6
Technology Project Discipline Product Line FPSO FLOATING PRODUCTION STORAGE AND OFFLOADING

FLOATING PRODUCTION STORAGE Technology SBM … · Technology COST & SCHEDULE Download Leaflet The sole intention of this factsheet is to share general information. Contact Details

Embed Size (px)

Citation preview

Page 1: FLOATING PRODUCTION STORAGE Technology SBM … · Technology COST & SCHEDULE Download Leaflet The sole intention of this factsheet is to share general information. Contact Details

Technology

COST & SCHEDULE

Download Leaflet

The sole intention of this factsheet is to share general information.

Contact Details [email protected]

© SBM Offshore 2017. All rights reserved. www.sbmoffshore.com

April 2017

*Note 1 Leased Units: YETAGUN FSO, FPSO KIKEH, FPSO MONDO, FPSO SAXI BATUQUE, FPSO ESPIRITO SANTO, FPSO CAPIXABA,

FPSO ASENG, FPSO CIDADE DE ANCHIETA, FPSO CIDADE DE PARATY, FPSO N’GOMA, FPSO CIDADE DE ILHABELA, FPSO CIDADE

DE MARICA, FPSO CIDADE DE SAQUAREMA, FPSO TURRITELLA – Operated Units: FPSO SERPENTINA, – Former fleet: FPSO FRADE,

P-57, FPSO VI, FSO DOMY, NKOSSA I, TANTAWAN EXPLORER, FPSO II, FPSO FALCON, FPSO FIRENZE, FPSO RANG DONG I, OKHA,

JAMESTON, FPSO MYSTRAS, FSO OGUZHAN, FSO UNITY, NKOSSA II, KUITO, FPSO BRASIL, SANHA LPG FPSO, FPSO MARLIM SUL

Project DisciplineProduct Line

FPSO

FLOATING PRODUCTION STORAGE AND OFFLOADING Meeting scheduled delivery dates is a key success factor. The graph

below (A) demonstrates SBM Offshore’s performance record for on-target and on-performance deliveries within budget, versus Industry performance (graph B).

Source: Independent Project Analysis, Inc (IPA)

COST GROWTH

SCHEDULE INDEX SCHEDULE SLIP

PRODUCTIONATTAINMENT

OPERABILITYPROBLEMS

“INDUSTRY FPSO PERFORMANCE IS POOR ACROSS ALL EXECUTION STRATEGIES”

CONVERSION FPSOS NEW BUILD FPSOS

90%

80%

70%

60%

50%

90%0%

0.80 -10%

0.90 0%

1.00 10%

1.10 20%

1.20 30%

80%10%70%20%

60%30%50%40%

100%

80%

60%

40%

20%

90%0%

0.80 -10%

0.90 0%

1.00 10%

1.10 20%

1.20 30%

80%10%70%20%

60%30%50%40%

COST GROWTH

SCHEDULE INDEX SCHEDULE SLIP

PRODUCTIONATTAINMENT

OPERABILITYPROBLEMS

(1) Data for the SBM Offshore study – illustrated in Graph A - was based on all SBM FPSO projects during the time period 2008-2016.

The above information and graphic is taken from ‘Great Expectations, a story about FPSO project performance’, Independent Project Analysis, Inc. Used by permission.

SBM FPSOS DELIVERED AND PRODUCING FROM 2008 – 2016

SBM OFFSHORE

Source: SBM Offshore

• Consistently on-time and on-budget

• Fewer start-up problems

• Reliable operations

SBM Offshore Track record

Experience pays - SBM Offshore versus the Industry

SBM Offshore track-record outperforms

SBM Offshore Average

Industry Conversion

Industry New Build

Cost Growth 8% 12% 23%

Schedule Slip 4% 10% 20%

Schedule Index 1.0 1.0 0.9

Operability Problems 30% 70% 80%

Production Attainment 97% 80% 65%

Page 2: FLOATING PRODUCTION STORAGE Technology SBM … · Technology COST & SCHEDULE Download Leaflet The sole intention of this factsheet is to share general information. Contact Details

Unrivalled experience and expertise in the design, construction and operation of FPSOs and Turret Mooring Systems in all environments

Leveraging expertize for standardization of FPSOs and offering solutions that maximize cost-saving opportunities and minimize schedule

Success for SBM Offshore is when our clients meet their goals. Our competitive technical and commercial solutions, our delivery track record, operational excellence and production uptime for all our FPSOs demonstrate it.

OUR FPSOs AT A GLANCE DELIVERING ACROSS THE FULL LIFECYCLE EXPERIENCE MATTERS

KEY FPSO ACHIEVEMENTS

14 FPSOs in current operating fleet

3 First Oils in 2016 – including:

• 2 high-capacity, pre-salt FPSOs offshore Brazil for Petrobras

• The world’s deepest production facility, on Shell’s Gulf of Mexico Stones project

99% total historical Oil production uptime

4.9 billion barrels of cumulative production

Delivery of the first Generic FPSO

2002

Delivery of the largest SeastarTM TLP

2003

New Build LPG FPSO

2005

CALM Buoy

1959

Drilling Jack-up

1960

DP Drillship

1972

SBS Mooring System

1973

SALS Mooring System

1977

Leased FPSO

1981

External Turret

1985

Jacket Soft Yoke

1985

Disconnectable Turret

1986

Turnkey North Sea FPSO

1996

Internal Turret

1993

Deepwater CALM Buoy

1999

Deepest Semi-Submerisible in the GoM

2006

Offshore Offloading Line : Trelline™ Installed

2006 2009 2012

GAP™ mid water Fluid Transfer System

2007

Largest Internal Turret with 75 risers

2007

First turret-moored FPSO using steel risers

COOL™ LNG Transfer System

2011

HV-AC Electric Swivel rated at 65KV and 150 MW

VHP Fluid Swivel rated at over 800 bar

1st Generation 3 FPSO (Paraty)

Twin HullTM FLNG ARCATM Mooring System GoM Disconnectable Turret FPSO

2013 2013 2015 2015 2016

Unique track record in EPC, FPSO delivery and operations

Feedback from SBM Offshore’s Projects and Operations team ensures continuous improvement across the full lifecycle

INSTALLATION

CONSTRUCTION

OPERATIONS

ENGINEERING PROCUREMENT

LIFE EXTENSION

DECOMMISSIONING

With more than 60 years of innovation SBM Offshore helps to unlock the Gulf of Mexico’s “Lower Tertiary” reservoirs

The world’s deepest production facility on Shell’s Stones project.

FPSO Turritella claims the world record for the deepest floating production unit at 2,900 meters and the largest disconnectable system, reinforcing SBM Offshore’s reputation as a technology pioneer. FPSO Turritella achieved first oil in September 2016.

• First disconnectanle system with Steel lazy wave risers

• World’s deepest production unit

• 10 year lease contract + options

FPSO ‘Generation 3’ standardized design for high-capacity pre-salt FPSOs offshore Brazil in 2016.

Cidade de Maricá / Cidade de Saquarema benefited from experience on Cidade de Ilhabela

• 25% fewer man hours

• 25% less time required to complete module integration

• 12% decrease in overall time to deliver the projects

SBM’s (G3) FPSO design has proven to be well adapted for pre-salt fields, with an impressive four pre-salt FPSOs in four years.

• 150,000 bpd processing capacity

• 1.6 million barrels storage capacity

• Moored in approximately 2,300 meters water depth

• 20 year lease & operate contracts

A new execution model for the next generation of FPSOs: Fast4WardTM

A faster, cheaper & safer gateway to First Oil in a cash constrained world

Building on the Company’s solid track record for FPSO delivery portfolio and leveraging almost 300 years of cumulative operational experience, SBM Offshore launched its Generation 4 standardized FPSO design in 2016.

