FLORIDA’S TURNPIKE ENTERPRISE CONSULTANT ACQUISITION PLAN (CAP) FY 2019 VIRTUAL FORUM 11/30/2017 Florida Department of TRANSPORTATION 1

Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

Embed Size (px)

Citation preview

Page 1: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

FLORIDA’S TURNPIKE ENTERPRISECONSULTANT ACQUISITION PLAN (CAP) FY 2019

VIRTUAL FORUM 11/30/2017

Florida Department ofTRANSPORTATION

1

Page 2: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

Opening Remarks

2

Page 3: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

Agenda

Opening Remarks – Mike Shannon, P.E.

Continuing Services Contracts – Kathy Alexander

Phase 22 (PD&E) – Rax Jung, P.E.

Phase 32 (DESIGN) – Kathy Alexander

Design Build Projects – Kathy Alexander

Phase 62 (CEI) – Karen Akers, P.E.

FY 20 Tentative Summary – Kathy Alexander

Top 10 Design Tips – Pat Muench, P.E.

Additional Resources – Kathy Alexander

Forum Q&A Review – Brianna Myers

3

Page 4: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

Continuing Services/Miscellaneous Design Services Contracts

ESTIMATED TOTAL CONTINUING/MISCELLANEOUS SERVICES CONTRACTS $8M

AD NO19801 19809

CONTRACT TYPED/W – MISC DESIGN SERVICES CONTRACT CONT SERVICES DESIGN BUILD RFP 

DEVELOPMENT

TYPE OF SERVICE MISCELLANEOUS DESIGN DESIGN BUILD RFP

CONTRACT AMOUNT & LENGTH

$1.5M / 3 YEARS(2 CONTRACTS WILL BE AWARDED) $5M / 5 YEARS

BDI? YES NO

FORMAL AD DATE 12/18/2017 1/2/2018

4

Page 5: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

Phase 22 (PD&E)

ESTIMATED TOTAL PHASE 22 CONTRACTS $4.50M

AD NUMBER19804 

(CURRENTLY UNDER ACQUISITION) 19803

PROJECT

WIDEN TPK FROM KISSIMMEE PARK RD TO US 192 (MP 238.5‐

242.5) (4 TO 8 LANES)PD&E WIDENING TPK FROM I‐595 TO ATLANTIC (8 TO 10 LANES)

FPID 441224‐1 442212‐1

BDI? NO NO

EST CONTRACT AMOUNT $1.5M (WITH OPTION FOR DESIGN $) $3.0M

COUNTY OSCEOLA BROWARD

PMBRIAN RIBARIC (PD&E)STEVE SOLDATI (DESIGN) BECKY BOLAN

FORMAL AD DATE 10/23/2017 2/19/2018

5

Page 6: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM BRIAN RIBARIC / 407.264.3095STEVE SOLDATI / 407.264‐3967

AD NO / FPID(S) AD NO 19804 / FPID 441224‐1

County/Counties OSCEOLA

Estimated Contract Amount $1.5M (WITH OPTION FOR DESIGN)

Estimated Contract Execution AUGUST 2018

Estimated Length of Contract 48 MONTHS

BDI NO

Project Description:

WIDEN TPK FROM KISSIMMEE PARK RD TO US 192 (MP 238.5 ‐ 242.5) (4 TO 8 LANES)

Major/Minor Work Types Anticipated

Major – 2.0, 3.3Minor – 3.1, 3.2, 4.1.1, 4.1.2, 6.1, 6.2, 6.3.1, 6.3.2, 6.3.3, 7.1, 7.2, 7.3, 8.1, 8.2, 8.3, 8.4, 9.1, 9.2, 9.4.1, 14.0, 15.0

PHASE 22

6

Page 7: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM BECKY BOLAN / 407.264.3416

AD NO / FPID(S) AD NO 19803 / FPID 442212‐1

County/Counties BROWARD

Estimated Contract Amount $3.0M

Estimated Contract Execution MARCH 2019

Estimated Length of Contract 24 MONTHS

BDI NO

Project Description:

PD&E WIDENING TPK FROM I‐595 TO ATLANTIC (8 TO 10 LANES)

Major/Minor Work Types Anticipated

Major – 2.0, 3.3Minor – 4.1.1, 4.1.2, 4.2.1, 4.2.2, 4.2.3, 6.1, 6.2, 6.3.1, 6.3.2, 6.3.3, 7.1, 7.2, 7.3, 8.1, 8.2, 8.3, 8.4, 9.1, 9.2, 9.4.1, 14.0, 15.0

PHASE 22

7

Page 8: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

Phase 32 (DESIGN)

ESTIMATED TOTAL PHASE 32 CONTRACTS $35.1M

8

AD NO FPID DESCRIPTION ESTIMATED CONTRACT AMT

19802 435786‐1 / 440294‐1

WIDEN TPK‐ MINNEOLA INTCHG TO US27 (MP279‐289.3) (4TO8 W/EXP) &RESURFACE TURNPIKE MAINLINE LAKE COUNTY MP 279.0 TO MP 287.7 

$24.4M

19805 405270‐5 SUNCOAST PARKWAY 2 ‐ SR 44 TO US19(PD&E RE EVAL)

$3.7M

19806 440291‐1 RESURFACE SEMINOLE EXPRESSWAY MP 38 TO MP 44.5 $1.3M (BDI)

19807 440293‐1 RESURFACE TURNPIKE MAINLINE ORANGE COUNTY MP 259.9 TO MP 266.8 $2.2M

19808(UNDER 

ACQUISITION)

436516‐1 RESURFACING TURNPIKE MAINLINE MP 234.95 TO 238.76 $0.6M (BDI)

19810 440423‐1 RESURFACE HEFT IN MIAMI‐DADE FROM MP 0.0‐5.1, & RAMPS FROM MP 5.1‐9.2

$1.3M 

19811 440700‐1 RESURFACING ‐ TURNPIKE OSCEOLA COUNTY MP 190.5 TO 198.3 $1.6M

Page 9: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM ANIL SHARMA / 407.264.3041

AD NO / FPID(S) AD NO 19802 / FPID(S) 435786‐1 & 440294‐1 

County/Counties LAKE

Estimated Contract Amount $24.4M

Estimated Contract Execution MARCH 2019

Estimated Length of Contract 30 MONTHS

BDI NO

Project Description:WIDEN TPK‐ MINNEOLA INTCHG TO US27 (MP279  ‐ 289.3) (4 TO 8 LANES  W/EXP LANES) &RESURFACE TURNPIKE MAINLINE LAKE COUNTY MP 279.0 TO MP 287.7 

Major/Minor Work Types Anticipated

Major – 3.3, 4.1.1, 4.1.2Minor – 3.1, 3.2, 6.2, 6.3.1, 7.1, 7.2, 7.3, 8.1, 8.2, 8.4, 9.1, 9.2, 9.3, 9.4.1, 14.0, 15.0

PHASE 32 (DESIGN)

9

Page 10: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM TOM NEYER / 407.264.3424

AD NO / FPID(S) AD NO 19805 / FPID 405270‐5

County/Counties CITRUS

Estimated Contract Amount $3.7M

Estimated Contract Execution JANUARY 2019

Estimated Length of Contract 60 MONTHS

BDI NO

Project Description:

SUNCOAST 2 FROM SR 44 TO US 19 (INCLUDES PD&E RE EVAL)

Major/Minor Work Types Anticipated

Major – 3.3, 4.1.1, 4.1.2Minor – 2.0, 3.2, 4.2.1, 5.4, 6.1, 6.3.1, 6.3.2, 6.3.3, 7.1, 7.2, 7.3, 8.1, 8.2, 8.3, 8.4, 9.1, 9.2, 9.4.1, 14.0, 15.0

PHASE 32 (DESIGN)

10

Page 11: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM SNEHAL AMBARE / 407.264.3414

AD NO / FPID(S) AD NO 19806 / FPID 440291‐1

County/Counties SEMINOLE

Estimated Contract Amount $1.3M

Estimated Contract Execution JANUARY 2019

Estimated Length of Contract 18 MONTHS

BDI YES

Project Description: 

