FLOOD DATA FOR THE SACRAMENTO RIVER AND
BUTTE BASIN, SACRAMENTO VALLEY, CALIFORNIA 1980-90
By Jerry G. Harmon
U.S. GEOLOGICAL SURVEY
Open-File Report 93-68
Prepared in cooperation with theCALIFORNIA DEPARTMENT OF WATER RESOURCES
c\ CM o
Sacramento, California 1994
U.S. DEPARTMENT OF THE INTERIOR BRUCE BABBITT, Secretary
U.S. GEOLOGICAL SURVEY Gordon P. Eaton, Director
Any use of trade, product, or firm names in this publication is for descriptive purposes only and does not imply endorsement by the U.S. Government.
For sale by the U.S. Geological Survey Earth Science Information Center Open-File Reports Section Box 25286, MS 517 Denver Federal Center Denver, CO 80225
For additional information write to: District Chief U.S. Geological Survey Federal Building, Room W-2233 2800 Cottage Way Sacramento, CA 95825
CONTENTS
Abstract 1 Introduction 1 Flood data 3
Peak flows 3Peak stages 10Floods of 1980-86 14
Channel geometry 15 Summary 15 References Cited 16
FIGURES
1-3. Maps showing:1. Location of study area 22 Locations of streamflow gaging stations, crest-stage gaging stations, and historical high-water-mark
sites for the Sacramento River and Butte Basin 4 3. Locations of floodflow-measuring sites on State Highway 162 near Butte City 7
4. Graph showing streamflow ratings for bridge 11-24 on State Highway 162 near Butte City for two flood periods 8
5. Hydrographs showing peak flow for Sacramento River and in Butte Basin at the latitude of Butte City, February 1980 8
6. Graph showing selected peak stages of the Sacramento River, February 1986 147. Map showing locations of cross sections that are surveyed annually 17
TABLES
1. Peak flows and peak stages for Sacramento River at Butte City and Angel Slough at Ord Ferry Road 82. Distributions of peak flows at the latitude of Butte City during selected floods, 1980-86 93. Elevations of peak stages in the Sacramento River and Butte Basin, 1980-86 114. Coordinate data for six cross sections of the Sacramento River 19
Contents
Conversion Factors and Vertical Datum
Conversion Factors
Multiply By To obtain
acre-foot (acre-ft)cubic foot per second (ft3/s)
cubic yard (yd3)foot (ft)
mile (mi)ton
0.0012330.028320.76460.30481.6090.9072
cubic hectometercubic meter per secondcubic metermeterkilometermegagram
Vertical Datum
Sea level: In this report "sea level" refers to the National Geodetic Vertical Datum of 1929 a geodetic datum derived from a general adjustment of the first-order level nets of the United States and Canada, formerly called Sea Level Datum of 1929.
Definition
Water year: A water year is a 12-month period that begins October 1 and ends September 30 and is designated by the calendar year in which it ends. In this report, years are water years unless otherwise noted.
IV Conversion Factors and Vertical Datum
FLOOD DATA FOR THE SACRAMENTO RIVER AND BUTTE BASIN,
SACRAMENTO VALLEY, CALIFORNIA, 1980-90
By Jerry G, Mormon
Abstract
Floodflows and peak stages of floods were measured and channel cross sections were sur veyed at sites along the Sacramento River and in Butte Basin, Sacramento Valley, California, dur ing 1980-90 to document magnitudes of flooding and channel changes. The study reach extends from rivermile 200 near Hamilton City to river- mile 134 near Meridian. Data were collected for each flood at about 70 sites that include stream- flow gages, crest-stage gages, bridges and road overflows on State Highway 162 east of Butte City, and locations of historical high-water marks. Six cross sections of the river between rivermiles 193.7 near Big Chico Creek and 183.3 near Ordbend were surveyed annually during calendar years 1981-84 and 1986-90.
Floodflows (peak flow 157,000 cubic feet per second) almost equaled the design flow capacity of the river at Butte City on March 2, 1983, when the peak stage of 93.0 feet was 5 feet below the top of the levee. This was the largest flood re corded at Butte City during 1980-90. The most recent flood occurred February 18-19, 1986, when the peak stage in the river at Butte City was 92.0 feet and the peak flow was 145,000 cubic feet per second.
INTRODUCTION
Floodflows and peak stages of floods were measured at sites along the Sacramento River and in
Butte Basin during 1980-90 to document magnitudes of flooding. The study reach extends from rivermile 200 near Hamilton City to rivermile 134 near Meridian (fig. 1); the rivermile system was desig nated by the U.S. Army Corps of Engineers (1984). Because streambank erosion and channel migration of the river may change proportional amounts of flow in the river and Butte Basin, peak stage and channel geometry changes were monitored in the study reach during 1980-90. Six cross sections of the river were surveyed annually during calendar years 1981-84 and 1986-90 to determine the extent of channel migration and scour caused by channel erosion. This report presents data that supplement flood data assembled during earlier studies of flooding of the Sacramento River and Butte Basin for 1874-1978 (Blodgett, 1981) and 1973-77 (Simpson, 1978). Studies of floodflows in the Sacramento River and Butte Basin have been reported by the U.S. Geological Survey in cooper ation with the California Department of Water Resources and other agencies since 1970.
Butte Basin is an agricultural area on the flood plain east of the Sacramento River (fig. 1) between Big Chico Creek and Meridian. Rice is the principal crop, but orchards and row crops also are cultivated in the area. Much of the basin is a waterfowl-wintering area that is enhanced by flooding. Changes in the distribution of flows across the flood plain are caused by farming activities, growth or clearing of vege tation, and roadway and bridge construction (Blodgett and Stiehr, 1974).
During periods of flooding on the Sacramento River between Big Chico Creek and Meridian (fig. 1), flows inundate Butte Basin. Levees on the left (east) bank of the river downstream from rivermile 176 near Glenn prevent flooding into Butte Basin; however,
Introduction 1
39°45'122°00' 121°45'
39°30'
39°15'
Hamilton b r* 200 City
Chico
Nelson
D Gridley
Yuba City
Butte \ Slough
Sutler Bypass
ME»CO
EXPLANATION
EAST-SIDE BASIN BOUNDARY
OVERFLOW LOCATION
LEVEE
200 RIVERMILE - Represents distance from mouth
0 5 MILESI l i l i II II ll|0 5 KILOMETERS
Figure 1. Location of study area. (Modified from Simpson, 1978).
2 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, California, 1980-90
during flows that exceed about 40,000 ft3/s, controlled overbank flow into Butte Basin occurs at Moulton and Colusa Weirs near Colusa. When river flows exceed about 80,000 ft3/s, flows begin to inundate Butte Basin between rivermiles 194 and 176 upstream from the end of the left-bank levee near Glenn by over-topping the riverbank and by entering sloughs and swales near the river channel. Filling of scour holes and modification of levees to regulate the amount of overbank flow to Butte Basin in the reach between rivermiles 194 and 176 were necessary following the floods in 1983 and 1986.
The diversions of floodwater to Butte Basin be tween Chico and Glenn decrease the total flow of the river within the leveed channel downstream from rivermile 176. The design flow capacity of the river in the leveed channel upstream from Moulton Weir to Butte City is 160,000 ft3/s; overbank diversions from the river to Butte Basin near Chico prevent excessive flows that could cause overtopping of levees on both banks downstream from Glenn.
Overland flow in Butte Basin was about one-third of the total peak flow of 225,000 ft3/s measured at the latitude of Butte City on January 24, 1970 (Blodgett and Pearce, 1971). Because most bridges on State Highway 162 in Butte Basin lack the capacity to con vey floods, excess floodflows cross the highway between bridges at eleven sites.
FLOOD DATA
Floodflows were measured at the following sites (figs. 2 and 3) to define flow distribution:
1. Sacramento River at Butte City (11389000)
2. Angel Slough at Ord Ferry Road (11390140)
3. Fifteen bridges and eleven road-overflow sites on State Highway 162, including Butte Creek (11390020) and Campbell Slough (11390027).
Bridges and road-overflow sites are considered miscellaneous measuring sites, except at Butte Creek and Campbell Slough (fig. 3), where streamflow gag ing stations are operated. Peak stages were measured at streamflow gaging stations, crest-stage gaging sta
tions, and historical high-water mark sites (fig. 2). Peak stage data at selected sites are used to define water-surface profiles and indicate locations where peak stages are encroaching on the levee freeboard. Freeboard is that part of the levee 3 ft below the top (U.S. Army Corps of Engineers, 1991).
