Document List
Fingerboards Mineral Sands Project Inquiry and Advisory Committee Version 27 – 25/03/2021
No. Date Description Presented by
1 28/09/20 Letter from Minister for Planning on East Gippsland Shire Council submission extension (20 09 20)
Minister for Planning
2 30/10/20 Fingerboards Mineral Sands Project – Radiation Report Review – Ken Joyner
Mr Wimbush, Chair IAC
3 6/11/20 Request from Earth Resources Regulation, Department of Jobs, Precincts and Regions (DJPR) to make a late submission
Mr Robinson, Earth Resources Regulation DJPR
4 12/11/20 Letter to Earth Resources Regulation DJPR in regard to making a late submission
Mr Wimbush, Chair IAC
5 16/11/20 Directions Hearing Notification Letter Mr Wimbush, Chair IAC
6 20/11/20 Letter from Kalbar to IAC - Request to defer hearing start date
Mr Power, White & Case for Proponent
7 20/11/20 Correspondence from Earth Resources Regulation DJPR to IAC - Advising no longer making a submission
Mr Hurst, Earth Resources Regulation DJPR
8 3/12/20 Letter to Earth Resources Regulation DJPR in regard to written advice
Mr Wimbush, Chair IAC
9 7/12/20 Inquiry and Advisory Committee - Expert Advice - Ken Joyner - Review of Radiation Assessment Report
Mr Joyner
10 9/12/20 Letter from Kalbar to IAC - Request for additional hearing days
Mr Power, White & Case for Proponent
11 10/12/20 Correspondence from Earth Resources Regulation DJPR to IAC in response to IAC questions
Mr Hurst, Earth Resources Regulation DJPR
12 10/12/20 Letter from Mine Free Glenaladale (MFG) to IAC regarding Hearing format, times and allocation
Mr Witherow and Ms Trescowthick, Environmental Justice Australia (EJA) for Mine Free Glenaladale (MFG)
13 11/12/20 Letter from Fingerboards IAC - Hearing Arrangements Mr Wimbush, Chair IAC
14 11/12/20 East Gippsland Shire Council - endorsed submission (submission 716B)
Mr Wong, Planology for East Gippsland Shire Council (EGSC)
15 11/12/20 Fingerboards IAC - IAC Members Declarations Mr Wimbush, Chair IAC
16 11/12/20 Fingerboards Mineral Sands Project IAC - Request for Information
Mr Wimbush, Chair IAC
17 14/12/20 Correspondence from Earth Resources Regulation DJPR to IAC - further information for contextual reference
Mr Hurst, Earth Resources Regulation DJPR
Document List | Fingerboards Mineral Sands Project Inquiry and Advisory Committee
Page 2
No. Date Description Presented by
18 18/12/20 Letter from Kalbar to IAC - compulsorily acquisition of land
Mr Power, White & Case for Proponent
19 21/12/20 Letter from Fingerboards IAC to Southern Rural Water seeking information
Mr Wimbush, Chair IAC
20 22/12/20 EPA Victoria - section 22 Notice Request for Further Information from Kalbar
Mr Hook, EPA
21 23/12/20 Letter to Department of Human and Health Services (DHHS) in regard to seeking written advice
Mr Wimbush, Chair IAC
22 23/12/20 Inquiry and Advisory Committee Directions Mr Wimbush, Chair IAC
23 “ Inquiry and Advisory Committee Hearing Timetable (v1) “
24 07/01/2020 Letter from Kalbar to IAC - Cover letter for responses to Directions 4, 26, 29 and 33
Mr Power, White & Case for Proponent
25 “ Kalbar – EES Submission summary (Response to Direction No. 26 – Issues raised by Submission number)
“
25b 12/03/2021 Kalbar – Updated EES Submission summary - Response to Direction No. 64 (tracked) – 12 March 2021
Mr Power and Ms Campbell, White & Case for Proponent
26 07/01/2020 Kalbar - List of Expert Witnesses Mr Power, White & Case for Proponent
27 “ Chapter 12 Environmental Management Framework (EMF) - Word Document
“
28 “ Attachment - C1 - Explanatory Report - Word Document
“
29 “ Attachment - C2 - Instruction Sheet - Word Document “
30 “ Attachment - C6 - Clause 45.12 - Specific Controls Overlay - Word Document
“
31 “ Attachment - C7 - Schedule to Cl 45.12 - Specific Controls Overlay - Word Document
“
32 “ Attachment - C8 - Schedule to Cl 72.03 - What does this Planning Scheme consist of – Word Document
“
33 “ Attachment- C9 - Schedule to Cl 72.04 - Documents Incorporated in this Planning Scheme - Word Document
“
34 “ Attachment - C10 - List of Amendments – Word Document
“
35 “ Attachment - C11 - Incorporated Document - Word Document
“
36 7/01/2021 Letter from East Gippsland Shire Council to IAC - List of Mr Wong, Planology for
Document List | Fingerboards Mineral Sands Project Inquiry and Advisory Committee
Page 3
No. Date Description Presented by
Expert Witnesses EGSC
37 7/01/2021 Email from Mine Free Glenaladale to IAC - List of Expert Witnesses
Ms Trescowthick, EJA for MFG
38 18/01/2021 Letter from Southern Rural Water to IAC - Response to IAC questions
Mr Fitzgerald, Southern Rural Water
39 18/01/2021 Letter from DHHS to IAC - Response to IAC questions - Professor Wallace, DHHS
40 “ Attachment 1 - DHHS Letter - Radiation safety regulation in Victoria - explanatory document
“
41 “ Attachment 2 - DHHS Letter - DHHS review of Kalbar project
“
42 18/01/2021 Letter from Kalbar to IAC - Proposed changes to the Fingerboards Project
Mr Power, White & Case for Proponent
43 “ Kalbar - Technical Note 01 (TN 001) - Implementation of centrifuges for water recovery and tailings management
“
44 “ Email from Kalbar to Department of Transport with proposed road and intersection geometry - 14 01 2021
“
45 “ Road Deviation Drawing - 2390-001. “
46 “ Road Deviation Drawing - 2390-002 “
47 “ Road Deviation Drawing - 2390-003 “
48 “ Road Deviation Drawing - 2390-004 “
49 “ Road Deviation Drawing - 2390-005 “
50 “ Road Deviation Drawing - 2390-006 “
51 “ Road Deviation Drawing - 2390-010 “
52 “ Road Deviation Drawing - 2390-011 “
53 “ Road Deviation Drawing - 2390-012 “
54 “ Road Deviation Drawing - 2390-013 “
55 “ Concept Designs - Southern Haul Road Infrastructure Drawings - 2390 Haul Road Plan (2020-12-10)
“
56 “ Concept Designs - Southern Haul Road Infrastructure Drawings - 2390 Haul Road Long Sections (2020-12-10).
“
57 “ Concept Designs - Southern Haul Road Infrastructure Drawings - 2390 Haul Road Cross Sections (2020-12-10)
“
58 “ Concept Designs - Southern Haul Road Infrastructure Drawings - Haul Road Typical Cross Sections - 5253-40-
“
Document List | Fingerboards Mineral Sands Project Inquiry and Advisory Committee
Page 4
No. Date Description Presented by
DWG-CI-51308
59 “ Concept Designs - Fernbank Rail Siding General Arrangement - 5253-40-DWG-CI-54401
“
60 28/01/2021 Letter from East Gippsland Shire Council to IAC - Request for changes to the timetable and directions from the IAC
Mr Wong, Planology for EGSC
61 “ Letter from Kalbar to East Gippsland Shire Council - Proposed incorporation of centrifuges - 21 Jan 2021
“
62 28/01/2021 Letter from Mine Free Glenaladale to IAC - Response to Councils request for changes to timetable and directions from the IAC
Mr Witherow and Ms Trescowthick, EJA for MFG
63 28/01/2021 Letter from East Gippsland Shire Council to IAC - Response supporting position of Mine Free Glenaladale
Mr Wong, Planology for EGSC
64 29/01/2021 Letter from Kalbar to IAC - Response to Council’s and Mine Free Glenaladale requests for changes to timetable and directions from the IAC
Mr Power, White & Case for Proponent
65 29/01/2021 Letter from East Gippsland Shire Council to IAC - Clarification on position in relation to request following Proponents response
Mr Wong, Planology for EGSC
66 29/01/2021 Letter from Fingerboards IAC - Response to requests around centrifuge issue
Mr Wimbush, Chair IAC
67 1/02/2021 Fingerboards Inquiry and Advisory Committee (IAC) - Site inspection itinerary and Maps - 1 February 2020
Mr Cook , Kalbar
68 2/02/2021 Letter from East Gippsland Shire Council to IAC - marked-up version of the incorporated document (without prejudice)
Mr Wong, Planology for EGSC
69 “ East Gippsland Shire Council - Incorporated Document (marked up without prejudice changes)
