1 la yXud % , Annexure-A fnukad % 29-09-2017 dks os.Mj vkosnu dh fLFkfr CURRENT STATUS OF FRESH VENDOR REGISTRATION AS ON 29-09-2017 dz e- la- S. No. vkbZ Ve dk uke Name of items vkosnd dk uke Name of applicant vkosnu fnukad Date of application orZ eku fLFkfr Current status pkyu 'kfDr& vkbZ Ve Motive Power BK items 1. CCB (with advance feature) M/s FTRTIL, Hosur. 12.01.11 DLW has been advised to place development order on 09.06.14. DLW has placed developmental order for 11 no. in June 14. Prototype inspection carried out at Italy and Hosur. Dispatch and fitment clearance for supply of ILS brake system of M/s FTRTIL was given on 10/3/2017 subject to compliance of certain condition. 2. Brake Interface Unit (BIU) M/s Lotus, Visakhapatnam 09.04.15 Development order for 10 Nos. BIU has been recommended to DMW/Patiala on 03.11.15. Functional testing is carried out from 18/11/15 to 21/11/15 & limitations observed in BIU Design are communicated to firm on 16/12/15. Type test results have also been sought from the firm. Firm reply received on 16.12.15 regarding type test. Some clarification is asked from firm on 15.01.16. Firm reply regarding type test was received on 25.01.16 & firm was advised on 27.01.16 to submit type test result accordingly. Firm has submitted the type test results. Clearance for BIU against WCR PO has been provided vide note, addressed to EC group, dt. 08/05/2016. 3. Brake Interface Unit (BIU) M/s Medha, Hyderabad 09.04.15 Functional Testing & Type Testing is completed in Aug 2015. Development order for 10 Nos. BIU has been recommended to DMW/Patiala on 11.09.15. 4. Gauge complex with AFI, HHP Loco M/s Midland Co., Kolkata 12.07.11 Capability assessment done. QAP approved. Modified Prototype inspection has done on 11.02.15. Fitment & functional test on loco has done on 18.03.15. DLW has been advised to place Dev. Order on 30.04.15. 04 unit supplied to DLW through control console manufacturer is fitted on loco. Control console supplier advised (dt. 17.04. 2017) to place P.O. of firm for 06 units. P.O. of 06 units has received from M/s Trolex. 5. Air Flow Indicator for CCB on ALCO Loco M/s Midland Co., Kolkata 10.02.15 Scrutiny done and shortcomings advised to firm on 18.02.15. C&CA done. Firm has been advised to submit revised QAP dated 7/29.10.15. Reminder issued on 08.02.16 & 03.05.16. Reminder also issued on 08.02.16 to Z. Rlys to submit field performance of items already supplied by firm to them. Revised QAP received on 04.10.16. QAP shortcoming advised dt. 22.12.16. Reminder issued on 25.08.17. 6. Auto Drain Valve M/s Prag Ploymers, Lucknow 11.02.15 Capacity assessment has been done on 31.12.15. Firm cleared for dev. order. DLW/DMW has been advised to place dev. Order on 05.04.16. For status of dev. order, reminder has been issued to DLW/DMW on 24.08.17. 7. Feed Valve M/s Prag Ploymers, Lucknow 09.04.15 Capacity assessment has been done on 31.12.15. Firm cleared for dev. order. DLW/DMW has been advised to place dev. Order on 05.04.16. DMW placed P.O. Test scheme for bench marking issued to brake lab on 27.03.17. Testing in brake lab under process. 8. Valve- Emergency Brake for HHP Loco M/s Recon, Howrah 09.04.15 Scrutiny done & shortcoming advised to firm on 03.06.2015. Firm reply received on 03.07.17. Factory License has been received on 10.09.15. Capacity assessment has been done on 07.01.16. Remarks of capacity assessment have been advised to firm on 12.02.16. Firm cleared for Development Order. DLW has been advised to place development order on

fnukad % 29-09-2017 dks os.Mj vkosnu dh fLFkfr …rdso.indianrailways.gov.in/works/uploads/File/Status of...1 layXud % , Annexure-A fnukad % 29-09-2017 dks os.Mj vkosnu dh fLFkfr CURRENT

  • Upload
    others

  • View
    20

  • Download
    0

Embed Size (px)

Citation preview

1

layXud % ,

Annexure-A

fnukad % 29-09-2017 dks os.Mj vkosnu dh fLFkfr

CURRENT STATUS OF FRESH VENDOR REGISTRATION AS ON 29-09-2017 dze- la-

S. No. vkbZVe dk uke

Name of items vkosnd dk uke

Name of applicant

vkosnu fnukad Date of

application

orZeku fLFkfr Current status

pkyu 'kfDr& vkbZVe

Motive Power –BK items

1. CCB (with advance feature)

M/s FTRTIL, Hosur.

12.01.11 DLW has been advised to place development order on 09.06.14. DLW has placed developmental order for 11 no. in June 14. Prototype inspection carried out at Italy and Hosur. Dispatch and fitment clearance for supply of ILS brake system of M/s FTRTIL was given on 10/3/2017 subject to compliance of certain condition.

2. Brake Interface Unit (BIU)

M/s Lotus, Visakhapatnam

09.04.15 Development order for 10 Nos. BIU has been recommended to DMW/Patiala on 03.11.15. Functional testing is carried out from 18/11/15 to 21/11/15 & limitations observed in BIU Design are communicated to firm on 16/12/15. Type test results have also been sought from the firm. Firm reply received on 16.12.15 regarding type test. Some clarification is asked from firm on 15.01.16. Firm reply regarding type test was received on 25.01.16 & firm was advised on 27.01.16 to submit type test result accordingly. Firm has submitted the type test results. Clearance for BIU against WCR PO has been provided vide note, addressed to EC group, dt. 08/05/2016.

3. Brake Interface Unit (BIU)

M/s Medha, Hyderabad

09.04.15 Functional Testing & Type Testing is completed in Aug 2015. Development order for 10 Nos. BIU has been recommended to DMW/Patiala on 11.09.15.

4. Gauge complex with AFI, HHP Loco

M/s Midland Co., Kolkata

12.07.11 Capability assessment done. QAP approved. Modified Prototype inspection has done on 11.02.15. Fitment & functional test on loco has done on 18.03.15. DLW has been advised to place Dev. Order on 30.04.15. 04 unit supplied to DLW through control console manufacturer is fitted on loco. Control console supplier advised (dt. 17.04. 2017) to place P.O. of firm for 06 units. P.O. of 06 units has received from M/s Trolex.

5. Air Flow Indicator for CCB on ALCO Loco

M/s Midland Co., Kolkata

10.02.15 Scrutiny done and shortcomings advised to firm on 18.02.15. C&CA done. Firm has been advised to submit revised QAP dated 7/29.10.15. Reminder issued on 08.02.16 & 03.05.16. Reminder also issued on 08.02.16 to Z. Rlys to submit field performance of items already supplied by firm to them. Revised QAP received on 04.10.16. QAP shortcoming advised dt. 22.12.16. Reminder issued on 25.08.17.

6. Auto Drain Valve M/s Prag Ploymers, Lucknow

11.02.15 Capacity assessment has been done on 31.12.15. Firm cleared for dev. order. DLW/DMW has been advised to place dev. Order on 05.04.16. For status of dev. order, reminder has been issued to DLW/DMW on 24.08.17.

7. Feed Valve M/s Prag Ploymers, Lucknow

09.04.15 Capacity assessment has been done on 31.12.15. Firm cleared for dev. order. DLW/DMW has been advised to place dev. Order on 05.04.16. DMW placed P.O. Test scheme for bench marking issued to brake lab on 27.03.17. Testing in brake lab under process.

8. Valve- Emergency Brake for HHP Loco

M/s Recon, Howrah

09.04.15 Scrutiny done & shortcoming advised to firm on 03.06.2015. Firm reply received on 03.07.17. Factory License has been received on 10.09.15. Capacity assessment has been done on 07.01.16. Remarks of capacity assessment have been advised to firm on 12.02.16. Firm cleared for Development Order. DLW has been advised to place development order on

2

10/12.02.2016. Proto type inspection has been done as per DLW P.O. DLW has been advised to fit 10 nos. subject item on HHP locos on 18.08.17.

9. Modified Hand Brake Assembly

M/s ACME, Howrah

11.05.15 Capacity assessment has been done on 08.01.16. Remarks of capacity assessment have been advised to firm on 10/12.02.16. Firm cleared for Development Order. DLW/DMW has been advised to place development order on 10.02.2016 and 14.09.2016. Since, DLW yet to place development order on firm, to expedite the case, the inspection against SE Rly. P.O. for HHP loco has been done and cleared for field trial. Inspection against DMW P.O. for ALCO loco has also been done and cleared for field trial. In this regard, it was requested to S.E. Rly. & DMW/PTA to furnish the field performance on 27.04.2017. Performance from DMW has been received on 12.08.17 and under process. Reminder has been issued to S.E. Rly. For performance feedback on 25.08.17.

10. Modified Hand Brake Assembly

M/s J. P. Seat, Howrah

20.05.15 Capability assessment has been done on 16 & 17.11.2016. Firm has already supplied modified hand brake assembly (169 nos.) to DLW, hence, instead of placement of development order, the quantity already supplied by the firm, firm has cleared for considered for performance monitoring. For performance monitoring, it was advised to Z. Rlys. to furnished field performance on 05.05.2017. Reminder has been issued to all Z. Rlys. for performance feedback on 25.08.17

11. Valve- Emergency Brake for HHP Loco

M/s Topgrip Instruments, Kolkata

07.05.15 Capacity assessment has been done on 16.07.2015. Firm cleared for Development Order. DLW has been advised to place development order on 03.09.15. Based on satisfactory prototype test, firm cleared for field trial. DLW has been advised to fit 10 nos. subject item on HPP loco dated 01.04.16. Reminder has been issued to DLW for fitment details on 22.06.2017. Letter has been issued to concerned Railways for field performance on 18.08.17.

12. Modified Hand Brake Assembly

M/s Topgrip Instruments, Kolkata

14.05.15 Capacity assessment has been done on 16.07.2015. Remarks of capacity assessment have been advised to firm on 12.08.2015.Firm reply received on 20.08.15 and found in order. Case is put up for approval of prototype inspection. Firm cleared for Development Order. DLW has been advised to place development order on 03.09.15. Vide DLW letter no. dlw.m.65.36 dated 14.12.2015, DLW informed that as per DLW production program, ALCo loco will not be manufactured by DLW. Hence, DMW has been requested to place development order on 29.12.2016. 01 no. proto type modified hand brake assembly for HHP loco has been cleared for field trial on 03.04.2017. Against DMW P.O., proto type inspection has been done on 18 to 20.07.2017 and some deviations were observed in dimensions during proto type inspection and advised to firm to submit compliance on 31.07.2017. Letter has been issued to DLW for fitment details of HHP loco on 25.08.17.

13. J-1 Safety valve M/s Topgrip Instruments, Kolkata

17.05.15 Capacity assessment has been done on 16.07.2015. Remarks of capacity assessment have been advised to firm on 12.08.2015.Firm reply received on 20.08.15 and found in order. Case is put up for approval of prototype inspection. Firm cleared for Development Order. Based on DLW letter no. dlw.m.65.24.1.1 dated 12.02.2016, E. Rly. has been advised to place development order on 19.02.16. Letter has been issued to E. Rly. for performance feedback on 18.08.17.

14. Brake M/s Wabtec 01.06.15 The Capacity & Capability assessment(C&CA) is to be

3

System,Computer / Microprocessor Controlled ALCO and EMD Locomotives

Railway Electronics, USA

under taken at firm premises i.e M/s Wabtec Railway Electronics, 21200, Dorsey Mill Road, Germantown, MD 20876, USA. Letter written to firm on 24/8/2017 to give date for capacity assessment. DLW has been advised to place development order on 18/20.09.17

15. Valve- Emergency Brake for HHP Locomotives

M/s Knorr Bremse India (P) Ltd

28.07.15 Capability assessment done and report under finalization. Discrepancies against QAP have been advised to M/s KBIL on 23.08.17. Letter has been issued to Z. Rlys. For performance feedback on 23.08.17.

16. Air Flow Measuring Valve and Air Flow Indicator

M/s Radish Technologies

29.07.15 Capability assessment done. DMW advised to place dev P.O. on 21.06.17.

17. N-1 Reducing valve M/s Topgrip Instruments Company, Kolkata

04.09.15 Shortcoming has been advised to firm on 28/29.10.2015. Firm reply received on 12.12.15. Capacity assessment has been done on 04.02.15. Remarks of capacity assessment have been advised to firm on 31.03.16. Firm reply received on 13.06.16. Firm cleared for dev. order. DMW has been advised to place dev. order On 18.09.17.

18. Valve feed, ALCo, EMD & Electric locomotives

M/s Topgrip Instruments Company, Kolkata

04.09.15 Shortcoming has been advised to firm on 28/29.10.2015. Firm reply received on 12.12.15 and firm cleared for dev. order. DLW/DMW has been advised to place dev. Order on 05.04.16. DMW placed P.O. Test scheme for bench marking issued to brake lab on 27.03.17. Testing in brake lab under process.

19. D-1 Emergency brake valve

M/s Topgrip Instruments Company, Kolkata

07.10.15 Shortcoming has been advised to firm on 28/29.10.2015. Firm reply received on 12.12.15. Capacity assessment has been done on 04.02.15. Remarks of capacity assessment have been advised to firm on 31.03.16. Firm reply received on 13.06.16. Firm cleared for dev. order. DMW has been advised to place dev. order On 18.09.17.

20. Brake Interface Unit (BIU)

M/s HBL Power Systems Limited

27.06.16 Capacity & Capability assessment of M/s HBL Power Systems Limited, Hyderabad, for their registration in RDSO vendor directory for mfg. & supply of Brake Interface Unit (BIU) for Train Collision Avoiding System and Distributed Power Control System for diesel locomotive fitted with IRAB class of Brake system (RDSO specification no. MP.0.01.00.31, Rev. 00, Dec-2014) was carried out on 6/7/2017 by DIR/MP/KJM, Bangalore. DMW has been advised to place development order on 14.09.17

21. Indigenous CCB with versatile Software

M/s Escorts Limited ( Railway Equipment Division)

30.06.16 Capability and capacity assessment of the M/s Escorts for manufacture and supply of Computer Controlled Brake System for Diesel Locomotives as per Specification no. MP.0.01.00.23 (Rev 00) of November 2009 has been carried out. Development order for 2 nos. Computer Control Brake System as per RDSO Specification no. MP.0.01.00.23 (Rev 00) of November 2009 for fitment on WDS6 locomotive has been recommended to DMW/Patiala on 22/05/2017.

22. Modified Hand Brake Assembly

M/s Radish Technologies Aligarh

16.06.16 Capability assessment has been done on 11.05.2017. Remarks on capability assessment have been advised to firm on 19.06.2017. Firm cleared for development Order. DLW & DMW has been advised to place development order on 19.06.17.

23. L’ Type Composition Brake Block, ALCO & Electric Locomotives

M/s Wabtec Texmaco Rail Private Limited, Kolkata

24.05.17 Capacity assessment has been done on 29 & 30.06.17. It was requested to SER/ Kolkata to place dev. order for conducting field trial on diesel & electric locomotives. It was advised to firm to submit the samples for dynamometer testing at BDL/RDSO along with internal dynamometer test & physical/chemical properties test results vide letter dt 03.08.2017. Firm’s reply received on 11.09.17& under scrutiny.

4

24. High Friction Composition Brake Block, HHP locomotives

M/s Wabtec Texmaco Rail Private Limited, Kolkata

29.05.17 Capacity assessment has been done on 29 & 30.06.17. It was requested to SER/ Kolkata & NWR/Jaipur to place dev. order for conducting field trial on HHP locomotives. It was advised to firm to submit the internal dynamometer test & physical/chemical properties test results vide letter dt 03.08.2017.

dze- la-

S. No. vkbZVe dk uke

Name of items vkosnd dk uke

Name of applicant

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr& bZlh vkbZVe

Motive Power – EC items

1. Conventional stick type Master controller BHEL model MC03802B

M/s Inspros Engineers Pvt Ltd,126, Sector-A, Industrial Area, Mandeep, Bhopal- 462046

03.01.12 Type test completed. Letter issued to DMW/PTA on 29.01.15 for placement of developmental order and fitment details.

2. Battery-8V, 500Ah lead acid

M/s United Lead oxide Products Pvt. Ltd.

12.06.13

Type test completed .Developmental Order placed by DLW. Letter issued to DLW for fitment details on 28.07.2017. Reminder sent to DLW on 28.09.2017, reply awaited.

3. Master Controller for EMD locomotive

M/s Saitronik Electric equipments Plot No. 2-10-168, EC Nagar, Post-Cherlapally, Hyderabad

14.03.14 Letter sent to DLW on 09.05.2016 for placing developmental order on the firm. Letter issued to DLW against their Query on developmental order on 08.08.2017. Letter issued to DLW on 28.09.17 for apprising current status.

