Presenters:
QR Code
Date:
Following Through on Lean Improvements: Starting the Lean Journey
Harry Kenworthy, Principal & Manager of the Quality and Productivity Improvement Center (QPIC, LLC)
Shannon Crouch, Process & Compliance Manager, City of Boca Raton
Lean is…
Developing an Organizational Culture of Continuous
Improvement through the relentless elimination of WASTE
Quote from 5 year old Katie: “Lean is getting rid of stuff that bugs you!”
2
What does Lean do? REDUCES
Costs Wastes
INCREASES Service
Capacity
CHANGES The
CULTURE
3
Lean Overview
Thinking People System (TPS)
Challenge Kaizen Genchi
Genbutsu Respect Teamwork
Continuous Improvement
Respect For people
True North
Learn to See 4
Problem Solving
(Continuous Improvement & Learning)
People & Partners (Respect, Challenge & Grow Them)
Process (Eliminate Waste – the 8 Wastes)
Philosophy (The Core Values of True North)
The 4Ps of TPS
The Lean Essentials
5
Five Basic Principles of Lean (Womack & Jones, 1996)
1. Add value for your customer 2. Value Stream Mapping – “Learn to See” 3. Create Flow – “one stop shopping” goal 4. Pull from the customer – keep pace with
the customer demand rate 5. Aim for perfection – “Right the first
time” – eliminate errors and rework We add: No lay offs – reduction by attrition (4-6%/year) and no new hires (unless a critical skill).
6
AP runs the Expenditure Approval Listing (EAL) multiple times in one day
AP receives invoices by either email, US mail, fax, or Requisition Department
City of Boca Raton Accounts Payable (AP) Process
Can you identify with any of these?
AP manually enters over 570 electric bill accounts in an excel file
Departments scan and save invoices electronically but a hardcopy is still kept
Requisition Department incorrectly enters the receiver in the system which causes re-work for Accounts Payable
Invoices are not electronically centralized
AP uses a substitute W-9 form instead of the official IRS form which causes confusion
7
City of Boca Raton Accounts Payable (AP) Process
Can you identify with any of these?
What if there was a method to help solve these problems by utilizing simple tools that did not require an investment in new technology?
Lean Process Improvement
8
City of Boca Raton’s Lean Journey
o Our Journey began on February 10, 2014 • Thank you to Linda Davidson, Director of Financial
Services and GFOA Past President for starting us on this journey.
• Our Journey started with training. We had Lean Process Improvement Training for 25 members of our staff conducted by Harry Kenworthy (QPIC, LLC) and Shayne Kavanagh (GFOA).
• The City had a Kaizen event focusing on the Accounts Payable (AP) process – The “AP Lean Team” was created.
9
What is Kaizen?
Kai Zen
To break apart Think
To modify Make good
To change Make better
Kaizen
Change for the better
Improvement
Continuous Improvement
10
City of Boca Raton’s Kaizen
Accounts Payable (AP) Lean Team
Desiree Sanchez
Shayne Kavanagh
Emmanuel Posadas
Ed Rolon
Connie King
Stephen Timberlake
Shannon Crouch
Rosis Suarez-
Elias
Victoria Guinn
Ella Moore-Poitier
Harry Kenworthy
Linda Davidson – Team Sponsor
11
City of Boca Raton’s Kaizen
“Observers”
Nicole Gasparri
Ken Dames
Gary Kapalka
Lynn Drew-Sugerman
Mickey Panella
Jean Bonds
12
AP Lean Team at work
Kaizen DAY 1
13
AP Lean Team Preliminary Project Charter
14
AP Lean Team Elevator Speech
o What is the Project?
• The Accounts Payable (AP) Lean team is looking to improve the AP process by identifying and minimizing areas that create duplicate efforts, excessive process times, and errors.
o Why are we doing it?
• To find ways to improve the AP process, to simplify the workflow and to improve vendor relationships.
o What do you expect out of me?
• Positive attitude, cooperation, your perspective and ideas for improvements.
o What’s in it for me?
• Improving the process and simplifying the work will generate better results to make your job process easier and less frustrating.
15
Preliminary AP Process Map
Discussing the process in a meeting room is not as valuable as visually watching the process.
An effective process map is developed by directly observing the process to understand it. The AP Lean Team learned that direct physical observation of the process is key to help identify the value added and non- value added steps (waste).
16
What are Value Added vs. Non-Value Added Activities?
o Value-Added Activities • Transform materials and
information into programs and services the customer wants and it is done right the first time.
o Non-Value Added Activities (WASTE) • Consume resources, but
do not directly contribute to a program or service. 17
8 Forms of Waste 8 Forms of Waste Examples of Waste
1 Transportation Great distances between process steps or having customers move between multiple work stations and areas, offices, floors, buildings etc.
2 Inventory Too many emails to read or voice mails to be processed or bulk purchase deals.
3 Motion (Unnecessary) Human motion that does not add value to the service that is being performed. Some causes include poor office layout, unorganized workplace and looking for items.
4 Waiting Waiting to complete the next step i.e. waiting for a signature/ approval/ email response (the more process steps the more waiting).
5 Overproducing Making too much, too soon, or too fast. Or making the wrong things at the wrong time.
6 Over processing Effort that adds no value to the customer i.e. multiple approvals or signatures, duplication of efforts within or between departments.
7 Defects Work is done incorrectly or with errors and causes re-work. Aim for perfection – “Right the first time” – eliminate errors and rework.
8 Underutilized people Ignoring or underutilizing the employee's knowledge, skills ideas and abilities.
In Lean, Waste
is the Enemy!
18
Lean Provides Tools to Make Waste Visible
o Lean teaches employees to recognize the 8 forms of waste that occur in a business process.
o Kaizen and Lean tools i.e. “Learn to See,” Process Mapping, 5S are tools used to make waste visible and to eliminate it.
19
o Directly observe the process to understand it.
o The AP Lean Team split off into 3 teams. The teams were off to “Learn to See” how other departments handle their invoice/ receiving process.
o The Lean approach is about empowering employees and involving them in the process.
“Learn to See”
Kaizen DAY 2 AM
20
“Learn to See”
Kaizen DAY 2 AM
Lean is about obtaining as much knowledge of a process as you can and sharing the problems identified with others so that solutions are easily accepted and implemented.
21
“Learn to See” Mapping the Process
Kaizen DAY 2 PM
Mapping out the Process
makes waste visible.
22
“Learn to See” Sharing our Findings
Kaizen DAY 2 PM
Cross share your findings with the rest of the Kaizen team to ensure everyone agrees with the results.
23
“Learn to See” Current State Process Maps
Blanket POs Contractors - Utilities
Regular POs
Analysis showed of 52 process steps, 31 steps “added value” by Lean Definition.
24
“Learn to See” Countermeasures
Effective use of countermeasures removes problems identified.
Problem Identified Countermeasure Receivers entered incorrectly causes re-work for Accounts Payable.
AP tracks errors to determine the education needs for vendors and internal end users.
Invoices are not electronically centralized
Invoices are scanned and saved electronically but a hardcopy is still kept.AP manually enters over 570 FPL account statement amounts in an excel file
Request to obtain the FPL bills electronically in an excel or pdf file format.
AP uses a substitute W-9 form versus the official IRS form which causes errors when vendors submit the form.
Create a new vendor package utilizing the official IRS W-9 form.
IT to work with the AP Staff to centralize a repository of invoices Citywide.
25
Countermeasures Error Tracking
In a two week period, AP found that there were 169 errors with concentration in five departments. Departments will be notified of the errors so that training can be provided.
26
Countermeasures Obtain Electronic FPL Statements
City has over 570 Florida Power & Light (FPL) accounts
AP Clerk manually entered each amount
AP Processing Time = 2 Hours
27
Countermeasures Obtain Electronic FPL Statements
AP Clerk obtains the FPL data electronically
AP Processing Time = 45 minutes
The time gained may now be used on value added activities.
28
Substitute W-9 Form
We found that there were 15 bad
W-9s out of 197 within a 12 day
period resulting in a 7.5% error rate.
Put the areas that errors occur the most at the top of the form or section of the form and develop concise forms by minimizing unnecessary words.
Countermeasures Vendor Package DRAFT
29
Stakeholders Analysis
Kaizen DAY 3
30
Preparing the Presentation to Management
Kaizen DAY 4 AM
31
Presenting the Kaizen Results to Management
Kaizen DAY 4 PM 32
Lean 5S Makes Waste Visible o Lean 5S is a methodology for standardization,
organization, and cleanliness and helps improve workplace organization. At the heart of 5S is the Lean goal of reducing waste.
o The five words that make up the 5S: 1. Sort - clearly distinguish needed items from unneeded and
eliminate the latter. 2. Straighten – keep needed items in the correct place to
allow for easy and immediate retrieval. Find things quickly. 3. Shine – keep the workplace neat and clean 4. Standardize – the method by which sort, straighten and
shine are made habitable. 5. Sustain – maintain established procedures.
33
What comes to mind when you see this picture?
Looks like a great opportunity to use the 5S Lean
Tool!
34
Before and After Pictures: Purchasing Manager’s Office
Before After
35
What happens after the Kaizen?
o The Kaizen Project Leader is the person responsible for ensuring that Kaizen action items are completed. • AP Lean Team meets monthly to discuss the status
of action items and the successes.
• Project Leader creates and publishes a monthly newsletter to share the results and successes with the Organization.
36
April 2014 Lean Newsletter
37
AP Lean Team Action Items: Status o Created an error tracking form to
track errors submitted by depts. to AP. The form is displayed as a visual control and is used to identify training needs.
o Purchasing Department educated employees on how to obtain contract information to verify prices when entering receivers.
o IT is working with the AP Staff to centralize a repository of invoices Citywide utilizing Laserfiche (electronic records management system).
o Expenditure Approval Listing is run 1/day versus 3/day.
As of 5/19/14, 90% of action
items have been completed
38
Keeping the Lean Momentum Going
39
Lean Steering Committee Responsibilities
Some of the responsibilities of the Committee include: 1. Developing a framework for the Boca Lean
Journey, including process improvement strategy. 2. Developing plans to increase awareness of the
Boca Lean Journey. 3. Prioritizing process improvement initiatives 4. Developing processes to identify and share
successes, accomplishments, and best practices.
40
Summary of Lessons Learned o You have to “Learn to See”
• Watch the process from beginning to end
• Conference room discussions of processes are not as valuable as physical observations of the processes
o Map out the process to make waste visible – TIMWOOD
• Transportation, inventory, motion, waiting, overproduction, overproducing, defects, and underutilized people.
o You can never have enough data and it can be simple to capture.
o Good teamwork is important.
o Don’t be afraid to speak up and share your thoughts/ideas.
o Constant improvement – although little incremental steps is good.
o Lean 5S is a great organization and standardization tool.
o Get people excited about Lean!