51
C A M P U S M A S T E R P L A N U P A T E Focus Group P r e s e r v a t i o n a n d A d a p t i v e R e u s e 27 April 2016

Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

CAMPUS MASTER PLAN UPATEFocus Group – P r e s e r vat i on a n d A d a p t iv e Re u s e

27 April 2016

Page 2: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

What we heard Campus Framework and Open Space Network Preservation Approach Heritage Buildings and Spaces (Defining the List) Demolition Adaptive Reuse Challenges and Benchmarking Discussion and Next Steps

AGENDA

Page 3: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

WHAT WE HEARD

Page 4: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Pedestrian Conflict Areas• Bizzell Street

• Academic / Engineering Area (Ross Mall, Ireland St., etc.)

• University Drive Crossings

White Creek• Erosion Issues

West Campus Remoteness• Connection from White Creek Housing to East Campus

• Connection from West Campus to East Campus

• West Campus feels remote due to lower population and

density

Memorial Student Center• Works well on multiple levels – Design Standards,

Signage, Branding, Green/Open Space, etc.

Traffic Congestion Points• Reed Arena/Parking Lots (100)

• Bizzell Street (Parking Lots 54)

Green Space• JK Williams Admin Building East Lawn (formal)

• All Quads (Cushing, Academic, Architecture)

• West Campus Green Space is underutilized

• Spence Park has great potential

• Simpson Drill Field – multifunctional open space

Build-to-Line• Identify (and Enforce?) – Is it still applicable?

Campus Policies and Process• Campus Policies and Process should align with the CMP

• Update in order to implement the plan accordingly

Campus Branding• Multiple opportunities to enhance TAMU branding

• Arrival points, institutional identity and campus traditions

need to be leveraged.

Off-Campus Development• Will lead to new access points and the need for improved

systems to support TAMU users of these developments

What We Heard: Collectivelisten:

Page 5: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Bush Library area and White Creek present an opportunity for future legacy buildings and are culturally significant.

What We Heard: Preservation & Adaptive Reuselisten:

Page 6: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

The Academic Building, over 100 years old, is an iconic building for the institution but it has not been taken care of - particularly on the inside.

What We Heard: Preservation & Adaptive Reuselisten:

Page 7: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Simpson Drill Field – program the green space.

What We Heard: Preservation & Adaptive Reuselisten:

Page 8: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Bizzell/Beutal Hall area are prime locations. Some of these buildings are contributing to campus, and some are not.

What We Heard: Preservation & Adaptive Reuselisten:

Page 9: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Memorial Student Center is a good example of maintaining character - feels like the same building, but has been completely refreshed.

What We Heard: Preservation & Adaptive Reuselisten:

Page 10: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

CAMPUS FRAMEWORK AND OPEN SPACE NETWORK

Page 11: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

The 2004 Civic Structureframe:

Page 12: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Framework Updateframe:

Page 13: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Framework Updateframe:

Page 14: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Framework Updateframe:

Page 15: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Framework Updateframe:

Page 16: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Framework Updateframe:

Page 17: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Open Space Networkframe:

Page 18: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Expanded Open Space Networkframe:

Page 19: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Campus Character Zonesframe:

Page 20: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

PRESERVATION APPROACH

Page 21: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

The Preservation Approachapproach:

1. Identify potential historic resources -buildings, interior spaces, open spaces, streets and walkways, site furniture and view corridors - that are have historic significance and are therefore worthy of preservation and likely to be determined eligible for the National Register of Historic Places. Identify opportunities for reconstruction or memorial projects.

2. Analyze the current campus process for preserving Heritage Buildings and ways in which other campus’ manage their heritage

resources using case studies.

3. Catalog the historic resources with respect to their level of significance or priority and gain stakeholder buy-in. • Description, date, architect, style,

condition, alterations and a statement of significance

• Utilize campus database or other means of easily communicating with other campus groups

• Define level of significance/priority level tied to standards for treatment

4. Create policies and guidelines that protect these resources.• Update extant guidelines• Create process organization chart • Include demolition and reconstruction

Page 22: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

LEGACY RESOURCES

Page 23: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Identify Eligible Buildings: Building Agelegacy:

1

1909 – 1929 23 structures1930 – 1949 34 structures1950 – 1969 79 structures1970 – 1975 97 structures

1990 – 2009 excluded2009 – Present excluded

1975 – 1989 excluded

Page 24: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Identify Eligible Buildings: National Park Servicelegacy:

1

Historic Integrity requires at least 4 of 7 aspects:•Location• Design• Setting•Materials•Workmanship• Feeling• Association

Texas Historical Commission determines Eligibility to the National Register of Historic Places for every building over 50 years old.

NPS suggests that historic resource surveys include properties over 50 years old AND include an additional 5 years.

Following NPS standards for Determination of Eligibility takes into account, Age, Architectural and Cultural Significance, and Historic Integrity.

Page 25: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

legacy:

1

Identify Eligible Resources: Buildings

47 - Total Eligible Buildings

Page 26: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Identify Eligible Resources: Heritage Buildingslegacy:

1

20 - Considered Heritage or Historic

Page 27: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Identify Eligible Resources: Heritage Buildingslegacy:

1 Jack K. Williams Cushing Library

Academic Nagle

Page 28: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Identify Eligible Resources: On the Fence Buildingslegacy:

1

20 - “On the Fence” Buildings

Page 29: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Identify Eligible Resources: On the Fence Buildingslegacy:

1 Corps Quadrangle

Utilities and Energy Services

Former Greenhouses

Thompson Hall

Page 30: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Identify Eligible Resources: 1970 - 1975legacy:

11 - Potential Buildings

Harrington

O & M Building

Page 31: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Identify Eligible Resources: Interior Spaceslegacy:

1

10 - Buildings with Potentially Important Interiors

Page 32: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Identify Eligible Resources: Open Spaceslegacy:

1

Page 33: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Identify Eligible Resources: Streets & Walkwayslegacy:

1

Page 34: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Identify Eligible Resources: Site Furniturelegacy:

1

Page 35: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Identify Eligible Resources: View Corridorslegacy:

1

Page 36: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Analyze: Extant Process and Guidelineslegacy:

1

Develop Flow Chart for each type of project, from Routine Maintenance to Capital Projects to integrate heritage building guidelines into the process:

• Planning Campus-Wide • Programming to Determine Appropriate Fit• Final Program of Requirements• Selection of A/E• Selection of Contractor or CM• Facility Design Standards/Preservation

Guidelines• Design Review Committee• Construction Phase Standards• Maintenance• Record keeping

Campus Heritage Building Guidelines - 2008

Page 37: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

legacy:

University of Texas Campus Master Plan

Analyze: Case Study 1 – UT Austin

Campus Master Plan – Historic Resource Survey Appendix• Tiered ranking system based on architectural or cultural importance• Each level tied to preservation approach

Catalog of Historic and Significant Campus Interiors• Reference catalog• Building, room and significant features information

Getty Foundation grant for conservation study for the historic buildings on The Forty Acres

Page 38: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

legacy:

University of Arkansas Campus Preservation Master Plan

Analyze: Case Study 2 – University of Arkansas

Chronology of Campus Development

Inventory and Evaluation• Defines character and styles of campus

Planning• Tiered ranking system

Treatment• Secretary of Interior Standards• Treatment Recommendations• Treatment Guidelines

Stewardship• Implementation• National Register Process

National Register District 2009

Page 39: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

legacy:

University of Virginia Historic Preservation Framework Plan

Analyze: Case Study 3 – University of Virginia

National Register District 1970

Chronology of Campus Development• Building and landscape style and history• Defines character and styles of campus

Evaluation• Tiered ranking system based on architectural or cultural

importance and integrity • Each level tied to preservation approach

Page 40: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

legacy:

Stanford University Historic District

Analyze: Case Study 4 – Stanford

Campus functions similar to municipal historic district• If included in county Heritage Resource Inventory, follows Sec.

of Interior’s Standards.

• If not on county inventory, Stanford shall evaluate structure for inclusion and submit to County Planning Office.

Page 41: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

legacy:

Texas Tech University Campus Master Plan

Analyze: Case Study 5 – Texas Tech University

National Register District 1996

Chronology of Campus Development• Building and landscape style and history• Defines character and style of campus

Campus construction zones• Provides architectural design guidelines for future compatible

development

Page 42: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

ADAPTIVE REUSE CHALLENGES AND BENCHMARKING

Page 43: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Challenges and Opportunitiesreuse:

1. Accessibility

2. Sustainability

3. Educating the Public

Page 44: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Accessibility reuse:

Page 45: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Sustainabilityreuse:

Page 46: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Educating the Public (Campus Users)reuse:

Johns Hopkins University Homewood CampusHopkins Retrospective is an initiative to better understand the history of Johns Hopkins University Student-led signage project

Signage Content Example Signs installedSign Locations

Page 47: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Educating the Public (Facilities Staff)reuse:

University of Chicago Facilities ServicesFacilities Standards DocumentStewardship and Heritage Resources

Building Resource Sheet Significant Space Resource Sheet Significant Space Resource Sheet

Page 48: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Significant Features

Educating the Public (Facilities Staff)reuse:

University of Texas Project Management and Constructions ServicesCatalog of Historic and Significant Interior Spaces

Room InformationBuilding Information

Page 49: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

DISCUSSION/NEXT STEPS

Page 50: Focus Group Preservation and Adaptive Reuse · West Campus Remoteness • Connection from White Creek Housing to East Campus • Connection from West Campus to East Campus • West

Next Stepslegacy:

1. Preliminary Determination of Eligibility List

2. Categorization of Eligible Buildings • Exceptional• Heritage• Eligible• Not Eligible

3. Obtaining buy-in for heritage resource plan

4. Integration of Heritage Buildings Guidelines into process

5. Case Studies – further research