Financial MattersHans Danielsson
Content
MOF (M&O A)
2015 (book closing)
2016 (current situation)
Budget Request for 2017 and Outlook
Sub-system maintenance cost (M&O B)
GTK
2NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
Budget codes
MOF (M&O A) T145400
Network and computing account (new) T145415
(From FRC 5th meeting 2015)
M&O B T145410
3NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
Sharing of the MOF
Institute MoUAdd.
2013
Add.
2014
Add.
2015
Add.
2016
Belgium 6%
Bulgaria 4%
Canada 4%
CERN 20%
Czech Rep. 2%
Germany 10%
Italy 32%
Mexico 2%
Russia /
INR+IHEP6%
Russia /
JINR6%
Romania 3%
Slovakia 2%
UK 10%
US 4%
TOTAL 100% 104% 107% 111% 111%
Nota Bene:
The 100% sealing at
500 kCHF per year.
111% gives 555 kCHF
Sharing of Contributions
4NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
MOF 2015 Book closing
5NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
MOF contributions 2015
(*) in-kind
Institute %Contri-
butionReceived Balance
Belgium 6% 30 30 0
Bulgaria 4% 20 0 -20
Canada 4% 20 20 0
CERN 20% 100 100 0
Czeck Rep. 2% 10 10 0
Germany 10% 50 50 0
Italy 32% 160 160 0
Mexico 2% 10 10 0
Romania 3% 15 15 0
Russia/
INR+IHEP6% 30 30* 0
Russia JINR 6% 30 30 0
Slovakia 2% 10 10 0
UK 10% 50 50 0
US 4% 20 20 0
111% 555 535 -20
6NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
Status Exceptional MOF contributions
Institute %Budget
[kCHF]
Received
2014 [kCHF]
Received
2015 [kCHF]
Balance
[kCHF]
Belgium 6% 27.8 27.8 0.0
Bulgaria 4% 18.5 -18.5
CERN 20% 92.6 46.3 46.3 0.0
Czeck Rep. 2% 9.3 9.3 0.0
Germany 10% 46.3 46.3 0.0
Italy 32% 148.2 18.0 58.9 -71.3
Mexico 2% 9.3 -9.3
Romania 3% 0.0
Russia
/INR+IHEP6% 27.8 13.9* 13.9* 0.0
Russia JINR 6% 27.8 13.9 13.9 0.0
Slowakia 2% 9.3 5.0 4.3 0.0
UK 10% 46.3 -46.3**
US 4% 18.5 18.5 0.0
107% 482 180.5 155.8 -145
For completion of the Detector in 2014/15
* in-kind ** payment expected in November 2016
7NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
MOF Cash Balance 2015Active kCHF Passive kCHF
Carry over 2014 370 MOF 2015 505
Consumables 131 MOF except. 142
Detector Related Cost MOF 2016 (advanced payments) 64
Operation/DCS/DSS 42 Other (pay back from JINR) 30
Tech. Support 107
LKR cryo 8
Safety + Glimos 74
General Services (EPOOL, Contracts..) 47
Admin. (secretariat, phones…) 1 Balance (Dec. 2015) 39
Total 780 Total 780
8NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
MOF Book closing 2015
The MOF end of year balance in 2015 is -39 kCHF
Large negative balance in 2014 was reduced as expected
9NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
MOF Situation in 2016
10NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
MOF contributions 2016(20/10/2016)
Institute %Budget
[kCHF]
Received
[kCHF]
Balance
[kCHF]
Belgium 6% 30 30 0
Bulgaria 4% 20 -20 114 kCHF accumulated
Canada 4% 20 20 0
CERN 20% 100 100 0
Czeck Rep. 2% 10 10 0
Germany 10% 50 50 0
Italy 32% 160 160 0
Mexico 2% 10 -10 In the pipeline…
Romania 3% 15 15 0
Russia
/INR+IHEP6% 30 15 * -15 In-kind
Russia JINR 6% 30 30 0
Slowakia 2% 10 10 0
UK 10% 50 50 0
US 4% 20 20 0
111% 555 495 510(*) -45
(*) in-kind11NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
MOF Budget for 2016
12
Category 2016
Consumables 65
Detector related costs
Operation 48
Tech. Support 118
LKR cryo system 12
Safety Glimos 73
General Services 42
Computing + Network 190
Admin. 7
Carry over 65
Total 555
(From FRC 5th meeting 2015)
NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
By September we have spent ~75 % of the budget.
Estimated balance at the end of the year: ~20 kCHF.
The router order has been delayed and payment is
expected only in 2017 (~ 65 kCHF).
MOF Expected spending 2016
13NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
MOF Budget 2017 Request
and Outlook
14NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
Issue with Neon shortage in 2015 resolved
The price has been lower than expected in 2016. Cost: 36 836 CHF for
150m3. It allows us to keep one complete fill in stock. The present leak
in the RICH is small (non-measurable over a period > 1month)
LKr maintenance
The calorimeter is >20 years old. Risk of increased maintenance and
replacement of components (e.g. High Voltage power supplies,
distribution, feed through, cryogenics, PLC, …)
Radiation (SEUs)
The situation has improved significantly with the shielding which was put
in place in 2015
Enhance remote and automatic resets for sensible equipment
15
Open Issues and Future
NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
Budget Plans:
Establish Online Replacement Account (from the current
budget) to renew Online equipment.
We need to replace the PC farm by 2020: estimated cost for
full renewal: 250-300 kCHF
93 kCHF is transferred in 2016 to T145415.
Estimation: 50-100kCHF/year in 2017 and 2018.
We need to strengthen the resources for data preparation in
2017/2018.
Estimation: 50 kCHF in 2017 and 100 kCHF in 2018
16
Future Computing Expenses
NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
MOF Budget request for 2017
Category 2017
Consumables 120 CERN stores, gas, cooling fluids, CERN work-shop orders, etc.
Detector related costs:
Operation 48 Operation support, DCS, software liscences…
Tech. Support 73Handling in experimental area, general maintenance (UPS, vacuum system, infrastructure, etc
LKR cryo system 20 Repair and maintenance of LKR cryo system
Safety Glimos 40Subsistence for GLIMOS , Safety equipment, Safety training,...
General Services 42 Epool, maintenance contracts, cars,…
Computing + Network 205TIER0, Online computing, Network (system management,etc.)
Admin. 7 secretariat, communication,…
Total 555
For Approval
17NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
MOF Budget OutlookKeep total budget stable
Category 2017 2018
Consumables 120 105
Detector related costs
Operation 48 48
Tech. Support 73 73
LKR cryo system 20 20
Safety Glimos 40 10
General Services 42 42
Computing + Network 205 250
Admin. 7 7
Total 555 555
18NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
M&O BSubsystem maintenance cost
Team account T145410
19
Was introduced 2014 to cover the GTK detector
replacements. (target 25 GTK assemblies).
NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
Status:
Pre-production is validated and all carrier boards have been produced
Cooling plate and detector production has been validated
Need 3 to 6 detectors/year due to radiation damage
Three stations are fully working and efficient (30/30 chips) since 15 September
Two additional detectors will be available by the end of the year
The assembly procedures for the detector production (20 pcs) has been established
Reminder:
Cost sharing: INFN/CERN/UCL ≡ 45%/45%/10%
For approval:
Budget request for 2017 : 115 kCHF/y
GTK Detector Cost (M&O B)
20NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
GTK Spending Profile
2015 2016 2017 2018 2019 2020 Total
Income 115 115 115 115 115 115 690
Expenses:
Cooling plates2 114 105 221
ASIC testing 5 15 20
Bump Bonding115 50 165
GTK Carrier 80 80
Det. Assembly21 10 5 36
Cooling Plant5 19 24
Det. Testing 22 25 8 3 58
Install. + Operation2 5 2 2 11
Total Expenses 36 394 175 10 0 0 615
Yearly Balance 79 -279 -60 105 115 115 75
Cumulative Balance 79 -200 -260 -155 -40 75
• We have seen during the 2016 that the n-in-p sensors are noise free.
The cost for a complete set of n-in-p sensors is ~ 50 kCHF
21
Spent
NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
Thank you for your
attention
And
For your continued support of NA62
22NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
Spares
23NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson
Summary Outstanding
Contributions
Contribution BalanceInstitute % 2010 2011 2012 2013 2014 2015 2016 2017 2018 TotalBudget 100.00 500 500 500 500
Belgium 6% 0.0 0.0 0.0 0 0 0 0 0Bulgaria 4% -5.2 -13.2 -15.2 -20 -20 -20 -20 -114Canada 4% 0 0 0CERN 20% 0.0 0.0 0.0 0 0 0 0 0Czeck Rep. 2% 0.0 0.0 0.0 0 0 0 0 0Germany 10% 0.0 0.0 0.0 0 0 0 0 0Italy 32% 0.0 0.0 0.0 0 0 0 0 0Mexico 2% 1.8 -4.2 0.0 -10 -10 0 -10 -32Romania 3% 0.0 0.0 0.0 0 0 0 0 0Russia /INR+IHEP 6% 0.0 0.0 0.0 0 0 0 -15 -15Russia JINR 6% 0.0 0.0 0.0 0 0 0 0 0Slowakia 2% 0.0 0.0 0.0 0 0 0 0 0UK 10% 0.0 0.0 0.0 0 0 0 0 0US 4% 5.0 -5.0 0.0 0 0 0 0 -0Total including In-Kind 111% 1.6 -22.4 -15.2 -30 -30 -20 -45 -161
24NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson