Substation

EAST WEST UNIVERSITYDepartment of Electrical and Electronics EngineeringPresentation OnASHUGANJ POWER STATION COMPANY LTD(APSCL)

1Presented By-Abdulla Al-Amin(2010-2-80-019)Omar Faruq (2010-2-80-018)Md. Rejaul Hassan (2011-1-80-064)ContentsCompany Profile (APSCL)Generator Steam power plantSubstationCombined Cycle Power Plant (CCPP)Conclusion

2Company Profile (APSCL)APSCL is one of the largest power station in Bangladesh.Location: 90 km North-East of Dhaka on the left bank of the river Meghna. Installed Capacity : 687MW Present de-rated capacity : 671 MWNumber of Generation Units: 7 (5 Steam Turbine + 1 Gas Turbine + 1 Gas Engine)Area of Land: 263.55 Acres

MissionTo increase the Capacity to 1500 MW by 2015. VisionTo become the leading power generation company in Bangladesh.

3

GeneratorGenerator It is a device which converts mechanical energy to electrical energy Equipment's of Generator Rotor Stator Slip ring Carbon brushWorking PrincipleWhen a magnetic flux cut a conductor than an electromotive force (emf) is induced according to Faradays laws of electromagnetic induction. This e.m.f. causes a current to flow if the conductor circuit is closed.4

Steam Power PlantA plant using steam as prime movers to drive electric generating apparatus called steam power plant.5Unit numberRated capacityTotal capacityUnit-164MW128MWUnit-264MWUnit-3150MW450MWUnit-4150MWUnit-5150MW

Fig: Steam power plant at APSCLSteam Power PlantMain sectorsWater treatment plantBoilercondenserTurbine

6

Fig: Water treatment plant at APSCL

Fig: Boiler at APSCLFig: Condenser at APSCLSubstationEquipmentsTransformerCircuit BreakerRelay Lightning ArresterWave trapControl RoomBattery and Battery charger roomTransmission LineBus bar

Substation (Continued.)TransformerPower transformerChanges voltage level but power and frequency remain constantCurrent Transformer (CT)Steps down the currentPotential Transformer (PT)Steps down the voltage

Fig.: Current Transformer Fig.: Potential Transformer Substation (Continued.)Circuit BreakerOil Circuit BreakerAir Blast Circuit BreakerSF6 Circuit Breaker

Fig.: Oil Circuit Breaker Fig.: Air Blast Circuit BreakerFig.: SF6 Circuit BreakerSubstation (Continued.)RelayLightning ArresterRod gapHorn GapWave trapControl Room

Fig.: Lightning ArresterFig. : Wave trapFig.: Control Room Gas Turbine UnitsDiesel engineTorque converterFlame detectorCompressorCombustion ChamberDiffuserAir intake filter

Fig.: Block diagram of a gas turbine power plantCCPP (Continued.)Steam turbine unitWaste Heat Recovery UnitBenefits of Waste Heat Recovery UnitPump used in CCPPBoiler feed pumpCooling water pumpCCPP (Continued.)

Fig.: Boiler feed pumpProtection and Control System of CCPPLube oil systemGovernor or Speed ControlCooling SystemPressure control systemTemperature control systemVibration control system

Fig. : Lube oil cooling plantCCPP (Continued.)Problem FacedUnable to see megger testRecommendationsThe time period should be increased to 90 days for Internship program.ConclusionWe gathered practical knowledge

Conclusion