Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
FluenceThe Next Big Thing in Energy Storage
Jan Namyslo
The Market is existing and massively growing
Source: IHS (2016)
< 2015 2016 2022
Introduction Strong Growth Growth / Maturity
Positioning of future market leaders
3 GW
28 GW
Very favorable market environment
Customer First
Drives our success
2022
Created and backed by two industry powerhouses
EXPERIENCE
10+ years of experience in energy
storage from two proven industry
pioneers
• World’s leading storage provider
• Deployed or been awarded 57
projects, in 16 countries, 500+
MW
Fluence brings unmatched experience at scale from the partner you can trust
3
SCALE
Complete technology and service
offerings delivered worldwide
• Proven technology platforms that
address full spectrum of
applications
• Delivery & integration in 160
countries
• Comprehensive services including
financing
THE RIGHT PARTNER
Deep understanding of modern
power markets, customer needs, and
local market challenges
• Collaborate with customers to
solve their energy challenges
• Avoid pitfalls of inexperienced
packagers and integrators
• Strong financial backing and
industry staying power
30 MW of energy storage for San Diego Gas & Electric, California, United States
Largest energy storage project in North America
30 MW / 120 MWh
Contract to online in 6 months
Sited on 1 acre, where a power plant could not be permitted
World’s largest contracted energy storage project
Generation Enhancement
Long Beach, California, United States
100 MW, 4-hour (400 MWh)
AES Alamitos, COD Jan 1, 2021
SERVICES
• Capacity, local reliability
• Peak power/off peak mitigation
• Ancillary services
IMPACT
• Competitive bid vs thermal peaker, cost
effective
• Replaces environmental retired units
• Meets flexibility (duck curve)
High speed as well as long duration systems
2. Island / diesel offset
4. Grid fee reduction
(peak shaving)
3. Critical Power
5. Black start capability
1. Frequency control
6. Capacity / Peak
Power
7. Renewable
Integration
8. T&D
Save cost & protect
environmentInsurance Make Money
INITIATIVES TO DRIVE THE 8 DESIGNATED APPLICATIONS
Frequency Regulation
• 0,5 to 1 h
Microgrids & Islands
• up to 4h
Critical Power
• up to 1h
Energy Cost Control
• up to 4 h
Generation Enhancement
• up to 1 h
CapacityPeak Power
• up to 6h
Renewable integration
• up to 4h
T&D Enhancement
• Up to 4h
1 3 4 5 62 7 8
Fluence ApplicationsCovering all storage needs from 1MW to >100MW
SIESTORAGE Platform
© Fluence Energy LLC. All Rights Reserved.7
Lightning fast energy. Trusted for critical loads.• Essential fast response for power
quality, black start, frequency response, and backup applications.
• Can provide grid support services and be grid forming, enabling customers to operate in island mode when the network becomes unavailable.
• Our deep experience from years of serving customers in the power sector is embedded in the SIESTORAGE architecture to deliver best in class performance.
Ultra Fast
Grid Support Capability
Embedded Experience
Advancion Platform
© Fluence Energy LLC. All Rights Reserved.8
Unmatched dependability. Designed to evolve.• Industry-leading reliability, up-time, and
years of safe operation
• Built from a massively parallel redundant architecture with safety designed into every layer of the architecture.
• 10 years of experience in operating storage-based power and energy services in markets worldwide is embedded in the Advancion architecture.
• Designed with the long-term owner operator in mind.
• Open architecture incorporates the best available technology now and in the future.
Unmatched Dependability
Embedded Experience
Future Proof
Deep dive into Frequency Regulation
© Fluence Energy LLC. All Rights Reserved.9
• Background: Primary frequency
control is a fast response grid service
which is directly reimbursed from
TSOs (Germany)
• Problem: Primary frequency control
has to be provided to guarantee a
safe and reliable operation for the
electricity grid
• Solution: Install a 10 MW/ 10 MWh
battery to provide frequency control
Consistent format across
the two case studies
Label energy storage
array on picture
Location: Wunsiedel, Germany
Size: 10 MW, 1hour (10 MWh)
Deep dive into Frequency Regulation
Key drivers for frequency regulation
© Fluence Energy LLC. All Rights Reserved.10
Frequency
Regulation
Market
Security
Agent
&
Trader
/
Operator
Customer
Deep dive into Frequency Regulation
National alignment on market rules
© Fluence Energy LLC. All Rights Reserved.11
Frequency
Regulation
Market
Deep dive into Frequency Regulation
National alignment on market rules – summary
© Fluence Energy LLC. All Rights Reserved.12
Frequency
Regulation
Market
Page 1 of 9
Minimum requirements for capacity
Minimum requirements for data points
Oversizing power electronics
Recharging strategy
Pool vs. Stand-alone
Deep dive into Frequency Regulation
Entry of new market players
© Fluence Energy LLC. All Rights Reserved.13
Security
Agent
&
Trader
/
Operator
Deep dive into Frequency Regulation
Elements of a quality business case
© Fluence Energy LLC. All Rights Reserved.14
Frequency
Regulation
Market
Rules ?
Security
Agent
&
Trader
/
Operator
Find the
setup!
TSO
Qualification?
Additional revenues
YYY €Black-start capability
Additional revenues
XXX €Generation capacity release
Customer
Power
Plant
Capability?
Frequency Regulation
Germany, 7 Projects
1 MW typical system size
50 MW being installed
SERVICES
• Frequency Regulation
• Primary Reserve Power
• Turnkey Solution
IMPACT
• Improved grid reliability
• Lower costs
Fluence is the global leader in energy storage
16 Countries
50+ Projects
500+ MW
10+ Years
Thank you