PEAK FLOWS
The possibility of flooding at Butte City can be estimated by using the California Department of Water Resources and California-Nevada forecast center, which provides hourly stage and flow data for the Sacramento River at Ord Ferry (11388700) (fig. 2) and other stations in the study reach. During the floods of February 1980, December 1981, January and March 1983, and February 1986, flow measurements were made in the Sacramento River at Butte City and in Butte Basin at selected locations on State Highway 162 (fig. 3) to determine the rates of flow in the river and in Butte Basin. Flows were not measured on State Highway 162 during the flood of December 1983. Measurements were made at the latitude of Butte City because the gaging stations Sacramento River at Butte City (11389000), Campbell Slough (11390027), and Butte Creek (11390020) are the only stations upstream from Moulton Weir that record the total flow of the river between the levees and overland flow in Butte Basin. During the flood of February 18-19, 1986, peak flow in Butte Basin east of Butte City including Butte Creek was 73,800 ftVs, which, when combined with 145,000 ft3/s in the river, indicates total flow of 219,000 ft3/s at Butte City. Peak flows and peak stages for years 1980-86, for the Sacramento River at Butte City and Angel Slough at Ord Ferry Road are given in table 1.
Flows at bridges were measured by suspending current meters with weights from the bridge, and road overflows were measured by using a wading rod placed along the highway centerline. Descriptions and a map of the overflow areas and bridges (fig. 3) were first prepared by Blodgett and Pearce (1971). Floodflows not obtained by field measurement were determined using streamflow rating curves, which were developed for each bridge and each road- overflow area. Revisions of the rating curves for different floods were required at some sites after
Flood Data 3
122°00' 121°55'
39°45' -
39°40
39°35' -
200.011383800
Hamilton City
3 Plug OVERFLOW(FLOOD 1ELIEF
Prd Ferry 11390140
183.0 PARROTT
EXPLANATIONGAGING STATION - Eight-digit number
(11383800) is U.S. Geological Survey gaging-station number
11383800
11389350 A-
Streamflow
StageOVERFLOWAREA (FLOOD RELIEF STRUCTURE)
179.0
Crest-stage gaging station or historical high-water-mark site
Partial-record (floods only)
^00.0 RjvERMILE - Represents distance from mouthGoose Lake
pumping plant 11388800
MATCH LINE
Figure 2. Locations of streamflow gaging stations, crest-stage gaging stations, and historical high-water mark sites for the Sacramento River and Butte Basin. (Modified by Simpson, 1978).
4 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, California, 1980-90
122°00' MATCH LINE 121°55'
39°30'
39°25'
177.8 PARROTT
_ 11389000 = Sacramento River
Butte City
11390&37CampbelbSloughatHighwaAl62
GLENN COCOLUSA" ~co
MATCH
Figure 2. Continued.
Flood Data 5
122°00'
39°20
39°15'
39°10'
39 __BUTTE C 0 SUTTER " CO
S11389470r8ColusaWeir
11390390 Butte Slough at
±1 \ Mawson Bridge
=[ ='//\\\\ \iiin\\ Meridian
0 1
SMILES J
3 KILOMETERS
Figure 2. Continued.
6 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, Caiifomia, 1980-90
122°
00'
121°
55'
121°
50'
39°3
0'
§
39°2
5'
0 1
2 3
KILO
MET
ERS
Figu
re 3
. Lo
catio
ns o
f flo
odflo
w-m
easu
ring
site
s on
Sta
te H
ighw
ay 1
62 n
ear
But
te C
ity.
Table 1 . Peak flows and peak stages for Sacramento River at Butte City and Angel Slough at Ord Ferry Road
[ft, foot above sea level; ft3/s, cubic foot per second. Location of stations shown in figure 2]
c * TD- *r> ** ^-* Angel Slough at Ord Ferry Road Sacramento River at Butte City 6 Ti-annun mRQom 11390140
Date (Partial-record station 7)Peak flow Peak stage Peak flow Peak stage
(ft3/s) (ft) (ft3/s) (ft)February 20, 1980 124,000 90.16 13,100 112.79December 20-21, 1981 102,000 88.36 9,000 111.75January 27-28, 1983 130,000 90.67 15,000 113.20March 2, 1983 157,000 92.97 18,500 113.85December 25-26, 1983 129,000 90.61 15,700 113.30February 18-19, 1986 145,000 91.99 19,500 114.00
86
84
£8201_j^LUCO
£80
8
tIf 78zLlf§ 76
74
72
I I I I
_ _
1984-86 -(^ {7j _ JL u'l
~~ (^) ~""Ti7 (O 1 Qov" Ow^^^£^~~^s^./^\^'^^- /&//
f //-
0 MEASURED STREAMFLOW
_
-
till
500
OZ
8LUOT 200CCLU 0.
ID£ 100oCDz>0II c«
oCO0
1Z)0 201- zgf3 10u_
5
I i I 1
Sacramento River at Butte City
^. »^
X^^ =
^-- "--..^**
__ / * ^
,' Butte Basin at State Highway 1 62 x ^ xX
/ X
I I I I19 20 21 22 23
FEBRUARY 1980
Figure 5. Peak flow for Sacramento River and inButte Basin at the latitude of Butte City, February1980.
0 1,000 2,000 3,000 4,000 5,000STREAMFLOW, IN CUBIC FEET PER SECOND
Figure 4. Streamflow ratings for bridge 11 -24 on State Highway 162 near Butte City for two flood periods.
channel changes, such as scour or vegetative growth, occurred. Different streamflow ratings for bridge 11- 24 for two flood periods are shown in figure 4.
The distribution of peak flows during 1980-86 at the latitude of Butte City during selected floods is given in table 2. The duration of flooding in Butte Basin is based on data obtained at the two gaging sta tions (Campbell Slough, 11390027, and Butte Creek, 11390020) on State Highway 162 near Butte City. The total volume of the flood of February 19-23, 1980, at the latitude of Butte City, computed from hy- drographs shown in figure 5, was 1.37 million acre-ft.
8 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, California, 1980-90
Table 2. Distributions of peak flows at the latitude of Butte City during selected floods, 1980-86
[Overflow sites described by Blodgett and Stiehr (1974). Location of overflow sites and bridges shown in figure 3. ft3/s, cubic foot per second; --, no measurement]
Road Bridgeoverflow No.
site
Flowduringtime of
current-metermeasurement
(ft3/s)
Peak flowduringtime of
peak stage (ft3/s)
February 1980
12-5612-57
1A11-27
111-2611-3411-3311-32
23
11-2411-3111-23
45
11-2267
11-2111-20
811-19
911-18
10
1561,070
1744,2401,0301,750
564915
1,62028; 149
30; 641,9402,2603,140
780; 1,2201,450; 1,830
1,9001,670; 1,790
80; 161821
1,670640; 800
345
292--
1701,100
1904,4001,0501,800
630990
1,80016075
2,3002,7003,3001,3102,4002,5002,100
330970
1,8101,150
4300
3150
Instantaneous peak flowButte Basin...........Sacramento River.
34,000124,000
December 1981
12-5612-57
1A11-27
111-2611-3411-3311-32
23
11-2411-3111-23
4
__ --
9581,2302,360
539; 872
000
3,1000
1,200590790
1,15000
1,4001,7402,6001,030
Road Bridgeoverflow No.
site
Flowduringtime of
current-metermeasurement
(ft3/s)
Peak flowduringtime of
peak stage(ft3/s)
December 19%1-Continued
5 11-2211-22
67
11-2111-20
811-19
911-18
10
0; 1,5201,340
1,020; 1,580266; 462
224; 669 ~
1,7501,6901,760
515770940870
0000
Instantaneous peak flowButte Basin ...........Sacramento River ,
20,900102,000
January 1983
12-5612-57
1A11-27
111-2611-3411-3311-32
23
11-2411-3111-23
45
11-2267
11-2111-20
811-19
911-18
10
201,180
5; 3502,890; 4,250
3601,800
4561,380
656
221,450; 2, 1401,350; 1,4503,250; 4, 1002,610; 2,880
3,7201,400; 1,8003,510; 4,5301,540; 1,850
1,900210; 462
4,210; 4,510119; 1,020
2,330; 2,440734650
7701,270
6604,400
9802,0001,0002,3001,350
030
2,9001,6004,3503,0003,9002,0004,6501,9302,140
6004,6001,1002,500
810740
Instantaneous peak flowButte Basin. ..........Sacramento River .
51,600130,000
Flood Data 9
Table 2. Distributions of peak flows at the latitude of Butte City during selected floods, 1 98Q-86»Continued
Road Bridgeoverflow No.
site
Flowduringtime of
current-metermeasurement
(fP/s)
Peak flowduringtime of
peak stage(ft3/s)
March 1983
12-5612-57
1A11-27
111-2611-3411-3311-32
23
11-2411-3111-23
45
11-2267
11-2111-20
811-19
911-18
10
__
2,4501,720; 2,290
6,2501,860
9602,500
8102,030
4,6403,3205,8205,9506,500
~7,3005,200
3602,6406,7601,3409,320
9602,690
2002,5502,8005,4007,5002,1001,2002,700
9002,800
05,0003,4005,8506,3006,6002,3007,6505,800
4503,1006,8001,6509,5001,2802,700
Instantaneous peak flowButte Basin............Sacramento River..
96,500157,000
Road overflow
site
BridgeNo.
Flowduring time of
current-meter measurement
(ft3/s)
Peak flow during time of
peak stage (ft3/s)
February 1986
1A
1
23
12-5612-57
11-27
11-2611-3411-3311-32
Cumulative flow for the above sites is 26,000 ft3/s, based ona stage-flow relationTotal for bridge 12-56 through
11-2411-3111-23
45
11-2267
11-2111-20
811-19
911-18
10
Instantaneous peak flowButte Basin.................Sacramento River, , , ,
1,570; 2,3601,460; 1,7603,100; 3,320
5,5806,350
1,510; 1,8407,6002,870
552; 6541,320; 1,730
5,430512
4,400749552
2,4001,8003,4005,8006,5002,0007,7503,180
7001,8005,600
5704,750
980600
73,800145,000
PEAK STAGES
Water-surface elevations (stage) of floods exceed ing 80,000 ft3/s at the Butte City gage (11389000) were documented at selected sites along both banks of the Sacramento River and in Butte Basin. Peak stage data can be used to determine flood profiles, indicate amount of freeboard in leveed reaches, and compute slopes of the water surface between selected locations. Data-collection sites (fig. 2) include streamflow gaging stations, crest-stage gaging stations and
locations of historical high-water marks, mostly near the banks of the river. Elevations of all marks were referenced to sea-level datum, using National Geodetic Survey benchmarks and a vertical control network established in Butte Basin during 1970-73 (BlodgettandStiehr, 1974; Blodgett, 1981).
Elevations of peak stages obtained at selected sites during 1980-86 are included in table 3. Hydrographs of selected peak stages of the Sacramento River at the gaging stations at Ord Ferry (11388700), Goose Lake
10 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, California, 1980-90
Table 3. Elevations of peak stages in the Sacramento River and Butte Basin, 1980-86
[HWM, historical high-water mark; CSG, crest-stage gage; SGS, streamflow gaging station; , no measurement. Location of sites shown in figure 2]
Site designation
HC-6:Left bank.............. ..................Right bank......... .....................
11383800 Sacramento Rivernear Hamilton City...........
Gianella Bridge, downstream:Left bank................................Right bank................... ...........
HC-7 ......................................W-25A, Dunning Slough
W-25 ......................................W-26 ......................................
Pine Creek:At State Highway 32..............At mouth.... ............................
W-54, Scotty's Landing... .......Sacramento Avenue ...............W-27 ......................................W-29, St. John Road..... .........E-10, Chico Landing..... .........
1, Big Chico Creek ................
Chico sewer outfall ................M-5 ........................................W-41 ......................................2.............................................
2.5..........................................Murphy Slough plug,
upstream...........................3.............................................W-30 ......................................
W-42 ......................................W-42A....................................W-52A, Road 29. ...................Murphy Slough plug,
downstream......................
X-5.........................................4.............................................5.............................................
W-31 ......................................
11388700 SacramentoRiver at Ord Ferry,right bank........ .................
Type of site
HWMCSG
SGS
HWMHWM
HWMHWM
HWMHWM
HWMHWM
HWMHWMHWMHWMHWM
CSG
HWMHWMHWMCSG
CSG
HWMCSGHWM
HWMHWMHWM
HWM
HWMCSGCSG
HWM
SGS
Rivermile or latitude,
Elevation, in feet above sea level1980
longitude February
199.5199.5
199.3
199.2199.2
199.1198.2
198.1197.0
196.4
196.1195.2195.1194.1193.7
39 C42/ 16//,i2i°56'i8"
192.7192.3192.039C41'05",
121°56'35"
191.0
190.5189.6189.2
188.4188.2187.5
187.0
186.5186.039C 38'54",
121°56'42"185.4
184.1
145.2145.0
144.6
144.4144.4
143.7-
141.2~
140.2139.2
139.1
133.7134.1
133.0
130.8
129.0
128.0
128.0126.4
__
123.5
120.9
118.7117.0117.2
~
114.1
1981December
-
143.8
~
-
__~
_ ~
132.3
130.7
128.3
127.7
127.6126.0
_
122.8
120.0
117.9116.0115.8
-
112.8
January
148.1
147.7
147.2147.4
__144.4
143.3141.6
142.4141.0
140.6
136.4134.6134.5
134.0
132.4
130.6130.1
129.0
129.1126.8128.1
125.2124.4123.7
121.6
119.7____
116.8
115.2
1983March
148.6--
148.4
147.7147.4
147.0144.2
143.9-
143.1142.2
140.7
135.0~
135.4
133.5
132.4131.6
129.8
130.1127.6128.7
_ --
~
____.
118.7
116.7
December
145.9
~
__--
142.5~
~--
__
135.3134.8
--
133.6
132.1
129.9
128.8
--126.0127.1
123.5
123.4
~
118.9117.3
116.7
114.8
1986February
148.6
148.2
147.6147.3
_145.1
143.8--
141.4141.3
141.1137.8136.6134.3136.0
135.2
131.1130.9
129.3
129.4126.9128.4
125.8
124.0
123.9
120.9118.1
117.0
115.6
Flood Data 11
Table 3. Elevations of peak stages in the Sacramento River and Butte Basin, 1 980-86-Continued
Site designation
Ord Ferry, left bank ...............6............................................
11390140 (site 7) AngelSlough at Ord Ferry Road
8.............................................
9.............................................
10...........................................
11...........................................
12...........................................
13...........................................
W-33,SR-81.. ........................
TP-61.....................................W-49,SR-80..........................W-34, milepost 9. ..................Hawaiian Gardens .................Levee protection site .............
P-7, Parrot plug .....................P-7B.......................................1 1388800 Sacramento River
at Goose Lake PumpP-7B .................................
W-44, Sidd's Landing............Bertopelli Ranch. ...................
TP-59, side levee:Shoreward........................Streamward......................
W-35, Reference Y.... ............20, End levee, left bank.........
W-36, Road 48.......... .............E-8 .........................................W-45 ......................................
E-7. ........................................E-6 .........................................E-5 .........................................E-4 .........................................X-171.7:
Left bank.. ........................Right bank .......................
E-3 .........................................E-2 .........................................X-169.9..................................E-l.........................................
Type ofcifp
HWMCSG
SGSCSG
CSG
CSG
CSG
CSG
CSG
HWM
HWMHWMHWMHWMHWM
CSGHWM
SGS
HWMHWM
HWMHWM
HWMCSG
HWMHWMHWM
HWMHWMHWMHWM
HWMHWM
HWMHWMHWMHWM
Rivermile or latitude,
Elevation, in feet above sea level1980
longitude February
184.139C 37'44",121 C 56'16"
~30C 37'34"121 C 56'53"39C 37'29"121 C 57'14"
39C 37'20"121 C 57'47"39C 37'09:,121 C 58'30"39 C 37'28",121 C 58'51'39 C 36'13",121 C 58'35"
182.1
181.9181.5180.9179.9179.0
._178.7
178.7
178.0177.8
177.0177.0
176.939C 32'01",121 C 58'12"
176.3175.5174.1
174.0173.0172.1171.9
171.7171.7
171.2170.3169.9169.5
114.4111.9
112.8114.1
110.6
112.1
113.6
114.0
110.2
110.7
__
107.2106.5
~
._
--
101.9100.5
«--
99.099.6
98.599.097.8
97.396.795.694.6
~
93.692.1
1981December
110.9
111.8113.8
110.6
111.5
112.8
113.2
108.7
109.3
107.8
105.7105.3103.7
102.6
99.898.8
~
98.298.5
97.298.596.3
95.495.193.993.2
93.192.0
90.290.189.8
January
115.2__
113.2115.0
114.0
112.6
114.1
114.8
__
111.4
110.0
108.1107.4106.8
--
104.2101.0
-
100.099.4
99.1
98.1
97.897.496.0
94.894.5
__92.8
92.0
1983March
115.0
113.81154
115.0
114.8
114.8
116.1
113.4
112.7
111.3110.2108.9108.4108.2
107.2~
--
105.7103.5
101.2100.4
101.4100.1
100.6
99.8
99.199.097.697.3
97.096.4
_94.6~
94.0
December
113.2
113.3114.6
113.4
112.4
113.7
114.6
111.3
111.0
_
107.3106.7
105.0105.5
~
104.5101.9
~~
101.0~
99.3
98.0
97.596.595.895.2
94.994.3
_92.592.091.5
1986February
..114.1
114.0115.0
114.5
114.0
114.3
__
112.3
111.6
110.0108.8108.1107.1
~
106.9~
105.7
104.7~
~~
101.2101.0
100.2
98.8
98.897.997.096.2
96.196.0
_93.9
92.3
12 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, California, 1980-90
Table 3. Elevations of peak stages in the Sacramento River and Butte Basin, 1980-86-Conf/nued
Site designation_, f Rivermile Type of . . 4 .
J . or latitude, site
Elevation, in feet above sea level1980
longitude February1981
December January1983
March December1986
February
11389000 Sacramento River atButte City, left bank,....,...
25, Butte City, right bank .....Princeton Ferry ......................16...........................................
16A................. .......................
18...........................................
21 ...........................................
22...........................................
26...........................................
27...........................................
28...........................................
29. ..........................................
30
30A........................................
32...........................................
33, Butte Creek atGridley Road ...................
34
34A........................................
37, Moulton Weir ..................37.5........................................
38...........................................
39
40...........................................
41...........................................
41.5........................................
42.7........................................11389470 Colusa Weir
near Colusa ......................
SGSCSGHWMCSG
CSG
CSG
CSG
CSG
CSG
CSG
CSG
CSG
CSG
CSG
CSG
CSGCSG
CSG
CSGCSG
CSG
CSG
CSG
CSG
CSG
CSG
SGS
168.6168.5164.339°33'04",
121°53'53"
39°33'04",121°53'47"39°32'49"*J 7 *J ** ~.x 9121°54'07"39°31'20"121°57'43"39°31'20" J S fc/ A 4*\J y121°57'23"39°25'12",121°56'24"
39°25'12",
39°25'12",121°54'16"39°25'12"+J S 4**J If* 9121°53'29"39°25'10" J S 4**J i\J 9121°53'49"39°25'10",121°53'47"
39°21'44",121°54'09"
~39°21'44",121°53'01"39°21'44",121°52'46"
158.139°19'43",121°52'51"39°18'41"121°57'43'39°18'23",121°52'56'39°18'03"121°55'53"
39°15'13"121°53'25"39°14'48"121°57'14"
147.4
146.0
90.289.5--__
_
__
94.0
93.6
72.9
73.1
72.0
72.1
71.8
71.6
64.1
64.263.7
63.8
72.261.4
61.4
61.0
61.2
60.5
60.7
69.5
64.5
88.487.4 _
__
_
92.8
92.9
71.0
72.8
71.8
72.0
71.4
~
63.8
63.762.3
62.1
70.459.7
_.
57.5
__
56.5
56.7
68.5
63.9
90.790.287.0
__
98.8
98.5
95.8
95.3
73.6
74.0
72.2
_
..
~
65.3
64.964.4
64.1
__60.7
..
59.4
__
594fc/,X *~
93.092.489.5
100.1
100.1
__
96.8
96.8
74.4
74.5
72.9
72.0
71.9
~
66.2
66.1
73.964.5
64.3
_
64.3
63.9
64.0
71.1
66.1
90.6~ _
_
98.0
94.8
94.9
73.6
74.1
72.1
72.2
72.0
65.2
64.7
64.7
70.861.4
_.
- .
_
60.3
61.6
70.1
65.3
92.0
88.199.1
_
__
96.5
__
75.0
__
__
--
__
_63.9
63.8
..
63.8
63.1
63.4
70.4
65.4
Flood Data 13
Table 3. Elevations of peak stages in the Sacramento River and Butte Basin, 1980-06-Continued
Site designation Type of site
Elevation, in feet above sea levelRiver mileor latitude, ~T980 1981 1983 1986 longitude February December January March December February
11389500 Sacramento River SGS at Colusa................................44........................................... CSG
11390370 (site 45) ButteSlough near outfall................ SGS46. Butte Slough atMawson Bridge..................... CSG47. Sutler Bypass atLong Bridge........................... CSG
143.3
39° 12'54", 121°54'09"
138.2
63.6
60.4
60.4
59.3
50.5
63.0
56.4
56.1
55.2
47.3
59.3
59.1
58.4
49.8
65.6
63.7
63.6
62.7
53.7
64.7
60.3
60.2
59.4
51.1
65.0
62.9
62.7
54.0
pumping plant (11388800), and Butte City (11389000) for the flood of February 18-19,1986, are shown in figure 6.
Peaks at crest-stage gaging stations were docu mented by lines of floating particles of cork that cling to wood sticks placed inside vertical steel pipes with holes to admit water and air.
Peaks at historical high-water-mark sites were determined by level surveys to high-water marks. These marks consist of grass particles, seeds, debris, mud stains, and washlines left at the highest (peak) stage.
FLOODS OF 1980-86
Water-surface elevation and floodflow data were collected in the study reach during floods of February 1980, December 1981, January, March, and Decem ber 1983, and February 1986. Peak flows for the floods in the Sacramento River at Butte City ranged from 102,000 to 157,000 ft3/s (table 1). Flooding did not occur between 1987 and 1990.
Tropical storms that began in January 1980 brought heavy rainfall at elevations as high as 9,000 ft in the mountains of northern California, which re sulted in snowmelt and excessive runoff. Butte Basin was flooded during February 19-24, 1980. The peak flow of the river at Butte City was 124,000 ft3/s.
Runoff during the 1982 water year was 151 percent of the 1951-80 median based on represen tative streamflow records (Fogelman and others,
120
_i 116 £a 112 2 £108
I 104
ffi 100z z 96
- Peak 115.6 feet at 2200 hours, February18 ORD FERRY (11388700)
Peak 105.7 feet at 2400 hours, February 18 GOOSE LAKE PUMPING IN 8 PLANT (11388800)
-/cPeak 94.9 feet at 0600 hours, February BUTTE CITY (1 1389000)
15 16 17 18 19 20 21 22 23 24 25 FEBRUARY 1986
Figure 6. Selected peak stages of the Sacramento River, February 1986.
1983) for an area that includes Butte Basin and the Sacramento River. Minor flooding in Butte Basin occurred December 21-22, 1981, concurrent with the peak flow at Butte City of 102,000 ft3/s.
Runoff during the 1983 water year ranged from 174 to 228 percent of the median based on represent ative streamflow records in the area (Fogelman and others, 1984). Peak flows were measured during Jan uary and March 1983. Maximum flows for the 1983 water year occurred on March 2, 1983, when the peak flow in the river at Butte City was 157,000 f^/s. The stage at this flow was 93.0 ft where the elevation of the top of the left bank levee is 98.0 ft. Flooding of Butte Basin continued for 20 days, February 28 to March 19, 1983. Flows were not measured on State Highway 162 during the flood of December 25-28, 1983, but peak stages were documented.
14 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, California, 1980-90
Heavy rains fell on northern and Central California for more than a week in February 1986, resulting in extensive flooding. The flood of Februt^ry 1986 had a longer duration than the flood of March 1983, but the peak flow of 145,000 ft3/s in the Sacramento River at Butte City was less. Flooding in Butte Basin at State Highway 162 began on February 15 and continued until March 1, when flows on the flood plain were confined to the overflow channels.