4. Master Controller Improved stick type for ALCo locomotives

Inspros Engineers Pvt. Ltd., 126, Sector-A, Industrial Area, Mandeep, Bhopal

08.07.15 Developmental Order placed by DMW. Prototype testing completed. Firm has been asked to conduct the vibration test from NABL accredited lab on 22.09.17.

5. Low Maintenance lead acid Batteries for Diesel Electric loco engine starting application (8 V, 500 Ah lead acid)

LEAD ACID BATTERY CO. (P) LTD, KOLKATA

28.03.16 Capacity assessment has been done on 09.09.16 and firm advised to develop prototype on 27.12.2016. Prototype yet to be offered by firm. Letter issued to firm on 28.09.17 for apprising current status.

6. Master Controller of EMD locomotive

Craftsman Automation Private Limited, Unit 3, 123/4 Sangothipalayam Road , Arasur Post, Coimbatore, Tamil Nadu,

12.05.16 Letter issued to Dir/MP/SBC on 01.08.2017 for carrying out capacity and capability assessment.

7. Control System, AC- AC Traction for 4500HP EMD Locomotives & its sub-assemblies

M/s Yongji Xinshisu Electric Equipment Co. Ltd., P.R. China

04.09.14 Further some calcifications sought from the firm vided this office letter dated-10.02.16. Reply received by the firm vide letter dated-13.04.17. Case is under process.

8. Distributed Power Control System for HHP Locomotives

Lotus Wireless Technologies India Pvt. Ltd.

22.01.15 Prototype test conducted Provisional clearance issued on 22.05.17. M/s Lotus make DPCS integrated with M/s Siemens AC-AC System validation on Locomotive is carried out in Aug’17 and prototype clearance given in Sept’17.

5

9. Distributed Power Control System for Alco Locomotives

Lotus Wireless Technologies India Pvt. Ltd.

22.01.15 Prototype clearance given on 01.08.17.

10. Loco Cab Video and Voice Recording System RDSO Spec. No. MP.0.0400.14, Rev-0

Matrix Security and Surveillance Pvt Ltd, 8-2-293/82/J/119-A, Journalist Colony, Phase II, Jubileehills, Hyderabad

16.04.15 Letter has been sent to CME/DLW on 22-01-2016 regarding placement of development order to M/s Matrix for HHP locomotives.

11. Distributed Power Control System for HHP Locomotives

MEDHA Servo Drives Pvt. Ltd., Hyderabad

15.04.15 Validation at Kazipet shed with CCB 2.0 has been carried out from 31st July-2nd Aug 2017.Validation with CCB 1.5 carried out in Raipur shed in Jan’2017. Prototype clearance given in Sept’17.

12. Auxiliary Power Unit (APU) for HHP Locomotives

IC Electricals Company (P) Limited, 156, 2nd Floor, DSIDC, Okhla Industrial Area, Phase-I, New Delh

07.05.15

Developmental order recommended. Clarification regarding alternator & Compressor are sought from the firm through e-mail on 29.04.16. Response of e-mail dated 29.03.16 regarding engine clarification awaited.

13. Auxiliary Power Unit (APU) for HHP Locomotives

Medha Servo Drives Pvt Ltd.

16.07.15 Prototype clearance of APU issued on 16.06.2017

14. Auxiliary Power Unit (APU) for Alco Locomotives

IC Electricals Company (P) Limited, 156, 2nd Floor, DSIDC, Okhla Industrial Area, Phase-I, New Delhi

30.07.15 Letter sent to DMW on 08.01.16 for recommending developmental order on firm.

15. Auxiliary Power Unit (APU) for HHP Locomotives

Cooper Corporation Private Limited, Nariman House. M-60/1 Additional Midc Post Kodoli Satara Maharashtra

04.09.15 Provisional clearance of prototype given. Validation on Locomotive is carried out in Sept’17.

16. Auxiliary Power Unit (APU) for HHP Locomotives

Kirloskar Oil Engine Ltd., Laxmanrao Kirloskar Road, Khadki, Pune -

04.09.15 One Prototype provided in one loco. Validation test conducted and Prototype clearance given in sept’17.

17. Control System, AC-AC Traction for 4500HP for EMD locomotives & its sub-assemblies

Bharat Heavy Electricals Limited, BHEL, Electronics Division, Mysore Road Bangalore

23.09.15 Letter sent to DLW on 09/09/2015 for placement of developmental order on the firm. Developmental order placed by DLW for 10 AC-AC traction Control system. Firm is developing prototype.

18. Auxiliary Power Unit (APU) for ALCo Locomotives

M/s Prag Polymers, Lucknow-226011

15.09.15 Prototype testing carried out in April 2017. Provisional clearance issued subject to successful validation on 01.06.17.

19. Auxiliary Power Unit (APU) for ALCo Locomotives

Cooper Corporation Private Limited, Satara Maharashtra

08.09.15 Capability assessment has been carried out in June 2016. Recommendation for developmental order given to DMW, Patiala on 06.07.2016.

20. Loco Cab Video and Voice Recording System

Medha Servo Drives Pvt Ltd., P-4/5B,IDA Nacharam,Hydrabad

03.12.15 Letter has been sent to CME/DLW on 22-01-2016 and CME/DMW on 11.12.2015 regarding placement of development order to M/s Medha. Developmental order has been placed by DLW and DMW.

21. Loco Cab Video and Voice

Kaysons Electricals Pvt.

07.04.16 Compliance of shortcomings from firm awaited.

6

Recording System Ltd., Varanasi

22. Remote Monitoring and Management of Locomotive and Trains

Lotus Wireless Technologies India Pvt. Ltd, B7, EEIE Industrial Park ,B-Block, Autonagar, Vishakapatnam

02.05.16 Provisional clearance for supply of LRMS and Antenna of REMMLOT system has been given on 26.07.2017

23. Remote Monitoring and Management of Locomotive and Trains

Siemens Ltd, Plot 6A, Sector 18, Maruti Industrial Area, HUDA Gurgaon

25.05.16 Provisional clearance for supply of LRMS and Antenna of REMMLOT system has been given on 18.09.17.

24. Automatic Control of Engine Stop with Auxiliary Power Unit-ACES with APU for Alco locomotives

Sirveen Control Systems Pvt. Ltd., Plot No.A-7/1 Ground & First Floor,Electronic Complex, Kusaiguda, Hyderabad-

25.11.16 Online application received on 25.11.16. Documents have been scrutinized and shortcomings advised to firm on 13.09.2017

25. Master Controller Improved stick type for ALCo locomotives

M/s.Saitronix Electro Drives Pvt. Ltd., Plot no. 2-10-168, besides Ganesh Temple,EC Nagar,HCL Post,Cherlapally,Hyderabad.

02.08.16 Documents from firm received on 16.06.2017. Case is under process.

26. Master controller Conventinal stick type for ALCo locomotives, BHEL model MC03802B

M/s.Saitronix Electro Drives Pvt. Ltd., Plot no. 2-10-168, besides Ganesh Temple,EC Nagar,HCL Post,Cherlapally,Hyderabad.

08.12.16 Documents from firm received on 16.06.2017. Case is under process.

27. Auxiliary Power Unit (APU) for Alco Locomotives

Kirloskar Oil Engines Ltd, A-11/1, MIDC, Ambad, Nasik – Maharashtra

08.03.16 Provisional Clearance issued vide letter dated 26.05.17.Validation by RDSO to be carried out at NKJ shed on availability of loco.

28. Auxiliary Power Unit for HHP Locomotives

K K Iron Industries, SH 15/79-A Shivpur Varanasi UP

07.02.16 Developmental order placed by DLW. RDSO issued provisional clearance against DLW PO as per Rev.1 specification based on prototype test conducted on 23.09.2016 against Older specification. Shortcomings regarding documents submitted by firm against their vendor registration as per latest Specification Rev.2 advised to firm on dated 19.09.2017.

dze- la-

S. No.

vkbZVe dk uke

Name of items

os.Mj dk uke

Name of Vendor

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr& bZe vkbZVe

Motive Power – EM items

1 Conductor copper Heat sealed kapton covered

M/s Mahendra Industries, Bangalore

16.07.12 On 08.0513, assessment done by RDSO officer. Type test witnessed from 22.01.14 to 24.01.14. Cleared for dev. order on 23.05.14 to DMW/PTA. Asked for PO status on 11.09.2017.

