24
Financial Matters Hans Danielsson

Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

Financial MattersHans Danielsson

Page 2: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

Content

MOF (M&O A)

2015 (book closing)

2016 (current situation)

Budget Request for 2017 and Outlook

Sub-system maintenance cost (M&O B)

GTK

2NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 3: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

Budget codes

MOF (M&O A) T145400

Network and computing account (new) T145415

(From FRC 5th meeting 2015)

M&O B T145410

3NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 4: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

Sharing of the MOF

Institute MoUAdd.

2013

Add.

2014

Add.

2015

Add.

2016

Belgium 6%

Bulgaria 4%

Canada 4%

CERN 20%

Czech Rep. 2%

Germany 10%

Italy 32%

Mexico 2%

Russia /

INR+IHEP6%

Russia /

JINR6%

Romania 3%

Slovakia 2%

UK 10%

US 4%

TOTAL 100% 104% 107% 111% 111%

Nota Bene:

The 100% sealing at

500 kCHF per year.

111% gives 555 kCHF

Sharing of Contributions

4NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 5: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

MOF 2015 Book closing

5NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 6: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

MOF contributions 2015

(*) in-kind

Institute %Contri-

butionReceived Balance

Belgium 6% 30 30 0

Bulgaria 4% 20 0 -20

Canada 4% 20 20 0

CERN 20% 100 100 0

Czeck Rep. 2% 10 10 0

Germany 10% 50 50 0

Italy 32% 160 160 0

Mexico 2% 10 10 0

Romania 3% 15 15 0

Russia/

INR+IHEP6% 30 30* 0

Russia JINR 6% 30 30 0

Slovakia 2% 10 10 0

UK 10% 50 50 0

US 4% 20 20 0

111% 555 535 -20

6NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 7: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

Status Exceptional MOF contributions

Institute %Budget

[kCHF]

Received

2014 [kCHF]

Received

2015 [kCHF]

Balance

[kCHF]

Belgium 6% 27.8 27.8 0.0

Bulgaria 4% 18.5 -18.5

CERN 20% 92.6 46.3 46.3 0.0

Czeck Rep. 2% 9.3 9.3 0.0

Germany 10% 46.3 46.3 0.0

Italy 32% 148.2 18.0 58.9 -71.3

Mexico 2% 9.3 -9.3

Romania 3% 0.0

Russia

/INR+IHEP6% 27.8 13.9* 13.9* 0.0

Russia JINR 6% 27.8 13.9 13.9 0.0

Slowakia 2% 9.3 5.0 4.3 0.0

UK 10% 46.3 -46.3**

US 4% 18.5 18.5 0.0

107% 482 180.5 155.8 -145

For completion of the Detector in 2014/15

* in-kind ** payment expected in November 2016

7NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 8: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

MOF Cash Balance 2015Active kCHF Passive kCHF

Carry over 2014 370 MOF 2015 505

Consumables 131 MOF except. 142

Detector Related Cost MOF 2016 (advanced payments) 64

Operation/DCS/DSS 42 Other (pay back from JINR) 30

Tech. Support 107

LKR cryo 8

Safety + Glimos 74

General Services (EPOOL, Contracts..) 47

Admin. (secretariat, phones…) 1 Balance (Dec. 2015) 39

Total 780 Total 780

8NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 9: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

MOF Book closing 2015

The MOF end of year balance in 2015 is -39 kCHF

Large negative balance in 2014 was reduced as expected

9NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 10: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

MOF Situation in 2016

10NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 11: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

MOF contributions 2016(20/10/2016)

Institute %Budget

[kCHF]

Received

[kCHF]

Balance

[kCHF]

Belgium 6% 30 30 0

Bulgaria 4% 20 -20 114 kCHF accumulated

Canada 4% 20 20 0

CERN 20% 100 100 0

Czeck Rep. 2% 10 10 0

Germany 10% 50 50 0

Italy 32% 160 160 0

Mexico 2% 10 -10 In the pipeline…

Romania 3% 15 15 0

Russia

/INR+IHEP6% 30 15 * -15 In-kind

Russia JINR 6% 30 30 0

Slowakia 2% 10 10 0

UK 10% 50 50 0

US 4% 20 20 0

111% 555 495 510(*) -45

(*) in-kind11NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 12: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

MOF Budget for 2016

12

Category 2016

Consumables 65

Detector related costs

Operation 48

Tech. Support 118

LKR cryo system 12

Safety Glimos 73

General Services 42

Computing + Network 190

Admin. 7

Carry over 65

Total 555

(From FRC 5th meeting 2015)

NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 13: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

By September we have spent ~75 % of the budget.

Estimated balance at the end of the year: ~20 kCHF.

The router order has been delayed and payment is

expected only in 2017 (~ 65 kCHF).