Fast4Ward accelerates not only the design process, but also the supply chain and construction phases:

• Save 6 to 12 months on schedule

• Make significant cost savings

Product Life Extension/

De-commissioning

Leader in FPSO relocation

World class after sales Green ship-recycling

Construction

Strategic partnerships Unrivalled EPCI project experience

Operations

Almost 300 years of offshore operational experience 99% total historical Oil

production uptime

Engineering

60 years of industry firsts Leading edge technology

Installation

Dedicated fleet Unparalleled experience

Procurement

Integrated supply chain Global efficiencies Local sourcing Frame agreements with vendors

Since our first FPSO operations for Shell in 1976, SBM Offshore has executed over 30 FPSO projects worldwide (*see Note 1 on back page). SBM Offshore maintains its role as a pioneer by continuously investing in new technology, and offering unique solutions tailored to challenging field dynamics and clients’ needs.

Contractor Specifications

Low cost / Fast-track schedule

Cost optimization

Equipment standardization

Economical ProductionUS$7.20 average unit cost/bbl

Technology & EfficiencyTransformation initiatives

Long-term ContractsAverage 14 year contracts

BacklogUS$17.1 billion

Catalogue of Solutions

FPSO Cidade de Ilhabela

SBM Offshore

50

100

1

0 6 11 16 21 26 31 36 41

.

. . .

.

150

250

200

300

= Industry peers, bubble size relates to cumulative throughput capacity of FPSOs built (kboepd)

Total number FPSOs built (Lease and EPC)

Cum

ulat

ive

FPSO

Op

erat

ing

Exp

erie

nce

(Yea

rs)

3 600 kboepd

2 600 kboepd

1 200 kboepd

Source: SBM Offshore research

Page 3: FLOATING PRODUCTION STORAGE Technology SBM … · Technology COST & SCHEDULE Download Leaflet The sole intention of this factsheet is to share general information. Contact Details

Unrivalled experience and expertise in the design, construction and operation of FPSOs and Turret Mooring Systems in all environments

Leveraging expertize for standardization of FPSOs and offering solutions that maximize cost-saving opportunities and minimize schedule

Success for SBM Offshore is when our clients meet their goals. Our competitive technical and commercial solutions, our delivery track record, operational excellence and production uptime for all our FPSOs demonstrate it.

OUR FPSOs AT A GLANCE DELIVERING ACROSS THE FULL LIFECYCLE EXPERIENCE MATTERS

KEY FPSO ACHIEVEMENTS

14 FPSOs in current operating fleet

3 First Oils in 2016 – including:

• 2 high-capacity, pre-salt FPSOs offshore Brazil for Petrobras

• The world’s deepest production facility, on Shell’s Gulf of Mexico Stones project

99% total historical Oil production uptime

4.9 billion barrels of cumulative production

Delivery of the first Generic FPSO

2002

Delivery of the largest SeastarTM TLP

2003

New Build LPG FPSO

2005

CALM Buoy

1959

Drilling Jack-up

1960

DP Drillship

1972

SBS Mooring System

1973

SALS Mooring System

1977

Leased FPSO

1981

External Turret

1985

Jacket Soft Yoke

1985

Disconnectable Turret

1986

Turnkey North Sea FPSO

1996

Internal Turret

1993

Deepwater CALM Buoy

1999

Deepest Semi-Submerisible in the GoM

2006

Offshore Offloading Line : Trelline™ Installed

2006 2009 2012

GAP™ mid water Fluid Transfer System

2007

Largest Internal Turret with 75 risers

2007

First turret-moored FPSO using steel risers

COOL™ LNG Transfer System

2011

HV-AC Electric Swivel rated at 65KV and 150 MW

VHP Fluid Swivel rated at over 800 bar

1st Generation 3 FPSO (Paraty)

Twin HullTM FLNG ARCATM Mooring System GoM Disconnectable Turret FPSO

2013 2013 2015 2015 2016

Unique track record in EPC, FPSO delivery and operations

Feedback from SBM Offshore’s Projects and Operations team ensures continuous improvement across the full lifecycle

INSTALLATION

CONSTRUCTION

OPERATIONS

ENGINEERING PROCUREMENT

LIFE EXTENSION

DECOMMISSIONING

With more than 60 years of innovation SBM Offshore helps to unlock the Gulf of Mexico’s “Lower Tertiary” reservoirs

The world’s deepest production facility on Shell’s Stones project.

