Daily Maintenance Weekly Maintenance Remove gross soils (labels, gum). Sweep or dust mop floor. Place “Wet Floor” signs in area. Remove gross soils (labels, gum). Sweep or dust mop floor. Place “Wet Floor” signs in area. Remove gross soils (labels, gum). Sweep or dust mop floor. Place “Wet Floor” signs in area. Dilute SPEEDEE MOP Floor Cleaner 2oz. per gallon of cold tap water. (Replace solution daily or when mop water becomes dirty.) Dilute POINT AFTER Revitalizer 4-8oz. per gallon into lined bucket. Apply to sealed floors with a mop or auto- scrubber. Allow floor to dry completely. Make what you plan to use. Using a clean mop, dip into restorer and press out excess - do not use wringer. When dry, if needed, burnish with ultra high speed machine and blue ice pad to high gloss. Never burnish with a soiled pad. Apply restorer as you would a finish, keeping 6” away from the edge. Allow to dry. When dry, buff or burnish. Scrub and Recoat 6-12 Months (or as needed) Strip and Finish Every 2 years (or as needed) Dilute SPEEDEE MOP Floor Cleaner 6oz. per gallon of cold tap water. Scrub with blue pad on auto scrubber or single disk machine. Pick up cleaning solution with scrubber or wet vac. (Replace solution when mop water becomes dirty.) Damp mop any residues with clear water. Allow floor to dry. Apply as many coats as required. Allow 30-45 minutes between coats. Last coat should cover edges. (To keep clean follow DAILY MAINTENANCE directions.) Line bucket with a fresh liner and pour in POLARIS ULTRA Floor Finish. Using a clean mop outline area to be finished. Then fill in using a figure eight motion. Stay 6” away from edges. S H E L F S H E L F Allow to stand 5-10 minutes minimum. DO NOT ALLOW SOLUTION TO DRY. Re-wet as needed. Divide work areas into small 5’x20’ areas. Dilute 1 part SUPER STRIP PLUS Emulsifying Stripper with 5 parts water. Apply enough material to ensure complete wetting. Scrub floor with auto scrubber or floor machine using a proper stripping pad to break softened film. Flip pad and replace as needed. Pick up solution with mop, wet vac or auto scrubber. Damp mop floor with clean water to remove all residue. Allow to dry before applying base coat. Line bucket with a fresh liner and pour in POLARIS ULTRA Floor Finish. Pour only what you plan to use. Use clean finish mop. Dip into finish and press out excess. To apply a full even coat, outline the area to be finished. Fill in the outlined area using a figure eight motion. Stay 6” away from edges. Allow 30 minutes to dry in between finish coats (4-5 coats). Last coat should cover edges. Allow to dry completely (4 hours) before allowing traffic. S H E L F S H E L F S T R I P S C R U B F I N I S H R E C O A T R E S T O R E C L E A N & ALWAYS WEAR GOGGLES, GLOVES AND SLIP RESISTANT SHOES WHEN USING THIS PRODUCT. ALWAYS WEAR GOGGLES, GLOVES AND SLIP RESISTANT SHOES WHEN USING THIS PRODUCT. ALWAYS WEAR GOGGLES, GLOVES AND SLIP RESISTANT SHOES WHEN USING THIS PRODUCT. ALWAYS WEAR GOGGLES, GLOVES AND SLIP RESISTANT SHOES WHEN USING THIS PRODUCT. 5-10 min. 30-45 MINUTES 30-45 MINUTES DALLAS LOS ANGELES BALTIMORE Floor Care PROCEDURES PROCEDURES C O M P A N Y ®

Floor Care PROCEDURES - Carroll Company · Daily Maintenance Weekly Maintenance Remove gross soils (labels, gum). Sweep or dust mop floor. Place “Wet Floor” signs in area. Remove

Embed Size (px)

Citation preview

Daily Maintenance

Weekly Maintenance

Remove gross soils (labels, gum). Sweep or dust mop floor. Place “Wet Floor” signs in area.

Remove gross soils (labels, gum). Sweep or dust mop floor. Place “Wet Floor” signs in area.

