95
[LAB LOGO] Manufacturer: Applicant’s Name Applicant’s address Test item: Power Bank for use in portable application Identification: (Model No.) Serial No.: Receipt No.: Date of receipt: Testing laboratory and its address: Lab Name Lab address Test specification: IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / IEC 60950-1: 2005 + A1: 2009 + A2 : 2013 Test Result: The test item passed / failed the test specification(s). Other Aspects: - Brief description or additional details could be given by the labs here. This test report relates to the test sample submitted and list of documents attached. Tested by: Approved by / Authorized Signatory: Issued by: (Name / Designation) (Name / Designation) (Name / Designation) Date: Date: Date: Test Report No.: xx001 Page 1 of xx Issue Date: DD/MM/YYYY

FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

  • Upload
    others

  • View
    8

  • Download
    1

Embed Size (px)

Citation preview

Page 1: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Manufacturer: Applicant’s Name Applicant’s address

Test item: Power Bank for use in portable application

Identification: (Model No.) Serial No.:

Receipt No.: Date of receipt:

Testing laboratory and its address:

Lab Name

Lab address

Test specification: IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / IEC 60950-1: 2005 + A1: 2009 + A2 : 2013

Test Result: The test item passed / failed the test specification(s).

Other Aspects:

- Brief description or additional details could be given by the labs here.

This test report relates to the test sample submitted and list of documents attached.

Tested by: Approved by / Authorized Signatory:

Issued by:

(Name / Designation) (Name / Designation) (Name / Designation)

Date: Date: Date:

Test Report No.: xx001 Page 1 of xx

Issue Date: DD/MM/YYYY

Page 2: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

TRF No. BIS_IT/PB_IS13252_V1.2

TEST REPORT

IS 13252 (Part 1): 2010 + A1: 2013+ A2: 2015 / IEC 60950-1: 2005 + A1: 2009 + A2: 2013

Information technology equipment – Safety –

Part 1: General requirements

“Power Bank for use in portable application”

Report Reference No. ..................... : xxxxxxxxx 001

Date of issue ..................................... : (see cover page)

Total number of pages ...................... (see cover page)

Testing Laboratory ......................... : Lab Name

Address ............................................ : Lab address

Manufacturer’s name ..................... : Applicant’s Name

Address ............................................ : Applicant’s address

Test specification:

Standard ........................................... : IS 13252 (Part 1): 2010 + A1: 2013+ A2:2015 / IEC 60950-1: 2005 + A1: 2009 +A2:2013

Test procedure ................................. : Compliance Report

Non-standard test method…………..: N/A

Test Report Form No. ..................... : BIS_IT/PB_IS13252_V1.2

Test Report Form(s) Originator ........ : Bureau of Indian Standards

Master TRF ....................................... : 03/06/2016

Test item description ..................... : Power Bank for use in portable application

Trade Mark ....................................... :

Model/Type reference ...................... :

Ratings ............................................. :

Other Documents submitted ............. : Please refer to Table – List of Attachments at Page No. xx

Tested by: Approved by / Authorized Signatory:

Issued by:

(Name / Designation) (Name / Designation) (Name / Designation)

Date: Date: Date:

Page 3: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 3 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Test Code Description Measurement/ testing Total No. of tests

Total no. of applicable tests/ Req.

No. of tests/ Req. passed

Page No.

EL 2100 General Requirements

Components (Cl.1.5)

EL 2101 General Requirements

Power interface (Cl.1.6)

EL 2102 Marking Requirements

Marking & instructions(Cl.1.7)

EL 2103 Electrical safety Protection from electric shock and energy hazards (Cl.2.1)

EL 2104 Electrical safety SELV Circuits (Cl.2.2)

EL 2105 Electrical safety TNV Circuits (Cl.2.3)

EL 2106 Electrical safety Limited current circuits (Cl.2.4)

EL 2107 Electrical safety Limited Power sources (Cl.2.5)

EL 2108 Electrical safety Provisions for earthing and bonding (Cl.2.6)

EL 2109 Electrical safety Overcurrent and earth fault protection in primary circuits (Cl.2.7)

EL 2110 Electrical safety Safety Interlocks (Cl.2.8)

EL 2111 Electrical safety Electrical Insulation (Cl.2.9)

EL 2112 Electrical safety Clearances, Creepage distances and distances through insulation (Cl.2.10)

EL 2113 Wiring Wiring, connections and supply (Cl.3)

EL 2114 Wiring Connection to a main supply (Cl.3.2)

EL 2115 Wiring Wiring terminals for connection of external conductors (Cl.3.3)

EL 2116 Wiring Disconnection for the main supply (Cl.3.4)

EL 2117 Wiring Interconnection of equipment (Cl.3.5)

EL 2118 Mechanical properties

Stability (Cl.4.1)

EL 2119 Mechanical properties

Mechanical strength (Cl.4.2)

Page 4: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 4 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

EL 2120 Mechanical properties

Design and construction (Cl.4.3)

EL 2121 Mechanical properties

Protection against hazardous moving parts (Cl.4.4)

EL 2122 Thermal Properties

Thermal requirements (Cl.4.5)

EL 2123 Mechanical properties

Openings in Enclosures (Cl.4.6)

EL 2124 Fire Safety Resistance to fire (Cl.4.7)

EL 2125 Insulating properties

Electrical requirements and simulated abnormal conditions(Cl.5),5.1

EL 2126 Insulating properties

Electric Strength (Cl.5.2)

EL 2127 Insulating properties

Abnormal operating and fault conditions (Cl.5.3)

EL 2128 Communicating connection

Protection of telecommunication network service persons, and users of other equipment connected to the network, from hazards in the equipment(Cl.6.1)

EL 2129 Communicating connection

Protection of equipment users from overvoltages on telecommunication networks (Cl.6.2)

EL 2130 Communicating connection

Protection of the telecommunication wiring system from overheating (Cl.6.3)

EL 2131 Connection to cable distribution systems

Connection to cable distribution systems

(Cl.7)

EL 2132 Fire safety Tests for resistance to heat and fire (Annex A)

EL 2133 Insulating properties

Motor tests under abnormal conditions (Annex B)

EL 2134 Electrical Safety Transformers (Annex C)

EL 2135 Insulating properties

Measuring Instruments For Touch-Current Tests (Annex D)

EL 2136 Thermal Properties

Temperature Rise Of A Winding(Annex E)

Page 5: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 5 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

EL 2137 Electrical safety Measurement Of Clearances And Creepage Distances(Annex F)

EL 2138 Electrical safety Alternative Method For Determining Minimum Clearances(Annex G)

EL 2139 Radiation Safety Ionizing Radiation(Annex H)

EL 2140 Electrical Safety Table of electrochemical potentials (Annex J)

EL 2141 General Requirements

Thermal controls (Annex K)

EL 2142 General Requirements

Normal load conditions for some types of electrical business equipment (Annex L)

EL 2143 Electrical Safety Criteria for telephone ringing signals (Annex M)

EL 2144 Electrical safety Impulse Test Generators(Annex N)

EL 2145 General Requirements

Normative References(Annex P)

EL 2146 General Requirements

Voltage dependent resistors (VDRs) (Annex Q)

EL 2147 General Requirements

Examples Of Requirements For Quality Control Programmes(Annex R)

EL 2148 General Requirements

Procedure For Impulse Testing (Annex S)

EL 2149 Protection against Ingress of water

Guidance On Protection Against Ingress Of Water (Annex T)

EL 2150 Wiring Insulated Winding Wires For Use Without Interleaved Insulation (Annex U)

EL 2151 Electrical

Safety

Ac Power Distribution Systems(Annex V)

EL 2152 Electrical

Safety

Summation Of Touch Currents (Annex W)

EL 2153 Electrical

Safety

Maximum Heating Effect In Transformer Tests(Annex X)

Page 6: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 6 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

EL 2154 Radiation safety Ultraviolet light conditioning test (Annex Y)

EL 2155 Electrical

Safety

Overvoltage Categories (Annex Z)

EL 2156 Mechanical

properties

Mandrel Test(Annex AA)

EL 2157 Electrical

Safety

Changes In The Second Edition(Annex BB)

EL 2158 Electrical Safety Evaluation Of Integrated Circuit (IC) Current Limiters (Annex CC)

EL 2159 Mechanical properties

Requirements For The Mounting Means Of Rack-Mounted Equipment (Annex DD)

EL 2160 Electrical

Safety

Household And Home/Office Document/Media Shredders (Annex EE)

Certificate: It is certified that the above tests were performed and found to be passing/Failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 7: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 7 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Copy of marking plate:

Copy of marking label:

Page 8: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 8 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Table – List of Attachments

Attachment No. Attachment Description No. of pages in Attachment

Attachment – 1 Photo Document xx

General remarks: The test results presented in this report relate only to the object tested.

This report shall not be reproduced, except in full, without the written approval of the Issuing testing laboratory.

Possible test case verdicts:

- test case does not apply to the test object ................ : N/A

- test object does meet the requirement ...................... : P (Pass)

- test object does not meet the requirement ................ : F (Fail)

Testing ......................................................................... :

Date of receipt of test item ........................................... :

Date(s) of performance of tests ................................... :

Laboratory conditions ............................................... :

Ambient Temperature ................................................... :

Ambient Humidity ......................................................... :

Page 9: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 9 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Test item particulars .................................................. :

Equipment mobility .................................................... : movable hand-held transportable stationary for building-in direct plug-in

Connection to the mains ............................................ : pluggable equipment [] type A [] type B permanent connection detachable power supply cord non-detachable power supply cord not directly connected to the mains

Operating condition ................................................... : continuous rated operating / resting time:

Access location ......................................................... : operator accessible restricted access location

Over voltage category (OVC) ................................... : OVC I OVC II OVC III OVC IV other:

Mains supply tolerance (%) or absolute mains supply values ....................................................................... :

-10%, +6% <OR> ±10%

Class of equipment ................................................... : Class I Class II Class III Not classified

Considered current rating of protective device as a part of the building installation (A) ............................ : 16A (for India)

Pollution degree (PD) ............................................... : PD 1 PD 2 PD 3

IP protection class .................................................... : IPXX or Not rated, indoor use only

Altitude during operation (m) .................................... : Up to 2000

Altitude of test laboratory (m) ................................... : < 1000

Mass of equipment (kg) ............................................ :

Abbreviations that may be used throughout this test report:

PE/PB .............. : protective earth/protective bonding Pri .....................: primary

CB .................... : circuit breaker sec ....................: secondary

(SW)PS ............ : (switching) power supply gnd ....................: ground

HV .................... : high voltage I/O .....................: input/output

PCB ................. : printed circuit (wiring) board ii ......................... : installation instruction

TIW .................... : triple insulated wire PSU ................... : Power Supply Unit

B/I ...................... : built-in application (compliance shall be guarantee in host equipment)

F/B/S/R : Functional/Basic/Supplementary/Reinforced Insulation

Page 10: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 10 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

General product information:

1) Application details / Description of the product:

Max. specified ambient temperature (°C) ...... : ?? °C

Laser classification ........................... ............ : < delete this line, if not applicable >

2) Differences between the models:

(N/A, one single model)

<OR> < describe the constructional differences in such general terms, that the informed reader can still make a rough evaluation of their safety relevance >

Model No. tested with-in the family series . : ??

3) Options:

The equipment was tested without any optional accessory installed. Hence, this report does not cover parameters that are influenced by the installation of optional accessory that might affect safety in the meaning of this standard.

Page 11: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 11 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to General Requirements EL 2100 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

1.5 Components* EL 2100-00

1.5.1 General: EL 2100-01

Components shall be complying with IEC 60950-1 or relevant component standard.

Components and subassemblies approved for IEC 62368-1 can be considered as complying with this standard

1.5.2 Evaluation and testing of components

EL 2100-02

1.5.3 Thermal controls EL 2100-03

1.5.4 Transformers EL 2100-04

1.5.5 Interconnecting cables* EL 2100-05

1.5.6 Capacitors bridging insulation * EL 2100-06

1.5.7 Resistors bridging insulation EL 2100-07

1.5.7.1 Resistors bridging functional, basic or supplementary insulation*

EL 2100-08

1.5.7.2 Resistors bridging double or reinforced insulation between a.c. mains and other circuits

EL 2100-09

1.5.7.3 Resistors bridging double insulation or reinforced insulation between the a.c. mains supply and circuits connected to an antenna or coaxial cable

EL 2100-10

1.5.8 Components in equipment for IT power distribution systems*

EL 2100-11

1.5.9 Surge suppressors EL 2100-12

1.5.9.1 General* EL 2100-13

1.5.9.2 Protection of VDRs* EL 2100-14

1.5.9.3 Bridging of functional insulation by a VDR*

EL 2100-15

1.5.9.4 Bridging of basic insulation by a VDR*

EL 2100-16

1.5.9.5 Bridging of supplementary, double or reinforced insulation by a VDR*

EL 2100-17

Page 12: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 12 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/ failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 13: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 13 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2101 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

1.6 Power interface* EL 2101-00

1.6.1 AC power distribution systems* EL 2101-01

1.6.2 Input current EL 2101-02

1.6.3 Voltage limit of hand-held equipment*

EL 2101-03

1.6.4 Neutral conductor * EL 2101-04

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/ failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 14: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 14 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Marking Requirements EL 2102 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

1.7 Marking and instructions* EL 2102-00

1.7.1 Power rating and identification markings

1.7.1.1 Power rating marking* EL 2102-01

Rated voltage(s) or voltage ranges(s) (V)*.

EL 2102-02

Multiple mains supply connections*.

EL 2102-03

Symbol for nature of supply, for d.c. only*:

EL 2102-04

Rated frequency or rated frequency range (Hz) *:

EL 2102-05

Rated current (mA or A)*: EL 2102-06

1.7.1.2 Identification markings* EL 2102-07

Manufacturer’s name or trade-mark or identification mark *:

EL 2102-08

Model identification or type reference *:

EL 2102-09

Symbol for Class II equipment only* :

EL 2102-10

Other markings and symbols*: EL 2102-11

1.7.1.3 Use of graphical symbols* EL 2102-12

1.7.2 Safety instructions and marking* EL 2102-13

1.7.2.1 General EL 2102-14

1.7.2.2 Disconnect devices* EL 2102-15

1.7.2.3 Overcurrent protective devices* EL 2102-16

1.7.2.4 IT power distribution systems* EL 2102-17

1.7.2.5 Operator access with a tool* EL 2102-18

1.7.2.6 Ozone* EL 2102-19

1.7.3 Short duty cycles* EL 2102-20

1.7.4 Supply voltage adjustment* EL 2102-21

1.7.5 Power outlets on the equipment* EL 2102-22

1.7.6 Fuse identification (marking, special fusing characteristics, cross-reference)

Fuse(s) shall clearly and adequately marked with fuse number and rating*.

EL 2102-23

1.7.7 Wiring terminals EL 2102-24

Page 15: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 15 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Marking Requirements EL 2102 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

1.7.7.1 Protective earthing and bonding terminals*

EL 2102-25

1.7.7.2 Terminals for a.c. mains supply conductors*

EL 2102-26

1.7.7.3 Terminals for d.c. mains supply conductors*

EL 2102-27

1.7.8 Controls and indicators EL 2102-28

1.7.8.1 Identification, location and marking *:

EL 2102-29

1.7.8.2 Colours* EL 2102-30

1.7.8.3 Symbols according to IEC 60417*:

EL 2102-31

1.7.8.4 Markings using figures* : EL 2102-32

1.7.9 Isolation of multiple power sources*

EL 2102-33

1.7.10 Thermostats and other regulating devices*

EL 2102-34

1.7.11 Durability EL 2102-35

1.7.12 Removable parts* EL 2102-36

1.7.13 Replaceable batteries* EL 2102-37

Language(s)

1.7.14 Equipment for restricted access locations*

EL 2102-38

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 16: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 16 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2103 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

2.1 Protection from electric shock and energy hazards*

EL 2103-00

2.1.1 Protection in operator access areas* EL 2103-01

2.1.1.1 Access to energized parts EL 2103-02

Test by inspection :

Test with test finger (Figure 2A)

Test with test pin (Figure 2B):

Test with test probe (Figure 2C)

2.1.1.2 Battery compartments * EL 2103-03

2.1.1.3 Access to ELV wiring EL 2103-04

Working voltage (Vpeak or Vrms); minimum distance through insulation (mm)

2.1.1.4 Access to hazardous voltage circuit wiring

EL 2103-05

2.1.1.5 Energy hazards : EL 2103-06

2.1.1.6 Manual controls EL 2103-07

2.1.1.7 Discharge of capacitors in equipment

Measured voltage (V);

time-constant (s):

EL 2103-08

2.1.1.8 Energy hazards – d.c. mains supply

a) Capacitor connected to the d.c. mains supply :

EL 2103-09

b) Internal battery connected to the d.c. mains supply :

EL 2103-10

2.1.1.9 Audio amplifiers to be tested according to IEC 60065, cl. 9.1.1.:

EL 2103-11

2.1.2 Protection in service access areas EL 2103-12

2.1.3 Protection in restricted access locations

EL 2103-13

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 17: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 17 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2104 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

2.2 SELV circuits* EL 2104-00

2.2.2 Voltages under normal conditions EL 2104-01

2.2.3 Voltages under fault conditions EL 2104-02

2.2.4 Connection of SELV circuits to other circuits* :

EL 2104-03

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 18: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 18 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2105 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

2.3 TNV circuits* EL 2105-00

2.3.1 Type of TNV circuits:

TNV-1 / TNV-2 / TNV-3

EL 2105-01

a) Limits of TNV-1: EL 2105-02

b) Limits of TNV-2 or TNV-3: Continuous voltages, combination of AC and DC values, are such that :

EL 2105-03

2.3.2 Separation from other circuits and from accessible parts*

EL 2105-04

2.3.2.1 General Requirements EL 2105-05

2.3.2.2 Protection by basic insulation EL 2105-06

2.3.2.3 Protection by earthing EL 2105-07

2.3.2.4 Protection by other constructions :

EL 2105-08

2.3.3 Separation from hazardous voltages

EL 2105-09

2.3.4 Connection of TNV circuits to other circuits

EL 2105-10

2.3.5 Test for operating voltages generated externally

EL 2105-11

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 19: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 19 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2106 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

