Generator Site Test
1 Surge comparison test
Surge comparison test is used to determine
condition of inter turn insulation of the stator
winding.
Yespulse transformer for impulse voltage and
an oscilloscopeDuring Overhauling
TDPS / Turbo Generator/India
Electrical Works/Gujrat Turbo/Pioneer
Generator/PENTAGON TURBINES (P)
LTD /POWER GEM ENGINEERS
2Check the contamination of
respective parts
To check the deposit of moisture and dust on
surfaceYes Visual Inspection and hand touch During Overhauling
Yes
3 Dry penetration Test
Test provides an indication of presence of cracks,
contamination and moisture in the insulation IR/PI
test between slip rings and the body is carried out
to check the integrity of the pole sleeve insulation
of the rotor
Yes
alkaline, solvent-removable, lipophilic post-
emulsification, or hydrophilic post-
emulsifiable ,aerosol spray cans, and may
employ acetone, isopropyl alcohol, or a
propellant.
During Overhauling
4 ELCID Test on Stator coredetection of faults in core inter lamination
insulation by electromagneticYes ELCID Evaluation Tester During Overhauling
5 Slot wedge test To check the looseness of winding wedges Yes Visual Inspection and Rubber hammer. During Overhauling
6 Magnetic shunt detection Yes - During Overhauling
7 Coil insulation tests To check the Insulation level of the winding Yes - During Overhauling Yes
8 Condition of bearings & shaft To check the condition f bearing and shaft of
generatorYes Visual Inspection. During Overhauling Yes
9Off line Rotor Winding Inter
turn Fault DetectionShorted Turn Detection For Generator Rotor Yes RSO ( Recurrent Surge Oscilloscope) During Overhauling
TDPS / Turbo Generator/India
Electrical Works/Gujrat Turbo/Pioneer
Generator/PENTAGON TURBINES (P)
LTD /POWER GEM ENGINEERS
10 Bearing insulation resistance Yes Digital Meggar During Overhauling Yes IS 7132
11Measurement of Air Gap
between Stator and RotorYes Air Gap Gauge During Overhauling
TDPS / Turbo Generator/India
Electrical Works/Gujrat Turbo/Pioneer
Generator/PENTAGON
TURBINES (P) LTD /POWER
GEM ENGINEERS
12 High Voltage Dielectric Test YesCommissioning
Test
13
Open Circuit Test or No-Load
Saturation Test Measurement of losses Yes -Commissioning
Test
14
No load and short circuit
saturation curve and Short
Circuit ratio
Measurement of losses Yes -Commissioning
Test
IS 5422, IS
7132
15 Dielectric test(tan delta) To determine the dielectric strength of generator Yes Ten Delta Test Kit 3Y IS 5422
16 Off line Partial Discharge test
Partial discharge test is a diagnostic test for HV
machines as it is capable of revealing incipient
faults in the stator winding structure.
YesPD Detector, High Voltage
Capacitor,Oscilloscope.3Y
TDPS / Turbo Generator/India
Electrical Works/Gujrat Turbo/Pioneer
Generator/PENTAGON
TURBINES (P) LTD /POWER
GEM ENGINEERS
TDPS / Turbo Generator/India
Electrical Works/Gujrat Turbo/Pioneer
Generator/PENTAGON TURBINES (P)
LTD /POWER GEM ENGINEERS
TDPS / Turbo Generator/India
Electrical Works/Gujrat Turbo/Pioneer
Generator/PENTAGON TURBINES (P)
LTD /POWER GEM ENGINEERS
TDPS / Turbo Generator/India
Electrical Works/Gujrat Turbo/Pioneer
Generator/PENTAGON TURBINES (P)
LTD /POWER GEM ENGINEERS
IS 5422, IS
7132
External Party Internally
Capable
IS
standard
TDPS / Turbo Generator/India
Electrical Works/Gujrat Turbo/Pioneer
Generator/PENTAGON TURBINES (P)
LTD /POWER GEM ENGINEERS
S. No. Test Purpose of test Site Test Instrument Req. Freq.
Page 1
Generator Site Test
17DC leakage current
measurement
Measurement of leakage current by applying DC
voltage in steps is frequently used to indicate the
status of the stator winding.
Yes DC Voltage generator,clock,and meggar. 3Y
18 Maintenance of Sleeve bearingTo ensure that sleeve bearing not have unilateral
contact.Yes
by checking visual inspection and hand
touch oil clearance must be measured
using lead wire
3Y Yes
19 Shaft Voltage measurementActual Shaft Voltage measurement
Yes voltage sensor for detecting shaft voltage Y Yes IS 7132
20Vibration measurement on
bearing housingUnbalancing bearing condition etc.
Yes Vibration Meter Y Yes IS 5422
21 Insulation Resistance testTo measure the insulation resistance of the
winding of generatorYes Digital Meggar and Milli ohms meter HY Yes IS 5422
22 Winding Resistance To measure the resistance of generator winding Yes Milli ohms meter HY Yes IS 5422
23 PI test To check the Insulation level of the winding Yes Digital Meggar HY Yes IS 5422
24Checking of Rotor Rectifier
AssemblyTo check the working of rectifier assembly Yes
Tester/Multi meter for check the continuity
of diode, Spanner and screwdriverHY Yes
25 Loose fit of bolt. Check the Tightness of the bolt Yes Spanner and screwdriver M Yes
26Temperature of respective
parts
Temp. rise limit not be exceed In case the temp.
rises gradually despite running at constant load,
caution is required.
YesRTD(for Cont. monitoring), Thermo
cameraFN Yes
27 Oil Leakage TestTo Check the Oil Leakage from any parts of the
generatorYes Visual Inspection D Yes
28 Lubricating condition
Oil flow should indicate no change form that at
normal time, to check the air foam in the oil, and
check the oil level.
YesVisual Inspection of inspection lid, looking
in to flow sight and oil level gouge.D Yes
29 Abnormal odor from main bodyThere should be no abnormal odor compared to
that at normal timesYes Resort of sense of smelling D Yes
TDPS / Turbo Generator/India
Electrical Works/Gujrat Turbo/Pioneer
Generator/PENTAGON TURBINES (P)
LTD /POWER GEM ENGINEERS
Page 2
Transformer Site test
1 Magnetic balance test
This test is done to find out the condition of stacking
of core laminations, tightness of core bolts and
perfection of magnetic circuit
Yessingle phase
supply,voltmeter,lamp
During Overhauling
/ Internal faultYes
2Measurement of Magnetizing
current
The magnetizing current is measured to test any
fault in the magnetic circuit and windingYes
balanced three phase
415V ac supply ,AC
Ammeter
During Overhauling
/ Internal faultYes
3
Measurement of zero
sequence impedance of 3-
phase transformers.
To measure Zero phase sequence impedance YesDuring Overhauling
/ Internal fault
4 Short circuit Current test. This test is carried out as a check for any loose contact in
the tap changer, lead connections etcYes
During Overhauling
/ Internal fault
I.S2026(Part
I)
5check' of voltage vector
relationship
to check vector symbol (To ascertain phase
displacement)Yes 415 V supply
Commissioning
/During
Overhauling /
Internal fault
Volt Amp / Elsytes Control
/India Electrical Works
/Power Gem
Engineer/New Delhi Lab
I.S2026
6
Measurement of impedance
voltage/ short-circuit
impedance (principal tapping)
and load loss.