RESURFACE SEMINOLE EXPRESSWAY MP 38 TO MP 44.5

Major/Minor Work Types Anticipated

Major – 3.3Minor – 3.1, 4.1.4, 4.1.2, 7.1, 7.2, 7.3, 8.1, 8.2, 9.1, 9.2

PHASE 32 (DESIGN)

11

Page 12: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM BRANDON BOBO / 407.264.3113

AD NO / FPID(S) AD NO 19807 / FPID 440293‐1

County/Counties ORANGE

Estimated Contract Amount $2.2M

Estimated Contract Execution JANUARY 2019

Estimated Length of Contract 12 MONTHS

BDI NO

Project Description:

RESURFACE TURNPIKE MAINLINE ORANGE COUNTY MP 259.9 TO MP 266.8

Major/Minor Work Types Anticipated

Major – 3.3Minor – 4.1.1; 4.1.2; 6.3.1; 6.3.2; 6.3.3; 7.1; 7.2; 8.1; 8.2; 8.3; 8.4; 9.1; 9.2

PHASE 32 (DESIGN)

12

Page 13: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM FRANCISCO CARDONA / 407.264.3029

AD NO / FPID(S) AD NO 19808 / FPID 436516‐1

County/Counties OSCEOLA

Estimated Contract Amount $0.63M

Estimated Contract Execution SEPTEMBER 2018

Estimated Length of Contract 10 MONTHS

BDI YES

Project Description:

RESURFACING TURNPIKE MAINLINE MP 234.95 TO MP 238.76

Major/Minor Work Types Anticipated

Major – 3.3Minor – 4.1.1; 4.1.2; 7.1; 8.1; 8.2; 9.1; 9.2

PHASE 32 (DESIGN)

13

Page 14: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM ANTHONY WASHINGTON / 407.264.3199

AD NO / FPID(S) AD NO 19810 / FPID 440423‐1

County/Counties MIAMI – DADE

Estimated Contract Amount $1.3M

Estimated Contract Execution JANUARY 2019

Estimated Length of Contract 18 MONTHS

BDI NO

Project Description:

RESURFACE HEFT IN MIAMI‐DADE FROM MP 0.0 TO MP 5.1, & RAMPS FROM MP 5.1 TO MP 9.2

Major/Minor Work Types Anticipated

Major – 3.3Minor – 4.1.1; 4.1.2; 6.2; 7.1; 7.2; 7.3; 8.2; 9.1; 9.2

PHASE 32 (DESIGN)

14

Page 15: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM STEVE SOLDATI / 407.264.3967

AD NO / FPID(S) AD NO 19811 / FPID 440700‐1

County/Counties OSCEOLA

Estimated Contract Amount $1.5M

Estimated Contract Execution JANUARY 2019

Estimated Length of Contract 14 MONTHS

BDI NO

Project Description:

RESURFACING ‐ TURNPIKE OSCEOLA COUNTY MP 190.5 TO MP 198.3

Major/Minor Work Types Anticipated

Major – 3.3Minor – 4.1.1; 4.1.2; 7.1; 8.1; 8.2; 9.1; 9.2

PHASE 32 (DESIGN)

15

Page 16: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

Design Build Projects

ESTIMATED DESIGN BUILD CONTRACTS $3.0M

16

FPID 442552‐1

PROJECT DESCRIPTION VETERAN’S EXPRESSWAY – SR 60 OPERATIONAL IMPROVEMENTS

ESTIMATED CONTRACT AMT $3.0M

ANTICIPATED LETTING JULY 2018

COUNTY HILLSBOROUGH

FORMAL AD 5/7/2018

Page 17: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM TOM NEYER / (407) 264‐3424

FPID(S) 442552‐1

County/Counties HILLSBOROUGH

Estimated Contract Amount $3.0M

Letting JULY 2018

BDI NO

Project Description:

VETERAN'S EXPRESSWAY‐SR 60 OPERATIONAL IMPROVEMENT

Major/Minor Work Types Anticipated

Major – 3.3Minor – 4.1.1, 6.1.7, 8.1, 8.2, 8.3

DESIGN BUILD

17

Page 18: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

ESTIMATED TOTAL CEI CONTRACTS AMOUNT $62M

PHASE 62 (CEI)

18

AD NO FPID DESCRIPTIONEST. CONTRACT AMOUNT

19818 435543‐1 WIDEN HEFT FROM SR 836 TO NW 106TH ST (MP26‐34)(6/8 LNS TO 10 LNS INC EXP) $17.4M

19820 435542‐1 WIDEN HEFT NW 106TH ST TO I‐75 (MP 34‐MP39) (6 LNS TO 10 LNS INC EXP) $13.7M

19814 441067‐2 DOLPHIN STADIUM INTERCHG (SR 91 MP 2X) ULTIMATE AET INSTALLATION $0.7M (BDI)

19815 428154‐4 SAWGRASS CANAL REVETMENT PHASE 4  $0.8M (BDI)

19821 429339‐1 AET 5C, TPK FROM SAWGRASS XWAY TO S OF LANTANA TOLL PLAZA (MP71‐88) $1.2M

19822 431737‐1 ALL ELECTRONIC TOLLING (AET) PHASE 8 TICKET SYSTEM (MP 88‐236) $6.5M

19823 437991‐1/3 MILL AND RESURFACE FROM MP 81.4‐83.822 AND MP 86.5‐90.183 $2.6M

19812 437992‐1/3 RESURFACE TPK MAINLINE IN MARTIN COUNTY, MP 117.843‐138.037 $4.8M

19817 437986‐1/3 RESURFACING MAINLINE ST. LUCIE COUNTY MP 138.130‐153.230 $6.5M

19816 441322‐1 /440859‐1

AET NORTHERN COIN CONVERSION (MP 236‐309) AND KISSIMMEE PARK ROAD TOLL GANTRY REPLACEMENT

$1.8M

19819 439457‐1 RESURFACE TPK MAINLINE IN ORANGE COUNTY, MP 269.4‐273.3 $1.4M (BDI)

19813 437300‐4 SUNTRAX INFIELD $4.0M 

19824 435605‐6 CENTRAL FLORIDA DMS IMPROVEMENTS AND REPLACEMENTS $0.6M 

Page 19: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM PACIFICO CASTILLO / 954.934.1118

AD NO / FPID(S) AD NO 19818 / FPID(S) 435543‐1

County/Counties MIAMI – DADE

Estimated Contract Amount $17.4M

Estimated CEI Contract Execution MAY 2019

BDI NO

Project Description:

WIDEN HEFT FROM SR836 TO NW 106TH ST (MP 26 TO MP 34) (6/8 LANES TO 10 INC EXP LANES) 

Major/Minor Work Types Anticipated

Major – 10.1Minor – 8.2

PHASE 62 (CEI)

19

Page 20: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM PACIFICO CASTILLO / 954.934.1118

AD NO / FPID(S AD NO 19820 / FPID(S) 435542‐1

County/Counties MIAMI ‐ DADE

Estimated Contract Amount $13.7M

Estimated CEI Contract Execution AUGUST 2018

BDI NO

Project Description:

WIDEN HEFT‐ NW 106TH ST TO I‐75 (MP34 TO MP39) 6 TO 10 LANES W/EXP LANES

Major/Minor Work Types Anticipated

Major – 10.1Minor – 8.2

PHASE 62 (CEI)

20

Page 21: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM JAIME GOMEZ / 954.934.1131

AD NO / FPID(S) AD NO 19814 / FPID 441067‐2

County/Counties MIAMI – DADE

Estimated Contract Amount $0.7M

Estimated CEI Contract Execution JANUARY 2019

BDI YES

Project Description:

DOLPHIN STADIUM INTCHG (SR 91 MP 2X) ULTIMATE AET INSTALLATION

Major/Minor Work Types Anticipated

Major – 10.1Minor – 8.2

PHASE 62 (CEI)

21

Page 22: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM JAIME GOMEZ / 954.934.1131

AD NO / FPID(S) AD NO 19815 / FPID(S) 428154‐4

County/Counties BROWARD

Estimated Contract Amount $0.8M

Estimated CEI Contract Execution FEBRUARY 2019

BDI YES

Project Description:

SAWGRASS CANAL REVETMENT PHASE 4

Major/Minor Work Types Anticipated

Major – 10.1Minor – 8.2

PHASE 62 (CEI)

22

Page 23: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM JAIME GOMEZ / 954.934.1131

AD NO / FPID(S) AD NO 19821 / FPID(S) 429339‐4

County/Counties DISTRICT WIDE

Estimated Contract Amount $1.2M

Estimated CEI Contract Execution JUNE 2019

BDI YES

Project Description:

AET 5C, TPK FROM SAWGRASS XWAY TO S OF LANTANA TOLL PLAZA (MP 71 TO MP 88)

Major/Minor Work Types Anticipated

Major – 10.1Minor – 8.2

PHASE 62 (CEI)

23

Page 24: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM KEN HUDSON / 954.934.1134

AD NO / FPID(S) AD NO 19822 / FPID 431737‐1

County/Counties DISTRIC WIDE

Estimated Contract Amount $6.5M

Estimated CEI Contract Execution JUNE 2019

BDI NO

Project Description:

ALL ELECTRONIC TOLLING (AET) PHASE 8 TICKET SYSTEM (MP 88 TO MP 236)

Major/Minor Work Types Anticipated

Major – 10.1Minor – 8.2

PHASE 62 (CEI)

24

Page 25: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM ROXANNE RIGGS / 954‐934‐1296

AD NO / FPID(S) AD NO 19823 / FPID 437991‐1

County/Counties PALM BEACH

Estimated Contract Amount $2.6M

Letting JUNE 2019

BDI NO

Project Description:

RESURFACE TPK MAINLINE IN PALM BEACH CNTY, MP 81.4 TO MP 87.3 

Major/Minor Work Types Anticipated

Major – 10.1Minor – 8.2

PHASE 62 (CEI)

25

Page 26: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM ROXANNE RIGGS / 954‐934‐1296

AD NO / FPID(S) AD NO 19812 / FPID(S) 437992‐1

County/Counties MARTIN

Estimated Contract Amount $4.8M

Estimated CEI Contract Execution SEPTEMBER 2018

BDI NO

Project Description:

RESURFACE TPK MAINLINE IN MARTIN CNTY, MP 117.843  TO MP 138.037

Major/Minor Work Types Anticipated

Major – 10.1Minor – 8.2

PHASE 62 (CEI)

26

Page 27: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM ROXANNE RIGGS / 954.934.1296

AD NO / FPID(S) AD NO 19817 / FPID(S) 437986‐1

County/Counties ST. LUCIE

Estimated Contract Amount $6.5M

Estimated CEI Contract Execution MAY 2019

BDI NO

Project Description:

RESURFACING MAINLINE ST. LUCIE COUNTY  MP 138.130 TO MP 153.230 

Major/Minor Work Types Anticipated

Major – 10.1Minor – 8.2

PHASE 62 (CEI)

27

Page 28: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM JON FORD / 407.264.3020

AD NO / FPID(S) 19816 / FPID(S) 441322‐1 & 440859‐1

County/Counties OSCEOLA / DISTRICT WIDE

Estimated Contract Amount $1.8M

Estimated CEI Contract Execution MARCH 2019

BDI NO

Project Description:

ALL ELECTRONIC TOLLING (AET) NORTHERN COIN CONVERSION (MP 236 TO MP 309)  &KISSIMMEE PARK ROAD TOLL GANTRY REPLACEMENT

Major/Minor Work Types Anticipated

Major – 10.1Minor – 8.2

PHASE 62 (CEI)

28

Page 29: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM CHRISTOPHER NESMITH / 407.264.3482

AD NO / FPID(S) AD NO 19819 / FPID(S) 439457‐1

County/Counties ORANGE

Estimated Contract Amount $1.4M

Estimated CEI Contract Execution MAY 2019

BDI YES

Project Description:

RESURFACE TPK MAINLINE IN ORANGE COUNTY, MP 269.4 TO MP  273.3  (PAVEMENT ONLY PROJECT)

Major/Minor Work Types Anticipated

Major – 10.1Minor – 8.2

PHASE 62 (CEI)

29

Page 30: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM TODD KELLY / 407.264.3370

AD NO / FPID(S) AD NO 19813 / FPID(S) 437300‐4

County/Counties POLK

Estimated Contract Amount $4.0M

Estimated CEI Contract Execution NOVEMBER 2018

BDI NO

Project Description:

SUNTRAX INFIELD

Major/Minor Work Types Anticipated

Major – 10.1Minor – 8.2

PHASE 62 (CEI)

30

Page 31: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

PM TODD KELLY / 407.264.3370

AD NO / FPID(S) AD NO 19824 / FPID 435605‐6

County/Counties DISTRICT WIDE

Estimated Contract Amount $0.6M

Estimated CEI Contract Execution JUNE 2019

BDI YES

Project Description:

CENTRAL FLORIDA DMS IMPROVEMENTS AND REPLACEMENTS

Major/Minor Work Types Anticipated

Major – 10.1Minor – 8.2

PHASE 62 (CEI)

31

Page 32: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

TENTATIVE CONSULTANT ACQUISITIONS FY 20

FY 20 ‐ TENTATIVE ACQUISITIONS(# OF PROJECTS / $ AMT)

PH 22  2 $4.5M

PH 32  10 $41.8M

PH 62   29 $50.2M

32

Page 33: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

DESIGN ‐ TOP 10 TIPS 

2. Turnpike Reviewers Are on Your Side…Be on Theirs

3. Quality…Improvements From Start to Finish

4. Turnpike Specific Criteria (TPPPH, GTR, etc.)...Learn It, Know It, Live It

5. It's Not Just About Getting it Done…When It Gets Done is Just As Important

6. Statutes and Policies…Not Just for the Lawyers

7. Coordinate...Early, Often and with Everybody

8. FGT Gas Lines...If They're There, Be Aware

9. Turnpike Project Acquisitions...Proper Planning Prevents Poor Performance

10. Turnpike Design Website...A Wealth of Valuable Resources ‐

http://www.floridasturnpike.com/design

33

Page 34: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

DESIGN ‐ TOP 10 TIPS 

1. Engineers Should Engineer…Identify, Evaluate, Recommend

34

Page 35: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

Public Records Requests for ALL Procurements

PRIOR Formal AdvertisementStephanie Hall (407) 264‐[email protected]

POST Formal AdvertisementProfessional Services Unit (PSU)[email protected]

* Assigned Contract Analyst information will be on the advertisement

Requests for Information

35

Page 36: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

FTE’s Marketing Websitehttp://www.dot.state.fl.us/procurement/marketingTP/

FDOT: Procurement ‐ Marketing – CAPhttp://www.dot.state.fl.us/procurement/CAP.shtm

FDOT: Procurement – Advertisements http://www.dot.state.fl.us/procurement/Advertisements.shtm

GIS ‐ Geographic Information Systems ‐ Work Program Mapshttp://fdot.maps.arcgis.com/apps/OnePane/basicviewer/index.html?appid=

71d5dbe101874d8ebef391a1cf94d962

FTE’s Design Websitehttp://design.floridasturnpike.com/index.html

WEB LINKS

Presentation Presentation 

will belocated here

36

Page 37: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

Florida Department ofTRANSPORTATION

Turnpike Program Management Staff

Mike Shannon, P.E. – Director of Transportation Development Paul Satchfield – District Program Management Administrator Kathy Alexander – District Program Administration Manager

[email protected] Karen Akers, P.E. – CEI Manager Brianna Myers – Production Manager

[email protected]

Special Presenter – Top 10 Design Tips

Pat Muench – District Design Engineer

37

Page 38: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

Florida Department ofTRANSPORTATION

38

Page 39: Florida Department of TRANSPORTATION FLORIDA’S … Virtual... · florida’s turnpike enterprise consultant acquisition plan (cap) fy 2019 virtual forum 11/30/2017 florida department

FINAL THOUGHTS…

39