The California Department of Water Resources, the California State Reclamation Board, and the U.S. Army Corps of Engineers developed a flood-control plan during 1980-87 which recommended that Sacramento River flows above a designated amount should enter Butte Basin at locations of historical overbank flow (Clifford L. Gregory, Jr., California Department of Water Resources, written commun., 1990). The three selected major overflow sites to Butte Basin are at rivermiles 190.8, 186.5, and 179.0 (fig. 2). During 1986, overbank flow eroded two scour holes at the flood relief structure upstream from Murphy Slough near rivermile 190.8. More than 12,000 tons of rock and 500,000 yd3 of soil were required to fill the holes (Clifford L. Gregory, Jr., California Department of Water Resources, written commun., 1990). A part of the 1980-87 flood-control plan included a flood-relief structure to replace a raised roadway known as the Parrott Plug near rivermile 179 (Woodward-Clyde, 1986). Construction was completed in 1988 (fig. 2).
CHANNEL GEOMETRY
Cross sections at fixed monumented locations of the Sacramento River were surveyed annually during 1981-84 and 1986-90 to determine the extent of channel migration and scour caused by channel erosion. These surveys supplement surveys made between 1971 and 1980. Coordinate data for six cross sections between rivermiles 193.7 near Big Chico Creek and 183.3 near Ordbend (fig. 7 and table 4, at back of report) were obtained by level surveys and fathometer. All elevations for these cross sections are referenced to sea-level datum. Because initial points (station 0 ft) on the left bank were the same for all surveys at each cross section, the surveys can be used to indicate changes in channel geometry and location. Cross sections are located where bank protection (rock riprap) was placed before 1980 (sections 1, 2,4,
and 6), where rock riprap was placed in 1988 (section 3), and where no riprap has been placed (section 5).
SUMMARY
Peak flows and peak stages of floods were measured and channel cross sections were surveyed at sites along the Sacramento River and in Butte Basin during 1980-90 to document magnitudes of flooding and channel changes. The study reach extends from rivermile 200 near Hamilton City to rivermile 134 near Meridian.
Levees on the left bank of the Sacramento River between rivermile 176 near Glenn and rivermile 134 near Meridian prevent flows from entering Butte Basin except controlled overbank flow at Moulton and Colusa Weirs. When river flows exceed about 80,000 cubic feet per second, flows begin to inundate Butte Basin between rivermile 194 near Chico and rivermile 176 near Glenn by overtopping the riverbank and by entering sloughs and swales near the river channel. Overflow into Butte Basin between Chico and Glenn decreases the total flow of the river entering the leveed channel downstream from Glenn. Overland flow in Butte Basin was about one-third of the total peak flow of 225,000 cubic feet per second measured at the latitude of Butte City on January 24, 1970.
Data were collected in the study reach during floods of February 1980, December 1981, January, March, and December 1983, and February 1986. These data were collected at about 70 sites for each flood. Peak flows in the Sacramento River at Butte City ranged from 102,000 to 157,000 cubic feet per second.
Flows were measured at the Sacramento River at Butte City, Angel Slough at Ord Ferry Road, and 15 bridges and 11 road-overflow sites on State Highway 162. Peak stages were documented at streamflow gaging stations, crest-stage gaging stations, and historical high-water-mark sites. Six cross sections of the Sacramento River between rivermiles 193.7 and 183.3 were surveyed annually during calendar years 1981-84 and 1986-90 to determine the extent of channel migration and scour caused by channel erosion.
Summary 15
References Cited
Blodgett, J.C., 1981, Flood data for the Sacramento River and Butte Basin, 1875 to 1978, Sacramento Valley, California: U.S. Geological Survey Open-File Report 80-971, 193 p.
Blodgett, J.C., and Pearce, V.F., 1971, Determination of floodflow of the Sacramento River at Butte City, California, January 1970: U.S. Geological Survey open-file report, 29 p.
Blodgett, J.C., and Stiehr, P.L., 1974, Hydraulic analysis of floodflows in Butte Basin at State Highway 162, Glenn and Butte Counties, California: U.S. Geological Survey open-file report, 48 p.
Fogelman, R.P., Mullen, J.R., Shelton, W.F., and Simpson, R.G., 1983, Water resources data-California, water year 1982. Volume 4. Northern Central Valley basins and the Great Basin from Honey Lake basin to Oregon State line: U.S. Geological Survey Water- Data Report CA-82-4, 319 p.
Fogelman, R.P., Mullen, J.R., Shelton, W.F., Simpson, R.G., and Grillo, D.A., 1984, Water resources data- California, water year 1983. Volume 4. Northern Central Valley basins and the Great Basin from Honey Lake basin to Oregon State line: U.S. Geological Survey Water-Data Report CA-83-4, 291 p.
Simpson, R.G., 1978, Flood hydrology of Butte Basin, 1973-77 water years, Sacramento Valley, California: U.S. Geological Survey Water-Resources Investigations Report 78-86, 69 p.
U.S. Army Corps of Engineers, 1984, Sacramento River, California, Aerial Atlas: Corps of Engineers, Sacramento, California, 41 p.
U.S. Army Corps of Engineers, 1991, Hydraulic design of flood control channels: U.S. Army Corps of Engineers, Engineer Manual 1110-2-1601, 4 chapters [variously paged].
Woodward-Clyde, 1986, Environmental impact report for the Butte Basin overflow area: Woodward-Clyde, Consultants, 106 p.
16 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, California, 1980-90
39°42'30"
39°40'
193.7-
121°58'
I
EXPLANATION
RIVERMILE - Represents distance from mouth
CROSS SECTION WITH RIVERMILE
121°56'
DIRECTION OF FLOW
SACRAMENTO RIVER FLOOD CONTROL PROJECT LEVEE
0 2,500 FEET I I I I II I 1 I
0 800 METERS
Figure 7. Locations of cross sections that are surveyed annually.
Figure 7 17
122°00' 121°58'
39°40'
39°37'30" ~
EXPLANATION
STREAMFLOW GAGING STATION AND NUMBER
RIVERMILE - Represents distance from mouth and based on USGS topographic maps dated 1949, photorevised 1969
186.5 (5 CROSS SECTION WITH RIVERMILE
DIRECTION OF FLOW
SACRAMENTO RIVER FLOOD CONTROL PROJECT LEVEE
Road
800 METERS
Figure?. Continued.