2 Conductor copper Heat sealed kapton covered

M/s Malwa Strips Pvt. Ltd., Dewas

05.10.10 On 07.07.11, firm cleared for placement of dev. order by DMW. On 07.02.14, reminder-I issued

7

to CME/DMW for placement of dev. order. Asked for PO status on 11.09.2017

3 Glass tape, Silicon elastomer

M/s MICAPLY, Bhopal

28.04.14 On 07.05.16, capacity assessment carried out. Recommended for developmental order 30.09.16.

4 Motor Armature, DC Traction for ALCo

M/s Daulat Ram Engg. Services (P) Ltd. Raisen

14.08.12 On 13.09.12, clearance given for fitment trial at DMW. On 16.04.13, cleared to supply balance quantity to DMW. P.O. for 6 nos. 05 supplied and 01 rejected. On 14.09.17, asked status of supply details.

5 Motor Commutating field coils assembly, DC Traction for ALCo

M/s Cosmic General Industries, Mumbai

13.06.13 On 22.02.14 & 19.03.15, RDSO officer visited for capability assessment. On 09.04.15, recommended for placement of dev. order from DMW. Type test carried out against DMW P.O. and on 01.03.16, cleared for field trial after heat run test at DMW. On 14.09.17, asked supply details.

6 Motor Complete, DC Traction for ALCo locomotives with following sub-assembly:A. Armature, B.Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame (machined)

M/s Daulat Ram Engg. Service (P) Ltd., Raisen.

13.04.12 On 29.04.13, type test completed and 02 nos. cleared for fitment & field trial at DLW. Provisional approval of O/L drawing and QAP was given on 24.12.13. On 14.09.17, asked supply details.

7 Motor Complete, DC Traction for ALCo locomotives with following sub-assembly:A. Armature, B.Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame (machined)

M/s Saini Electrical & Engineering Works, Navi Mumbai

08.05.12 Type test completed. On 20.07.12, advised for fitment at DMW for field trial. On 04.12.12, 04 TMs cleared for trial at DMW. Prototype clearance was given on 29.07.15. Supply details have been asked on 14.09.17

8 Motor Complete, DC Traction for ALCo locomotives with following sub-assembly:A. Armature, B.Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame (machined)

M/s Rotomac Electricals Pvt. Ltd., Kolkata

06.06.13 On 05.09.13, assessment of Kolkata premises done by RDSO officer. On 23.09.13, assessment of Sahibabad premises done by RDSO officer. On 16.02.15, recommended for developmental order to DMW. Asked for PO status on 13.09.17.

9 Motor Complete, DC Traction for ALCo with following sub-assembly:A Armature B. Commutator, C. Commutating field coils assembly, D. Main field coils assembly, E. Magnet frame(machined)- (TM 5002)

M/s Integrated Electric Co. Pvt. Ltd., Bangalore

27.04.10 On 02.03.12, recommended for developmental order to DMW. Letter sent to DMW/PTA on 22.11.13 for status of P.O. On 14.09.17, asked status of dev. P.O.

10 Motor Main Field Coils assembly, DC Traction for ALCo

M/s Cosmic General Industries, Mumbai

19.07.13 On 22.02.14 & 19.03.15, RDSO officer visited for capability assessment. On 09.04.15, recommended for placement of dev. order from DMW. On 14.09.17, status of dev. P.O.

11 Motors Traction AC, for EMD locomotives

M/s Daulat Ram Engg. Service (P) Ltd., Raisen.

21.12.10 On 18.01.11, recommended for developmental order. On 10.09.15, again recommended for developmental order to be placed by DLW. On 14.09.17, asked current status of development of AC TM against DLW P.O.

12 Motors Traction AC, for EMD locomotives

M/s CSR ZHUZHOU Electric CO., LTD

04.07.13 On 17.12.13, design detail received. On 15.05.14, received revised QAP. On 16.06.2014, asked RA/Berlin for carrying out capacity & capability assessment of the firm. On 13-14 January 2015, assessment was done by

8

RA Berlin. On 08.06.15, recommended for developmental order. On 13.09.17, asked current status of dev. P.O. On 14.09.17, firm replied for not getting P.O.

13 Motors Traction AC, for EMD locomotives

M/s Saini Electrical and Engg. Works, Ambernath (East), Dist. Thane.

28.07.14 On 18.01.11, recommended for developmental order. Also advised shortcomings on 04.02.11. On 10.09.15, again recommended for developmental order to be placed by DLW. On 14.08.17, firm offered for prototype test against dev. order from DLW for 60 nos. vide PO no.091410030.16118595, dtd.28.05.16. On 14.08.17, offered for type test. On 23.08.17, asked clarification regarding type testing.

14 3 Phase Squirrel Cage Induction Motor for 5500HP AC-AC WDG5 Locomotives

M/s Siemens Ltd., New Delhi

16.11.15 On 06.09.16, prototype cleared. On 14.09.17, asked details of supply status.

15 Tape, Kapton adhesive M/s MICAPLY, Bhopal

30.09.13 On 22.10.13, assessment done by officer. From 26.12.13 to 28.12.13, type test conducted at firm’s premises. Cleared for dev. order on 07.05.14 to DMW/PTA. Type test carried out against DMW P.O. and on 05.06.17, advised for six month field trial.

16 Tape, Resi-glass banding M/s Rotomac Electricals Pvt Ltd., Kolkata

03.12.12 On 02.05.13, assessment done by RDSO officer. On 19.08.13, advised DMW for placement of developmental order. On 13.09.17, asked status of dev. P.O.

17 Tape, Resi-glass banding M/s Nashik Insulations Pvt. Ltd., Nashik

13.05.13 On 01/05.05.15, recommended for placement of dev. order from DMW. Type test carried out against DMW P.O. and on 13.06.17, cleared for fitment trial at DMW.

18 Class 200 resin-preimpregnated semi-cured unidirectional Polyglass banding tapes Used on traction machines (TG/TM/AG) of diesel electric Locomotives and DEMUs

M/s MICAPLY, Bhopal

07.10.15 On 07.05.16, capacity assessment carried out. On 06 & 07.02.17, type test carried out against DMW P.O. On 13.09.17, dispatch clearance given for fitment trial at DMW/Patiala.

19 Axle Gear Steel (Carburizing Type)

M/s Elecon Engineering Company Ltd., Anand Sojitra Road

14.08.12 On 14-15.12.12, capacity assessment carried out. On 22.01.13, recommended for dev. order to DLW. Again on 03.07.13, 04.10.13 & 20.3.14, advised DLW for placement of dev. order. On 14.7.2017, RDSO has sent a letter to Dy. CDE/DLW for fitment details of supplied traction gears. On 07.09.2017, sent Reminder-I to Dy. CDE/DLW for fitment details of supplied traction gears. On 22.09.17, fitment details received. On 27.9.17, letter sent to all concerned Sr.DME /Dsl sheds for the performance feedback of firm make 77teeth & 90 teeth bull gears of HHP locos

20 Axle Gear Steel (Carburizing Type)

M/s Vulcan Industrial Engg Ct Ltd., Dist - Anand, Gujarat

07.02.14 On 25/26.08.17, capability assessment carried out by RDSO officer and on 15.09.17, recommended for developmental order.

21 Axle Gear Steel (Carburizing Type)

M/s Shanthi Gears Ltd., Coimbatore.

07.03.11 On 17.06.11, cleared for dev. order for item. After scrutiny of the documents, all documents are found satisfactory. Prototype inspection of 77 teeth and 90 teeth bull gears will be carried out from 20.12.2016 and onwards. On 24.5.2017 & 2.8.2017, firm submitted internal inspection report and requested to RDSO for prototype inspection of the same. From 22-08-2017 to 26-08-2017, Prototype inspection of 77 teeth and 90 teeth bull gears of HHP locos carried out. On 12.09.17, dispatch letter

9

clearance given for fitment at DLW.

22 Pinion Gear Steel (43 B 17)

M/s Elecon Engineering Company Ltd., Anand Sojitra Road

14.08.12 On 14-15.12.12, capacity assessment carried out. On 22.01.13, recommended for dev. order to DLW. Again on 03.07.13, 04.10.13 & 20.3.14, advised DLW for placement of dev. order. On 14.7.2017, RDSO has sent a letter to Dy. CDE/DLW for fitment details of supplied traction pinions. On 07.09.2017, sent Reminder-I to Dy. CDE/DLW for fitment details of supplied traction pinions. On 22.09.17, fitment details received. On 22.9.2017, only 25 nos firms make pinions are fitted on HHP locos at DLW.

23 Pinion Gear Steel (43 B 17)

M/s G. G. Automotive Gears Ltd., Dewas

19.02.11 On 26-27.03.12, capacity-cum-capability assessment done and on 02.05.12, cleared for dev. order. On 27/28-07-2017, capacity cum capability assessment done. On 14.7.17, asked from DLW for fitment details for pinions. On 07.09.2017, sent Reminder-I to Dy. CDE/DLW for fitment details of supplied traction pinions. On 11.09.17, received fitment details from DLW. On 27.9.17, letter sent to all concern Sr.DME /Dsl sheds for the performance of firm make pinions.

