Northgate Pedestrian and
Bicycle Bridge
Open House
June 3, 2014
8/12/2019 Final_open House Presentation
2/63
SDOTs mission & vision
Mission: delivering a first-rate transportation system for Seattle.
Vision: a vibrant Seattle with connected people, places, and products.
8/12/2019 Final_open House Presentation
3/63
SDOTs values
Keep it safe
Focus on thebasics
Build healthycommunities
Support athriving
economy
Provide greatservice
8/12/2019 Final_open House Presentation
4/63
Maple Leaf
Licton Springs
Site and Context
Bridge Area
Northgate Mall
Future SoundTransit Station
North SeattleCommunity College
North PublicHealth Center Interstate
8/12/2019 Final_open House Presentation
5/63
Project Need
I-5 is a barrier separating the communities onthe east and west sides.
The project will create improved connections
to major transit investments, educationfacilities, retail centers and reconnect thecommunity.
8/12/2019 Final_open House Presentation
6/63
Project Benefits
The project benefits Northgateneighborhoods, businesses and schools by: Increasing ridership at the Transit Center and
future Light Rail Station.
Creating an easier connection for students to andfrom North Seattle College by shortening the walkdistance from the Transit Center by almost a mile.
Providing important access for bicyclists andpedestrians to other improvements coming to theNorthgate area.
8/12/2019 Final_open House Presentation
7/63
Northgate Pedestrian and BicycleBridge Project Overview
Currently in early design and environmentalreview
Overall length is estimated at 1800 to 2200feet depending on the chosen alternative
Exact location and access points to thebridge are being developed
8/12/2019 Final_open House Presentation
8/63
Project Timeline
8/12/2019 Final_open House Presentation
9/63
Screening Criteria:Alignment Options
8/12/2019 Final_open House Presentation
10/63
Design Feeback from YOU today:
ALIGNMENT SPANDESIGN+
8/12/2019 Final_open House Presentation
11/63
North Seattle College
14,000 STUDENTSAND OVER 400 STAFF
8/12/2019 Final_open House Presentation
12/63
Existing Northgate Transit Center
CURRENTLY6,000 RIDERS / DAY
8/12/2019 Final_open House Presentation
13/63
Future Northgate Sound Transit Station
15,000 PASSENGERS
PER DAY PROJECTED
8/12/2019 Final_open House Presentation
14/63
Existing Connections
1.2 MILES
8/12/2019 Final_open House Presentation
15/63
Existing Connections
1.2 MILES
8/12/2019 Final_open House Presentation
16/63
Existing East Walking Connections
Northgate Way at I-5 overpass Northgate Way at 1stAve NE
8/12/2019 Final_open House Presentation
17/63
Existing West Walking Connections
92ndStreet Overpass Northgate Way at I-5 Overpass
id i
8/12/2019 Final_open House Presentation
18/63
Bridge Access Points
8/12/2019 Final_open House Presentation
19/63
Existing Conditions
1.2 MILES
B id Ali O i
8/12/2019 Final_open House Presentation
20/63
Bridge Alignment Options
MILE!
8/12/2019 Final_open House Presentation
21/63
Proposed Bike Infrastructure
1stAvenue
Bike Lane
100thSt Primary
Bicycle Connection
100th
St PrimaryBicycle Connection
8/12/2019 Final_open House Presentation
22/63
Expanded walk and bike sheds
B id C
8/12/2019 Final_open House Presentation
23/63
Bridge Components
35 elevation gain 45 elevation gain
@ ~20 above grade17.5 clear height beneath
h l
8/12/2019 Final_open House Presentation
24/63
BIKE LANES
BIKE LANESWALKWAY WALKWAY
WALKWAY
Bridge Components: Pathway Elements
15 20 WIDE
W A h
8/12/2019 Final_open House Presentation
25/63
Bridge Components: West Approach
AT-GRADE APPROACH ELEVATED APPROACH
WEST APPROACH
E t A h
8/12/2019 Final_open House Presentation
26/63
Bridge Components: East Approach
AT-GRADE APPROACH ELEVATED APPROACH
EAST APPROACH
E t A h
8/12/2019 Final_open House Presentation
27/63
Bridge Components: East Approach
STAIRS ELEVATOR
EAST APPROACH
P i S
8/12/2019 Final_open House Presentation
28/63
Bridge Components: Primary Span
CABLE STAY
TIED ARCH
TUBE / TRUSS
PRIMARY SPAN
C bl St
8/12/2019 Final_open House Presentation
29/63
Primary Span Types: Cable Stay
C bl St
8/12/2019 Final_open House Presentation
30/63
Primary Span Types: Cable Stay
C bl St
8/12/2019 Final_open House Presentation
31/63
Primary Span Types: Cable Stay
C bl St
8/12/2019 Final_open House Presentation
32/63
Primary Span Types: Cable Stay
C bl St
8/12/2019 Final_open House Presentation
33/63
Preliminary Design Concept: Cable Stay
C bl St
8/12/2019 Final_open House Presentation
34/63
Preliminary Design Concept: Cable Stay
VIEW FROM NORTHEAST
C bl St
8/12/2019 Final_open House Presentation
35/63
Preliminary Design Concept: Cable Stay
VIEW FROM NE 100THST AND 1STAVE N.
C bl St
8/12/2019 Final_open House Presentation
36/63
Preliminary Design Concept: Cable Stay
VIEW FROM SPAN
P i S T Tied Arch
8/12/2019 Final_open House Presentation
37/63
Primary Span Types: Tied Arch
P i S T Tied Arch
8/12/2019 Final_open House Presentation
38/63
Primary Span Types: Tied Arch
P i S T Tied Arch
8/12/2019 Final_open House Presentation
39/63
Primary Span Types: Tied Arch
P i S T Tied Arch
8/12/2019 Final_open House Presentation
40/63
Primary Span Types: Tied Arch
li i i C Tied Arch
8/12/2019 Final_open House Presentation
41/63
Preliminary Design Concept: Tied Arch
P li i D i C Tied Arch
8/12/2019 Final_open House Presentation
42/63
Preliminary Design Concept: Tied Arch
P li i D i C Tied Arch
8/12/2019 Final_open House Presentation
43/63
Preliminary Design Concept: Tied Arch
VIEW FROM NORTHEAST
P li i D i C t Tied Arch
8/12/2019 Final_open House Presentation
44/63
Preliminary Design Concept: Tied Arch
VIEW FROM NE 100TH
ST AND 1ST
AVE N.
P li i D i C t Tied Arch
8/12/2019 Final_open House Presentation
45/63
Preliminary Design Concept: Tied Arch
VIEW FROM SPAN
Primary Span Types: Tube / Truss
8/12/2019 Final_open House Presentation
46/63
Primary Span Types: Tube / Truss
Primary Span Types: Tube / Truss
8/12/2019 Final_open House Presentation
47/63
Primary Span Types: Tube / Truss
Primary Span Types: Tube / Truss
8/12/2019 Final_open House Presentation
48/63
Primary Span Types: Tube / Truss
Primary Span Types: Tube / Truss
8/12/2019 Final_open House Presentation
49/63
Primary Span Types: Tube / Truss
Primary Span Types: Tube / Truss
8/12/2019 Final_open House Presentation
50/63
Primary Span Types: Tube / Truss
Primary Span Types: Tube / Truss
8/12/2019 Final_open House Presentation
51/63
Primary Span Types: Tube / Truss
Preliminary Design Concept: Tube / Truss
8/12/2019 Final_open House Presentation
52/63
Preliminary Design Concept: Tube / Truss
Preliminary Design Concept: Tube / Truss
8/12/2019 Final_open House Presentation
53/63
Preliminary Design Concept: Tube / Truss
Preliminary Design Concept: Tube / Truss
8/12/2019 Final_open House Presentation
54/63
Preliminary Design Concept: Tube / Truss
VIEW FROM NORTHEAST
Preliminary Design Concept: Tube / Truss
8/12/2019 Final_open House Presentation
55/63
Preliminary Design Concept: Tube / Truss
VIEW FROM NE 100TH
ST AND 1ST
AVE N.
Preliminary Design Concept: Tube / Truss
8/12/2019 Final_open House Presentation
56/63
Preliminary Design Concept: Tube / Truss
VIEW FROM WITHIN WEST APPROACH
8/12/2019 Final_open House Presentation
57/63
Project Timeline
8/12/2019 Final_open House Presentation
58/63
Project Funding & TIGER Grant
Funding is provided by $5 million contributions fromSDOT and Sound Transit. An additional $15 million isrequired fully fund the project.
SDOT is seeking additional funding through a FederalTIGER Grant application.
The TIGER Grant application is available on our
website.
Outreach Activities
8/12/2019 Final_open House Presentation
59/63
Outreach Activities
Held community briefings throughout the spring
Open Housetonight!
Another round of briefings will be held once a finalrecommendation is made in the fall
8/12/2019 Final_open House Presentation
60/63
Next Steps
Keep in touch!
Join our email list sign up at welcome table
Check out our website:www.seattle.gov/transportation/northgatepedbridge.htm
http://www.seattle.gov/transportation/northgatepedbridge.htmhttp://www.seattle.gov/transportation/northgatepedbridge.htmhttp://www.seattle.gov/transportation/northgatepedbridge.htmhttp://www.seattle.gov/transportation/northgatepedbridge.htm8/12/2019 Final_open House Presentation
61/63
Questions?
8/12/2019 Final_open House Presentation
62/63
Thanks!
http://www.seattle.gov/transportation
Screening Criteria:
8/12/2019 Final_open House Presentation
63/63
Screening Criteria:Alignment Options