To measure losses occurring at rated load , including
I2R loss and stray loss and measured voltage
required to circulate rated current through one
winding when the other winding is short-circuited
Yes variable voltage sourceCommissioning
Test
Volt Amp / Elsytes Control
/India Electrical Works
/Power Gem
Engineer/New Delhi Lab
[IS 2026
(part I):1977
7Measurement of winding
resistance.To measure resistance of transformer winding Yes
Digital Meggar and Milli
ohms meter3Y Yes
IS 2026 (part
I):1977
8 Ten Delta test.
To determine ratio of the power dissipated in the
insulation in watts to the product of the effective
voltage and current in volt-amperes when test under
a sinusoidal voltage
Yes Ten Delta Test Kit 3Y
Volt Amp / Elsytes Control
/India Electrical Works
/Power Gem Engineer
9Measurement of voltage
ratioTo know correct voltage ratio at each tap. Yes
415 V supply , Voltage
measuring Instrument3Y Yes I.S2026
10 Polarization Index Test. Polarization Index Test. Yes Digital Meggar Y Yes[IS 2026
(part I):1977
11 PPA test.To Determine contamination of the oil with particle of
matter.Yes Y New Delhi Labs/ERDA
12 Leakage test Check leakage of tank Yes Y New Delhi Labs/ERDA13 Sludge test Point Check Dissolved Contamination Yes Y New Delhi Labs/ERDA
14Neutralization Number ( Acid
Number )
This tests measures the amount of acids that are
contained in the oil.Yes Y New Delhi Labs/ERDA
IS1448
PART2
15 Interracial Tension testThis test measure the ability of oil to resist the
absorption of moisture in to the oil molecule.Yes Y New Delhi Labs/ERDA IS 6104
16Capacitance and PF / Dissipation
factor
To Estimate the deterioration of the insulation
contamination and physical damage.Yes Y New Delhi Labs/ERDA
17 Karl Fisher test
The Karl Fisher test measures the exact amount of
free and dissolved water molecules contained in the
oil sample
Yes Y New Delhi Labs/ERDA IS 2362
18 Flash Point Test Fire catching Point Yes Y New Delhi Labs/ERDAIS1448
PART21
19 Oil Power Factor
To Ensure the oil integrity is maintained and as an
indication of changed in quality resulting from
contamination and deterioration.
Yes Y New Delhi Labs/ERDA IS 6262
External Party Internally
CapableIS standard
Volt Amp / Elsytes Control
/India Electrical Works
/Power Gem
Engineer/New Delhi Lab
S. No. Test Purpose of test Site Test Instrument Req. Freq.
Page 3
Transformer Site test
20 Furanes values test.
To measure the Degradation of paper in the form of
sheets, tapes and other pressed shapes,
Heat,moisture and oxygen .
Yes Y New Delhi Labs/ERDA I.S2026
21 Partial Discharge.To measure the radio-influence voltage (RIV)
generated by any internal partial dischargeYes Y New Delhi Labs/ERDA I.S2026
22Tighten all bus and ground
connectionTo ensure Tightness of all Joints ans bus bars Yes Spanner and screwdrivers Y Yes
23
Alarm / Trip Test Ensure the Alarm and Tripping of the transformer.Yes
Manually Y Yes
24 BDV of main TankTo Measure the oil 's ability to with stand electrical
steers with out failure.Yes BDV Test instrument HY Yes IS: 335.
25 BDV of OLTC Tank Yes BDV Test instrument HY Yes
26 DGA.To Determine if there is an incipient fault condition or
unusual aging.Yes HY New Delhi Labs/ERDA IS 9434
27Measurement of insulation
resistance.
To determine the insulation resistance from
individual windings to ground or between individual
windings
Yes Digital Meggar and Milli
ohms meterHY Yes
[IS 2026 (part
I):1977
28Checking for foundation and
cracking and settling
A slight shift or transformer may break bushing or
connecting oil or water linesYes Visual Inspection M Yes
Page 4
IS for Transf Oil Specification
Un-inhibited Inhibited -IA
1 Appearance
Clear & transparent and
free from suspended
matter or sediments
Clear & transparent and
free from suspended
matter or sediments
Clear & transparent and
free from suspended
matter or sediments
2Density
g/cm3 0.89 at 27
0C < 0.895 at 20
0 C < 0.895 at 20
0 C
3 Kinematic viscosity at 270 Max.
27 cSt
at 270C
16.5 cSt
at 40 0C
16.5 cSt
at 40 0C
4 Interfacial tension Min. 0.04 N/m at 270C 0.04 N/m at 25
0C 0.04 N/m at 25
0C
5Flash point
Pansky-Marten (closed) Min140
0C 140
0C 140
0C
6Pour point
Max.-9
0 C -30
0 C -30
0 C
7
Neutralization value
Total acidity
Max.