18 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, California, 1980-90
Table 4. Coordinate data for six cross sections of the Sacramento River
[All values are in feet. Elevation in feet above sea level. See figure 7 for location of cross sections]
Distance from Eleva- Distance from Eleva- Distance from initial point tion initial point tion initial point
Eleva- Distance from tion initial point
Eleva- Distance from Eleva tion initial point tion
Rivermile 193.7. October 1981--Cross section 10
10132134
08
203858728588
0148172204234310313328336
127.1127.0127.2123.9117.9
137.6137.0132.9128.9128.1129.0129.2128.8
125.0124.0121.8119.6124.3125.0125.0109.0102.8
35436075
101
9494
104125155173242307
352376392416436452464472480
114.5106.3101.5100.0100.9
Rivermile 192.8.122.8112.1104.699.989.192.197.1
101.1
Rivermile 190.8.102.498.597.497.298.099.597.297.595.5
132181217241296
September337376397409419458484519
September496517601689697712752785804
101.4104.5106.8109.3111.1
321476548616699
114.5120.0120.3118.5119.9
710730755
121.8124.8124.8
198 l--Cross section 2105.1107.1109.1109.6112.2115.2122.1121.9
579620708726787794827841
123.1122.4122.4124.5123.4122.8123.3124.3
863871882920936
1,0071,031
123.7124.4124.2126.2127.8128.5129.6
1981 --Cross section 396.796.6
100.0106.5106.7109.1110.0114.1115.9
874928954990
1,0181,0431,0861,0951,108
114.5117,7117.0116.1115.3121.7120.2120.6116.6
1,1491,1991,2621,3011,3721,4561,5181,5201,540
119.5121.8122.3121.0120.3123.1123.7124.4123.5
Rivermile 189.3. Ausust 1981~Cross section 40
40548897
114130137
125.124.6123.8105.3101.3101.399.9
100.1
147173203237260293310346
97.896.898.196.296.598.398.5
101.3
363371413600610620774780
103.3105.2107.3111.3115.3113.3109.9109.1
804858923932939
1,0501,1231158
119.0119.2115.0117.4115.7115.0117.6117.6
1,1911,2181,2271,2331,260
118.6116.7116.8117.9118.3
Table 4 19
Table 4. Coordinate data for six cross sections of the Sacramento River-Continued
Distance from Eleva- Distance from Eleva- Distance from Eleva- Distance from initial point tion initial point tion initial point tion initial point
0496069
105169228240255264286309
018326373
106
01324303245
06
2034517579848996
119.5119.2118.9112.0113.3110.6111.6103.2110.197.794.794.5
112.4113.0112.092.188.080.0
127.1127.2122.1116.4115.6109.3
137.5137.3132.9129.2128.0129.1129.5114.0104.4103.6
327394434488502528555605685726748757
166186249262305338
546570919497
97101105108116122130131135137
Rivermile 186.595.289.093.297.397.297.797.795.497.296.797.797.7
Rivermile 183.86.285.687.387.389.790.0
Rivermile 193.104.497.897.998.298.398.1
Rivermile 192.8103.599.299.297.096.594.092.593.492.091.3
Eleva- Distance from Eleva tion initial point tion
. September 1981 -Cross section 5772811975
1,1011,1721,2331,2531,2691,3291,3441,3631,373
3. August398477500627634648
7. Januarv128136158164204208
100.4103.2110.4108.5111.5111.3114.2114.8113.6110.0110.8114.1
1,4021,4291,4511,4721,4861,5471,6181,7101,8011,8191,8581,913
108.9109.8116.6116.1111.6114.1115.4114.2112.0113.8114.7114.2
1,9632,0332,1272,1522,2592,2842,3032,373
113.5115.7113.3107.0107.1111.4112.4114.9
198 1-Cross Section 691.994.594.896.097.896.2
723786834854883898
96.395.7
100.796.6
102.8102.6
939961993
1,0571,122
106.0106.6107.4108.7109.6
1982-Cross section 1100.1100.9103.3103.8105.0106.1
269276323327370372
111.6111.5114.2114.3116.7117.0
414429469710730
118.0118.4120.1122.1124.8
. September 1982 Cross section 2156160190210245288353429439455
92.292.294.696.198.0
100.0103.5109.3114.0115.4
475507559668705799945
1,0211,0651,156
122.7122.4123.2122.3124.2122.6128.3129.7130.1129.9
1,2921,3551,3731,4111,4291,4611,4861,5471,6201,741
129.0126.5127.6124.3125.4123.7125.9126.0126.5132.5
20 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, California, 1980-90
Table 4. Coordinate data for six cross sections of the Sacramento River-Conf/nued
Distance from Eleva- Distance from Eleva- Distance from Eleva- Distance from initial point tion initial point tion initial point tion initial point
0186222261300307312315326
040508994
111
021
135202204216229231255293352392
01626364959
125.0123.9123.5118.8123.9124.2116.7112 A108.5
125.0124.6124.7106.2102.9102.3
119.1119.1110.5113.2113.2104.9100.899.196.994.694.692.7
112.2112.8111.9111.1100.293.7
334344363380389409428448455
122173187233269297
414426443459559603745799869909928940
6581
102112153187
Rivermile 190.8106.6104.7100.398.497.797.196.295.895.9
Rivermile 189100.996.897.293.696.996.3
Rivermile 186.597.798.197.298.398.297.697.997.395.395.391.290.1
Rivermile 18385.682.076.477.480.779.0
Eleva- Distance from Eleva tion initial point tion
. September 1982-Cross section 3465473483487494506531566588
.3. August324407422492613623
96.496.196.495.396.796.896.699.0
101.0
602612617632738839924
1,015
102.4105.5108.5112.7111.6116.0114.7116.4
1,0821,1511,2301,2881,3631,3941,4451,499
119.1120.2120.8118.6120.1121.2122.0123.4
1982-Cross section 497.8
104.1106.0110.8113.0116.1
631773773794813824
113.4110.4111.5111.1120.2118.3
1,0471,1241,2091,2331,244
115.7117.8118.8117.1118.5
. September 1982-Cross section 5967972990
1,0001,0781,1111,1441,2531,3461,4481,4601,483
.3. August200217242297346420
94.696.696.796.9
101.4104.3110.5111.5114.8110.2111.9111.8
1,5151,5601,5731,5851,6591,6891,7171,8811,8951,9121,9352,013
108.1112.4111.0113.6116.6114.5115.5111.3114.6116.0114.6115.8
2,0252,0732,1612,2172,2372,3522,3752,432
113.4115.8116.4114.3108.3106.6110.4115.1
1982-Cross section 677.877.980.782.986.889.4
440614734865967
1,000
93.696.696.197.7
103.0102.2
1,0281,0471,0801,0921,1461,191
105.8107.3105.6109.2109.0110.2
Table 4 21
Table 4. Coordinate data for six cross sections of the Sacramento River-Continued
Distance from Eleva- Distance from Eleva- Distance from initial point tion initial point tion initial point
Eleva- Distance from tion initial point
Eleva- Distance from Eleva tion initial point tion
Rivermile 193.7. Mav 1983-Cross section 10
10132225293338
05
1837546982
064
119194261273303
127.1127.0127.2121.5119.1117.3114.1110.2
137.6137.6133.1128.9128.4129.0115.9
124.8124.0124.2123.9123.7120.6110.0
43495664728292
102
87124141163220231237
313347373425431497538
107.8103.799.595.493.694.595.596.9
Rivermile 192.8.100.890.893.093.897.899.097.8
Rivermile 190.8.105.097.895.695.895.095.395.9
114128144162182204228254
September244267289370395462472
September571601651661881954
1,034
97.8100.0101.1103.9106.8108.4110.5112.0
1983-Cross99.899.6
100.2104.8106.0113.6115.8
1983--Cross95.0
101.0108.0109.9111.4113.6118.3
282312342372402432456548
section 2472537616657707744773
section 31,0411,1101,1531,2141,3001,4001,479
113.7115.3116.4117.4118.7120.2121.5122.5
122.7122.5124.5123.7125.8125.7123.7
121.2122.4120.8123.7121.1122.1121.6
616699710730
842907936
1,150
1,5581,5641,6581,6971,7271,7401,785
118.5119.9121.8124.8
128.0128.5129.8130.0
120.4122.7120.5119.8122.9121.9121.4
Rivermile 189.3. Aueust 1983--Cross section 40
40528590
120131
0135093
146160165171176
124.9124.6124.5108.3104.6100.7100.9
119.0118.7113.5111.1113.4112.2108.9107.1104.4
149158225255280296320
214219260212344372393541718
99.397.393.194.695.593.592.3
Rivermile 186.5.102.0100.394.696.997.097.997.597.497.5
340375432452555627672
September753863948
1,2351,3131,5051,6351,6581,671
93.8100.8105.8108.2111.9116.8115.6
717781791821892951
1,081
111.8112.5115.7120.0119.8116.4121.3
1,1281,2391,2871,3171,385
120.9118.8117.8120.6123.1
1983-Cross section 5100.6100.098.698.495.493.087.489.488.9