FPSO Turritella claims the world record for the deepest floating production unit at 2,900 meters and the largest disconnectable system, reinforcing SBM Offshore’s reputation as a technology pioneer. FPSO Turritella achieved first oil in September 2016.

• First disconnectanle system with Steel lazy wave risers

• World’s deepest production unit

• 10 year lease contract + options

FPSO ‘Generation 3’ standardized design for high-capacity pre-salt FPSOs offshore Brazil in 2016.

Cidade de Maricá / Cidade de Saquarema benefited from experience on Cidade de Ilhabela

• 25% fewer man hours

• 25% less time required to complete module integration

• 12% decrease in overall time to deliver the projects

SBM’s (G3) FPSO design has proven to be well adapted for pre-salt fields, with an impressive four pre-salt FPSOs in four years.

• 150,000 bpd processing capacity

• 1.6 million barrels storage capacity

• Moored in approximately 2,300 meters water depth

• 20 year lease & operate contracts

A new execution model for the next generation of FPSOs: Fast4WardTM

A faster, cheaper & safer gateway to First Oil in a cash constrained world

Building on the Company’s solid track record for FPSO delivery portfolio and leveraging almost 300 years of cumulative operational experience, SBM Offshore launched its Generation 4 standardized FPSO design in 2016.

Fast4Ward accelerates not only the design process, but also the supply chain and construction phases:

• Save 6 to 12 months on schedule

• Make significant cost savings

Product Life Extension/

De-commissioning

Leader in FPSO relocation

World class after sales Green ship-recycling

Construction

Strategic partnerships Unrivalled EPCI project experience

Operations

Almost 300 years of offshore operational experience 99% total historical Oil

production uptime

Engineering

60 years of industry firsts Leading edge technology

Installation

Dedicated fleet Unparalleled experience

Procurement

Integrated supply chain Global efficiencies Local sourcing Frame agreements with vendors

Since our first FPSO operations for Shell in 1976, SBM Offshore has executed over 30 FPSO projects worldwide (*see Note 1 on back page). SBM Offshore maintains its role as a pioneer by continuously investing in new technology, and offering unique solutions tailored to challenging field dynamics and clients’ needs.

Contractor Specifications

Low cost / Fast-track schedule

Cost optimization

Equipment standardization

Economical ProductionUS$7.20 average unit cost/bbl

Technology & EfficiencyTransformation initiatives

Long-term ContractsAverage 14 year contracts

BacklogUS$17.1 billion

Catalogue of Solutions

FPSO Cidade de Ilhabela

SBM Offshore

50

100

1

0 6 11 16 21 26 31 36 41

.

. . .

.

150

250

200

300

= Industry peers, bubble size relates to cumulative throughput capacity of FPSOs built (kboepd)

Total number FPSOs built (Lease and EPC)

Cum

ulat

ive

FPSO

Op

erat

ing

Exp

erie

nce

(Yea

rs)

3 600 kboepd

2 600 kboepd

1 200 kboepd

Source: SBM Offshore research

Page 4: FLOATING PRODUCTION STORAGE Technology SBM … · Technology COST & SCHEDULE Download Leaflet The sole intention of this factsheet is to share general information. Contact Details

Unrivalled experience and expertise in the design, construction and operation of FPSOs and Turret Mooring Systems in all environments

Leveraging expertize for standardization of FPSOs and offering solutions that maximize cost-saving opportunities and minimize schedule

Success for SBM Offshore is when our clients meet their goals. Our competitive technical and commercial solutions, our delivery track record, operational excellence and production uptime for all our FPSOs demonstrate it.

OUR FPSOs AT A GLANCE DELIVERING ACROSS THE FULL LIFECYCLE EXPERIENCE MATTERS

KEY FPSO ACHIEVEMENTS

14 FPSOs in current operating fleet

3 First Oils in 2016 – including:

• 2 high-capacity, pre-salt FPSOs offshore Brazil for Petrobras

• The world’s deepest production facility, on Shell’s Gulf of Mexico Stones project

99% total historical Oil production uptime

4.9 billion barrels of cumulative production

Delivery of the first Generic FPSO

2002

Delivery of the largest SeastarTM TLP

2003

New Build LPG FPSO

2005

CALM Buoy

1959

Drilling Jack-up

1960

DP Drillship

1972

SBS Mooring System

1973

SALS Mooring System

1977

Leased FPSO

1981

External Turret

1985

Jacket Soft Yoke

1985

Disconnectable Turret

1986

Turnkey North Sea FPSO

1996

Internal Turret

1993

Deepwater CALM Buoy

1999

Deepest Semi-Submerisible in the GoM

2006

Offshore Offloading Line : Trelline™ Installed

2006 2009 2012

GAP™ mid water Fluid Transfer System

2007

Largest Internal Turret with 75 risers

2007

First turret-moored FPSO using steel risers

COOL™ LNG Transfer System

2011

HV-AC Electric Swivel rated at 65KV and 150 MW

VHP Fluid Swivel rated at over 800 bar

1st Generation 3 FPSO (Paraty)

Twin HullTM FLNG ARCATM Mooring System GoM Disconnectable Turret FPSO

2013 2013 2015 2015 2016

Unique track record in EPC, FPSO delivery and operations

Feedback from SBM Offshore’s Projects and Operations team ensures continuous improvement across the full lifecycle

INSTALLATION

CONSTRUCTION

OPERATIONS

ENGINEERING PROCUREMENT

LIFE EXTENSION

DECOMMISSIONING

With more than 60 years of innovation SBM Offshore helps to unlock the Gulf of Mexico’s “Lower Tertiary” reservoirs

The world’s deepest production facility on Shell’s Stones project.

FPSO Turritella claims the world record for the deepest floating production unit at 2,900 meters and the largest disconnectable system, reinforcing SBM Offshore’s reputation as a technology pioneer. FPSO Turritella achieved first oil in September 2016.

• First disconnectanle system with Steel lazy wave risers

• World’s deepest production unit

• 10 year lease contract + options

FPSO ‘Generation 3’ standardized design for high-capacity pre-salt FPSOs offshore Brazil in 2016.

Cidade de Maricá / Cidade de Saquarema benefited from experience on Cidade de Ilhabela

• 25% fewer man hours

• 25% less time required to complete module integration

• 12% decrease in overall time to deliver the projects

SBM’s (G3) FPSO design has proven to be well adapted for pre-salt fields, with an impressive four pre-salt FPSOs in four years.

• 150,000 bpd processing capacity

• 1.6 million barrels storage capacity

• Moored in approximately 2,300 meters water depth

• 20 year lease & operate contracts

A new execution model for the next generation of FPSOs: Fast4WardTM

A faster, cheaper & safer gateway to First Oil in a cash constrained world

Building on the Company’s solid track record for FPSO delivery portfolio and leveraging almost 300 years of cumulative operational experience, SBM Offshore launched its Generation 4 standardized FPSO design in 2016.

Fast4Ward accelerates not only the design process, but also the supply chain and construction phases:

• Save 6 to 12 months on schedule

• Make significant cost savings

Product Life Extension/

De-commissioning

Leader in FPSO relocation

World class after sales Green ship-recycling

Construction

Strategic partnerships Unrivalled EPCI project experience

Operations

Almost 300 years of offshore operational experience 99% total historical Oil

production uptime

Engineering

60 years of industry firsts Leading edge technology

Installation

Dedicated fleet Unparalleled experience

Procurement

Integrated supply chain Global efficiencies Local sourcing Frame agreements with vendors

Since our first FPSO operations for Shell in 1976, SBM Offshore has executed over 30 FPSO projects worldwide (*see Note 1 on back page). SBM Offshore maintains its role as a pioneer by continuously investing in new technology, and offering unique solutions tailored to challenging field dynamics and clients’ needs.

Contractor Specifications

Low cost / Fast-track schedule

Cost optimization

Equipment standardization

Economical ProductionUS$7.20 average unit cost/bbl

Technology & EfficiencyTransformation initiatives

Long-term ContractsAverage 14 year contracts

BacklogUS$17.1 billion

Catalogue of Solutions

FPSO Cidade de Ilhabela

SBM Offshore

50

100

1

0 6 11 16 21 26 31 36 41

.

. . .

.

150

250

200

300

= Industry peers, bubble size relates to cumulative throughput capacity of FPSOs built (kboepd)

Total number FPSOs built (Lease and EPC)

Cum

ulat

ive

FPSO

Op

erat

ing

Exp

erie

nce

(Yea

rs)

3 600 kboepd

2 600 kboepd

1 200 kboepd

Source: SBM Offshore research

Page 5: FLOATING PRODUCTION STORAGE Technology SBM … · Technology COST & SCHEDULE Download Leaflet The sole intention of this factsheet is to share general information. Contact Details

Technology

COST & SCHEDULE

Download Leaflet

The sole intention of this factsheet is to share general information.

Contact Details [email protected]

© SBM Offshore 2017. All rights reserved. www.sbmoffshore.com

April 2017

*Note 1 Leased Units: YETAGUN FSO, FPSO KIKEH, FPSO MONDO, FPSO SAXI BATUQUE, FPSO ESPIRITO SANTO, FPSO CAPIXABA,

FPSO ASENG, FPSO CIDADE DE ANCHIETA, FPSO CIDADE DE PARATY, FPSO N’GOMA, FPSO CIDADE DE ILHABELA, FPSO CIDADE

DE MARICA, FPSO CIDADE DE SAQUAREMA, FPSO TURRITELLA – Operated Units: FPSO SERPENTINA, – Former fleet: FPSO FRADE,

P-57, FPSO VI, FSO DOMY, NKOSSA I, TANTAWAN EXPLORER, FPSO II, FPSO FALCON, FPSO FIRENZE, FPSO RANG DONG I, OKHA,

JAMESTON, FPSO MYSTRAS, FSO OGUZHAN, FSO UNITY, NKOSSA II, KUITO, FPSO BRASIL, SANHA LPG FPSO, FPSO MARLIM SUL

Project DisciplineProduct Line

FPSO

FLOATING PRODUCTION STORAGE AND OFFLOADING Meeting scheduled delivery dates is a key success factor. The graph

below (A) demonstrates SBM Offshore’s performance record for on-target and on-performance deliveries within budget, versus Industry performance (graph B).

Source: Independent Project Analysis, Inc (IPA)

COST GROWTH

SCHEDULE INDEX SCHEDULE SLIP

PRODUCTIONATTAINMENT

OPERABILITYPROBLEMS

“INDUSTRY FPSO PERFORMANCE IS POOR ACROSS ALL EXECUTION STRATEGIES”

CONVERSION FPSOS NEW BUILD FPSOS

90%

80%

70%

60%

50%

90%0%

0.80 -10%

0.90 0%

1.00 10%

1.10 20%

1.20 30%

80%10%70%20%

60%30%50%40%

100%

80%

60%

40%

20%

90%0%

0.80 -10%

0.90 0%

1.00 10%

1.10 20%

1.20 30%

80%10%70%20%

60%30%50%40%

COST GROWTH

SCHEDULE INDEX SCHEDULE SLIP

PRODUCTIONATTAINMENT

OPERABILITYPROBLEMS

(1) Data for the SBM Offshore study – illustrated in Graph A - was based on all SBM FPSO projects during the time period 2008-2016.

The above information and graphic is taken from ‘Great Expectations, a story about FPSO project performance’, Independent Project Analysis, Inc. Used by permission.