2.4 Limited current circuits * EL 2106-00

2.4.1 General requirements * EL 2106-01

2.4.2 Limit values EL 2106-02

2.4.3 Connection of limited current circuits to other circuits*

EL 2106-03

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 20: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 20 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2107 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

2.5 Limited power sources * EL 2107-00

a) Inherently limited output EL 2107-01

b) Impedance limited output EL 2107-02

c) Regulating network limited output under normal operating and single fault condition

Use of integrated circuit (IC) current limiters

EL 2107-03 (See Annex CC)

d) Overcurrent protective device limited output

EL 2107-04

Max. output voltage (V),

Max. output current (A),

Max. apparent power (VA)

EL 2107-05

Current rating of overcurrent protective device (A)

EL 2107-06

*- Total number of Requirements to be observed / inspected = 01

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted = 06

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 21: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 21 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2108 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

2.6 Provisions for earthing and bonding* EL 2108-00

2.6.1 Protective earthing EL 2108-01

2.6.2 Functional earthing :

The Functional earthing either separated from hazardous voltages by double or reinforced insulation or by protectively earthed screen or conductive part separated by at least basic insulation, or safely connected to Protective Bonding Conductor.*

EL 2108-02

Use of symbol for functional earthing:*

EL 2108-03

2.6.3 Protective earthing and protective bonding conductors*

EL 2108-04

2.6.3.2 Size of protective earthing conductors

EL 2108-05

Rated current (A), cross-sectional area (mm2),

2.6.3.3 Size of protective bonding conductors

EL 2108-06

Protective current Rating (A), cross-sectional area (mm2)

2.6.3.4 Resistance of earthing conductors and their terminations; resistance (), voltage drop (V), test current (A), duration (min):

EL 2108-07

2.6.3.5 Colour of insulation*: EL 2108-08

2.6.4 Terminals

2.6.4.2 Protective earthing and bonding terminals : Rated current(A), Type, Nominal thread diameter (mm)

EL 2108-09

2.6.4.3 Separation of the protective earthing conductor from protective bonding conductors*

EL 2108-10

2.6.5 Integrity of protective earthing*

2.6.5.1 Interconnection of equipment* EL 2108-11

2.6.5.2 Components in protective earthing conductors and protective bonding conductors*

EL 2108-12

2.6.5.3 Disconnection of protective earth* EL 2108-13

2.6.5.4 Parts that can be removed by an operator*

EL 2108-14

2.6.5.5 Parts removed during servicing* EL 2108-15

Page 22: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 22 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

2.6.5.6 Corrosion resistance* EL 2108-16

2.6.5.7 Screws for protective bonding* EL 2108-17

2.6.5.8 Reliance on telecommunication network or cable distribution system*

EL 2108-18

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 23: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 23 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2109 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

2.7 Overcurrent and earth fault protection in primary circuits*

EL 2109-00

2.7.1 Basic requirements:

Protection in primary circuits against overcurrents, short-circuits and earth faults shall be provided, either as an integral part of the equipment or as part of building installation.

EL 2109-01

If pluggable equipment Type B or permanently connected equipment relies on protective device external to the equipment for protection, the equipment installation Instructions shall so state and shall also specify the requirements for short-circuit protection or overcurrent protection or, where necessary, for both.

2.7.2 Faults not simulated in 5.3.7* need not be fitted as an integral part of the equipment

EL 2109-02

2.7.3 Short-circuit backup protection EL 2109-03

2.7.4 Number and location of protective devices :

EL 2109-04

2.7.5 Protection by several devices* EL 2109-05

2.7.6 Warning to service personnel* : EL 2109-06

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 24: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 24 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2110 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

2.8 Safety Interlocks* EL 2110-00

2.8.1 General principles* EL 2110-01

2.8.2 Protection requirements EL 2110-02

2.8.3 Inadvertent reactivation EL 2110-03

2.8.4 Fail-safe operation EL 2110-04

2.8.5 Moving parts EL 2110-05

2.8.6 Overriding* EL 2110-06

2.8.7 Switches, relays and their related circuits

EL 2110-07

2.8.7.1 Separation distances for contact gaps and their related circuits`

EL 2110-08

2.8.7.2 Overload test EL 2110-09

2.8.7.3 Endurance test EL 2110-10

2.8.7.4 Electric strength test EL 2110-11

2.8.8 Mechanical actuators EL 2110-12

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 25: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 25 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2111 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

2.9 Electrical insulation* EL 2111-00

2.9.1 Properties of insulating materials* EL 2111-01

2.9.2 Humidity conditioning EL 2111-02

Relative Humidity : 93 ±3 %,

Temperature: t at 40 ± 2°C

Duration : 120 hours

2.9.3 Grade of insulation* EL 2111-03

2.9.4 Separation from hazardous voltages*

EL 2111-04

Method(s) used

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 26: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 26 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2112 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

2.10 Clearances, creepage distances and distances through

Insulation*

EL 2112-00

2.10.1.1 Frequency * EL 2112-01

2.10.1.2 Pollution degrees* EL 2112-02

2.10.1.3 Reduced values for functional insulation

EL 2112-03

2.10.1.4 Intervening unconnected conductive parts

EL 2112-04

2.10.1.5 Insulation with varying dimensions EL 2112-05

2.10.1.6 Special separation requirements EL 2112-06

2.10.1.7 Insulation in circuits generating starting pulses

EL 2112-07

2.10.2 Determination of working voltage EL 2112-08

2.10.2.2 RMS working voltage EL 2112-09

2.10.2.3 Peak working voltage EL 2112-10

2.10.3 Clearances EL 2112-11

2.10.3.1 General EL 2112-12

2.10.3.2 Mains transient voltages*

a) AC mains supply * : EL 2112-13

b) Earthed d.c. mains supplies* ..............................EL 2112-14

c) Unearthed d.c. mains supplies* : EL 2112-15

d) Battery operation* : EL 2112-16

2.10.3.3 Clearances in primary circuits EL 2112-17

2.10.3.4 Clearances in secondary circuits EL 2112-18

2.10.3.5 Clearances in circuits having starting pulses

EL 2112-19

2.10.3.6 Transients from a.c. mains supply : EL 2112-20

2.10.3.7 Transients from d.c. mains supply : EL 2112-21

2.10.3.8 Transients from telecommunication networks and cable distribution systems ................................................................

EL 2112-22

2.10.3.9 Measurement of transient voltages

a) Transients from a mains supply EL 2112-23

For an a.c. mains supply

For a d.c. mains supply

b) Transients from a telecommunication network

EL 2112-24

Page 27: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 27 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

2.10.4 Creepage distances* EL 2112-25

2.10.4.1 General EL 2112-26

2.10.4.2 Material group and comparative tracking index : CTI tests*

EL 2112-27

2.10.4.3 Minimum creepage distances EL 2112-28

2.10.5 Solid insulation EL 2112-29

2.10.5.1 General EL 2112-30

2.10.5.2 Distances through insulation EL 2112-31

2.10.5.3 Insulating compound as solid insulation

EL 2112-32

2.10.5.4 Semiconductor devices EL 2112-33

2.10.5.5. Cemented joints EL 2112-34

2.10.5.6 Thin sheet material – General EL 2112-35

2.10.5.7 Separable thin sheet material EL 2112-36

2.10.5.8 Non-separable thin sheet material EL 2112-37

2.10.5.9 Thin sheet material – standard test procedure

EL 2112-38

Electric strength test as per Cl.5.2.2

2.10.5.10 Thin sheet material – alternative test procedure

EL 2112-39

Electric strength test as per Cl.5.2.2

2.10.5.11 Insulation in wound components EL 2112-40

2.10.5.12 Wire in wound components

If Peak Working voltage >71 V

a) Basic insulation not under stress EL 2112-41

b) Basic, supplementary, reinforced insulation

EL 2112-42

c) Compliance with Annex U EL 2112-43

d) Where two winding wires in contact inside wound component; angle between 45 and 90

EL 2112-44

2.10.5.13 Wire with solvent-based enamel in wound components

a) Electric strength test (Type test as per Cl.5.2.2)

EL 2112-45

b) Electric Strength test (Routine test as per Cl.5.2.2)

EL 2112-46

2.10.5.14 Additional insulation in wound components

If Peak Working Voltage >71V

a) Basic insulation not under stress EL 2112-47

Page 28: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 28 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

b) Supplementary, reinforced insulation

EL 2112-48

2.10.6 Construction of printed boards*

2.10.6.1 Uncoated printed boards EL 2112-49

2.10.6.2 Coated printed boards EL 2112-50

2.10.6.3 Insulation between conductors on the same inner surface of a printed board

EL 2112-51

2.10.6.4 Insulation between conductors on different surfaces of a printed board*

a) Minimum Thickness of insulation: 0.4mm or

EL 2112-52

b) Confirm with one of the specification and pass the relevant tests as per Table 2R

EL 2112-53

2.10.7 Component external terminations EL 2112-54

2.10.8 Tests on coated printed boards and coated components

2.10.8.1 Sample preparation and preliminary inspection*

EL 2112-55

2.10.8.2 Thermal conditioning EL 2112-56

2.10.8.3 Electric strength test EL 2112-57

2.10.8.4 Abrasion resistance test EL 2112-58

2.10.9 Thermal cycling EL 2112-59

2.10.10 Test for Pollution Degree 1 environment and insulating compound

EL 2112-60

2.10.11 Tests for semiconductor devices and cemented joints

EL 2112-61

2.10.12 Enclosed and sealed parts EL 2112-62

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted :

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 29: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 29 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Wiring EL 2113 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

3.0 Wiring, connections and supply* EL 2113-00

3.1.1 Current rating and overcurrent protection

EL 2113-01

3.1.2 Protection against mechanical damage*

EL 2113-02

3.1.3 Securing of internal wiring* EL 2113-03

3.1.4 Insulation of conductors EL 2113-04

3.1.5 Beads and ceramic insulators EL 2113-05

3.1.6 Screws for electrical contact pressure*

EL 2113-06

3.1.7 Insulating materials in electrical connections*

EL 2113-07

3.1.8 Self-tapping and spaced thread screws*

EL 2113-08

3.1.9 Termination of conductors :

10 N pull test

EL 2113-09

3.1.10 Sleeving on wiring* EL 2113-10

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 30: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 30 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Wiring EL 2114 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation

Verdict

3.2 Connection to a mains supply* EL 2114-00

3.2.1 Means of connection

3.2.1.1 Connection to an a.c. mains supply* EL 2114-01

3.2.1.2 Connection to a d.c. mains supply* EL 2114-02

3.2.2 Multiple supply connections EL 2114-03

3.2.3 Permanently connected equipment EL 2114-04

3.2.4 Appliance inlets:

Are so Located that parts at hazardous voltage are not accessible during insertion or removal of the connector, connector can be inserted without difficulty and after insertion of the connector, the equipment is not supported by the connector for any position of normal use on a flat surface

( appliance inlets complying with IEC 60309 or IEC 60320 considered to comply with this requirement.

EL 2114-05

3.2.5 Power supply cords

3.2.5.1 AC power supply cords* EL 2114-06

Rated current (A), cross-sectional area (mm²), AWG

3.2.5.2 DC power supply cords* EL 2114-07

3.2.6 Cord anchorages and strain relief

Mass of the equipment: Pull Force (N):

EL 2114-08

b) Longitudinal displacement: 2 mm (Max) EL 2114-09

3.2.7 Protection against mechanical damage EL 2114-10

3.2.8 Cord guards

a) Diameter or minor dimension D (mm) :

Test mass (g) :

EL 2114-11

b) Radius of curvature of cord : 1.5 D (Min) EL 2114-12

3.2.9 Supply wiring space EL 2114-13

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 31: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 31 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Wiring EL 2115 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

3.3 Wiring terminals for connection of external conductors*

EL 2115-00

3.3.1 Wiring terminals* EL 2115-01

3.3.2 Connection of non-detachable power supply cords

EL 2115-02

3.3.3 Screw terminals* EL 2115-03

3.3.4 Conductor sizes to be connected

EL 2115-04

Rated current (A), cord/cable type, cross-sectional area (mm2)

3.3.5 Wiring terminal sizes EL 2115-05

Rated current (A), type, nominal thread diameter (mm)

3.3.6 Wiring terminal design EL 2115-06

3.3.7 Grouping of wiring terminals* EL 2115-07

3.3.8 Stranded wire EL 2115-08

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 32: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 32 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Wiring EL 2116 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

3.4 Disconnection from the mains supply*

EL 2116-00

3.4.1 General Requirement

A disconnect device or devices shall be provided to disconnect the equipment from the mains supply for servicing.

EL 2116-01

3.4.2 Disconnect devices* EL 2116-02

3.4.3 Permanently connected equipment*

EL 2116-03

3.4.4 Parts which remain energized* EL 2116-04

3.4.5 Switches in flexible cords* EL 2116-05

3.4.6 Number of poles - single-phase and d.c. equipment*

EL 2116-06

3.4.7 Number of poles - three-phase equipment*

EL 2116-07

3.4.8 Switches as disconnect devices* EL 2116-08

3.4.9 Plugs as disconnect devices* EL 2116-09

3.4.10 Interconnected equipment* EL 2116-10

3.4.11 Multiple power sources* EL 2116-11

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 33: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 33 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Wiring EL 2117 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

3.5 Interconnection of equipment* EL 2117-00

3.5.1 General requirements* EL 2117-01

3.5.2 Types of interconnection circuits*

EL 2117-02

3.5.3 ELV circuits as interconnection circuits *

EL 2117-03

3.5.4 Data ports for additional equipment

EL 2117-04

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 34: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 34 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Mechanical Properties EL 2118 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

4 PHYSICAL REQUIREMENTS* EL 2118-00

4.1 Stability EL 2118-01

a) A unit having a mass of 7 kg or more shall not fall over when tilted to an angle of 10° from its normal upright position. Alternatively, the unit is placed in its intended position of use on a plane, inclined at an angle of 10° to the horizontal, and then rotated slowly through an angle of 360° about its normal vertical axis.

EL 2118-02

b) A floor-standing unit having a mass of 25 kg or more shall not fall over when a force equal to 20 % of the weight of the unit, but not more than 250 N, is applied in any direction except upwards, at a height not exceeding 2 m from the floor.

EL 2118-03

c) A floor-standing unit shall not fall over when a constant downward force of 800 N is

applied at the point of maximum moment to any horizontal surface of at least 125 mm by at least 200 mm, at a height up to 1 m from the floor.

EL 2118-04

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 35: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 35 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Mechanical Properties EL 2119 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

4.2 Mechanical Strength EL 2119-00

4.2.1 General EL 2119-01

4.2.2 Steady force test, 10 N EL 2119-02

4.2.3 Steady force test, 30 N EL 2119-03

4.2.4 Steady force test, 250 N EL 2119-04

4.2.5 Impact test EL 2119-05

a) Fall test as per Fig. 4A EL 2119-06

b) Swing test as per Fig. 4A EL 2119-07

4.2.6 Drop test;

height (mm) :

EL 2119-08

4.2.7 Stress relief test EL 2119-09

4.2.8 Cathode Ray Tubes EL 2119-10

4.2.9 High Pressure Lamps* EL 2119-11

4.2.10 Wall or ceiling mounted equipment; force(N)

EL 2119-12

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 36: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 36 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Mechanical Properties EL 2120 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

4.3 Design and Construction* EL 2120-00

4.3.1 Edges and corners* EL 2120-01

4.3.2 Handles and manual controls; force (N) ................................................................

EL 2120-02

4.3.3 Adjustable controls EL 2120-03

4.3.4 Securing of parts EL 2120-04

4.3.5 Connections by Plugs and Sockets*

EL 2120-05

4.3.6 Direct plug-in equipment EL 2120-06

Torque EL 2120-07

Compliance with the relevant mains plug standard

EL 2120-08

4.3.7 Heating elements in earthed equipment*

EL 2120-09

4.3.8 Batteries

Portable secondary sealed cells and batteries (other than button) containing alkaline or other non-acid electrolyte shall comply with IEC 62133

a) Overcharging of a rechargeable battery

EL 2120-10

b) Unintentional charging of a non-rechargeable battery

EL 2120-11

c) Reverse charging of a rechargeable battery

EL 2120-12

d) Excessive discharging rate for any battery

EL 2120-13

e) Electric strength as per Cl.5.3.9.2

EL 2120-14

4.3.9 Oil & grease* EL 2120-15

4.3.10 Dust, powders, liquids and gases

EL 2120-16

4.3.11 Containers for liquids or gases EL 2120-17

4.3.12 Flammable liquids EL 2120-18

4.3.13 Radiation

4.3.13.2 Ionizing radiation EL 2120-19

4.3.13.3 Effect of ultraviolet (UV) radiation on materials

EL 2120-20

Page 37: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 37 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

4.3.13.4 Human exposure to ultraviolet (UV) radiation

EL 2120-21

4.3.13.5 Lasers (including laser diodes) and LED’s:

4.3.13.5.1 Lasers (including laser diodes) For laser see IEC 60825-1, respective part as applicable.

EL 2120-22

Laser class ................................

4.3.13.5.2 Light emitting diodes (LED’s) EL 2120-23

4.3.13.6 Other types* EL 2120-24

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 38: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 38 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Mechanical Properties EL 2121 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

4.4 Protection against hazardous moving parts

EL 2121-00

4.4.1 General EL 2121-01

4.4.2 Protection in operator access areas

EL 2121-02

4.4.3 Protection in restricted access locations *

EL 2121-03

4.4.4 Protection in service access areas*

EL 2121-04

4.4.5 Protection against moving fan blades

EL 2121-05

4.4.5.1 General* EL 2121-06 m = r = N = K =

Not considered likely to cause pain or injury. a)……..….:

EL 2121-07 =

Is considered likely to cause pain, not injury. b)

EL 2121-08 =

Considered likely to cause injury. c)………………..……:

EL 2121-09

4.4.5.2 Protection for users* EL 2121-10

Use of symbol or warning* EL 2121-11

4.4.5.3 Protection for service persons* EL 2121-12

Use of symbol or warning * EL 2121-13

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 39: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 39 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Thermal Properties EL 2122 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

4.5 Thermal Requirements* EL 2122-00

4.5.1 General EL 2122-01

4.5.2 Temperature tests EL 2122-02

4.5.3 Temperature limits for materials* EL 2122-03

4.5.4 Touch temperature limits* EL 2122-04

4.5.5 Resistance to abnormal heat EL 2122-05

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 40: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 40 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Mechanical Properties EL 2123 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

4.6 Openings in enclosures* EL 2123-00

4.6.1 Top and side openings EL 2123-01

Dimensions (mm) :

4.6.2 Bottoms of fire enclosures : EL 2123-02

Construction of the bottom, dimensions (mm) :

4.6.3 Doors or covers in fire enclosures*

EL 2123-03

4.6.4 Openings in transportable equipment

EL 2123-04

4.6.4.1 Constructional design measures EL 2123-05

Dimensions (mm)

4.6.4.2 Evaluation measures for larger openings

EL 2123-06

4.6.4.3 Use of metallized parts EL 2123-07

4.6.5 Adhesives for constructional purposes: Compliance is checked by examination of the construction and of the available data. If such data is not available, compliance is checked by the following tests.

EL 2123-08

a)Temperature Conditioning at :

100 °C ± 2 °C for one week; or

90 °C ± 2 °C for three weeks; or

82 °C ± 2 °C for eight weeks.

EL 2123-09

After temperature conditioning

b) Leave the sample between 20°C to 30°C for 1 hour

EL 2123-10

c) Place the sample at - 40°C±2°C for 4 hours

EL 2123-11

d) Remove and allow the sample to come to any convenient temperature between 20 °C and

30 °C for 8 h;

EL 2123-12

e) Place the sample in a cabinet at 91 % to 95 % relative humidity for 72 h;

EL 2123-13

Page 41: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 41 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

f) Remove the sample and leave it at any convenient temperature between 20 °C and 30 °C for 1 h;

EL 2123-14

g) Place the sample in an oven at the temperature used for the temperature conditioning for 4 h;

EL 2123-15

h) Remove the sample and allow it to reach any convenient temperature between 20 °C; and

30 °C for 8 h.

EL 2123-16

i) The sample is then immediately subjected to the tests of Cl.4.2 as applicable.

EL 2123-17

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 42: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 42 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Fire Safety EL 2124 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

4.7 Resistance to fire* EL 2124-00

4.7.1 Reducing the risk of ignition and spread of flame

Method 1, selection and application of components wiring and materials OR

EL 2124-01

Method 2, application of all of simulated fault condition tests

EL 2124-02

4.7.2 Conditions for a fire enclosure*

4.7.2.1 Parts requiring a fire enclosure* EL 2124-03

4.7.2.2 Parts not requiring a fire enclosure

EL 2124-04

4.7.3 Materials* EL 2124-05

4.7.3.1 General* EL 2124-06

a)Class of material used* EL 2124-07

b) Where HB40 CLASS MATERIAL, HB75 CLASS MATERIAL or HBF CLASS FOAMED MATERIAL, is required,

material passing the glow-wire test at 550 °C according to IEC 60695-2-11 is acceptable as an

alternative.

EL 2124-08

c) Where it is not practical to protect components against overheating under fault conditions, the components shall be mounted on V-1 CLASS MATERIAL. Additionally, such components shall be separated from material of a class lower than V-1 CLASS MATERIAL by at least 13 mm of air, or by a solid barrier of V-1 CLASS MATERIAL.

EL 2124-09

4.7.3.2 Materials for fire enclosures

a) For MOVABLE EQUIPMENT having a total mass not exceeding 18 kg, the material of a FIRE ENCLOSURE, in the thinnest significant wall thickness used, shall be of V-1 CLASS MATERIAL or shall pass the test of Clause A.2.

EL 2124-10

Page 43: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 43 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

b) For MOVABLE EQUIPMENT having a total mass exceeding 18 kg and for all STATIONARY EQUIPMENT, the material of a FIRE ENCLOSURE, in the thinnest significant wall thickness used, shall be of 5VB CLASS MATERIAL or shall pass the test of Clause A.1.

EL 2124-11

c) Materials for components that fill an opening in a FIRE ENCLOSURE, and that are intended to be mounted in this opening shall :

be of V-1 CLASS MATERIAL; or

pass the tests of Clause A.2; or

comply with the flammability requirements of the relevant IEC component standard

EL 2124-12

d) Plastic materials of a FIRE ENCLOSURE shall be located more than 13 mm through air from arcing parts such as unenclosed commutators and unenclosed switch contacts.

EL 2124-13

e)Plastic materials of a FIRE ENCLOSURE located less than 13mm through air from non-arcing parts which, under any condition of normal or abnormal operation,could attain a temperature sufficient to ignite the material, shall be capable of passing the test of IEC 60695-2-20.

The average time to ignition of the samples shall be not less than 15sec. If the sample melts through without igniting, the time at which this occurs is not considered to be the time to ignition.

EL 2124-14

4.7.3.3 Materials for components and other parts outside fire enclosures *

Page 44: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 44 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

a) Materials shall be of :

− HB75 CLASS MATERIAL if the thinnest significant thickness of this material is < 3 mm, or

− HB40 CLASS MATERIAL if the thinnest significant thickness of this material is ≥ 3 mm, or

− HBF CLASS FOAMED MATERIAL.*

EL 2124-15

b) Connectors shall comply with one of the following:

− be made of V-2 CLASS MATERIAL; or

− pass the tests of Clause A.2; or

− comply with the flammability requirements of the relevant IEC component standard; or

− be mounted on V-1 CLASS MATERIAL and be of a small size; or

− be located in a SECONDARY CIRCUIT supplied by a power source that is limited to a

maximum of 15 VA (see 1.4.11) under normal operating conditions and after a single fault

in the equipment (see 1.4.14).

EL 2124-16

4.7.3.4 Materials for components and other parts inside fire enclosures

a) Inside FIRE ENCLOSURES, materials for components and other parts shall comply with

one of the following:

− be of V-2 CLASS MATERIAL or

HF-2 CLASS FOAMED MATERIAL; or

− pass the flammability test described in Clause A.2; or

− meet the flammability requirements of a relevant IEC component standard that includes such requirements.

EL 2124-17

Requirements for voltage dependent resistors (VDR’s) are in Annex Q.*

EL 2124-18

Page 45: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 45 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

4.7.3.5 Materials for air filter assemblies :

Air filter assemblies shall be constructed of V-2 CLASS MATERIAL, or HF-2 CLASS FOAMED

MATERIAL.

EL 2124-19

4.7.3.6 Materials used in high-voltage components

a) High-voltage components operating at peak-to-peak voltages exceeding 4 kV shall either be

of V-2 CLASS MATERIAL, or

HF-2 CLASS FOAMED MATERIAL, or comply with 14.4 of IEC 60065 or

pass the needle flame test according to IEC 60695-11-5.

EL 2124-20

b) Compliance is checked by inspection of the equipment and material data sheets and, if

necessary, by

− the tests for V-2 CLASS MATERIAL or HF-2 CLASS FOAMED MATERIAL; or

− the test described in 14.4 of IEC 60065; or

− the needle flame test according to IEC 60695-11-5.

EL 2124-21

c) In addition to above, the following details apply, referring to clauses of IEC 60695-11-5:

Clause 7 - Severities

EL 2124-22

Clause 8 - Conditioning EL 2124-23

Clause 11 - Evaluation of test results

EL 2124-24

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 46: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 46 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Insulating Properties EL 2125 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

5.0 ELECTRICAL REQUIREMENTS AND SIMULATED ABNORMAL CONDITIONS*

EL 2125-00

5.1 Touch current and protective conductor current*

EL 2125-01

5.1.2 Configuration of equipment under test (EUT)*

EL 2125-02

5.1.2.1 Single connection to an a.c. mains supply*

EL 2125-03

5.1.2.2 Redundant multiple connections to an a.c. mains supply*

EL 2125-04

5.1.2.3 Simultaneous multiple connections to an a.c. mains supply

EL 2125-05

5.1.3 Test circuit EL 2125-06

5.1.4 Application of measuring instrument

EL 2125-07

5.1.5 Test procedure EL 2125-08

5.1.6 Test measurements

a) r.m.s value of voltage, U2 measured using the instrument as per Fig. D.1 or

r.m.s value of current measured using the instrument as per Fig. D.2

Alternatively, peak value of voltage, U2, is measured using the measuring instrument described in Clause D.1

EL 2125-09

b) Measured touch current (mA): EL 2125-10

c) Calculated value of TOUCH CURRENT (mA) = U2 / 500

EL 2125-11

d ) Measured protective conductor current(mA)

EL 2125-12

e) Max. protective conductor current =5% of Input current

EL 2125-13

5.1.7 Equipment with touch current exceeding 3.5 mA

EL 2125-14

5.1.7.1 General EL 2125-15

5.1.7.2 Simultaneous multiple connections to the supply

EL 2125-16

Page 47: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 47 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

5.1.8 Touch currents to telecommunication networks and cable distribution systems and from telecommunication networks

EL 2125-17

5.1.8.1 Limitation of the touch current to a telecommunication network or to a cable distribution system

EL 2125-18

Supply voltage (V)

Measured touch current (mA)

Max. allowed touch current (mA)

5.1.8.2 Summation of touch currents from telecommunication networks

EL 2125-19

a) EUT with earthed telecommunication ports :

b) EUT whose telecommunication ports have no reference to protective earth

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 48: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 48 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Insulating Properties EL 2126 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

5.2 Electric strength* EL 2126-00

5.2.1 General* EL 2126-01

5.2.2 Test procedure

a) The test voltages for electric strength for the appropriate grade of insulation [FUNCTIONAL

INSULATION if required by 5.3.4 b), BASIC INSULATION, SUPPLEMENTARY INSULATION or

REINFORCED INSULATION] are as specified in either:

− Table 5B using the PEAK WORKING VOLTAGE (U), as determined in 2.10.2; or

− Table 5C using the REQUIRED WITHSTAND VOLTAGE, as determined in G.4.