24 Pinion Gear Steel (43 B 17)

M/s Kalyani Engineering Works, Ghazizbad

18.11.11 On 22.08.13 & 17.09.13, capacity-cum-capability

assessment carried out. On 18.10.13,

recommended for developmental order to DLW.

DLW placed 66 nos 17 teeth pinions of HHP

locos against DLW P.O.no.

061310360.14137302, dated 17.2.2014.

On 08.09.2017, advised to submit clarification regarding delay and current status of pinions manufacturing and tentative date for prototype inspection of these pinions.

25 Pinion Gear Steel (43 B 17)

M/s Research Dev & Mfg Corporation, Bangalore

13.09.11 On 15.03.12, advised DLW for dev. order. On 20.3.14, again advised DLW for placement of dev. order for pinions. On 14.7.17, asked from DLW for fitment details of pinions of HHP locos. On 07.09.2017, sent Reminder-I to Dy. CDE/DLW for fitment details of supplied traction pinions. On 22.09.17, fitment details received. On 26.9.17, letter sent to all concerned Sr.DME /Dsl sheds for the performance of firm make pinions.

26 Pinion Gear Steel (43 B 17)

M/s Vulcan Industrial Engg Ct Ltd., Dist - Anand, Gujarat

07.02.14 capability assessment carried out & recommended for dev. PO on 15.9.17

27 Traction Gears, (Case hardened) for ALCo

M/s Elecon Engineering Company Ltd., Anand Sojitra Road.

28.01.13 On 02.05.13 and 04.10.13, recommended DMW/PTA for dev. order Prototype inspection of 65 T carried out. From 22.01.16 to 24.01.16, prototype inspection of 74T carried out. DMW sent fitment details on 16-11-16. Performance feedback letter sent to zonal railways on 14-7-17 & 07.09.17.

28 Traction Gears, (Case hardened) for ALCo

M/s Kalyani Engineering Works, Ghaziabad.

18.11.11 On 22.08.13 & 17.9.13, capacity-cum-capability assessment carried out. On 18.10.13, recommended for dev. order to DMW for both items. Clarification was sought from the firm on 22-07-17 & 22-8-17. Firm sent reply on 22-8-17. Firm was again asked on 23-8-17 to give status of DMW P.O. On 12.09.17, asked to submit status of P.O.

29 Traction Gears, (Case M/s Trina Quebec 04.03.13 Prototype inspection of 65 teeth & 74 teeth

10

hardened) for ALCo Gears Ltd., New Delhi

gears carried out from 18.02.14 to 21.02.14 against DMW P.O. On 05.03.14, IC issued. On 30.09.15, cleared for placement of developmental order for pinion from DMW. Only Fitment details of11 nos. of gears (1 no. 65 teeth and 11 nos. 74 teeth bull gears received from DMW on 22/11/16. On 13.07.17, letter was sent to DMW on 13-7-17 for fitment details of 66 nos. i.e., 42 Nos. 65T & 24 Nos. 74T. Performance feedback letter given to zonal Rlys on 14-7-17 & 07.09.17.

30 Traction Pinions, (Case hardened) for ALCo

M/s Elecon Engineering Company Ltd., Anand Sojitra Road.

28.01.13 On 02.05.13 and 04.10.13, recommended DMW/PTA for dev. order. Prototype inspection of 18T pinion (GR 18:74) carried out from 25-02-17 to 28-02-17.Letter sent to M/s CGL for carrying out inspection in compliance to P.O. norms. Inspection report from M/s CGL received on 26-7-17. Clarification sought from CGL for deviation in drg. on 25-8-17. On 13.09.17, letter sent for prototype inspection on 18-19.09.17. Prototype inspection carried out from 18.09.17 to 19.09.17. Dispatch clearance for 18T pinions (GR18:65) given to firm on 26-9-17.

31 Traction Pinions, (Case hardened) for ALCo

M/s Kalyani Engineering Works, Ghaziabad.

18.11.11 On 22.08.13 & 17.9.13, capacity-cum-capability assessment carried out. On 18.10.13, recommended for dev. order to DMW for both items. On 13.11.13, DMW/PTA placed 18 teeth pinions dev. Order. Clarification was sought on 22-07-17 & 22-8-17. Firm sent reply on 22-8-17. Firm was again asked on 23-8-17 to give status of DMW P.O. On 12.09.17, asked to submit status of P.O.

32 Traction Pinions, (Case hardened) for ALCo

M/s Trina Quebec Gears Ltd., New Delhi

04.03.13 Prototype inspection of 18T (GR 18:65) pinion carried out from 28-01-17 to 30-01-17. Dispatch clearance given on 09-02-2017 for 6 nos. of pinions. Fitment details sought from DMW on 09-02-17. Fitment details received on 01.09.17 from DLW.

33 Bearings, Traction Motor- TM Drive end & TM Non-drive end for EMD locomotives

M/s FARO-S.p.A, Calendasco (PC) Italy

19.06.14 Compliance of the shortcomings received on 30.01.15. On 07.04.15, advised to submit credentials. Compliance of the credentials received on 14.05.15. On 19.05.15 & 08.06.15, cleared for developmental order. Prototype inspections offered by the firm against DMW POs vide their letter no. NTI/RDSO/1807A/2015-16 dated 18.07.16. Prototype inspection under process at FARO/Italy. On 18.09.17, firm requested for prototype inspection with revised date along with P.O. Prototype inspection under process at FARO/Italy & plan for visit on 24

th to 27

th Oct.17.

34 Bearings for Traction motor, ALCo locomotives - (NU328 & NH 318 rivetless)

M/s FAG Bearings India Ltd., Vadodara

31.07.12 On 06.02.13, assessment carried out. On 06.08.14, advised DMW for placement of developmental order. On 01.09.17, asked from firm details of development orders. On 12.09.17, replied for not getting P.O.

35 Bearings for Traction motor, ALCo locomotives - (NU328 & NH 318 rivetless)

M/s SKF Technologies (India) Pvt. Ltd., Ahmedabad.

30.09.13 Cleared for developmental order on 02.08.12. Inspection carried out against NR’s P.O. and IC issued on 07.04.17. Asked status of supply details on 14.09.17. On 28.09.17, reply received for supplied qty. But qty is 11 nos. against 30 QQ.

36 Bearings for Traction motor, ALCo locomotives - (NU328 & NH 318 rivetless)

M/s Austin Engineering Company Ltd., Junagadh (Gujarat)

07.10.14 On 12.05.15, advised shortcomings of compliance received on 17.04.15. Again, on 31.07.15, shortcomings advised. Compliance of the shortcomings received on 12.10.2015. On 22.02.16 advised to submit details of compliance

11

as per RDSO Doc. No. QO-F-7.1-8 Ver. 1.0. Details of compliance received on 04.04.16. From 23.08.17 to 24.08.17, assessment carried out. On 14.09.17, cleared for dev. order.

37 Bearings, roller type of Traction motor for ALCo locomotives, (NH320 rivetless - Commutator end; NU330 rivetless - Pinion end & Alternator / Generator bearings)

M/s Austin Engineering Company Ltd., Junagadh (Gujarat)

07.10.14 On 12.05.15, advised shortcomings of compliance received on 17.04.15. Again, on 31.07.15, shortcomings advised. Compliance of the shortcomings received on 12.10.2015. On 22.02.16 advised to submit details of compliance as per RDSO Doc. No. QO-F-7.1-8 Ver. 1.0. Details of compliance received on 04.04.16. From 23.08.17 to 24.08.17, assessment carried out. On 14.09.17, cleared for dev. order.

38 Tube Suspension: Housing bearing kit (consisting 11 items)

M/s P.D. Steels, Mohali.

17.12.12 On 18.10.13, assessment carried out. On 16.01.14, cleared for placement of developmental order by DLW. Prototype inspection of 1 set carried out against DLW P.O. and on 03.03.17, IC issued after successful fitment at DLW. Asked status of supply details on 14.09.17. On 26.09.17 replied for 29 sets inspected by RITES & IC issued on 20.9.17.

39 Tube Suspension: Housing bearing kit (consisting 11 items)

M/s Sonak Engineering Pvt. Ltd. Navi Mumbai

23.09.11 On 18.09.12 & 02.02.13, assessment carried out. On 12.03.13 cleared for developmental order. Prototype inspection carried out at firms premises from 11.01.16 to 13.01.16 against DLW P.O. On 16.02.16, dispatch clearance given to DLW for fitment trial. Asked status of supply details on 14.09.17.