1,7011,7241,7291,7471,7671,8651,8931,9161,969
96.799.4
102.9106.6114.8114.1115.8115.9112.8
2,0212,0842,0252,2232,2702,3492,3622,385
114.2116.8116.8106.9104.1106.1110.1110.4
22 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, California, 1980-90
Table 4. Coordinate data for six cross sections of the Sacramento River-Con//ni/eaf
Distance from Eleva- Distance from Eieva- Distance from initial point tion initial point tion initial point
0162531545876
018243040
0193866718288
050
117214249264282
030558490
103112123143
112.4112.9111.8111.994.992.884.9
127.7127.1123.4118.9110.0
137.5132.9128.9129.3129.1115.4105.3
123.5124.0124.3123.9124.0122.9111.3
124.9124.5124.3107.9103.0101.5100.5101.097.1
90120180200226250305
557190
113135
101119132141199251265
291326356375404436455
169205226244256282294311333
Rivermile 183.76.180.083.381.483.784.287.9
Rivermile 193.7,108.9101.194.396.097.9
Rivermile 192.8.104.095.692.494.298.0
101.5101.4
Rivermile 190.8.109.5103.696.395.497.296.995.6
Rivermile 189.96.194.094.294.795.594.593.193.695.2
Eleva- Distance from tion initial point
Eleva- Distance from Eleva tion initial point tion
3. August 1983-Cross section 6315344380435465498523
. December143175214233251
September279310348400407430461
September465484532576602626653
89.589.990.992.794.896.195.2
644673698723781833888
96.995.993.993.391.991.291.9
1
939949,050
1,088111
,111,227,237
93.295.9
107.6106.3109.3110.3110.1
1984~Cross section 197.1
100.5104.9106.6107.1
1984-Cross100.4102.9105.3108.3112.0111.8112.3
278324371401493
section 2469474479584683814902
111.2113.8115.9118.8123.3
115.3118.1120.5122.0123.3127.1124.2
111
619665720
962,014,044,329
119.8121.8124.9
129.2130.4131.1129.1
1984 Cross section 395.797.194.193.294.997.1
103.0
673694715823932
1,0221,155
106.0107.1109.4115.7119.3121.0122.3
11111
,222,282,397,512,624
123.1121.2122.2121.3121.9
3. August 1984 Cross section 4359374390417444456601623664
97.098.5
100.5102.7104.5107.8114.8117.5113.4
715769787791812823905925
1,064
114.3112.1113.0112.0119.9120.7120.4114.8118.4
11111
,082,144,266,334,390
120.6120.8119.6119.0120.0
Table 4 23
Table 4. Coordinate data for six cross sections of the Sacramento River-Continued
Distance from Eleva- Distance from Eleva- Distance from initial point tion initial point tion initial point
0152395
152161182201234246267272
02736576778899497
08
131721
08
20314452596983
119.0119.1114.6112.3114.7114.6108.2102.699.597.695.998.5
112.3111.9113.194.889.286.079.579.176.7
127.0126.8127.2125.8123.0
137.3136.9133.0131.8131.9127.8125.2120.6116.8
278303308313316321362367373409511543
137144148153164181188218231
2837455779
8595
119128135141146160172
Rivermile 186.594.897.7
100.599.898.6
100.8100.398.599.499.098.999.6
Rivermile 18380.081.985.283.887.880.380.586.286.7
Rivermile 193.7118.4114.8108.6106.398.3
Rivermile 192.8113.8107.8103.098.592.889.888.888.991.6
, September563576583591619629650714732743779944
Eleva- Distance from tion initial point
Eleva- Distance from Eleva tion initial point tion
1984-Cross section 599.299.298.599.3
100.098.698.799.699.2
100.199.9
102.7
.3. August 1984-Cross242248277317356421512634641
, September102109118155197
. September185197214227270310404435453
87.988.889.590.191.394.696.597.895.6
1,0911,2631,2981,3411,3891,4461,4751,5001,5871,6241,6571,728
section 6667684704735762786832857884
102.799.999.198.896.994.594.292.391.792.293.093.1
92.992.592.491.590.389.990.790.991.4
1,7581,7731,8181,8261,8511,8952,0142,1612,1892,3462,3602,385
912954
1,0361,0541,0851,0981,1031,1091,227
96.197.499.6
102.8112.2116.8115.7116.8105.8107.1109.8112.7
92.795.7
103.8107.9106.9106.9109.5109.3109.0
1986-Cross section 193.593.894.098.8
106.4
227275291316398
110.6112.3113.3114.7118.8
470493532617714
123.4123.2123.8119.8124.0
1986-Cross section 293.193.893.793.596.3
100.8104.3104.8105.6
471481485500523568619667728
107.5108.8109.8113.7117.1119.2121.3122.6124.3
794847871887912942
124.5123.1129.1125.5125.7131.0
24 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, California, 1980-90
Table 4. Coordinate data for six cross sections of the Sacramento River-Con//nued
Distance from Eleva- Distance from Eleva- Distance from initial point tion initial point tion initial point
01458
103108109116125129
124.0125.1124.4124.1124.3118.4113.3109.2108.0
141153170198203216232241267
Rivermile 190.8.103.5102.099.495.194.995.396.196.196.8
September271282331355370379369406413
Eleva- Distance from tion initial point
Eleva- Distance from Eleva tion initial point tion
1986-Cross section 397.096.695.094.694.894.595.295.695.8
434459474547626678738839929
98.8102.7108.0111.6114.6116.9117.1117.0121.8
1,0141,1301,1511,1841,3721,502
122.8118.0119.9122.8123.8123.2
Rivermile 189.3. Aueust 1986--Cross section 40
36495262758898
04997
220284414460572673
0172328374655617179
124.8124.5124.4124.2118.4111.5106.6101.6
119.4119.0114.8114.6101.5107.4106.2102.0102.2
112.4112.9112.0112.2111.5106.1100.394.082.583.1
106118126146153176211233
735789919
1,0191,0871,2071,2451,3201,402
84869097
108118135157167171
101.099.698.498.698.896.496.696.8
Rivermile 186.5.101.4101.6101.2101.6105.8104.3112.6112.7110.5
Rivermile 183.3.83.080.578.077.178.379.881.283.084.286.0
248260265282290307325350
September1,4471,5161,6241,7041,7591,8781,9071,9551,967
September177184197254354394416456535622
96.294.994.893.992.894.196.498.2
396403417440455467487553
103.3103.6103.0104.3104.9104.8106.5110.5
603613618797
114.6116.5116.2115.0
1986-Cross section 5109.2105.2101.298.497.095.295.896.496.2
2,0302,0622,1022,1522,1642,1722,2202,2362,297
97.298.6
101.5104.7109.2109.4107.5104.8109.1
2,3012,3402,3772,3872,3922,466
109.0105.4104.5111.3111.7116.0
1986--Cross section 685.386.989.192.293.995.796.997.497.696.6
632662675691708727778840898920
94.793.092.592.291.991.390.990.390.691.0
947965989
1,0041,0631,0911,1131,1241,1771,252
91.591.093.595.2
102.7106.3110.0110.1110.0110.5
Rivermile 193.7. Aueust 1987--Cross section 10
133235
127.0127.6118.8115.4
476277
124
104.798.492.695.4
148180204240
97.9102.4105.4108.9
260291341412
111.9112.4115.4119.8
493630708750
123.3119.1124.2124.8
Table 4 25
Table 4. Coordinate data for six cross sections of the Sacramento River-Continued
Distance from Eleva- Distance from Eleva- initial point tion initial point tion
Distance from Eleva- Distance from initial point tion initial point
Eleva- Distance from Eleva tion initial point tion
Rivermile 192.8. Seotember 1987-Cross section 208
20254461
137.4137.0133.0132.2131.3125.2
8095
107117124132
114.1106.1104.199.094.191.1
140150180220276343
89.392.094.196.199.1
103.2
384440478490504512
104.1105.0107.1109.0108.1109.0
522681868
1,0601,190
114.1123.9126.9131.6129.9
Rivermile 190.8. Seotember 1987-Cross section 30
90106109123128133
02452648489
113
01964
183204240251
0365868737892
124.1124.2124.2117.2110.8108.3102.0
124.6124.5124.3117.1106.8101.7100.7
119.1119.1114.2114.4114.5100.9100.9
112 .4111.894.089.591.084.077.0
155187216265295326358
126166192212242260282
264430443611669
1,1591,234
104114120130134140157
98.395.596.393.893.391.893.3
Rivermile99.599.797.296.795.495.794.1
Rivermile106.3105.3103.099.8
101.2101.7101.5
Rivermile79.080.083.587.084.886.089.0
385409426443474484541
189.3. August304322350371386412441
186.5. August1,2761,3021,4851,6221,6421,6651,730
183.3. August175182210242267462631
94.398.3
103.3105.3106.3108.2112.2
651740871918981
1,0171,093
114.8116.9117.5121.1123.0121.9117.2