EL 2126-02

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 49: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 49 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Insulating Properties EL 2127 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

5.3 Abnormal operating and fault conditions

EL 2127-00

5.3.1 Protection against overload and abnormal operation

EL 2127-01

5.3.2 Motors EL 2127-02

5.3.3 Transformers EL 2127-03

5.3.4 Functional insulation: EL 2127-04

5.3.5 Electromechanical components EL 2127-05

5.3.6 Audio amplifiers in ITE : EL 2127-06

5.3.7 Simulation of faults EL 2127-07

5.3.8 Unattended equipment EL 2127-08

5.3.9 Compliance criteria for abnormal operating and fault conditions*

5.3.9.1 During the tests EL 2127-09

5.3.9.2 After the tests EL 2127-10

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 50: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 50 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Communicating Connection EL 2128 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

6.1 Protection of telecommunication network service persons, and users of other equipment connected to the network, from hazards in the equipment

EL 2128-00

6.1.1 Protection from hazardous voltages

EL 2128-01

6.1.2 Separation of the telecommunication network from earth*

6.1.2.1 Requirements:

- Surge suppressors that bridge the insulation shall have a minimum rated operating voltage Uop of

Uop =Upeak + ΔUsp + ΔUsa

Where Upeak is 360V or 180V

ΔUsp is the maximum increase of the rated operating voltage due to variations in component production(If not specified by the manufacturer, shall be taken as 10% of the rated operating voltage of the component)

ΔUsa is the maximum increase of the rated operating voltage due to the component ageing over the expected life of the equipment(If not specified by the manufacturer, shall be taken as 10% of the rated operating voltage of the component)

-Insulation is subjected to electric strength test according to 5.2.2. The a.c test voltage is 1.5kV or 1.0kV

- Components bridging the insulation that are left in place during electric strength testing shall not be damaged. There shall be no breakdown of insulation during electric strength testing.

EL 2128-02

Page 51: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 51 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

6.1.2.2 Exclusions EL 2128-03

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 52: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 52 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Communicating Connection EL 2129 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

6.2 Protection of equipment users from overvoltages on telecommunication networks*

EL 2129-00

6.2.1 Separation requirements EL 2129-01

6.2.2 Electric strength test procedure EL 2129-02

6.2.2.1 Impulse test EL 2129-03

6.2.2.2 Steady-state test EL 2129-04

6.2.2.3 Compliance criteria EL 2129-05

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 53: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 53 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Communicating Connection EL 2130 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

6.3 Protection of the telecommunication wiring system from overheating

EL 2130-00

a)If current limiting is due to the inherent impedance of the power source, the output current into any resistive load, including a short-circuit, is measured. The current limit shall not be

exceeded after 60 s of test.

Max. output current (A) :

EL 2130-01

b) If current limiting is provided by an overcurrent protective device having a specified time/current characteristic:

– the time/current characteristic shall show that a current equal to 110 % of the current limit will be interrupted within 60 min; and

EL 2130-02

c) the output current into any resistive load, including a short-circuit, with the overcurrent protective device bypassed, measured after 60 s of test, shall not exceed 1 000/U,

where U is the output voltage measured in accordance with 1.4.5 with all load circuits

disconnected.

EL 2130-03

Page 54: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 54 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

d) If current limiting is provided by an overcurrent protective device that does not have a

specified time/current characteristic:

– the output current into any resistive load, including a short-circuit, shall not exceed the

current limit after 60 s of test; and

– the output current into any resistive load, including a short-circuit, with the overcurrent

protective device bypassed, measured after 60 s of test, shall not exceed 1 000/U, where

U is the output voltage measured in accordance with 1.4.5 with all load circuits

disconnected.

EL 2130-04

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 55: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 55 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Connection to cable distribution system EL 2131 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

7 Connection to cable distribution systems*

EL 2131-00

7.1 General requirements* EL 2131-01

7.2 Protection of cable distribution system service persons, and users of other equipment connected to the system, from hazardous voltages in the equipment

EL 2131-02

7.3 Protection of equipment users from overvoltages on the cable distribution system

EL 2131-03

7.4 Insulation between primary circuits and cable distribution systems

EL 2131-04

7.4.1 General EL 2131-05

7.4.2 Voltage surge test EL 2131-06

7.4.3 Impulse test EL 2131-07

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 56: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 56 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Fire Safety EL 2132 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

A ANNEX A, TESTS FOR RESISTANCE TO HEAT AND FIRE

EL 2132-00

A.1 Flammability test for fire enclosures of movable equipment having a total mass exceeding 18 kg, and of stationary equipment (see 4.7.3.2)

EL 2132-01

A.1.1 Samples: EL 2132-02

Wall thickness (mm):

A.1.2 Conditioning of samples; temperature (C) :

EL 2132-03

A.1.3 Mounting of samples : EL 2132-04

A.1.4 Test flame (see IEC 60695-11-3)

EL 2132-05

Flame A, B, C or D :

A.1.5 Test procedure EL 2132-06

A.1.6 Compliance criteria EL 2132-07

Sample 1 burning time (s):

Sample 2 burning time (s):

Sample 3 burning time (s):

A.2 Flammability test for fire enclosures of movable equipment having a total mass not exceeding 18 kg, and for material and components located inside fire enclosures (see 4.7.3.2 and 4.7.3.4)

EL 2132-08

A.2.1 Samples, material: EL 2132-09

Wall thickness (mm):

A.2.2 Conditioning of samples; temperature (°C) :

EL 2132-10

A.2.3 Mounting of samples : EL 2132-11

A.2.4 Test flame (see IEC 60695-11-4)

EL 2132-12

Flame A, B or C :

A.2.5 Test procedure EL 2132-13

A.2.6 Compliance criteria EL 2132-14

Sample 1 burning time (s):

Page 57: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 57 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Fire Safety EL 2132 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

Sample 2 burning time (s):

Sample 3 burning time (s):

A.2.7 Alternative test acc. to IEC 60695-11-5, cl. 5 and 9

EL 2132-15

Sample 1 burning time (s):

Sample 2 burning time (s):

Sample 3 burning time (s):

A.3 Hot flaming oil test (see 4.6.2) EL 2132-16

A.3.1 Mounting of samples EL 2132-17

A.3.2 Test procedure EL 2132-18

A.3.3 Compliance criterion EL 2132-19

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 58: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 58 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Insulating Properties EL 2133 – V1.4 Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

B ANNEX B, MOTOR TESTS UNDER ABNORMAL CONDITIONS (see 4.7.2.2 and 5.3.2)

EL 2133-00

B.1 General requirements EL 2133-01

Position :

Manufacturer :

Type :

Rated values :

B.2 Test conditions EL 2133-02

B.3 Maximum temperatures EL 2133-03

B.4 Running overload test EL 2133-04

B.5 Locked-rotor overload test EL 2133-05

Test duration (days):

Electric strength test: test voltage (V) :

B.6 Running overload test for d.c. motors in secondary circuits

EL 2133-06

B.6.1 General EL 2133-07

B.6.2 Test procedure EL 2133-08

B.6.3 Alternative test procedure EL 2133-09

B.6.4 Electric strength test; test voltage (V):

EL 2133-10

B.7 Locked-rotor overload test for d.c. motors in secondary circuits

EL 2133-11

B.7.1 General EL 2133-12

B.7.2 Test procedure EL 2133-13

B.7.3 Alternative test procedure EL 2133-14

B.7.4 Electric strength test; test voltage (V) :

EL 2133-15

B.8 Test for motors with capacitors EL 2133-16

B.9 Test for three-phase motors EL 2133-17

B.10 Test for series motors EL 2133-18

Operating voltage (V) :

Page 59: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 59 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 60: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 60 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2134 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

C ANNEX C, TRANSFORMERS (see 1.5.4 and 5.3.3)*

EL 2134-00

Position :

Manufacturer :

Type :

Rated values :

Method of protection:

C.1 Overload test EL 2134-01

C.2 Insulation EL 2134-02

Protection from displacement of windings:

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 61: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 61 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Insulating Properties EL 2135 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

D ANNEX D, MEASURING INSTRUMENTS FOR TOUCH-CURRENT TESTS (see 5.1.4)

EL 2135-00

D.1 Measuring instrument EL 2135-01

D.2 Alternative measuring instrument

EL 2135-02

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 62: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 62 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Thermal Properties EL 2136– V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

E ANNEX E, TEMPERATURE RISE OF A WINDING (see 1.4.13)

EL2136-00

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 63: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 63 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2137 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

F ANNEX F, MEASUREMENT OF CLEARANCES AND CREEPAGE DISTANCES (see 2.10 and Annex G)

EL2137-00

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 64: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 64 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical safety EL 2138 – V1.4 Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

G ANNEX G, ALTERNATIVE METHOD FOR DETERMINING MINIMUM CLEARANCES

EL 2138-00

G.1 Clearances EL 2138-01

G.1.1 General EL 2138-02

G.1.2 Summary of the procedure for determining minimum clearances

EL 2138-03

G.2 Determination of mains transient voltage (V)