“
70 2/02/2021 Expert Witness Statement - Aaron Organ - Ecology Ms Campbell, White & Case for Proponent
71 “ Expert Witness Statement - Christophe Delaire - Noise “
72 “ Expert Witness Statement - Darren Billingsley - Radiation
“
73 “ Expert Witness Statement - Dr Doris Blaesing - Horticulture
“
74 “ Expert Witness Statement - Dr Michael Cheetham - Erosion and sedimentation
“
75 “ Expert Witness Statement - Dr Robert Loch - Rehabilitation
“
Document List | Fingerboards Mineral Sands Project Inquiry and Advisory Committee
Page 5
No. Date Description Presented by
76 “ Expert Witness Statement - Hugh Middlemis - Groundwater
“
77 “ Expert Witness Statement - James Weidmann - Surface water and flooding
“
78 “ Expert Witness Statement - Jarrah Muller - Water balance
“
79 “ Expert Witness Statement - Joel Georgiou - Groundwater
“
80 “ Expert Witness Statement - John Glossop - Planning “
81 “ Expert Witness Statement - John Sweeney - Water impact
“
82 “ Expert Witness Statement - Karen Teague - Health “
83 “ Expert Witness Statement - Paul Carter - Traffic and transport
“
84 “ Expert Witness Statement - Simon Welchman - Air Quality
“
85 “ Expert Witness Statement - Tony McAlister - Surface water quality
“
86 2/02/2021 Letter from Mine Free Glenaladale to IAC - Expert Witness Statements
Mr Witherow and Ms Trescowthick, EJA for MFG
87 “ Expert Witness Statement - Assoc. Prof. Gavin Mudd - Radiation
“
88 “ Expert Witness Statement - Assoc. Prof. Matthew Currell - Hydrogeology
“
89 “ Expert Witness Statement - Assoc. Prof. Tilman Ruff - Health and Radiation
“
90 “ Expert Witness Statement - Dr Jessica Drake - Soil Science and Rehabilitation
“
91 “ Expert Witness Statement - Dr Julia Jasonsmith - Tailings
“
92 “ Expert Witness Statement - Lincoln Kern - Ecology “
93 “ Expert Witness Statement - Roderick Campbell - Economics
“
94 2/02/2021 Letter from East Gippsland Shire Council to IAC - Expert Witness Statements
Mr Wong, Planology for EGSC
95 “ Expert Witness Statement - Assoc. Prof. Anthony Kiem - Surface Water
“
96 “ Expert Witness Statement - Assoc. Prof. John Webb - “
Document List | Fingerboards Mineral Sands Project Inquiry and Advisory Committee
Page 6
No. Date Description Presented by
Groundwater
97 “ Expert Witness Statement - Brett Lane - Ecology “
98 “ Expert Witness Statement - Stephen Hunt - Traffic Engineering
“
99 31/01/2021 Email from Proponent - witness statements from extra witnesses - 31 01 2021
Mr Power, White & Case for Proponent
100 31/01/2021 Email from Fingerboards IAC - Response to witness statements from extra witnesses from Proponent - 31 01 2021
Ms Selvaraj, PPV on behalf of the IAC
101 5/02/2021 Letter from Mine Free Glenaladale to IAC - seeking adjournment request
Mr Witherow, EJA for MFG
102 5/02/2021 Letter from Proponent to IAC - Response to MFG adjournment request
Mr Power, White & Case for Proponent
103 5/02/2021 Letter from East Gippsland Shire Council to IAC - Response to MFG adjournment request
Mr Wong, Planology for EGSC
104 5/02/2021 Email from Proponent to IAC - Response Direction 61a -Supplementary expert witness statements on centrifuge proposal
Mr Power, White & Case for Proponent
105 8/02/2021 Letter from Fingerboards IAC to Parties - Adjournment of Hearing and second Directions Hearing
Mr Wimbush, Chair IAC
106 8/02/2021 Letter from Proponent to IAC – provision of EES Submissions summary, response to IAC Request for Further Information and Direction 59 material
Mr Power, White & Case for Proponent
107 “ Response by Proponent to issues raised in submissions (Direction 27)
“
108 23/02/2021 Table of Responses to IAC Request for Further Information (RFI) (clean and marked up version) (Direction 28)
Note the original document submitted on 8 February was updated to refer to new technical notes that were provided and to correct broken links and other minor errors.
Ms Campbell, White & Case for Proponent
109 8/02/2021 Kalbar - Technical Note 02 (TN 002) – Expert recommendations (Part 2.1, Questions 1 and 2) – RFI Response
Mr Power, White & Case for Proponent
110 “ Kalbar - Technical Note 03 (TN 003) - Implementation and enforcement (Part 2.3, Questions 4 - 6) - RFI Response
“
111 “ Kalbar - Technical Note 05 (TN 005) – Scheduling (Part 2.2, Question 3) - RFI Response
“
Document List | Fingerboards Mineral Sands Project Inquiry and Advisory Committee
Page 7
No. Date Description Presented by
112 “ Kalbar - Technical Note 06 (TN 006) - Infrastructure design (Parts 2.4 – 2.5, Questions 8, 10, 11, 12) - RFI Response
“
113 “ TN 006 – Fingerboards Bankable Feasibility Study – Section 11 - Tailings Management Report (4567-30-RPT-GE-00011 – August 2018)
“
114 “ TN 006 – Tailings Storage Facility and Fresh Water Dam General Arrangement (4567-40-DWG-CI-31101 REV E)
“
115 “ TN 006 – Tailings Storage Facility Typical Sections and Details (4567-40-DWG-CI-31102 REV B)
“
116 “ TN 006 – Perry Gulley TSF Catchment Dam General Arrangement (4567-40-DWG-CI-32001 REV B)
“
117 “ TN 006 – Perry Gulley TSF Catchment Dam Typical Sections and Details (4567-40-DWG-CI-32002 REV B)
“
118 “ TN 006 – Perry Gulley TSF Catchment Dam Typical Spillway Details (4567-40-DWG-CI-32003 REV B)
“
119 “ TN 006 – Perry Gulley TSF Sand Staking Area – Drainage and Flood Protection Berm Details (4567-40-DWG-CI-32004 REV B)
“
120 “ Kalbar - Technical Note 08 (TN 008) - Cultural heritage (Part 12) - RFI Response
“
121 “ Kalbar - Technical Note 09 (TN 009) - Land subject to the Specific Controls Overlay (SCO) (Part 15.1, Question 139) - RFI Response
“
122 “ Kalbar - Updated Project Description (Chapter 3 of the EES) - Tracked Changes (Direction 59)
“
123 “ Supplementary Expert Witness Statement - Aaron Organ - Ecology (Direction 59)
“
124 “ Supplementary Expert Witness Statement - Christophe Delaire – Noise (Direction 59)
“
125 “ Supplementary Expert Witness Statement - Darren Billingsley - Radiation (Direction 59)
“
126 “ Supplementary Expert Witness Statement - Dr Doris Blaesing - Horticulture (Direction 59)
“
127 “ Supplementary Expert Witness Statement - Dr Michael Cheetham - Erosion and sedimentation (Direction 59)
“
128 “ Supplementary Expert Witness Statement - Dr Robert Loch - Rehabilitation (Direction 59)
“
129 “ Supplementary Expert Witness Statement - Hugh “
Document List | Fingerboards Mineral Sands Project Inquiry and Advisory Committee
Page 8
No. Date Description Presented by
Middlemis - Groundwater (Direction 59)
130 “ Expert Witness Statement - Ivan Saracik - Centrifuge (Direction 59)
“
131 “ Supplementary Expert Witness Statement - James Weidmann - Surface water and flooding (Direction 59)
“
132 “ Supplementary Expert Witness Statement - Jarrah Muller - Water balance (Direction 59)
“
133 “ Supplementary Expert Witness Statement - Joel Georgiou -Groundwater (Direction 59)
“
134 “ Supplementary Expert Witness Statement - John Glossop - Planning (Direction 59)
“
135 “ Supplementary Expert Witness Statement - John Sweeney - Water impacts (Direction 59)
“
136 “ Supplementary Expert Witness Statement - Karen Teague - Health (Direction 59)
“
137 “ Supplementary Expert Witness Statement - Paul Carter - Traffic and transport (Direction 59)
“
138 “ Supplementary Expert Witness Statement - Tony McAlister - Surface water quality (Direction 59)
“
139 9/02/2021 Supplementary Expert Witness Statement - Simon Welchman - Air Quality (Direction 59)
Mr McArdle, White & Case for Proponent
140 11/02/2021 Kalbar - Technical Note 11 (TN 011) - Consultation for agricultural and horticultural assessments (Part 11.1, Question 102) - RFI Response
Ms Campbell, White & Case for Proponent
141 12/02/2021 Kalbar - Written Submissions in response to IAC request regarding the proposed inclusion of centrifuges
Ms Campbell, White & Case for Proponent
142 12/02/2021 EPA - Response from Kalbar to EPA on response to Section 22 Notice - Works Approval
Mr Hook, EPA
143 14/02/2021 Letter from Jane Hildebrant to IAC - response to Kalbar Written Submissions - Tabled Document 141
Ms Hildebrant
144 19/02/2021 Inquiry and Advisory Committee Consolidated Directions
Mr Wimbush, Chair IAC
145 23/02/2021 Kalbar - Technical Note 4 (TN 004) - Sensitive Receptors (Part 2.8, Questions 23 and 24) - RFI Response
Ms Campbell, White & Case for Proponent
146 “ Kalbar - Technical Note 7 (TN 007) - Dust deposition tables (Questions 57 and 61) - RFI Response
“
147 “ Kalbar - Technical Note 10 (TN 010) – Landscape and visual (Part 10, Questions 79–92 and 95-98) - RFI Response
“
Document List | Fingerboards Mineral Sands Project Inquiry and Advisory Committee
Page 9
No. Date Description Presented by
148 “ Kalbar - Technical Note 10 (TN 010) – Landscape and visual - Graphics Package - RFI Response
“
149 “ Kalbar - Technical Note 12 (TN 012) - Adjacent residences (Part 10.2.2 and 13.4, Questions 82 and 120) - RFI Response
Note as outlined in the IAC’s RFI this information would be provided to the IAC only in the first instance.
“
150 25/02/2021 Fingerboards Mineral Sands Project IAC – Second Request for Information - centrifuges
Mr Wimbush, Chair IAC
151 26/02/2021 Letter from Kalbar to IAC - Response to Directions 31, 46 and 58
Mr Power, White & Case for Proponent
152 26/02/2021 Letter from Mine Free Glenaladale to IAC - Response to Directions 3, 46 and request to file late evidence
Mr Witherow and Ms Trescowthick, EJA for MFG
153 26/02/2021 Letter from East Gippsland Shire Council to IAC - Response to Directions 3 and 45
Mr Wong, Planology for EGSC
154 26/02/2021 Letter from Mine Free Glenaladale to IAC - Confirmation of geotechnical centrifuge modelling expert
Mr Witherow and Ms Trescowthick, EJA for MFG
155 29/01/2021 Submission 24 - Comments on EES Submission Summary
Mr Peel
156 29/01/2021 Submission 54 - Comments on EES Submission Summary
Mr Campbell
157 27/01/2021 Submission 61 - Comments on EES Submission Summary
Mr Frisch
158 30/01/2021 Submission 90 - Comments on EES Submission Summary
Ms Fawcus
159 1/02/2021 Submission 103 - Comments on EES Submission Summary
Ms Guy for South Pines Golf Club
160 30/01/2021 Submission 163 - Comments on EES Submission Summary
Ms Maloney
161 27/01/2021 Submission 224 - Comments on EES Submission Summary
Mr Eason
162 30/01/2021 Submission 225 - Comments on EES Submission Summary
Mr Maloney
163 11/01/2021 Submission 335 - Comments on EES Submission Summary
Ms Hildebrant
164 29/01/2021 Submission 373 - Comments on EES Submission Summary
Ms Di Campli San Vito
165 30/01/2021 Submission 423 - Comments on EES Submission Mr Barton
Document List | Fingerboards Mineral Sands Project Inquiry and Advisory Committee
Page 10
No. Date Description Presented by
Summary
166 1/02/2021 Submission 488 and Submission 724 - Comments on EES Submission Summary
Ms Barnes
167 5/02/2021 Submission 556 - Comments on EES Submission Summary
Ms Haviman
168 27/01/2021 Submission 610 - Comments on EES Submission Summary
Mr Vaughan
169 5/02/2021 Submission 649 - Comments on EES Submission Summary
Dr Parkington
170 5/02/2021 Submission 691 - Comments on EES Submission Summary
Mr Coleman
171 8/02/2021 Submission 734 - Comments on EES Submission Summary
Mr Favell for Gippsland Environment Group
172 26/01/2021 Submission 765 and Submission 814 - Comments on EES Submission Summary
Ms Carruthers for Gasfield Free Bairnsdale and herself
173 1/02/2021 Submission 831 - Comments on EES Submission Summary
Ms Knights
174 4/03/2021 Submission 268 - Response to Tabled Document 141 and Direction 58 (Direction 59 of IAC consolidated Directions)
Ms Johnson
175 5/03/2021 Mine Free Glenaladale - Submission 813 - Response to Tabled Document 141 and Direction 58 (Direction 59 of IAC consolidated Directions)
Ms Trescowthick, EJA for MFG
176 5/03/2021 Gasfield Free Bairnsdale - Submission 765 - Response to Tabled Document 141 and Direction 58 (Direction 59 of IAC consolidated Directions)
Ms Carruthers for Gasfield Free Bairnsdale
177 5/03/2021 East Gippsland Shire Council - Submission 716 - Response to Tabled Document 141 and Direction 58 (Direction 59 of IAC consolidated Directions)
Mr Wong, Planology for EGSC
178 5/03/2021 Letter to Kalbar - Responses to Directions 31, 46 and 58 and question on Centrifuge RFI
Mr Wimbush, Chair IAC
179 5/03/2021 Letter to Mine Free Glenaladale - Response to request for leave to file late evidence
Mr Wimbush, Chair IAC
180 7/03/2021 Submission 335 - Comments on EES Submission Summary and Tabled Documents 78 and 79
Ms Hildebrant
181 8/03/2021 Email from Proponent - Update on timing for documents to be provided to the IAC
Mr Power, White & Case for Proponent
182 “ Kalbar – Coffey Updated socioeconomic sources (Question 114) - RFI Response
“
Document List | Fingerboards Mineral Sands Project Inquiry and Advisory Committee
Page 11
No. Date Description Presented by
183 3/02/2021 Submission 554 - Bendigo and District Environment Council Corrected
Dr Perrin for Bendigo and District Environment Council
184 12/03/2021 Letter from Mine Free Glenaladale to IAC - Witness Statements on centrifuges (Direction 4)
Mr Witherow and Ms Trescowthick, EJA for MFG
185 “ Expert Witness Statement - Assoc. Prof. Conleth O’Loughlin - Centrifuges (Direction 4)
“
186 “ Supplementary Expert Witness Statement - Assoc. Prof. Matthew Currell - Hydrogeology (Direction 4)
“
187 “ Supplementary Expert Witness Statement - Roderick Campbell - Economics (Direction 4)
“
188 12/03/2021 Letter from East Gippsland Shire Council to IAC - Supplementary Witness Statements (Direction 4 and 5)
Mr Wong, Planology for EGSC
189 “ Supplementary Expert Witness Statement - Brett Lane - Ecology (Direction 5)
“
190 “ Supplementary Expert Witness Statement - Assoc. Prof. John Webb – Groundwater (Direction 4)
“
191 12/03/2021 Letter from Kalbar to IAC – Response to Request for Information (question 2 and centrifuge), Direction 59(c), reply to legal submissions (Direction 60), updated EES Submissions Summary (Direction 64) and updated work plan, risk management and treatment plans
Mr Power and Ms Campbell, White & Case for Proponent
192 “ Kalbar - Technical Note 13 (TN 013) - Additional expert recommendations (Part 2.1, Question 2) - RFI Response
“
193 “ Kalbar - Impacts of the use of centrifuges on EES study areas cross referenced table - Direction 59(c)
“
194 “ Kalbar - Technical Note 14 (TN 014) - Response to IAC centrifuge Request for Information (excluding C11) – 2nd RFI Response (Direction 29)
“
195 “ Kalbar - Technical Note 14 (TN 014) - Exhibit 1 - Additional centrifuge test work - 2nd RFI Response (Direction 29)
“
196 “ Kalbar - Reply submission on responses to Tabled Document 141 (Direction 60)
“
197 “ Kalbar - Amended Draft Work Plan - use of centrifuges and removal of Tailing Storage Facility (Fingerboards Rev4_D)
“
198 “ Kalbar - Updated Risk management plan (Rev4 - 24 02 2021) (updated Appendix B to revised Draft Work Plan)
“
Document List | Fingerboards Mineral Sands Project Inquiry and Advisory Committee
Page 12
No. Date Description Presented by
199 “ Kalbar - Updated Risk treatment plan biodiversity (RevD 11 03 2021)
“
200 “ Kalbar - Updated Risk treatment plan template airborne and deposited dust (RevC 11 03 2021)
“
201 “ Kalbar - Updated Risk treatment plan template noise (RevD 11 03 2021)
“
202 “ Kalbar - Updated Risk treatment plan Water Quality and Hydrology (RevC) - 12 03 2021
“
203 17/03/2021 Letter to Bendigo District Environment Council (BDEC) on adjournment request and concerns on mine model and use of centrifuges, including mail attachments
Mr Wimbush, Chair IAC
204 “ Letter to Submitter 639 on request for further delay of the Hearing
“
205 18/03/2021 Letter from Fingerboards IAC to Parties – Notification of Third Directions Hearing
Mr Wimbush, Chair IAC
206 18/03/2021 Letter from East Gippsland Shire Council to IAC – Format of expert conclave reports
Mr Wong, Planology for EGSC
207 18/03/2021 Letter from Proponent to IAC – Response to Council letter on format of expert conclave reports
Mr Power, White & Case for Proponent
208 19/03/2021 Letter from Mine Free Glenaladale to IAC – Response to Council and Proponent letters on format of expert conclave reports
Mr Witherow and Ms Trescowthick, EJA for MFG
209 22/03/2021 Letter from Mine Free Glenaladale to IAC – Drake and Jasonsmith Witness Statements on Centrifuges (Direction 4)
Mr Witherow and Ms Trescowthick, EJA for MFG
210 “ Supplementary Expert Witness Statement - Dr Jessica Drake - Soil Science and Rehabilitation (Direction 4)
“
211 “ Supplementary Expert Witness Statement - Dr Julia Jasonsmith - Tailings – Combined – 03 02 2021 and 22 03 2021 (Direction 4)
“
212 23/03/2021 Inquiry and Advisory Committee - Ruling on Tailings Storage Facility (TSF) and Reasons (Direction 61)
Mr Wimbush, Chair IAC
213 24/03/2021 Inquiry and Advisory Committee Hearing Timetable (v2) Mr Wimbush, Chair IAC
214 25/03/2021 Email from Kalbar to IAC - Providing draft mine rehabilitation plan
Ms Campbell, White & Case for Proponent
215 “ Kalbar – updated Draft Mine Rehabilitation Plan - 24 March 2021 (Appendix C to revised draft Work Plan)
“
216
217
Document List | Fingerboards Mineral Sands Project Inquiry and Advisory Committee
Page 13
No. Date Description Presented by
218
219
220
221
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250