions Tong Mi Road Nathan Road Stage 2 Stage 1 Argyle Street Mong Kok is a busy commercial and shopping district with heavy vehicular and pedestrian flows. It was mentioned in the 2008-09 Policy Address that the Administration would consider an extension of the footbridge system in Mong Kok to cover Central Mong Kok and the Tai Kok Tsui area to improve the pedestrian environment with a view to minimizing vehicle-pedestrian conflicts. In this regard, a consultancy study was commissioned by the Transport Department in March 2009 to explore the improvement of the pedestrian environment by constructing a new pedestrian footbridge system in the centre of Mong Kok, and preliminarily draw up some conceptual plans for the proposed footbridge system. The consultancy study was completed in 2010. Subsequently, we carried out a technical feasibility study in 2011 based on the proposed conceptual plans and reported the progress of the study to Traffic and Transport Committee of the Yau Tsim Mong District Council in November 2013 jointly with the Transport Department. Since Mong Kok is a highly developed area, the construction of a new footbridge system in the area requires thorough consideration of various factors and constraints, including studies on the transport facilities and developments in the vicinity, locations of footbridge piers, staircases, escalators and lifts, and the impact of footbridges on traffic, pedestrian flow, and underground facilities (including Mong Kok MTR Station). A consultant was also engaged in 2013 to conduct further investigation for the project and a preliminary scheme was established based on the findings of the investigation. For more information about the project, please visit the website www.mkfs-hyd.hk and provide participant’s details, including name, contact number, email address and first four digits of HKID card number (relevant information will be used for identification of participant at the forum). Office Hours: Monday to Friday, 10:00am - 5:00pm Note 1: If the Tropical Cyclone Warning Signal No. 8 or above is hoisted or Black Rainstorm Warning Signal is issued by the Hong Kong Observatory 2 hours before the community forum, the programme will be cancelled and rescheduled to the same time on 7 October 2017 at the same venue. For enquiry, please call 2972 1773. Note 2: Simultaneous interpretation in English will be provided in the community forum to be held on 16 September 2017. Project Background ** The programme of Stage 2 is subject to the progress of Proposed Redevelopment of Government Sites at Sai Yee Street, as it involves the improvement works to a section of Argyle Street and Sai Yee Street and the relocation of the red minibus terminus at Tung Choi Street to the new public transport interchange at the proposed Redevelopment of Government Sites at Sai Yee Street. Note 2 The proposed Scheme: (Please the appropriate box) Reasons: Other comments: *I am interested in attending the Community Forum on 16/9/2017 *Name: *Contact number: *Email address: (Please the appropriate box) Local resident (Building name: ) Organization (Name: ) Others (Please specify: ) Date: Signature: (1): Personal data provided by you in this form will be used by Highways Department only for the purposes of handling your comment. (2): If you do not provide the above personal data, we may not be able to handle your comments. support no comment oppose *

Footbridge Mong Kok...Centre, 1/F (Hall), 45 Fuk Tsun Street, Tai Kok Tsui, Kowloon For registration please call 2972 1773 or email to [email protected] Stage 1: The section along Argyle

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Footbridge Mong Kok...Centre, 1/F (Hall), 45 Fuk Tsun Street, Tai Kok Tsui, Kowloon For registration please call 2972 1773 or email to MKFS@hyd.gov.hk Stage 1: The section along Argyle

A staircase, escalator and a lift to be provided at Fuk Tsun StreetA staircase, escalator and a lift to be provided at Fuk Tsun StreetA staircase, escalator and a lift to be provided at Fuk Tsun Street

Proposed Pedestrian

Footbridge

System In Mong Kok

We are launching a series of public consultation activities in 2017, including consultation with District Council, focus group meetings, roving exhibitions, distribution of leaflets and community forums. Details of the community forums are as follows:

Date: 10 September 2017 (Sunday) and 16 September 2017 (Saturday)Time: 2:00pm - 4:30pm (Registration will start at 1:30pm)Venue: Mong Kok Kai Fong Association Limited Chan Hing Social Service Centre, 1/F (Hall), 45 Fuk Tsun Street, Tai Kok Tsui, Kowloon

For registration please call 2972 1773 or email to [email protected]

Stage 1 : The section along Argyle Street from Tong Mi Road to Fa Yuen Street, including the landing near Fa Yuen Street; and along Tong Mi Road from Fuk Tsun Street to Argyle Street.Stage 2**: The section along Argyle Street from Fa Yuen Street to Hak Po Street; and the landing near Tung Choi Street.

Construction Arrangement

Temporary Traffic Arrangement During ConstructionTo reduce the impact on traffic and pedestrians during construction of the pedestrian footbridge, temporary rerouting of footpaths and carriageways will be implemented in stages, and the works areas will be confined. Besides, the pedestrian footbridge will be constructed in stages to shorten the duration of the closure of footpaths / carriageways. The proposed mitigation measures include:lTemporary narrowing of existing footpaths (a section of the southern

footpath along Argyle Street between Nathan Road and Sai Yeung Choi Street South, and a section of the northern footpath along Argyle Street between Sai Yeung Choi Street South and Tung Choi Street) for conversion to provisional carriageways

l Temporary adjustment to the timing of traffic lights to optimize the green time utilization for pedestrians and vehicular phases at critical junctions