EL 2138-04

G.2.1 AC Mains supply EL 2138-05

G.2.2 Earthed d.c. mains supplies EL 2138-06

G.2.3 Unearthed d.c. mains supplies EL 2138-07

G.2.4 Battery operation EL 2138-08

G.3 Determination of telecommunication network transient voltage (V)

EL 2138-09

G.4 Determination of required withstand voltage (V)

EL 2138-10

G.4.1 Mains transients and internal repetitive peaks

EL 2138-11

G.4.2 Transients from telecommunication networks:

EL 2138-12

G.4.3 Combination of transients EL 2138-13

G.4.4 Transients from cable distribution systems

EL 2138-14

G.5 Measurement of transient voltages (V)

EL 2138-15

a) Transients from a mains supply

For an a.c. mains supply

For a d.c. mains supply

b) Transients from a telecommunication network

G.6 Determination of minimum clearances

EL 2138-16

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Page 65: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 65 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 66: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 66 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Radiation Safety EL 2139 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

H ANNEX H, IONIZING RADIATION (see 4.3.13)

EL 2139-00

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 67: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 67 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2140 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

J ANNEX J, TABLE OF ELECTROCHEMICAL POTENTIALS (see 2.6.5.6)*

EL 2140-00

Metal(s) used :

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 68: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 68 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to General Requirement EL 2141 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

K ANNEX K, THERMAL CONTROLS (see 1.5.3 and 5.3.8)*

EL 2141-00

K.1 Making and breaking capacity EL 2141-01

K.2 Thermostat reliability; operating voltage (V) :

EL 2141-02

K.3 Thermostat endurance test; operating voltage (V) :

EL 2141-03

K.4 Temperature limiter endurance; operating voltage (V) :

EL 2141-04

K.5 Thermal cut-out reliability EL 2141-05

K.6 Stability of operation EL 2141-06

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 69: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 69 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to General Requirement EL 2142 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

L ANNEX L, NORMAL LOAD CONDITIONS FOR SOME TYPES OF ELECTRICAL BUSINESS EQUIPMENT (see 1.2.2.1 and 4.5.2)*

EL 2142-00

L.1 Typewriters* EL 2142-01

L.2 Adding machines and cash registers*

EL 2142-02

L.3 Erasers* EL 2142-03

L.4 Pencil sharpeners* EL 2142-04

L.5 Duplicators and copy machines*

EL 2142-05

L.6 Motor-operated files* EL 2142-06

L.7 Other business equipment* EL 2142-07

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 70: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 70 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2143 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

M ANNEX M, CRITERIA FOR TELEPHONE RINGING SIGNALS (see 2.3.1)

EL 2143-00

M.1 Introduction* EL 2143-01

M.2 Method A EL 2143-02

M.3 Method B EL 2143-03

M.3.1 Ringing signal EL 2143-04

M.3.1.1 Frequency (Hz) ................................EL 2143-05

M.3.1.2 Voltage (V) .............................................................EL 2143-06

M.3.1.3 Cadence; time (s), voltage (V) ...............................EL 2143-07

M.3.1.4 Single fault current (mA) ................................EL 2143-08

M.3.2 Tripping device and monitoring voltage ................................................................

EL 2143-09

M.3.2.1 Conditions for use of a tripping device or a monitoring voltage

EL 2143-10

M.3.2.2 Tripping device EL 2143-11

M.3.2.3 Monitoring voltage (V) ................................EL 2143-12

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 71: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 71 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical safety EL 2144 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

N ANNEX N, IMPULSE TEST GENERATORS (see 1.5.7.2, 1.5.7.3, 2.10.3.9, 6.2.2.1, 7.3.2, 7.4.3 and Clause G.5)

EL 2144-00

N.1 ITU-T impulse test generators EL 2144-01

N.2 IEC 60065 impulse test generator

EL 2144-02

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 72: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 72 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to General Requirements EL 2145– V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

P ANNEX P, NORMATIVE REFERENCES

EL 2145-00

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 73: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 73 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to General Requirements EL 2146 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

Q ANNEX Q, Voltage dependent resistors (VDRs) (see 1.5.9.1)

EL 2146-00

A VDR shall comply with iec 61051-2, whether a fire enclosure is provided or not, taking into account all of the following:

a) Preferred climatic categories

Lower category temperature:

-10ºC

Upper category temperature: +85ºC

Duration of damp Test, steady state test:21 days

b) Maximum continuous voltage:

Atleast 1,25 times the rated voltage of the equipment or

Atleast 1,25 times the upper voltage of the rated voltage range

c) Combination pulse : EL 2146-01

d) Body of the VDR shall comply with Needle flame test according to IEC 60695-11-5 with the following test severities:

duration of application of the test flame: 10 s

after flame time: 5s

[This test is not required if VDR complies with V-1 CLASS MATERIAL]

EL 2146-02

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 74: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 74 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to General Requirement EL 2147– V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

R ANNEX R, EXAMPLES OF REQUIREMENTS FOR QUALITY CONTROL PROGRAMMES*

EL 2147-00

R.1 Minimum separation distances for unpopulated coated printed boards (see 2.10.6.2)*

EL 2147-01

R.2 Reduced clearances (see 2.10.3)*

EL 2147-02

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 75: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 75 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to General Requirement EL 2148 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

S ANNEX S, PROCEDURE FOR IMPULSE TESTING (see 6.2.2.3)*

EL 2148-00

S.1 Test equipment* EL 2148-01

S.2 Test procedure* EL 2148-02

S.3 Examples of waveforms during impulse testing*

EL 2148-03

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 76: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 76 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Protection against Ingress of water EL 2149 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

T ANNEX T, GUIDANCE ON PROTECTION AGAINST INGRESS OF WATER (see 1.1.2)*

EL 2149-00

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 77: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 77 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Wiring EL 2150 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

U ANNEX U, INSULATED WINDING WIRES FOR USE WITHOUT INTERLEAVED INSULATION (see 2.10.5.4)

EL2150-00

U.1 GENERAL EL2150-01

U.2 TYPE TESTS EL2150-02

U.2.1 GENERAL EL2150-03

U.2.2 ELECTRIC STRENGTH EL2150-04

U.2.2.1 SOLID ROUND WINDING WIRE AND STRANDED WINDING WIRES

EL2150-05

U.2.2.1.1 WIRES WITH NOMINAL CONDUCTOR DIAMETER UPTO AND INCLUDING 0.100MM

EL2150-06

U.2.2.1.2 WIRES WITH NOMINAL CONDUCTOR DIAMETER OVER 0.100MM AND INCLUDING 2.500MM

EL2150-07

U.2.2.1.3 WIRES WITH NOMINAL CONDUCTOR DIAMETER OVER 2.500MM

EL2150-08

U.2.2.2 SQUARE OR RECTANGULAR WIRES

EL2150-09

U.2.3 FLEXIBILITY AND ADHERENCE EL2150-10

U.2.4 HEAT SHOCK EL2150-11

U.2.5 RETENTION OF ELECTRIC STRENGTH AFTER BENDING

EL2150-12

U.3 TESTING DURING MANUFACTURING

EL2150-13

U.3.1 GENERAL EL2150-14

U.3.2 ROUTINE TESTS EL2150-15

U.3.3 SAMPLING TEST EL2150-16

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Page 78: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 78 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 79: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 79 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2151 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

V ANNEX V, AC POWER DISTRIBUTION SYSTEMS (see 1.6.1) *

EL 2151-00

V.1 Introduction* EL 2151-01

V.2 TN power distribution systems EL 2151-02

V.3 TT Power Distribution systems EL 2151-03

V.4 IT Power Distribution systems EL 2151-04

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 80: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 80 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2152 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

W ANNEX W, SUMMATION OF TOUCH CURRENTS *

EL 2152-00

W.1 Touch current from electronic circuits*

EL 2152-01

W.1.1 Floating circuits* EL 2152-02

W.1.2 Earthed circuits* EL 2152-03

W.2 Interconnection of several equipments*

EL 2152-04

W.2.1 Isolation* EL 2152-05

W.2.2 Common return, isolated from earth*

EL 2152-06

W.2.3 Common return, connected to protective earth*

EL 2152-07

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 81: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 81 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2153– V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

X ANNEX X, MAXIMUM HEATING EFFECT IN TRANSFORMER TESTS (see clause C.1)*

EL 2153-00

X.1 Determination of maximum input current*

EL 2153-01

X.2 Overload test procedure* EL 2153-02

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 82: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 82 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Radiation Safety EL 2154– V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

Y ANNEX Y, ULTRAVIOLET LIGHT CONDITIONING TEST (see 4.3.13.3)

EL 2154-00

Y.1 Test apparatus ................................EL 2154-01

Y.2 Mounting of test samples ................................EL 2154-02

Y.3 Carbon-arc light-exposure apparatus ...............................................................

EL 2154-03

Y.4 Xenon-arc light exposure apparatus ...............................................................

