Report Date 28.02.2011 Last Data Update: 01.03.2011 11:41:46 Display As Profit Center SINGRAULI UNIT-1 SINGRAULI UNIT-2 Stn. Forced (Eqpt.) Outage YTD - (NO.) 137 2 3 Boiler Tube Leakage No. YTD - (NO.) 51 1 3 Planned Outage YTD - (%) 4.27 Forced Outage YTD - (%) 2.17 0.60 1.58 Forced Outage Others YTD - (%) 0.00 0.01 33 Daily/Monthly/Yearly Performance Report for Coal Plant To adjust filter area, drag characteristics from navigation area into filter area Overall Result

Documentfo

  • Upload
    vibhav

  • View
    3

  • Download
    0

Embed Size (px)

DESCRIPTION

fo

Citation preview

Page 1: Documentfo

Report Date 28.02.2011

Last Data Update:

01.03.2011 11:41:46

Display As

Profit Center Overall Result SINGRAULI UNIT-1 SINGRAULI UNIT-2

Stn. Forced (Eqpt.) Outage YTD - (NO.) 137 2 3

Boiler Tube Leakage No. YTD - (NO.) 51 1 3

Planned Outage YTD - (%) 4.27

Forced Outage YTD - (%) 2.17 0.60 1.58

Forced Outage Others YTD - (%) 0.00 0.01

33

Daily/Monthly/Yearly Performance Report for Coal Plant

To adjust filter area, drag characteristics from navigation area into filter area

Page 2: Documentfo

SINGRAULI UNIT-3 SINGRAULI UNIT-4 SINGRAULI UNIT-5 SINGRAULI UNIT-6 SINGRAULI UNIT-7 RIHAND STG-I UNIT-1

2 4 4 9 9 3

1 1 5 7 2

5.72 7.47 8.02 8.44

0.04 1.02 1.39 3.02 2.89 1.42

Page 3: Documentfo

RIHAND STG-I UNIT-2 RIHAND STG-II UNIT-3 RIHAND STG-II UNIT-4 UNCHAHAR ST-I UNIT-1 UNCHAHAR ST-I UNIT-2

10 5 8 3 9

3 3 5 1

15.29 1.21

1.53 1.71 4.43 0.44 1.02

0.04

Page 4: Documentfo

UNCHAHR ST-II UNIT-3 UNCHAHR ST-II UNIT-4 UNCHAHR ST-II UNIT-5 TANDA ST-I U-1 TANDA ST-I U-2 TANDA ST-I U-3

8 10 3 15 12 8

3 6 1 1 2 4

9.98 7.02 5.44 6.71

2.50 5.19 0.80 1.04 0.92 1.02

Page 5: Documentfo

TANDA ST-I U-4

10

2

4.19

9.59