40 Tube Suspension: Housing bearing kit (consisting 11 items) for EMD locomotives

M/s Saurabh Metal Pvt. Ltd., Bhopal

03.06.09 From 02-05-14 to 03-05-14, prototype inspection carried out against DLW P.O. On 17.10.14 IC issued. 1 set of suspension tube has been successfully fitted at DLW on 19.09.2014. Asked status of supply details on 14.09.17. On 21.09.17, reply from firm received.

41 Tube Suspension: Housing bearing kit (consisting 11 items) for EMD locomotives

M/s Special Engineering Services Ltd., Kolkata

24.04.15 Capability assessment was done. On 22.04.2016, cleared for placement of developmental order. Asked status of supply details on 14.09.17.

42 Tube Suspension: Housing bearing kit (consisting 4 items) for EMD locomotives

M/s P.D. Steels, Mohali

07.10.14 Case closed on 27.09.17.

43 Tube Suspension: Housing bearing kit (consisting 4 items) for EMD locomotives

M/s Sonak Engineering Pvt. Ltd., Navi Mumbai

14.10.14 On 18.04.15, assessment carried out. On 01.05.15, firm cleared for placement of developmental order. Asked to submit details of dev. orders on 14.09.17.

44 Tube Suspension: Housing bearing kit (consisting 4 items) for EMD locomotives

M/s Indore Nitriders, Indore

12.02.15 On 16.02.15, advised shortcomings of vendor form. Reminder-1 issued on 22.05.15. Reminder -II issued on 24.07.15. Compliance of the shortcomings received on 02.12.15. Again, advised shortcomings on 18.01.16. On 15.07.16 capability assessment was carried out. On 10.08.17, cleared for developmental order.

45 Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s Alert Engineering Enterprises, Bhopal

21.12.11 On 20.03.13 assessment again carried out. On 04.07.13, firm cleared for placement of developmental order by DMW. Asked to submit details of dev. orders on 14.09.17.

46 Tubes & accessories, Suspension bearing (10 components) of ALCo

M/s P.D. Steels, Mohali.

17.12.12 On 18.10.13, assessment carried out. On 16.01.14, cleared for placement of developmental order by DLW. Prototype inspection carried out at firms premises from 24.03.15 to 26.03.15 against DMW P.O. Clearance letter issued on 08.06.15 to firm for material dispatched to DMW. Inspection Certificate issued on 13.10.2015 after successful fitment trial at DMW/PTA. Asked status of supply details on 14.09.17. On 26.09.17 replied for 24

12

sets inspected by RITES & IC issued on 09.5.17.

47 Tubes & accessories, Suspension bearing (10 components) For TM 4907 & TM 5002 of ALCo locomotives

M/s Excelsior Industries, Habibganj, Bhopal

09.02.15 On 16.02.15, advised shortcomings of vendor form. Reminder-1 issued on 22.05.15. Compliance of shortcomings received on 05.06.15. On 05.05.16 & 06.05.16, assessment carried out & on 06.12.16, cleared for dev. order. Asked to submit details of dev. orders on 14.09.17. On 15.09.17, reply from firm received.

48 Locomotive Insulated Wire – Sizes AWG # 3 and Smaller

M/s Apar Industries Ltd. (Unit: Uniflex Cables), Mumbai

27.06.13 On 19.06.14, Internal test results received. From 17.03.15 to 18.03.15, capacity assessment by an officer carried out. On 23.10.15, revised internal test results received. Type test completed on 21.07.16. On 28.10.16, cleared for developmental order. Firm received developmental order and supplied to DMW/PTA. On 14.09.17, DMW/PTA requested for submission of fitment details.

49 Flame Retardant 200C Fluoroelastomer Insulated Main Lead & Brush Gear Cables used in Traction Motors of Diesel Electric Locomotives

M/s Siechem Technologies Pvt. Ltd., Pondicherry

21.01.13 On 31.06.13, capability cum capacity assessment and type testing completed. On 19.08.13, advised for fitment trial at DMW on 2 TMs. On 05.09.17, asked current status of fitment trial. On 21.09.17, firm informed to send cable sample to DMW with end fittings.

50 Flame Retardant 200C Fluoroelastomer Insulated Main Lead & Brush Gear Cables used in Traction Motors of Diesel Electric Locomotives

M/s United cables Industries, Noida.

13.07.10 On 11.08.11, advised DMW for placement of developmental order & to conduct fitment trial. On 20.08.13, asked for legal documents. On 21.10.13, advised for fitment trial at DMW on 2 TMs. On 01.09.17, asked current status of dev. P.O.

51 Locomotive Power Cable – Sizes AWG # 1 and Larger

M/s Apar Industries Ltd. (Unit: Uniflex Cables), Mumbai

27.06.13 On 19.06.14, Internal test results received. From 17.03.15 to 18.03.15, capacity assessment by an officer carried out. On 23.10.15, revised internal test results received. Type test completed on 21.07.16. On 28.10.16, cleared for developmental order. On 17.07.17, firm submitted supply details against DMW dev. P.O. On 14.09.17, asked fitment details from DMW/Patiala.

52 Alternator, Traction with Auxiliary Machines & their sub-assemblies for Broad Gauge Diesel Electric ALCo locomotives

M/s Saini Electrical and Engineering Works, Navi Mumbai

22.10.13 Capability assessment of the firm done on 16.07.14. On 18.09.14, recommended for dev. order. Unit under field trial observation at MLDT. Clearance given to dispatch balance 3 Nos. against Developmental PO on 10-02-17 based on successful field trial.

53 Alternator-Rectifier Traction, for EMD locomotives (for alternator)

M/s Saini Electrical and Engineering Works, Navi Mumbai

03.09.13 Capability Assessment of the firm done on 16.07.14 & 16.04.15. On 05.05.15, recommended for placement of dev. order from DLW. DLW placed developmental PO no. 091510190.15118284 dated 21-1-15 for 10 units. Stage inspection carried out from 07.05.16 to 10.05.16. On 22.01.17, prototype inspection done. Unit under field trial at SR/GOC since 24.05.17 for six months.

54 Alternator-Rectifier Traction, for EMD locomotives for alternator (for Alternator & Rectifier)

M/s Daulat Ram Engineering Services (P) Ltd., Raisen

20.08.13 Capability assessment of the firm done on 17-06-14. On 16.09.14, recommended for dev. order. On 19.09.16, during meeting at RDSO, firm has been advised to improve insulation of equipment. After post improvement done and verified by RDSO dispatch clearance given on 16-11-16. Unit under field trial at JMP/ER since 22-08-17 for six months.

55 Alternator-Rectifier Traction, for EMD locomotives for alternator

M/s Crompton Greaves Ltd., Bhopal

24.04.15 On 05.05.15, advised shortcomings. On 15-06-15, firm has submitted QAP and other details fallen short. Performance of TAs

13

supplied/repaired is under field trial observation. Performance of field trial asked from all CMPEs on 23-08-17.

56 Alternator Mounted Rectifier Assembly For AC/DC Diesel Electric Locomotives

M/s Ruttonsha International Rectifier Ltd., Panchmahals, Gujarat

02.08.16 Capability assessment of the firm has been done by RDSO on 21-10-16. On 28.10.16, recommended for developmental order. Firm received Advance Acceptance letter from DMW/PTA dated 28-08-17 for 13 Units of AMR against DMW tender no. 21/18/20800.

57 Rectifier Bank Assembly for HHP Locomotives (EMD Part No 40027895, DLW Part No 18021554 or equivalent

Ruttonsha International Rectifier Ltd. Dist. Panchmahals, Gujarat

31.03.16 Capability assessment of the firm has been done by RDSO on 21-10-16. On 28.10.16, recommended for developmental order.

58 Three Phase AC-AC Transmission System & Associated Control Equipment for 1600 H`P Diesel Electric Multiple Unit

M/s Crompton Greaves Ltd.,

01.06.15 Firm has already developed and supplied 2 Rack DEMU DPC with their Electrics to ICF. Under trial.

59 Kapton covered copper conductor for traction machines

M/s Slimlite Electricals Pvt. Ltd. (Unit-II), Daman

23.11.16 Capability assessment will be completed by October’17

60 Glass tape, Silicon elastomer

M/s Sneham International Belgaum

04.02.15 Capability assessment will be completed by October’17.

61 Motor Armature, DC Traction for ALCo

M/s IC Electricals Company (P) Limited, Haridwar,

15.12.16 On 14.09.17, advised shortcomings.

62 Motor Armature, DC Traction for ALCo

M/s Rotomac Electricals Pvt Ltd., Kolkata

28.07.17 Shortcomings advised on 14.09.17. Planned for capability assessment on 11.10.17.

63 Motor Commutating Field Coils assembly, DC Traction for ALCo

M/s IC Electricals Company (P) Limited, Haridwar, Uttarkhand

15.12.16 On 14.09.17, advised shortcomings.

64 Motor Complete, DC traction for ALCo locomotives with following sub-assemblies: A) Armature, B) Commutator, C) Commutating field coils assembly, D) Main field coils assembly, E) Magnet frame (machined)

M/s IC Electricals Company (P) Limited, Haridwar, Uttarkhand

15.12.16 On 14.09.17, advised shortcomings.

65 Motor Main Field Coils assembly, DC traction for ALCo

M/s IC Electricals Company (P) Limited, Haridwar, Uttarkhand

15.12.16 On 14.09.17, advised shortcomings.

66 Motor Main Field Coils assembly, DC traction for ALCo

M/s Rotomac Electricals Pvt. Ltd.

09.01.17 Capability assessment planned in October-2017.

67 3-phase induction motors for 4500 hp,AC- AC WDG4 & WDP4B diesel electric locomotives

M/s Rotomac Electricals Pvt. Ltd., Kolkata

07.06.16 On 11.07.16, advised shortcomings. On 28.07.16, reply from firm received. On 27.07.17 Shortcoming advised. On 14.09.17, reminder given for compliance of shortcomings.

68 3-phase induction motors for 4500 hp,AC- AC WDG4 & WDP4B diesel electric locomotives

M/s ABB India Ltd., Vadodara

13.06.16 On 30.03.17, shortcomings advised. On 12.09.17, reminder-1 sent for compliance of shortcomings. On 13.09.17, firm replied, will submit documents till 30.11.17.

69 3 Phase Squirrel Cage Induction Motor for 5500HP AC-AC WDG5 Locomotives

M/s Saini Electrical and Engineering Works, Ambernath [East], Dist. Thane

21.09.15 Capability assessment planned in Oct’17.

70 3-phase induction motors M/s Escorts Limited 30.09.16 On 27.09.16, advised shortcomings. On 27.02.17,

14

for 4500 hp,AC- AC WDG4 & WDP4B diesel electric locomotives

(Railway Equipment Division), Faridabad

reply from firm received. On 14.09.17, shortcomings advised.

71 Tape, Kapton adhesive M/s Sneham International, Belgaum

09.02.15 Capability assessment will be completed by October’17

72 Tape, Kapton adhesive M/s 3A Associates Incorporated, silvasa

15.11.16 Capability assessment planned on 7.10.17.

73 Bearings, Traction alternator (EMD Part No. 9549071) for EMD locomotives

M/s FAG Bearings India Limited, Vadodara

19.05.16 Shortcomings advised on 20.07.2016. Compliance of the shortcomings received on 06.09.2016. Planned for capability assessment on 25.10.17.

74 Resins & Varnishes For Traction Machines Used On diesel Electric Locomotives

M/s Fine Finish Organics Pvt Ltd., Navi Mumbai

22.05.14 On 13.01.15, advised for properties of INSUFINE-5002. On 20.07.15, clarification on shortcomings received. On 16.10.15, received QAP & mandatory declarations. Capacity and capability assessment planned in Oct’17.

75 Cleaning Solvent For Electrical Rotating Machines Of Diesel Electric Locomotives

M/s Unijules Life Sciences Ltd., Nagpur

23.11.16 On 22.09.17, capability assessment carried out and under process.

76 Rectifier Bank Assembly for HHP Locomotives (EMD Part No 40027895, DLW Part No 18021554 or equivalent

M/s Hind Rectifiers Limited, Mumbai

17.12.15 Shortcomings advised to firm on 29-01-16. Firm submitted documents fallen short on 15-02-16. Firm has been advised to carry out pending tests from outside agency on 23.08.17. Capacity assessment pending.

77 Three Phase AC-AC Transmission System & Associated Control Equipment for 1600 HP Diesel Electric Multiple Unit

M/s Bharat Forge Ltd., Pune

13.06.16 On 14.09.17, advised shortcomings.

78 E-Locker/ Dustbin Motor Blower Assly for EMD (WDG5)

M/s Saini Electrical and Engineering Works, Ambernath [East], Dist.

21.09.15 On 24.11.15, advised shortcomings of vendor form. Reply on shortcomings received on 30.12.15. On 28.07.17, advised shortcomings. On 12.09.17, reminder-1 issued to submit clarification within 15 days.

79 E-Locker/ Dustbin Motor Blower Assly for EMD (WDG5) Locomotives

M/s Thyron Engineering Pvt. Ltd., Sativali Road, Vasai

07.10.15 On 29.09.17, case temporary closed.

dze- la-

S. No.

vkbZVe dk uke

Name of items

os.Mj dk uke

Name of Vendor

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr&batu vkbZVe

Motive Power – Engine items

1. Main Bearings of HHP Loco & Main Bearing Con Rod & Thrust Bearing of Alco Loco.

M/s Hi-Bond Bearings Pvt. Ltd., Rajkot

19.12.14 Firm has not submitted some documents required for processing the case. Reply received on 28.08.2015 & 18.11.2015, 27.11.2015, 08.02.2016 & 15.06.2016. Deficiencies advised on 14.08.2015, 10.12.2015 & 08.03.16 & 14.10.2016. . Information/documents received on 09.09.2017. Assessment of firm planed on 5 & 6 October 17.

2. Bearing - Con Rod

M/s PBW Pvt. Ltd., Rajkot

21.09.11 i) Part – I status given for con rod bearing lower only on 05.07.2016. ii) Prototype Inspection of upper con rod bearings done on 07.07.2017. Performance under monitoring.

3. Main Bearings

M/s Saarvam Industries LLP,Jaipur

07.08.17 Deficiency advised to firm on 01.09.2017. Reply awaited.

4. Connecting Rod Bearings

M/s Benara Automotives Pvt.

30.05.13 DLW & DMW have been advised on 20.06.2014 to place developmental order on the firm.

15

Ltd., Agra-282007

dze- la-

S. No. vkbZVe dk uke

Name of items os.Mj dk uke

Name Of Vendor

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr & batu flLVe vkbZVe

Motive Power – Engine System items

1. Soak Back Lube oil Filter for EMD Locomotives.

M/s Parker Hannifin India Pvt. Ltd. Bangalore.

14.07.14 Deficiencies advised to firm on 30.07.2014. Reply received on 11.11.2014. Deficiencies advised to firm on 25.11.2014. Reply received on 02.03.2015. Deficiencies advised to firm on 27.03.2015. Reply received on 03.12.2015. Deficiencies advised to firm on 31.12.2015. Reply received on 29.02.16. Capability assessment carried out on 25.05.16 to 27.05.16. Type testing is to be done at the firm’s premises. Letter dated 13.09.17 sent to firm to give their preparedness for type testing.

2. Disposable car body filters with built – in louvers and casing.

M/s G S Products, Lucknow

04.02.15 Deficiencies advised to firm on 18.02.2015. Reply received on 17.03.2015. Capability assessment carried out on 02.09.15. Advised to firm for type testing on 22.03.16 and reminder on 31.05.16 & 20.09.16. Vide letter received on 28.04.17. Firm vide letter dt. 04.09.17 has requested for testing at their premises. Vide letter dated 27.09.17 firm has requested for type testing after 03.10.2017.

3. Disposable car body filters with built – in louvers and casing.

M/s Spectrum Filtration Pvt. Ltd., Howrah

11.05.15 Deficiencies advised to firm on 26.06.2015. Reply received on 07.09.15. Deficiencies advised to firm on 18.09.2015. Reply received on 06.11.2015. Deficiencies advised to firm on 01.12.2015. Reply received on 15.12.2015. Deficiencies advised to firm on 25.02.16. Capability assessment carried out on 09.&10.03.16 and report is being prepared. Deficiencies advised to firm on 20.06.2016. Reply received on 14.07.2016, vide this letter firm has informed that they will do the re-testing in 3-4 weeks. Further communication from the firm is awaited. Internal test report received on 15.11.16. Vide letter received on 06.03.17, Firm has requested for visit of their premises. Firm has requested by e-mail on 15.09.17 to revisit at their firm’s premises for Capability assessment and testing.

dze- la-

S. No.

vkbZVe dk uke

Name of items

vkosnd dk uke

Name of applicant

vkosnu fnukad

Date of application

orZeku fLFkfr

Current status

pkyu 'kfDr& Ogh-Mh-th] vkbZVe

Motive Power – VDG items

1. Motor Nose Link Bushing for HHP Locomotives

M/s B.D. Bansal Steel Industries, Chembur, Mumbai

29.04. 15 Shortcomings noticed during capability assessment were advised on 15.06.17. Reply received on 01.08.2017. Firm requested to give us 4-6 months time for compliance. Pending for compliance.

2. Bushing Traction Rod for HHP Locomotives.

M/s B.D. Bansal Steel Industries, Chembur, Mumbai

29.04. 15 Shortcomings noticed during capability assessment were advised on 15.06.17. Reply received on 01.08.2017 & Firm requested to give us 4-6 months time for compliance. Pending compliance.

3. Bushing Rubber for HHP locomotives

M/s B.D. Bansal Steel Industries, Chembur, Mumbai

29.04. 15 Shortcomings noticed during capability assessment were advised on 15.06.17. Reply received on 01.08.2017 & Firm requested to give us 4-6 months time for compliance. Pending compliance.

16

4. Spring – Single Coil for HHP

locomotives

M/s Gurudev Springs Pvt.Ltd., 42 Km stone, Delhi-Mathura Road, Ballabgarg

04.09.17 Under scrutiny.

5. Rubber Spring Assembly for WDG4 locomotive

M/s Climax Overseas Pvt. Ltd., IMT, Manesar, Gurgaon,

25.07.17 Application scrutinized, shortcomings communicated to firm on 08.08.2017. Reply is awaited.

6. Centre Pivot Block assembly

M/s Electro-plast, Ghaziabad

23.08.17 Application scrutinised, shortcomings are communicated on 06.09.2017. Reply received. Capability assessment to be done.

7. Eq. beams, Comp. beams and Links of locomotive high adhesion bogies & Eq, beams (long & short) of Trimount locomotive Bogies

M/s Razzlakshmi Enterprise, Kona Check Post, Benaras Road, Howrah - 711114

27.07.16 Shortcomings noticed during capacity assessment have been advised to firm, on 10.07.17. Compliance awaited.

8. Bushing Car body for WDG5 locomotives

M/s Stork Rubber Product Pvt., Gurgaon

15.12.16 A reminder letter issued for compliances of shortcomings on 13.09.2017. Reply is awaited.

9. Vertical and Lateral hydraulic dampers

M/s GB Equipment Systems Ltd., Dehradun

23.01.15 Capability assessment to be done.

10. Motor Nose Link Bushing for HHP Locomotives

M/s Frontier Alloy Steels Ltd., Paonta Sahib, Distt. Sirmaur

13.10.15 Recommended for developmental order on 23.08.2017.

11. Motor Nose Link Bushing for HHP Locomotives

M/s Innova Rubbers Pvt. Ltd., Ambad,

Nashik

15.12.16 Recommended for developmental order on 14.09.2017.

12. Bushing Traction Rod for HHP Locomotives.

M/s Mandeep Industries, Amausi Industrial Area, Nadarganj, Lucknow

19.08.14 Firm has to resubmit the prototype sample for testing as initial samples failed during testing. Reminder sent on 07.09.2017 along with closure notice. Reply is awaited.

13. Bushing Traction Rod for HHP Locomotives.

M/s Frontier Alloy Steels Ltd., Paonta Sahib, Distt. Sirmaur

13.10.15 Recommended for developmental order on 23.08.2017.

14. Bushing Traction Rod for HHP Locomotives.

M/s Innova Rubbers Pvt. Ltd., Ambad, Nashik

15.12.16 Recommended for developmental order on 14.09.2017.

15. Truck frame assembly for HHP locomotives

M/s UP Steels, Nara, Meerut Road Distt. Muzaffarnagar U.P.

09.07.12 Recommended for developmental order. Letter sent to firm to intimate status of installation of Plano-miller on 16.06.2017. Reply awaited.

16. Spring – Single Coil for HHP

locomotives

M/s Shandong Zhiheng Vibration

Damping Tech. Co. Ltd., P.R. China

14.03.14 Firm has been cleared for developmental order in Mar 15. Firm has offered prototype inspection; the same has been processed for deputation of RDSO officer to carry out inspection at CHINA. Waiting for clearance from Railway Board.

17. Rubber Spring Assembly for WDG4 locomotive

M/s Aryan Exporter Pvt. Ltd., Lucknow

18.05.12 Item under field trial.

18. Rubber Spring Assembly for WDG4 locomotive

M/s Frontier Alloy Steels Ltd., Paonta Sahib, Distt. Sirmaur

13.10.15 Recommended for developmental order on 25.08.2017.

17

19. Rubber Spring Assembly for WDG4 locomotive

M/s MGM Rubber Company, 277 Jessore Road, Kolkata-700048

01.11.16 Recommended for developmental order on 10.07.17.

20. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Simplex Castings Limited, Bhilai

28.04.09 Item under field trial. Compliance against upgraded STR pending.

21. Fabricated Bogie Frame & Bolster Assembly for locomotive

M/s Beekay Engineering Corporation, Bhilai

26.02.11 Item under field trial. Compliance against upgraded STR pending.

22. Truck frame assembly for HHP locomotives

M/s Titagarh Wagons Limited, Abdul Quddus Road, West Bengal

16.03.14 Item under field trial.

23. Primary vertical damper for HHP locomotives

M/s India Auto Industries Pvt. Ltd. Janakpuri, New Delhi

24.01.12 Recommended for developmental order on 09.05.17.

24. Primary vertical damper for HHP locomotives

M/s Suomen Vaimennin Oy- Finland C/o River Engg. Pvt Ltd,

04.04.13 Item under field trial.

25. Primary vertical damper for HHP locomotives

M/s Escort Limited (Railway Equipment Division), Plot No -115 ,Sector -24, Faridabad

09.07.14 Item under field trial.

26. Secondary Yaw Damper for HHP locomotives

M/s Suomen Vaimennin Oy- Finland C/o River Engg. Pvt Ltd,

27.06.11 Item under field trial.

27. Secondary Yaw Damper for HHP locomotives

M/s India Auto Industries Pvt. Ltd. Janakpuri, New Delhi

24.01.12 Recommended for developmental order on 09.05.17.

28. Secondary Yaw Damper for HHP locomotives

M/s Escort Limited (Railway Equipment Division), Plot No. -115 , Sector -24 Faridabad

09.07.14 Item under field trial.

29. Rubber Spring assembly –A & B for WDP4

M/s Prag Industries (I) Pvt. Ltd., E-7

Talkatora Industrial Estate, Lucknow

08.05.12 Recommended for developmental order on 24.08.12. A reminder letter to CMPE/NWR, CMPE/ECoR & firm on 13.09.2017 for status of developmental order.

30. Half cylinder wear for HHP locomotives

M/s Shree Meenakshi Polymer, site-II, Loni Road, Mohan Nager,Ghaziabad

13.04.15 Recommended for developmental order on 18.01.17.

31. Vertical and Lateral Hydraulic Dampers (WDM3D)

M/s India Auto Industries Pvt. Ltd. Janakpuri, New Delhi

03.12.12 Item under field trial.

32. Vertical and Lateral Hydraulic Dampers (WDM3D)

M/s Knorr Bremse India Pvt Ltd.,

Palwal, Haryana

07.08.13 Item under field trial.

33. Bushing Rubber for HHP locomotives

M/s Frontier Alloy Steels Ltd., Paonta Sahib, Distt. Sirmaur

13.10.15 Recommended for developmental order on 23.08.17.

34. Centre Pivot Block assembly

M/s Shree Meenakshi Polymer,

13.04.15 Recommended for developmental order 18.01.17.

18

site-II, Loni Road, Mohan Nager, Ghaziabad

35. Vertical and Lateral hydraulic dampers

M/s Gabriel India Ltd., Distt.- Pune

29.10.10 Firm has been cleared for developmental order on 26.04.2012. Firm has been approved for Vertical damper on 22.09.2017. As the firm has not got dev. order of secondary lateral dampers, on firm’s request, a letter sent to CMPE (D)/NCR on 14.07.2016, recommending dev order of 05 loco sets of the same.

36. Bushing Traction Rod for HHP Locomotives.

M/s Manisha Rubber Enterprises. Mumbai

26.11.10 Inspection completed on 18.11.15. Dispatch memo issued. Material under fitment at DLW for field trial of one year. Fitment detail as well as performance feedback has been asked on 14.09.2017. Fitment detail received on 26.09.2017, under review.

37. Half cylinder wear for HHP locomotives

M/s A-One Enterprises Pvt. Ltd, Gurgaon.

24.07.12 Firm has been recommended for development order of 05 loco set on dated 28.04.2014. Firm has supplied 05 Nos. to DLW in Aug 2015 and 46 Nos. in Jan 2017. Item under field trial of one year.