Remove gross soils (labels, gum). Sweep or dust mop floor. Place “Wet Floor” signs in area.

Dilute SPEEDEE MOP Floor Cleaner 2oz. per gallon of cold tap water. (Replace solution daily or when mop water becomes dirty.)

Dilute POINT AFTER Revitalizer 4-8oz. per gallon into lined bucket.

Apply to sealed floors with a mop or auto-scrubber. Allow floor to dry completely.

Make what you plan to use. Using a clean mop, dip into restorer and press out excess - do not use wringer.

When dry, if needed, burnish with ultra high speed machine and blue ice pad to high gloss. Never burnish with a soiled pad.

Apply restorer as you would a finish, keeping 6” away from the edge. Allow to dry. When dry, buff or burnish.

Scrub and Recoat6-12 Months (or as needed)

Strip and FinishEvery 2 years (or as needed)

Dilute SPEEDEE MOP Floor Cleaner 6oz. per gallon of cold tap water. Scrub with blue pad on auto scrubber or single disk machine.

Pick up cleaning solution with scrubber or wet vac. (Replace solution when mop water becomes dirty.)Damp mop any residues with clear water. Allow floor to dry.

Apply as many coats as required. Allow 30-45 minutes between coats. Last coat should cover edges. (To keep clean follow DAILY MAINTENANCE directions.)

Line bucket with a fresh liner and pour in POLARIS ULTRA Floor Finish. Using a clean mop outline area to be finished. Then fill in using a figure eight motion. Stay 6” away from edges.

SHELF

SHELF

Allow to stand 5-10 minutes minimum. DO NOT ALLOW SOLUTION TO DRY. Re-wet as needed.

Divide work areas into small 5’x20’ areas. Dilute 1 par t SUPER STRIP PLUS Emulsifying Stripper with 5 parts water. Apply enough material to ensure complete wetting.

Scrub floor with auto scrubber or floor machine using a proper stripping pad to break softened film. Flip pad and replace as needed.

Pick up solution with mop, wet vac or auto scrubber. Damp mop floor with clean water to remove all residue. Allow to dry before applying base coat.

Line bucket with a fresh liner and pour in POLARIS ULTRA Floor Finish. Pour only what you plan to use. Use clean finish mop. Dip into finish and press out excess.

To apply a full even coat, outline the area to be finished. Fill in the outlined area using a figure eight motion. Stay 6” away from edges.

Allow 30 minutes to dry in between finish coats (4-5 coats). Last coat should cover edges. Allow to dry completely (4 hours) before allowing traffic.

SHELF

SHELF

STRIP

SCRUB

FINISH

RECOAT

RESTORE

CLEAN

&

ALWAYS WEAR GOGGLES, GLOVES AND SLIP RESISTANT SHOES WHEN USING THIS PRODUCT.

ALWAYS WEAR GOGGLES, GLOVES AND SLIP RESISTANT SHOES WHEN USING THIS PRODUCT.

ALWAYS WEAR GOGGLES, GLOVES AND SLIP RESISTANT SHOES WHEN USING THIS PRODUCT.

ALWAYS WEAR GOGGLES, GLOVES AND SLIP RESISTANT SHOES WHEN USING THIS PRODUCT.

5-10 min.

30-45 MINUTES

30-45 MINUTES

DALLAS LOS ANGELES BALTIMORE

Floor CarePROCEDURESPROCEDURES

C O M P A N Y

®

Mantenimiento Diario

Mantenimiento Semanal

Remueva la suciedad pesada (etiquetas, goma). Barra o limpie con trapeador seco el piso. Coloque señales de “Piso Mojado” en el área.

Remueva la suciedad pesada (etiquetas, goma). Barra o limpie con trapeador seco el piso. Coloque señales de “Piso Mojado” en el área.

Diluya agua 2oz. de SPEEDEE MOP por galónfría (Reemplazar la solución diariamente o .cuando el agua para trapear esté sucia.)

Diluir 4-8 oz de POINT AFTER por galón en un cubo forrado con plástico.

Aplicar con trapeador o fregadora automática en pisos sellados. Dejar que el piso se seque completamente.