1,1671,3311,497
121.7123.4123.2
1987--Cross section 493.795.296.799.7
101.7104.0103.2
474494549610617702747
104.8106.8111.1116.5116.5114.2116.1
784794823
112.5115.4120.1
1987-Cross section 5111.7111.7108.0101.099.098.596.5
1,7951,8581,9001,9291,9631,9802,032
96.095.094.595.095.596.597.0
2,0682,1092,1392,2232,3732,4382,502
98.099.0
101.0106.7110.4104.3111.7
1987-Cross section 691.090.591.593.094.098.095.0
661722760810840880930
94.092.591.090.090.290.591.3
9691,0001,0201,0761,1161,236
92.293.095.0
102.7108.7110.1
26 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, California, 1980-90
Table 4. Coordinate data for six cross sections of the Sacramento River~Con//ni/ed
Distance from Eleva- Distance from Eleva- initial point tion initial point tion
01323374252
06
2044627884
094
107108120130147
0355265838999
0206485
204240251
127.0127.6123.4116.1109.8107.1
137.4137.2133.0131.2123.7115.0111.2
124.2124.0124.0118.0109.2104.1100.2
124.7124.5124.2116.5107.7103.0102.6
119.1119.1114.2114.2114.5100.9100.9
647687
100123145
100124136154160171197
167188216230246264277
108114121131152168189
264430611669
1,1591,2341,244
Rivermile102.196.193.692.694.196.1
Rivermile110.5105.0101.089.589.495.098.0
Rivermile97.195.395.194.593.192.792.8
Rivermile101.299.699.998.698.696.694.2
Rivermile106.3105.399.8
101.2101.7101.5112.8
Distance from Eleva- Distance from Eleva- Distance from Eleva- initial point tion initial point tion initial point tion
193.7. August186221233242270296
192.8. August234270324366411428454
190.8. August294306317329338362380
189.3. August203212226237245255265
186.5. August1,3331,6061,6861,7101,7251,7601,772
1988-Cross section 1101.1105.1106.1108.1110.1111.1
320350467492527581
112.6116.1123.4123.2124.0122.0
636657699750
119.3121.6124.1124.8
1988-Cross section 299.0
101.0102.0104.0104.5105.3105.0
479485515606693907932
107.2108,0115.0121.0124.2126.0130.4
942992
1,042
133.5128.7131.6
1988-Cross section 392.392.391.992.091.693.092.6
391406420435470494746
93.196.6
100.1103.1109.1111.2117.2
9861,0931,1671,331
122.4117.2121.7123.4
1988. Cross section 495.694.895.695.694.693.894.6
274295318341359383411
93.696.096.699.4
101.6103.6102.6
438468505615701791820
103.6104.8107.6116.2114.3115.3120.0
1988-Cross section 5110.8101.799.898.198.196.896.6
1,8181,8601,8821,9161,9802,0002,053
96.095.895.094.695.195.197.0
2,1032,1632,2012,2932,4232,502
98.1102.0105.6110.5105.0111.7
Table 4 27
Table 4. Coordinate data for six cross sections of the Sacramento River-Conf/nued
Distance from Eleva- Distance from Eleva- Distance from initial point tion initial point tion initial point
Eleva- Distance from tion initial point
Eleva- Distance from Eleva tion initial point tion
Rivermile 183.3. Aueust 1988-Cross section 60
3437566696
128
014303545
08
203543799499
112.4111.9112.494.775.274.777.7
127.0127.9118.3115.4103.9
137.4137.0133.0131.7132.0114.5104.7104.0
159172190210250300363
728095
110140
104109115120125129135138
79.282.282.782.289.490.092.7
Rivermile 193.7.92.492.493.494.498.4
Rivermile 192.8.102.599.596.592.589.588.888.890.5
383453587615645700723
September175190202216253
September145170187200203232265319
Rivermile 190.8. Seotember0
5285
134144153161177
034508999
110
124.4124.4124.0107.6100.6102.0101.197.6
124.7124.6124.5105.7100.7100.7
182195212225246259275300
136172193202208214
92.992.893.792.992.992.691.691.3
Rivermile 189.3.97.996.794.593.593.594.3
325338356371386395400406
September245252267281303335
94.698.296.995.692.089.689.1
747820833868920
1,0021,027
89.189.689.290.191.192.295.6
1,0681,0781,1171,1671,244
99.7103.2109.3109.7110.2
1989--Cross section 1102.4104.7105.4108.0110.9
285331341169493
112.4113.9115.4123.5123.2
531647676
123.9119.8123.3
1989-Cross section 293.096.097.597.898.9
100.5100.5103.0
365396418449457473489499
103.5104.9104.5105.0105.5108.0110.4114.4
524694925939967
117.8124.4126.4131.2130.3
1989-Cross section 391.191.692.694.197.699.699.6
102.1
416428433551634721863946
104.6106.4107.6112.2117.3116.4121.4121.4
1,0131,0511,1521,252
123.6117.6117.2122.8
1989-Cross section 495.395.1
930793.192.294.4
367415456496619706
98.0102.6102.5105.7116.4114.1
772794854
117.6115.8120.0
28 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, California, 1960-90
Table 4. Coordinate data for six cross sections of the Sacramento River-Conflnued
Distance from Eleva- Distance from Eleva- initial point tion initial point tion
Distance from Eleva- Distance from initial point tion initial point
Eleva- Distance from Eleva tion initial point tion
Rivermile 186.5. Seotember 1989 Cross section 50
206485
204240251264430
119.1119,1114.2114.2114.5100.9100.9106.3105.3
611669
1,1591,2341,2781,2941,4581,6431,693
99.8101.2101.7101.5109.2112.9109.2100.298.7
1,7261,7421,7921,8031,8321,8611,8691,8861,905
97.897.095.895.694.995.395.095.594.9
1,9291,9782,0152,0562,1062,1362,1652,1802,230
96.096.997.497.698.8
100.5102.6108.0109.0
2,3042,3262,3802,3882,3912,4292,4722,501
108.8105.7105.1111.2111.7115.8117.6114.9
Rivermile 183.3. Seotember 1989-Cross section 60
243760702£8189
107115
0163550
08
2035
032
137152126
112.4112.0112.892.979.476.476.278.480.782.9
127.1127.0115.0103.5
137.4137.0133.0131.7
124.3124.1108.0103.5101.0
125130140146157170178190244302
7490
113173
437994
108
190200215234250
86.986.983.183.487.489.389.990.490.991.4
Rivermile100.092.594.0
102.0
Rivermile131.0113.9106.9105.9
Rivermile98.595.592.893.593.0
342385403473560617624640670683
193.7. August212220296336
192.8. August121132158180
190.8. August267283305347390
92.895.499.498.497.197.094.893.992.491.9
709728760770782827844856915967
91.290.489.989.790.189.990.390.291.992.9
9971,0441,1181,1451,2351,252
93.997.5
109.4109.8109.2110.6
1990-Cross section 1106.5108.3112.5115.0
493529650674
123.2124.0119.7123.4
1990-Cross section 2101.992.496.498.2
252373415453
101.9104.9104.9106.4
503696941971
113.9124.3131.4130.4
1990--Cross section 390.593.093.592.593.5
410420433440451
94.595.5
102.0103.5106.0
466735996
1,0771,187
108.0116.9123.2116.8122.5
Table 4 29
Table 4. Coordinate data for six cross sections of the Sacramento River-Conf/nued
Distance from Eleva- Distance from Eleva- initial point tion initial point tion
03652879298
0206485
204240251264430
0386065707686
124.8124.6124.2106.2101.0101.2
119.1119.1114.2114.2114.5100.9100.9106.3105.3
112.4111.693.584.383.580.076.5
111124138160193204
611669
1,1591,2341,2911,4551,6341,6841,772
95105120136159171182
Rivermile99.599.898.498.495.295.2
Rivermile99.8
101.2101.7101.5112.8109.0101.097.895.0
Rivermile76.579.079.880.585.783.584.5
Distance from Eleva- Distance from Eleva- Distance from Eleva- initial point tion initial point tion initial point tion
189.3. August214244258284302322
186.5. August1,8131,8371,8591,8831,9081,9351,9681,9822,018
183.3. August197207242262336376441
1990-Cross section 494.895.095.693.793.292.2
337346367382405430
92.597.799.7
101.7102.2102.2
446468488616696786
102.5103.2106.2116.5114.4115.6
1990-Cross section 594.894.694.394.394.093.393.793.496.5
2,0622,0802,0952,1072,1142,1342,1592,1792,304
96.796.697.098.099.0
101.0102.9108.8108.5
2,3712,3872,3922,4112,465
104.8111.0111.7114.5117.5
1990-Cross section 688.089.090.590.592.593.597.8
495583640664684730111
98.098.396.394.391.390.389.6
869960
1,0071,0571,1451,1611,202
89.690.492.894.3
109.7109.7110.6
30 Flood Data for the Sacramento River and Butte Basin, Sacramento Valley, California, 1980-90~GPO 683-399/39010