Inorganic acidity/alkalinity
0.03mg
KOH/g
Nil
0.03mg
KOH/g
Nil
0.03mg
KOH/g
Nil
8 Corrosive sulpher Non-corrosive Non-corrosive Non-corrosive
9
Electric Strength (Breakdown voltage)
Min.
New unfiltered oil
After filtration
30 kV (RMS)
50 kV (RMS)
30 kV (RMS)
50 kV (RMS)
30 kV (RMS)
50 kV (RMS)
10Dielectric dissipation factor( tand) at 90
0
Max.0.005 0.005 0.005
11
Specific resistivity
At 900 Min.
At 27 0
Min.
30x 1018
ohm-cm
500x 1018
ohm-cm
-
-
-
-
12
Oxidation stability
Neutralization value after
oxidation Max.
Total sludge after oxidation Max.
0.40 mg
KOH/g
0.10% by weight
0.40 mg
KOH/g
0.10% by weight
No limit
INSULATING OILS [IS: 335-1983 OR IEC: 296-1982]
There are no specific lit of type/routine /acceptance tests to be performed on manufactured insulating oil. However, the
manufacturer shall verify the following characteristics by carrying out relevant tests on the insulating oil.
S. No. Property
As per IS: 335
(Un-inhibited)
As per IEC: 296
Page 5
CT Site test
1
Determination of errors or other
characteristics according to the
requirements of the appropriate
designation or accuracy class.
To check the error of the instrument
transformer both ratio and phase
angle error check the accuracy
class of transformer. Yes
3YDatagen Power
System
IS 2705
2Measurement of Tand and
Capacitance
To determine ratio of the power
dissipated in the insulation in watts to
the product of the effective voltage
and current in volt-amperes when test
under a sinusoidal voltage Yes
Ten Delta Test Kit 3 YrShanthala Power
Limited
3IR test on each winding, winding
to earth and between windings.
To determine the insulation
resistance from individual windings
to ground or between individual
windings Yes
Digital Meggar and
Milli Ohms MeterY
Yes IS 2705
4Checking of winding ratios by
primary injection test set.
Check the winding ratio of current
transformer. YesPrimary Injection Test Kit Y
Yes IS 2705
5Checking tightness of earthing
connections.Earthing connection
Yes
Spanner and
screwdrivers, Visual
Inception
Y
Yes IS 2705
6 Partial discharge measurement
Partial discharge test is a diagnostic
test for HV machines as it is capable
of revealing incipient faults Yes
PD Detector, High
Voltage
Capacitor,Oscilloscope
.
Y High Power Lab
IS 2705
7DGA and testing of other
parameters of oilOil Testing for internal fault.
YesY
New Delhi
Lab/ERDA
8Thermo vision Scanning of CT and
Top dome
To check the Heating of any
parts/clamp of PT YesIn fared Camera Y
Yes
9Checking and Cleaning of Marsh
ling Box.Yes
Visual Inspection,
Spanner,screwdriver
and Blower
Y
Yes
10 Checking of insulator for cracks.Measure the cracking of insulator
disc YesVisual Inception M
Yes IS 2705
11Measurement of CT Secondary
resistance Yes
Internal fault/
RequirementHigh Power Lab
12 Magnetization CharacteristicsYes
Internal fault/
RequirementHigh Power Lab
External Party Internal
CapabilityIS standardS. No. Test Purpose of test Site Test Instrument Req. Freq.
Page 6
Potential Transformer
1
Determination of errors or other
characteristics according to the
requirements of the appropriate designation
or accuracy class.
to determine whether the errors of the PT are within
specified limits. Yes 3Y
Datagen Power
System
IS :3156 Part 1
2 Measurement of Tand and CapacitanceIndicates dielectric loss of the insulation. Yes Tan Delta Test Kit 3Y
Shanthala Power
Limited
3IR test on each winding, winding to earth
and between winding.To determine the insulation resistance from individual
windings to ground or between individual windings Yes
Digital Meggar Y Yes IS :3156
4 Checking tightness of earthing connections.Earthing connection Yes
Spanner and screwdrivers, Visual
InspectionY Yes IS:3156
5Partial discharge measurement Yes Y
High Power LabIS:3156
6Checking of winding ratios by primary
injection test set.Check the winding ratio of Potential transformer.
Yes Primary Injection Test Kit Y Yes IS :3156 Part 1
7 Partial discharge measurementYes Y
High Power Lab
8 DGA and testing of other parameters of oilOil Testing for internal fault. Yes Y
New Delhi Lab/ERDA
9 Checking of insulator for crackMeasure the cracking of insulator disc Yes Visual Inspection M Yes IS:3156
10 Thermo vision Scanning of PT and Top domeTo check the Heating of any parts/clamp of PT Yes Thermo Vision Camera M Yes
11 Magnetization CharacteristicsYes
Internal fault/
RequirementHigh Power Lab
PT TEST
S. No. Test Purpose of testSite
TestInstrument Req. Freq. External Party Internal Capability IS standard
Page 7
1
Checking of
leakage(Third Harmonic
Resistive Current) current analyzer (mA) Yes
current analyzer (mA)
Y
Shanthala Power
Limited
2
Testing by Surge Monitor kit-
counter and meter tests
Yes
Surge Monitor kit-counter
Y
Shanthala Power
Limited
3
Resistance of bolted
connections Detects poor contacts
Yes
Milli volt drop meter
Y
Shanthala Power
Limited
4
Cleaning of Porcelain Insulator Yes HY Yes
5 IR Value Detects serious flaws, moisture
absorption and cleanliness.
Yes
Digital meggar
HY Yes
6Measurement of
Capacitance and TandYes
Tan Delta test Kit In case of
requiremen
t
Shanthala Power
Limited
Lighting Arrester
S. No. Test Purpose of testSite
TestInstrument Req. Freq. External Party
Internally
Capable
IS
standard
1Computerized Digital ELCID of stator core Determines healthiness of stator core inter
laminar insulation Yes ELCID Evaluation Tester During Overhauling
India Electric works,Vikas
Electro Engineers,Aditya
Engg Services
2IR & PI Stator
Detects serious flaws, moisture absorption and
cleanliness of winding Yes Digital Megger 3Y Yes
IS-325
3Tan Delta / Power factor of Stator Winding Evaluation of stress grading, dielectric losses
and homogeneity of the winding insulation Yes Tan delta kit 3Y Yes
4AC Impedance on poles Detects the presence of short circuit turns
Yes 3Y
5 Motor Circuit Analysis Phase angle,current/ frequency
response,resistance,inductance and impedance
YesAll Test Pro 2000 Motor
circuit analyzer3Y Diagnostic Technologies
6 DC HV step voltage / Leakage Current Detects Insulation weakness and possibility of
warning of breakdown of incipient fault Yes 3Y
India Electric works,Vikas
Electro Engineers,Aditya
Engg Services
7
Surge Voltage on Stator Winding
Determines healthiness of turn insulation. Yes 3Y Yes
8 PD TestEvaluation of stress grading system and
location of Partial Discharge sites. Yes
PD Detector, High Voltage
Capacitor,Oscilloscope.3Y
India Electric works,Vikas
Electro Engineers,Aditya
Engg Services
9 Complete Overhauling of Motor For preventive maintenance Purpose.
Yes
3Y
India Electric works,Vikas
Electro Engineers,Aditya
Engg Services
10 Air gap MeasurementTO check the Measurement of the air gap
between stator and rotor Yes Air gap GuageY
Yes
11 Maintenance of cooling system Ensure the working of cooling system. Yes Visual Inception,Air Blower Y Yes
12 Winding Insulation resistance test
Detects serious flaws, moisture absorption and
cleanliness of winding. Yes Digital HT Meggar Y Yes
IS-325
13 Lubrication of Motor Bearing
Lubrication on a scheduled basis, in
conformance with the manufacturer's
recommendations, provides optimum bearing
life.