SBM FPSOS DELIVERED AND PRODUCING FROM 2008 – 2016

SBM OFFSHORE

Source: SBM Offshore

• Consistently on-time and on-budget

• Fewer start-up problems

• Reliable operations

SBM Offshore Track record

Experience pays - SBM Offshore versus the Industry

SBM Offshore track-record outperforms

SBM Offshore Average

Industry Conversion

Industry New Build

Cost Growth 8% 12% 23%

Schedule Slip 4% 10% 20%

Schedule Index 1.0 1.0 0.9

Operability Problems 30% 70% 80%

Production Attainment 97% 80% 65%

Page 6: FLOATING PRODUCTION STORAGE Technology SBM … · Technology COST & SCHEDULE Download Leaflet The sole intention of this factsheet is to share general information. Contact Details

Technology

COST & SCHEDULE

Download Leaflet

The sole intention of this factsheet is to share general information.

Contact Details [email protected]

© SBM Offshore 2017. All rights reserved. www.sbmoffshore.com

April 2017

*Note 1 Leased Units: YETAGUN FSO, FPSO KIKEH, FPSO MONDO, FPSO SAXI BATUQUE, FPSO ESPIRITO SANTO, FPSO CAPIXABA,

FPSO ASENG, FPSO CIDADE DE ANCHIETA, FPSO CIDADE DE PARATY, FPSO N’GOMA, FPSO CIDADE DE ILHABELA, FPSO CIDADE

DE MARICA, FPSO CIDADE DE SAQUAREMA, FPSO TURRITELLA – Operated Units: FPSO SERPENTINA, – Former fleet: FPSO FRADE,

P-57, FPSO VI, FSO DOMY, NKOSSA I, TANTAWAN EXPLORER, FPSO II, FPSO FALCON, FPSO FIRENZE, FPSO RANG DONG I, OKHA,

JAMESTON, FPSO MYSTRAS, FSO OGUZHAN, FSO UNITY, NKOSSA II, KUITO, FPSO BRASIL, SANHA LPG FPSO, FPSO MARLIM SUL

Project DisciplineProduct Line

FPSO

FLOATING PRODUCTION STORAGE AND OFFLOADING Meeting scheduled delivery dates is a key success factor. The graph

below (A) demonstrates SBM Offshore’s performance record for on-target and on-performance deliveries within budget, versus Industry performance (graph B).

Source: Independent Project Analysis, Inc (IPA)

COST GROWTH

SCHEDULE INDEX SCHEDULE SLIP

PRODUCTIONATTAINMENT

OPERABILITYPROBLEMS

“INDUSTRY FPSO PERFORMANCE IS POOR ACROSS ALL EXECUTION STRATEGIES”

CONVERSION FPSOS NEW BUILD FPSOS

90%

80%

70%

60%

50%

90%0%

0.80 -10%

0.90 0%

1.00 10%

1.10 20%

1.20 30%

80%10%70%20%

60%30%50%40%

100%

80%

60%

40%

20%

90%0%

0.80 -10%

0.90 0%

1.00 10%

1.10 20%

1.20 30%

80%10%70%20%

60%30%50%40%

COST GROWTH

SCHEDULE INDEX SCHEDULE SLIP

PRODUCTIONATTAINMENT

OPERABILITYPROBLEMS

(1) Data for the SBM Offshore study – illustrated in Graph A - was based on all SBM FPSO projects during the time period 2008-2016.

The above information and graphic is taken from ‘Great Expectations, a story about FPSO project performance’, Independent Project Analysis, Inc. Used by permission.

SBM FPSOS DELIVERED AND PRODUCING FROM 2008 – 2016

SBM OFFSHORE

Source: SBM Offshore

• Consistently on-time and on-budget

• Fewer start-up problems

• Reliable operations

SBM Offshore Track record

Experience pays - SBM Offshore versus the Industry

SBM Offshore track-record outperforms

SBM Offshore Average

Industry Conversion

Industry New Build

Cost Growth 8% 12% 23%

Schedule Slip 4% 10% 20%

Schedule Index 1.0 1.0 0.9

Operability Problems 30% 70% 80%

Production Attainment 97% 80% 65%