Tong Mi Road

Nathan Road

Stage 2

Stage 1Argyle Street

Mong Kok is a busy commercial and shopping district with heavy vehicular and pedestrian flows. It was mentioned in the 2008-09 Policy Address that the Administration would consider an extension of the footbridge system in Mong Kok to cover Central Mong Kok and the Tai Kok Tsui area to improve the pedestrian environment with a view to minimizing vehicle-pedestrian conflicts. In this regard, a consultancy study was commissioned by the Transport Department in March 2009 to explore the improvement of the pedestrian environment by constructing a new pedestrian footbridge system in the centre of Mong Kok, and preliminarily draw up some conceptual plans for the proposed footbridge system. The consultancy study was completed in 2010. Subsequently, we carried out a technical feasibility study in 2011 based on the proposed conceptual plans and reported the progress of the study to Traffic and Transport Committee of the Yau Tsim Mong District Council in November 2013 jointly with the Transport Department. Since Mong Kok is a highly developed area, the construction of a new footbridge system in the area requires thorough consideration of various factors and constraints, including studies on the transport facilities and developments in the vicinity, locations of footbridge piers, staircases, escalators and lifts, and the impact of footbridges on traffic, pedestrian flow, and underground facilities (including Mong Kok MTR Station). A consultant was also engaged in 2013 to conduct further investigation for the project and a preliminary scheme was established based on the findings of the investigation.

r

For more information about the project, please visit the website www.mkfs-hyd.hk

and provide participant’s details, including name, contact number, email address and first four digits of HKID card number (relevant information will be used for identification of participant at the forum).

Office Hours: Monday to Friday, 10:00am - 5:00pm

Note 1: If the Tropical Cyclone Warning Signal No. 8 or above is hoisted or Black Rainstorm Warning Signal is issued by the Hong Kong Observatory 2 hours before the community forum, the programme will be cancelled and rescheduled to the same time on 7 October 2017 at the same venue. For enquiry, please call 2972 1773.Note 2: Simultaneous interpretation in English will be provided in the community forum to be held on 16 September 2017.

Project Background

** The programme of Stage 2 is subject to the progress of

Proposed Redevelopment of Government Sites at Sai Yee Street,

as it involves the improvement works to a section of Argyle Street

and Sai Yee Street and the relocation of the red minibus terminus

at Tung Choi Street to the new public transport interchange at the

proposed Redevelopment of Government Sites at Sai Yee Street.

Note 2

The proposed Scheme: (Please the appropriate box)

Reasons:

Other comments:

*I am interested in attending the Community Forum on 16/9/2017

*Name: *Contact number:

*Email address:

(Please the appropriate box)

Local resident (Building name: )

Organization (Name: )

Others (Please specify: )

Date: Signature:

(1): Personal data provided by you in this form will be used by Highways Department only for the purposes of handling your comment.

(2): If you do not provide the above personal data, we may not be able to handle your comments.

support no comment oppose

P u b l i c C o n s u l t a t i o n

JULY 2017

*

Page 2: Footbridge Mong Kok...Centre, 1/F (Hall), 45 Fuk Tsun Street, Tai Kok Tsui, Kowloon For registration please call 2972 1773 or email to MKFS@hyd.gov.hk Stage 1: The section along Argyle

Pro

po

sed

De

velo

pm

en

ts a

t th

e e

xist

ing

�e

ld’s

D

ep

ot/

WS

D’s

O�

ce S

ite

, Mo

ng

kok

Planter

2.5m

2m

4m

2m

2m

2.5m

2.5m

2m

4m

2m

2m

Cross Section A-ACross Section B-B

Landing near Fuk Tsun Street Landing near Reclamation Street Landing near Tung Choi Street Landing near Sai Yee Street

A staircase, a lift and an escalator to be provided at Fuk Tsun Street

A staircase, a lift and an escalator to be provided at Reclamation Street

A staircase, a lift and an escalator to be provided at Tung Choi Street

A staircase, a lift and an escalator to be provided at Sai Yee Street

West Kow

loon Corridor

Mong Kok Road

Fuk Tsun Street

Tong Mi Road

Tong Mi Road

Landing near Canton Road Landing near Langham Place Landing between Nathan Road and Sai Yeung Choi Street South

Landing near Hak Po Street

Two lifts to be provided at the junction of Canton Road and Argyle Street

A staircase and a lift to be provided outside Langham Place

A staircase to be provided at Argyle Street between Nathan Road and Sai Yeung Choi Street South

Two lifts to be provided at Fa Yuen Street

A staircase and a lift to be provided at Hak Po Street

Mong Kok East Station

Fa Yuen Street

Sai Yee Street

Hak Po Street

Argyle Centre

Possible Connection

Possible Connection

Proposed Redevelopment of Government Sites at

Sai Yee Street (Under Investigation)

Existing Yim Po Fong Street

Footbridge

Existing Tong Mi Road

Footbridge

Yim Po

Fong Street

Nathan Road

Nathan Road

Sai Yeung Choi Street South

Tung Choi Street

Argyle Street Argyle Street

Shanghai Street

Portland Street

Langham Place

Possible Connection

Canton Road

Reclamation Street

Ex- Mong Kok

Market

Possible Connection

AluminumCladding

Skylight Cladding

Aluminum Cladding

AluminumCladding

Skylight Cladding

Aluminum Cladding

Section of the Proposed Footbridge along Argyle Street

(Mimic Diagram)

Without Planters

With Planters

Lift

Escalator

Staircase

Footbridge

Legend

PlanterThe photographs, images, drawings or sketches in this leaflet are not drawn to scale and / or may be computer-modified for information only. Details and blueprint of the project may be revised after the public consultation and detailed design.

Landing near Fa Yuen Street

Landing between Nathan Road and Portland Street

Hong Lok Street

A staircase to be provided at Argyle Street between Nathan Road and Portland Street

PROPOSED PEDESTRIAN FOOTBRIDGE SYSTEM IN MONG KOK