EL 2154-04

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 83: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 83 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2155– V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

Z ANNEX Z, OVERVOLTAGE CATEGORIES (see 2.10.3.2 and Clause G.2)*

EL 2155-00

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 84: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 84 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Mechanical Properties EL 2156 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

AA ANNEX AA, MANDREL TEST (see 2.10.5.8)

EL 2156-00

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 85: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 85 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Electrical Safety EL 2158 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

CC Evaluation of integrated circuit (IC) current limiters*

EL 2158-00

CC.1 Integrated circuit (IC) current limiters*

EL 2158-01

CC.2 Test program 1 EL 2158-02

CC.3 Test program 2 EL 2158-03

CC.4 Test program 3 EL 2158-04

CC.5 Compliance EL 2158-05

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 86: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 86 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Mechanical Properties EL 2159 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

DD Requirements for the mounting means of rack-mounted equipment*

EL 2159-00

DD.1 General

DD.2 Mechanical strength test, variable N………………..:

EL 2159-01

DD.3 Mechanical strength test, 250N, including end stops………..:

EL 2159-02

DD.4 Compliance*………………….: EL 2159-03

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 87: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 87 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

Tests relating to Mechanical Properties EL 2160 – V1.4

Cl. No. Test / Requirement name Test Code Test result/ observation Verdict

EE ANNEX EE, Household and home/office document/media shredders

EL 2160-00

EE.1 General

EE.2 Markings and instructions* EL 2160-01

Use of markings or symbols*…………………………:

Information of user instructions, maintenance and/or servicing instructions*…………………………:

EE.3 Inadvertent reactivation test…………………………:

EL 2160-02

EE.4 Disconnection of power to hazardous moving parts*

EL 2160-03

Use of markings or symbols*………………………:

EE.5 Protection against hazardous moving parts

Test with test finger (Figure 2A) ……………………:

EL 2160-04

Test with wedge probe (Figure EE1 and EE2) ……:

EL 2160-05

*- Total number of Requirements to be observed / inspected =

Total No of applicable Requirement =

No of Requirements for which the sample passed=

Total number of tests to be conducted =

Total No of applicable Tests =

No. of tests for which the sample passed=

Certificate: It is certified that the above tests were performed and found to be passing/failing in the requirement tested.

...............................................................................

(Approving Authority)

Page 88: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 88 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

1.5.1 TABLE: List of components

Object/part no. Manufacturer/ trademark

Type/model Technical data Standard Mark(s) of conformity

Supplementary information:

1.6.2 TABLE: Electrical data (in normal conditions)

U (V) I (A) Irated (A) P (W) Fuse # Ifuse (A) Condition/status

Supplementary information:

2.1.1.5 TABLE: Energy hazard measurement

Voltage (rated) (V)

Current (rated) (A)

Voltage (max.) (V)

Current (max.) (A)

VA (max.) (VA)

Supplementary information:

2.1.1.7 TABLE: Discharge test

Condition calculated (s)

measured (s)

t u 0V (s)

Comments

Supplementary information:

2.2.2 TABLE: SELV measurement (under normal conditions)

Transformer Location Voltage (max.) (V) Voltage Limitation

Page 89: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 89 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

V peak V d.c. Component

Supplementary information:

2.2.3 TABLE: SELV measurement (under fault conditions)

Location Voltage (max.) (V) Comments

Supplementary information:

2.4.2 TABLE: Limited current circuit measurement

Location Voltage (V)

Current (mA)

Freq. (kHz)

Limit (mA)

Comments

Supplementary information:

2.5 TABLE: Limited power source measurement

Limits Measured Verdict

According to Table 2B/2C (normal condition)

current (in A)

apparent power (in VA)

According to Table 2B/2C (single fault condition)

current (in A)

apparent power (in VA)

Supplementary information:

2.6.3.4 TABLE: Resistance of earthing measurement

Location Resistance measured (m) Comments

Supplementary information: Tested current 32A.

Page 90: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 90 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

<OR>

2.6.3.4 TABLE: Resistance of earthing measurement

Location Voltage drop (V) Comments

Supplementary information: Tested current 32A.

2.10.2 Table: Working voltage measurement

Location RMS voltage (V) Peak voltage (V) Comments

Supplementary information:

2.10.3 and 2.10.4

TABLE: Clearance and creepage distance measurements

Clearance (cl) and creepage distance (cr) at/of/between:

U peak (V)

U r.m.s. (V)

Required cl (mm)

cl (mm)

Required cr (mm)

cr (mm)

Functional:

Basic / supplementary:

Reinforced:

Supplementary information:

Page 91: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 91 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

2.10.5 TABLE: Distance through insulation measurements

Distance through insulation (DTI) at/of: U peak (V)

U r.m.s. (V)

Test voltage

(V)

Required DTI

(mm)

DTI (mm)

Basic:

Supplementary:

Reinforced:

Supplementary information:

4.3.8 TABLE: Batteries

The tests of 4.3.8 are applicable only when appropriate battery data is not available

Is it possible to install the battery in a reverse polarity position?

Non-rechargeable batteries Rechargeable batteries

Discharging Un-intentional charging

Charging Discharging Reversed charging

Meas. current

Manuf. Specs.

Meas. current

Manuf. Specs.

Meas. current

Manuf. Specs.

Meas. current

Manuf. Specs.

Max. current during normal condition

Max. current during fault condition

Test results: Verdict

- Chemical leaks

- Explosion of the battery

- Emission of flame or expulsion of molten metal

- Electric strength tests of equipment after completion of tests

Supplementary information:

Page 92: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 92 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

4.5 TABLE: Temperature rise measurements

Temperatures were measured according cl. 1.4.5. Test in condition A and B at continuous normal operation as for power input measurements of table 1.6.2 resulted in highest temperature values. Temperatures are calculated according cl. 1.4.12.3 with regard to the maximum ambient operation temperature of °C(Tma), as specified by the manufacturer.

test voltage(s) (V): A: V, Hz B: V, Hz

tamb1 (°C): A: B: tamb2 (°C): A: B:

Temperature of part/at: (measured with thermocouples)

Measured temperature rise at

Tamb

Calculated temperature at Tma

Allowed Tmax (°C)

A dT (K)

B dT (K)

A T (°C)

B T (°C)

Supplementary information:

Temperatures measured with winding resistance method: Not used

temperature T of winding: (winding resistance method)

(V) R1 () R2 () T (C) allowed Tmax (C)

insulation class

Supplementary information:

4.5.5 TABLE: Ball pressure test of thermoplastic parts

Allowed impression diameter (mm) .................. : 2 mm

Part Test temperature (°C)

Impression diameter (mm)

Supplementary information:

Page 93: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 93 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

4.6.1, 4.6.2 Table: Enclosure opening measurements

Location Size (mm) Comments

Supplementary information:

4.7 Table: Resistance to fire

Part Manufacturer of material

Type of material Thickness (mm)

Flammability class

Evidence

Supplementary information:

5.1.6 TABLE: Touch current and protective conductor current measurement

Test voltage (V) ....................................... : AC ……..V, ………Hz

Measurement location Polarity (normal) [mA]

Polarity (reverse) [mA]

Limit (mA)

Comments

(Terminal A connected to...) Switch: ON

Switch: OFF

Switch: ON

Switch: OFF

Earth terminal ("e" = open)

Operating Panel ("e" = close)

Supplementary information:

5.2 TABLE: Electric strength tests, impulse tests and voltage surge tests

Test voltage applied between: Voltage shape (AC, DC,

impulse, surge)

Test voltage (V)

Breakdown Yes / No

Functional:

Basic / supplementary:

Reinforced:

Supplementary information:

Page 94: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 94 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

5.3 TABLE: Fault condition tests

Ambient temperature (°C) ...................................... :

Power source for EUT: Manufacturer, model/type, output rating ........................................................... :

Component No.

Fault Supply voltage

(V)

Test time

Fuse # Fuse current

(A)

Observation

Supplementary information:

C.2 TABLE: Insulation of transformers

Transformer part name ........................... :

Manufacturer ........................................... :

Type ........................................................ :

Clearance (cl) and creepage distance (cr) at/of/between:

U peak (V)

U r.m.s. (V)

Required cl (mm)

cl (mm)

Required cr (mm)

cr (mm)

Primary /input winding and secondary/output winding (internal)

Primary/input winding and core (internal)

Secondary/output winding and core (internal)

Primary/input part and secondary/output part (external)

Primary/input part and core (external)

Primary/input part and secondary/output winding (external)

Secondary/output part and core (external)

Secondary/output part and primary/input winding (external)

Description of design:

(a) Bobbin

Primary/input pins ..................................................... :

Secondary/output pins .............................................. :

Material (manufacturer, type, ratings) ...................... :

Thickness (mm) ........................................................ :

Page 95: FINALIZED TRF IS 13252+A1+A2 Power bank V1.2 · 2018-12-10 · >/$% /2*2@ 5hsruw 1r [[[[[ ,6 3duw $ $ 3djh ri 'dwhg [[[[[ ,(& $ $ 75) 1r %,6b,7 3%b,6 b9 7hvw &rgh 'hvfulswlrq 0hdvxuhphqw

[LAB LOGO]

Report No. xxxxxx IS 13252 (Part 1): 2010 + A1: 2013 + A2 : 2015 / Page 95 of 95

Dated: xxxxxx IEC 60950-1: 2005 + A1:2009 + A2 : 2013

TRF No. BIS_IT/PB_IS13252_V1.2

(b) General

Please insert here a description of the transformer design describing:

Supplementary information: