4

FLORENCE - GE Oil and Gas · 2019-01-24 · Control System MarkTM VIe Operation for Aeroderivative Gas Turbine FLC Sept 09-13 5 3,000 Control System MarkTMVIe Maintenance for Aeroderivative

  • Upload
    others

  • View
    30

  • Download
    2

Embed Size (px)

Citation preview

FLORENCE/ITALY DOHA/QATAR

Turbo-compressor FamiliarizationCentrifugal Compressor driven by Aero Gas Turbine

FLC Sept 03-05 3 1,950

Control System MarkTM VIe Operation for Aeroderivative Gas Turbine

FLC Sept 09-13 5 3,000

Control System MarkTMVIeMaintenance for Aeroderivative Gas Turbine

FLC Sept 16-20 5 3,000

Aeroderivative Gas GeneratorLevel 1 Inspection

TTA Sept 23-27 5 4,600

Reciprocating Compressor Induction

FLC Oct 01-03 3 1,500

Power-generator Familiarization Power generator driven by Heavy Duty Gas Turbine

FLC Oct 08-10 3 1,950

Heavy Duty Gas Turbine InductionSupported by Virtual Reality

FLC Oct 07-11 5 3,500

Centrifugal Compressor InductionSupported by Virtual Reality

FLC Oct 14-18 5 3,500

Control System MarkTMVIeOperation for Heavy Duty Gas Turbine

FLC Oct 14-18 5 3,000

Control System MarkTMVIeMaintenance for Heavy Duty Gas Turbine

FLC Oct 21-25 5 3,000

Centrifugal PumpMaintenance and hands on

TTA Oct 21-25 5 3,000

Centrifugal CompressorMajor Inspection

TTA Nov 04-15 10 9,000

Heavy Duty Gas TurbineMajor Inspection

TTA Nov 18-29 10 9,000

Turbo-compressor Familiarization Centrifugal Compressor driven by Steam Turbine

FLC Nov 26-28 3 1,950

Steam Turbine Minor Inspection

TTA Dec 02-06 5 4,600

COURSE LOCATION FROM>TO DAYS COURSE LOCATION FROM>TO DAYS

All courses are in English languageFLC – GE Florence Learning Center TTA – Technical Training Academy QSC – Qatar Service Center SDC – GE Skills Development CenterFor information and enrollment click here

PRICEPER PERSON (EUR)

PRICEPER PERSON (USD)

PERTH/AUSTRALIA

Control System MarkTMVIeOperation for Heavy Duty Gas Turbine

QSC Mar 31-Apr 4 5 3,600

Control System MarkTMVIeMaintenance for Heavy Duty Gas Turbine

QSC Apr 7-11 5 3,600

Heavy Duty Gas TurbineMajor Inspection

QSC Apr 7-18 10 13,000

Aeroderivative Gas Turbine Introduction & Gas Generator Maintenance

SDC Mar 11-15 5 7,700

Control System MarkTM VIeOperation for Aeroderivative Gas Turbine

SDC Mar 11-15 5 5,100

Control System MarkTMVIeMaintenance for Aeroderivative Gas Turbine

SDC Mar 18-22 5 5,100

LOCATION FROM>TO DAYS PRICEPER PERSON (AUD)COURSE

ONLINE

Aeroderivative Gas Turbine Theory of Operation & Description

About150 min.

700

Aeroderivative Gas Turbine Maintenance

Abaout170 min.

1,100

Aeroderivative Gas Turbine Operation & Auxiliary Systems

About240 min.

1,500

Aeroderivative Gas Turbine Operation & Maintenance

About260 min.

1,800

Heavy-Duty Gas TurbineTheory of Operation & Description

About60 min.

7,00

Heavy-Duty Gas TurbineMaintenance

About170 min.

1,100

Heavy-Duty Gas TurbineOperation & Auxiliary Systems

About180 min.

1,500

Heavy-Duty Gas TurbineOperation & Maintenance

About270 min.

1,800

Centrifugal CompressorDescription

About50 min.

450

Centrifugal CompressorMaintenance

About120 min.

700

Centrifugal CompressorOperation & Auxiliary Systems

About115 min.

1,100

Centrifugal CompressorOperation & Maintenance

About185 min.

1,500

Liquefied Natural Gas Process

About60 min.

450

Oil & Gas ProcessesTechnologies and resources, upstream, midstream and downstream

About720 min.

1,800

COURSE DURATIONPRICE

PER PERSON (EUR)

All courses are in English languageHigh speed Internet connection (8Mbit/s download and 1 Mbit/s in upload) is a mandatory requirementFor information and enrollment click here

Oil & Gas processesUpstream

About360 min.

700

Oil & Gas processesMidstream

About360 min.

700

Oil & Gas processesDownstream

About360 min.

700

COURSE DURATIONPRICE

PER PERSON (EUR)