Mezclar la cantidad que planea usar. Sumergir un trapeador limpio en el restaurador y escurrir el exceso - no utilice un escurrido.

Al estar seco, si es necesario, pula con una máquina de velocidad ultra alta y el paño azul para obtener un brillo superior. Nunca pula con un paño sucio.

Aplicar el restaurador como lo haría con un cera terminador, manteniéndolo 6” alejado del borde. Dejarlo secar. Cuando esté seco darle brillo o pulirlo.

Fregado y Recubrimiento6-12 Months (or as needed)

Raspado y AcabadoEvery 2 years (or as needed)

Diluya 6oz. de SPEEDEE MOP por galónagua fría Fregar con fibras (pad) de color . azul con una fregadora automática o máquina de un disco.

SHELF

SHELF

SHELF

SHELF

RASPADO

FREGADO

ACABADO

RECUBRIMIENTO

SIEMPRE UTILICE GAFAS, GUANTES Y ZAPATOS ANTIDESLIZANTES AL UTILIZAR ESTE PRODUCTO.

SIEMPRE UTILICE GAFAS, GUANTES Y ZAPATOS ANTIDESLIZANTES AL UTILIZAR ESTE PRODUCTO.

SIEMPRE UTILICE GAFAS, GUANTES Y ZAPATOS ANTIDESLIZANTES AL UTILIZAR ESTE PRODUCTO.

SIEMPRE UTILICE GAFAS, GUANTES Y ZAPATOS ANTIDESLIZANTES AL UTILIZAR ESTE PRODUCTO.

5-10 min.

30-45 MINUTES

30-45 MINUTES

DALLAS LOS ANGELES TOLEDO

isoPROCEDIMIENTOS PARAPROCEDIMIENTOS PARA

Recoger la solución limpiadora con la fregadora o con una aspiradora para líquidos. (Reemplazar la solución cuando el agua para trapear se encuentre sucia). Trapear los residuos con agua limpia y clara. Dejar que el piso se seque.

Aplicar cuantas capas sean necesarias. Deje pasar de 30-45 minutos entre aplicación. La última aplicación debe cubrir los bordes. (Para mantenerlo limpio siga las instrucciones del MANTENIMIENTO DIARIO.)

Forrar el cubo y verter FLOOR FINISH. Usando un trapeador limpio marcar el contorno del área donde se aplicará el acabado. Luego rellenarla usando un movimiento en forma de ocho. Mantenerse 6” alejado de los bordes.

Remover la suciedad (etiquetas, goma de mascar). Barrer o pasar el trapeador de polvo (trapeado en seco). Colocar letreros de “Piso Mojado” en el área.

Déjelo reposar por un mínimo de 5-10 minutos. NO PERMITA QUE LA SOLUCION SE SEQUE. Vuelva a mojarlo como sea necesario.

Dividir el área de trabajo en áreas pequeñas de 5'x20'. Diluir 1 parte de SUPER STRIP PLUS en 5 partes de agua. Aplicar material suficiente para asegurarse que moja por completo el área.

Fregar el piso con una fregadora automática o máquina para pisos haciendo uso de la fibra (pad) para fregar apropiada para romper la capa blanda. De vuelta y reemplace la fibra (pad) como sea necesario.

Recoja la solución con un trapeador, aspiradora de líquidos o fregadora automática. Mojar el trapeador de pisos con agua limpia para remover todos los residuos. Déjelo secar antes de aplicar la capa base.

Forrar el cubo y verter FLOOR FINISH. Vierta solamente lo que va a utilizar. Utilice un trapeador para acabados limpio. Sumergirlo en el acabado y escurrir el exceso.

C O M P A N Y

®

Deje pasar 30 minutes para que se seque entre aplicaciones de acabado (4-5 aplicaciones). La última aplicación debe cubrir los bordes. Dejarlo secar por completo (4 horas) antes de permitir el tráfico.

Para aplicar un acabado uniforme, marcar el contorno del área que se le va a aplicar el acabado. Luego rellenar usando un movimiento en forma de ocho. Mantenerse 6” alejado de los bordes.