12
1 IRITEL TELECOMMUNICATIONS & ELECTRONICS www.iritel.com [email protected]

FM MSAN Commissioning

Embed Size (px)

DESCRIPTION

IRITELTELECOMMUNICATIONS & ELECTRONICSIRITEL Multiplexing Equipment Commissioning

Citation preview

Page 1: FM MSAN Commissioning

11

IRITELTELECOMMUNICATIONS

& ELECTRONICS

www.iritel.com

[email protected]

Page 2: FM MSAN Commissioning

2

IRIT

EL

Tra

nsm

issi

on S

yst

em

s

2

FM-MSAN

IRITEL Multiplexing Equipment

Commissioning

November 2007

Page 3: FM MSAN Commissioning

3

IRIT

EL

Tra

nsm

issi

on S

yst

em

s

FM-MSAN Commissioning – Contents FM-MSAN Analog Interface Units

Analog 4-wire Interface Units PEM10 – 10 2-wire/4-wire interfaces with E/M signalling

Analog 2-wire Interface Units PAC10 – 10 POTS interfaces (exchange side) PAT10 – 10 POTS interfaces (subscriber side) PLB10 – 10 field phone (with local battery) interfaces

FM-MSAN Digital Interface Units PCO – 10 G.703 64 kbit/s codirectional interfaces PN64 – 4 X.21/V.11 interfaces with n x 64 kbit/s capacity PN64A – 8 asynchronous transparent RS232 interfaces PIU-NT – 4 ISDN BRI U-interfaces (exchange side) PIU-LT – 4 ISDN BRI U-interfaces (subscriber side) PET – 3 Ethernet Bridge ports with n x 64 kbit/s capacity

Page 4: FM MSAN Commissioning

4

IRIT

EL

Tra

nsm

issi

on S

yst

em

s

FM-MSAN Analog Interface Units – Connecting Test Equipment Each analog interface that is switched on and configured will be

carried in one 64 kbit/s timeslot of a 2 Mbit/s multiplex. To test an FM-MSAN analog interface, connect the testing equipment to the appropriate connecting points of the MDF (Main Distribution Frame) and DDF (Digital Distribution Frame): Connect the analog test equipment (or alternatively, terminal

equipment) to the MDF port of the analog interface to be tested Connect the E1 tester to the appropriate E1 link and enter the

timeslot that corresponds to the analog interface to be tested

When executing test as described above, you are testing, all at once: FM MSAN configuration Analog voice and signaling interfaces 2 Mbit/s multiplex and cross-connect Cabling between the interface unit and MDF/DDF MDF/DDF cabling

Page 5: FM MSAN Commissioning

5

IRIT

EL

Tra

nsm

issi

on S

yst

em

s

Testing 4-wire PEM10 Interface Unit – PEM10 Test Block Diagram and Test Conditions

Testing conditions: Connect the E1 tester to the appropriate E1 link and enter the timeslot that

corresponds to the analog interface to be tested Make the voice channel and E/M signaling loopback connection on the MDF port

of the analog interface to be tested Configure PEM10 interface as 4-wire, in order to use separate input (Rx) and

output (Tx) portsNote: by testing PEM10 4-wire interface, you are also testing its 2-wire interface

FM-MSAN

4-wire analog

interface

2 Mbit/s(E1 link)

FMV or PE1 unit

PЕМ10 interface unit

Tx

Rx

E1 Tester(Sunrise Telecom SunLite E1)

DDF

MDF

Tx Rx

Loopback on both voice channel and E/M signaling interface

IRITEL testing equipment:• Sunrise Telecom SunLite E1

Page 6: FM MSAN Commissioning

6

IRIT

EL

Tra

nsm

issi

on S

yst

em

s

Testing 4-wire PEM10 Interface Unit – PEM10 Test Procedure

Test: Check the voice channel interface

Set the desired transmit frequency and transmit signal level (IRITEL standard values: 1020 Hz, -10 dBm)

Measure the receive frequency and receive signal level: The transmitted signal is sent through the DDF, FM‑MSAN and MDF and via the loopback is sent back and received by E1 tester. The received frequency should be the same as the transmitted frequency. The received signal level will be approximately 0.1 dB to 0.4 dB lower then transmitted signal – this is due to loss on MDF. If higher values of signal loss are detected, the bad wiring should be suspected

Check the E/M signaling interface Change transmit signaling A and B bits and check if the receive

bits correspond to changes.Note: in some applications only A bit is used (B bit is not wired on MDF)

Page 7: FM MSAN Commissioning

7

IRIT

EL

Tra

nsm

issi

on S

yst

em

s

Testing 4-wire PEM10 Interface Unit – PEM10 Test Form

Signaling Interface #

A bit B bit

Tx Frequency

[Hz]

Tx Level [dBm]

Rx Frequency

[Hz]

Rx Level [dBm]

Test Result (Pass/Fail)

1 1020 -10

2 1020 -10

3 1020 -10

4 1020 -10

5 1020 -10

6 1020 -10

7 1020 -10

8 1020 -10

9 1020 -10

10 1020 -10

Page 8: FM MSAN Commissioning

8

IRIT

EL

Tra

nsm

issi

on S

yst

em

s

Testing 2-wire Analog Interface Units – PAC10, PAT10 and PLB10 Test Block Diagram and Test ConditionsTesting conditions: Connect the E1 tester to the appropriate E1 link and enter the timeslot that

corresponds to the analog interface to be tested Connect the telephone/exchange tester to the MDF port of the analog

interface to be tested

IRITEL testing equipment:• Sunrise Telecom SunLite E1• Elektronika ETT10 Telephone & Exchange Tester

FM-MSAN

2-wire analog

interface

2 Mbit/s(E1 link)

FMV or PE1 unit

PAC10, PAT10 or PLB10 interface unit

Telephone & Exchange Tester(Elektronika ETT10)

MDF

Tx

Rx

E1 Tester(Sunrise Telecom SunLite E1)

DDF

Page 9: FM MSAN Commissioning

9

IRIT

EL

Tra

nsm

issi

on S

yst

em

s

Testing 2-wire Analog Interface Units – PAC10, PAT10 and PLB10 Test Procedure

Test: Check the voice channel interface

Check reception by sending the signal from E1 tester to telephone/exchange tester

Check transmission by sending the signal from telephone/exchange tester to E1 tester

Check the receiving and outgoing signaling Depending on the type of interface unit, check

ringing, on/off-hook condition and metering

Page 10: FM MSAN Commissioning

10

IRIT

EL

Tra

nsm

issi

on S

yst

em

s

Testing 2-wire Analog Interface Units – PAC10, PAT10 and PLB10 Test Form

Signaling Interface #

Receiving Outgoing

Voice channel

Interface (Pass/Fail)

1

2

3

4

5

6

7

8

9

10

Page 11: FM MSAN Commissioning

11

IRIT

EL

Tra

nsm

issi

on S

yst

em

sTesting 2-wire Analog Interface Units – PAC10, PAT10 and PLB10 Alternative Test Procedure

Alternatively, you can check PAC10 and PAT10 interface units using end-to-end connection and terminal equipment (telephone exchange and telephone).

Similarly, you can check PLB10 interface units using end-to-end connection and terminal equipment (field phones on both sides)

Page 12: FM MSAN Commissioning

12

IRIT

EL

Tra

nsm

issi

on S

yst

em

sTesting 2-wire Analog Interface Units – PAC10, PAT10 and PLB10 Alternative Test Procedure Block Diagram

PАC10

PАТ10

PLB10

FM-MSAN

FM-MSAN

Telephone Exchange

Telephone Interface

PLB10

Transmission System

Test PAC10-PAT10 and PLB10-PLB10 end-to-end connection functionally:

• Check voice channel in both directions

• Check signaling in both directions:• ringing• on/off-hook, if applicable• metering, if applicable

Note1: PLB10 does not support on/off hook and metering signalingNote2: For metering detection use Telephone Call Meter