Yes Lubrication,Lubrication Gun HY or Running Hrs. Yes
14 Vibration Measurement of DE/NDE Side.
It tends to shake windings loose and
mechanically damages insulation by cracking,
flaking or abrading the material.
Yes Vibration Meter FN Yes
15 Earthing Connection Checking To ensure double earthing of motor. Yes Visual Inception M Yes
16 Temperature Measurement of DE/NDE side
Excessive heat is both a cause of motor failure
and a sign of other motor problems. Yes RTD,Thermo vision Camera M Yes
17 VisuaInspection To check the Motor Condition Yes Visual Inspection D Yes
18 On line Motor Current Signature Analysis
To determine the healthiness of Motor by giving
all the electrical parameters, Harmonic
analysis, Rotor bar health and bearing problems
Yes Electrical Signature analyzer On line Diagnostic Technologies
19 Acoustics Emission analysis
Motors Generate acoustics signal due to defect
growth in material,loss of lubrication,impact and
friction
YesMemo Pro Acoustics
Emission analyzerOn line Diagnostic Technologies
India Electric works,Vikas
Electro Engineers,Aditya
Engg Services
HT MOTOR
S. No. Test Purpose of testSite
TestInstrument Req. Freq. External Party
Internally
Capable
IS
standard
Battery Bank
1 Checking of electrolyte level
To ensure the DM water level in battery Yes
Hand gloves and
visual inspectionM Yes
2Checking of emergency DC
lighting to control roomYes Visual Inpection
M Yes
3Checking of Sp. Gravity and
cell voltageYes
Battery Hydro
Meter,multi meterM Yes
4
Terminal Tightness of Battery loosenes of contact Yes
VisualInpection, Hand
glovesM Yes
5Capacity Discharge Test of
Battery SetTo Check the Loading Capacity of battery Yes
Battery Hydro
Meter,multi
meter,watch,Termo
cam
3Y Yes
6
Checking of charger panel /
DCDB for electrical
connection tightness and
cleanliness Yes
Air Blower,
Multimeter,Screwdrive
r
Y Yes
Battery Bank
S. No. Test Purpose of test Site Test Instrument Req. Freq.External
Party
Internally
Capable
IS
standard
Page 10
Extarnal Company Details
S.No. Name of Company Contact Details. Web/Mail Address
1 TDPS 0807734432-38,0807770541 www.tdps.co.in
2 India Electricl Works
3 Power Engineering Services Pvt. Ltd. 91-11-26348020 http://www.spespl.com/
4 Gujrat Turbo Enterprieses 91-422-2402574 [email protected],
5 Pioneer Generator 91-(11)-28111236, 28112306, 28112372http://www.processregister.com/Pioneer_Gen
erator_Co/Supplier/sid11453.htm
6 Pentagon Turbines (P) Ltd
+91 (80) 4292 1111/ 2780 5974 ,+91 (11)
4153 8031,+91 (40) 2381 5673,www.pentagonturbines.com
7 Power Gem Engineers
011-
27154771,47062960,47062960,29236074,2
2618199,22231620 ,27486910 www.powergem.com,[email protected]
8 Volt Amp +91-11-224 28331 / 224 39457
www.voltamptransformers.com
9 New Delhi Lab 01276-268404,011-25534101, 25534102http://www.newdelhilab.com/
10 Datagen Power System91-124-4670500,91-124-4670202 www.datagensystems.com,support@datagen
systems.com
11 Shanthala Power Limited 91 836 2335936/ 2335934/ 2334908 www. shanthala india.com
12 Vikas Electro Engineers
13 Aditya Engg Services 9810444992 [,95120-2895280
14 Diagnostic Technologies 0250-2392060,2392086,2392162 [email protected]
15 Padmavahini Transformers Pvt Ltd. 422-6531222,09843041222- 09442141222 http://www.padmavahinitransformers.com
16 Karytron Electrical Industries
91-11-45620856/45620857/65454780
http://karytronelectricals.tradeindia.com/Expor
ters_Suppliers/Exporters/hp/13052/home_pag
e.html