MOF Expected spending 2016

13NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 14: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

MOF Budget 2017 Request

and Outlook

14NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 15: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

Issue with Neon shortage in 2015 resolved

The price has been lower than expected in 2016. Cost: 36 836 CHF for

150m3. It allows us to keep one complete fill in stock. The present leak

in the RICH is small (non-measurable over a period > 1month)

LKr maintenance

The calorimeter is >20 years old. Risk of increased maintenance and

replacement of components (e.g. High Voltage power supplies,

distribution, feed through, cryogenics, PLC, …)

Radiation (SEUs)

The situation has improved significantly with the shielding which was put

in place in 2015

Enhance remote and automatic resets for sensible equipment

15

Open Issues and Future

NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 16: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

Budget Plans:

Establish Online Replacement Account (from the current

budget) to renew Online equipment.

We need to replace the PC farm by 2020: estimated cost for

full renewal: 250-300 kCHF

93 kCHF is transferred in 2016 to T145415.

Estimation: 50-100kCHF/year in 2017 and 2018.

We need to strengthen the resources for data preparation in

2017/2018.

Estimation: 50 kCHF in 2017 and 100 kCHF in 2018

16

Future Computing Expenses

NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 17: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

MOF Budget request for 2017

Category 2017

Consumables 120 CERN stores, gas, cooling fluids, CERN work-shop orders, etc.

Detector related costs:

Operation 48 Operation support, DCS, software liscences…

Tech. Support 73Handling in experimental area, general maintenance (UPS, vacuum system, infrastructure, etc

LKR cryo system 20 Repair and maintenance of LKR cryo system

Safety Glimos 40Subsistence for GLIMOS , Safety equipment, Safety training,...

General Services 42 Epool, maintenance contracts, cars,…

Computing + Network 205TIER0, Online computing, Network (system management,etc.)

Admin. 7 secretariat, communication,…

Total 555

For Approval

17NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 18: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

MOF Budget OutlookKeep total budget stable

Category 2017 2018

Consumables 120 105

Detector related costs

Operation 48 48

Tech. Support 73 73

LKR cryo system 20 20

Safety Glimos 40 10

General Services 42 42

Computing + Network 205 250

Admin. 7 7

Total 555 555

18NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 19: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

M&O BSubsystem maintenance cost

Team account T145410

19

Was introduced 2014 to cover the GTK detector

replacements. (target 25 GTK assemblies).

NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 20: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

Status:

Pre-production is validated and all carrier boards have been produced

Cooling plate and detector production has been validated

Need 3 to 6 detectors/year due to radiation damage

Three stations are fully working and efficient (30/30 chips) since 15 September

Two additional detectors will be available by the end of the year

The assembly procedures for the detector production (20 pcs) has been established

Reminder:

Cost sharing: INFN/CERN/UCL ≡ 45%/45%/10%

For approval:

Budget request for 2017 : 115 kCHF/y

GTK Detector Cost (M&O B)

20NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 21: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

GTK Spending Profile

2015 2016 2017 2018 2019 2020 Total

Income 115 115 115 115 115 115 690

Expenses:

Cooling plates2 114 105 221

ASIC testing 5 15 20

Bump Bonding115 50 165

GTK Carrier 80 80

Det. Assembly21 10 5 36

Cooling Plant5 19 24

Det. Testing 22 25 8 3 58

Install. + Operation2 5 2 2 11

Total Expenses 36 394 175 10 0 0 615

Yearly Balance 79 -279 -60 105 115 115 75

Cumulative Balance 79 -200 -260 -155 -40 75

• We have seen during the 2016 that the n-in-p sensors are noise free.

The cost for a complete set of n-in-p sensors is ~ 50 kCHF

21

Spent

NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 22: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

Thank you for your

attention

And

For your continued support of NA62

22NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 23: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

Spares

23NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson

Page 24: Financial Matters - indico.cern.ch€¦ · Operation/DCS/DSS 42 Other (pay back from JINR) 30 Tech. Support 107 LKR cryo 8 Safety + Glimos 74 General Services (EPOOL, Contracts..)

Summary Outstanding

Contributions

Contribution BalanceInstitute % 2010 2011 2012 2013 2014 2015 2016 2017 2018 TotalBudget 100.00 500 500 500 500

Belgium 6% 0.0 0.0 0.0 0 0 0 0 0Bulgaria 4% -5.2 -13.2 -15.2 -20 -20 -20 -20 -114Canada 4% 0 0 0CERN 20% 0.0 0.0 0.0 0 0 0 0 0Czeck Rep. 2% 0.0 0.0 0.0 0 0 0 0 0Germany 10% 0.0 0.0 0.0 0 0 0 0 0Italy 32% 0.0 0.0 0.0 0 0 0 0 0Mexico 2% 1.8 -4.2 0.0 -10 -10 0 -10 -32Romania 3% 0.0 0.0 0.0 0 0 0 0 0Russia /INR+IHEP 6% 0.0 0.0 0.0 0 0 0 -15 -15Russia JINR 6% 0.0 0.0 0.0 0 0 0 0 0Slowakia 2% 0.0 0.0 0.0 0 0 0 0 0UK 10% 0.0 0.0 0.0 0 0 0 0 0US 4% 5.0 -5.0 0.0 0 0 0 0 -0Total including In-Kind 111% 1.6 -22.4 -15.2 -30 -30 -20 -45 -161

24NA62 - FRC 6th Meeting 10/11/2016 H. Danielsson