FINAL REPORT
ON SOIL INVESTIGATION
FOR
PROPOSED CONSTRUCTION AT
SS-6B AREA AT
HPCL VISAKH REFINERY VISAKHAPATNAM ANDHRA PRADESH
J.J. ASSOCIATES(VISAKHAPATNAM) AETP(P) LIMITED
#11-6-3, RockDale Layout, MaharaniPeta, Visakhapatnam – 530 002.
Table of Contents
Tables and Figures (Enclosures)............................................................................................
1 INTRODUCTION............................................................................................................... 1
2 SCOPE OF WORK ........................................................................................................... 1
3 INVESTIGATION METHODOLOGY..............................................................................1-2
4 FIELD INVESTIGATIONS ................................................................................................ 2
4.1 Standard Penetration Tests ..................................................................................................... 2 4.2 Sampling .................................................................................................................................. 2
5 LABORATORY INVESTIGATIONS ..............................................................................2-3
6 Generalised geological profile....................................................................................... 4
6.1 Geological Profile for Proposed Construction of SS-6B area .................................................. 4
7 DESIGN SOIL PARAMETERS FOR FOUNDATIONS..................................................... 4
8 SUMMARY ,ANALYSIS, CONCLUSIONS & RECOMMENDATIONS..........................4-6
Tables and Figures (Enclosures)
• Field Bore logs
• Laboratory test results
• Bore Log Details
• Site Plan
J.J.ASSOCIATES (Vskp) AETP (P) LIMITED
1
1. INTRODUCTION
M/s Hindustan Petroleum Corporation Limited proposed to conduct Soil Investigation at
SS-6B Area in DHT project at Visakha Refinery ,Visakhapatnam. Accordingly, land soil
investigations were envisaged to evolve various soil/rock parameters in order to carry
out engineering analysis and foundation design. In this connection, the soil investigation
work was awarded to M/s J.J.Associates (VSKP) AETP Pvt Ltd., Visakhapatnam vide
Purchase order No. 9000163-OQ-10004 dated 11/2/2010 to carry out the land soil
investigations at the proposed site.
Broad objectives of the investigations are as follows.
(a) To evaluate the parameters of soil/rock at the proposed site .
(b) To assess the engineering parameters and to estimate the safe bearing
capacity of soil
2. SCOPE OF WORK
The scope of work includes drilling of One(1) Land Boreholes at SS-6B Area.
Location of the boreholes is presented in the enclosed figure. “Borehole Locations”
sketch provided by M/S TOYO ENGINEERING CORPORATION / HPCL.
The scope also includes carrying out field tests like Standard Penetration Test (SPT) in
boreholes, collection of disturbed and undisturbed soil samples and carrying out the
relevant laboratory tests on collected soil samples.
3. INVESTIGATION METHODOLOGY
The details of the drilling rigs and methodology of boring are explained in the following
sections. Boreholes were terminated as per the direction of Engineer In charge.
After positioning the rig at the specified location, for drilling through soil. Borehole was
sunk by mechanically operated Cable Tool (Shell & Auger) in soil and Rotary drilling in
rock. Flush jointed steel casing tubes were provided to prevent possibility of side
collapse in boreholes. After reaching the desired depth, depending upon the soil layer
encountered, either Standard Penetration Tests & Vane Shear Tests were conducted or
Undisturbed or disturbed soil samples were collected.
J.J.ASSOCIATES (Vskp) AETP (P) LIMITED
2
The location of the boreholes is shown in the enclosed sketch. The field tests and sample
collections were conducted in the boreholes in accordance with the relevant Indian
Standard codes of practice and as per the following.
(a) Standard Penetration Test in soils at regular depth intervals
(b) Disturbed & Undisturbed soil samples
4. FIELD INVESTIGATIONS
4.1 Standard Penetration Tests
Standard penetration tests (SPT) were carried out in soil within boreholes to determine
strength characteristics of soil. This was carried out in accordance with IS: 2131. The
number of blows required to drive the standard split spoon sampler for penetration of
0.30 m by a 63.5 kg hammer falling freely from a height of 750 mm is recorded “N”
Value at regular intervals in the borehole. If the sampler is not fully penetrating into soil,
then the test was terminated after refusal noting the rate of penetration.
4.2 Sampling
Disturbed & Undisturbed representative soil samples were collected during investigations
and subsequently sent to laboratory for visual examination and testing. The disturbed
soil samples were also collected from split spoon sampler.
5. LABORATORY INVESTIGATIONS
All collected soil samples from the boreholes were brought to laboratory for necessary
testing and rechecking the preliminary borelogs. The laboratory tests comprised of
a. Grain Size distribution of all samples collected from boreholes
Grain size distribution was determined in two stages. The soil fraction retained on 75
micron IS Sieve was analysed by Sieve analysis using standard set of IS Sieve as
prescribed by IS 460 – 1962. Sieve analysis is again done in two stages. The oven dried
samples of soil was separated into two fractions by passing it through 4.75mm IS Sieve.
The portion passing through the sieve was analysed by fine analysis using the IS Sieve
Nos. 2mm, 1mm, 500, 425, 300, 212, 150 and 75 microns. The portion retained on this
sieve was analysed by coarse analysis using IS Sieve Nos. 100, 60, 20, 10 and 4.75mm.
J.J.ASSOCIATES (Vskp) AETP (P) LIMITED
3
b. Atterberg Limits on all clay fractions
Liquid limit of the soil was determined by Casagrande method using Casagrande type
mechanical liquid limit apparatus. Plastic limit was determined as per the standard
procedure.
c. Natural moisture content
Natural moisture content of the soil was determined by oven drying method as per IS :
2720 Part – II, 1969. Weights were taken to an accuracy of 0.001gr.
d. Bulk & Dry density
Bulk density and dry density of the undisturbed soil samples were evaluated as per
IS:2720
e. Triaxial Test.
The encountered strata was stiff in consistency, careful attention is made to extract
sample from the tube. The test is conducted as per part of IS 2720.
f. Specific Gravity Tests
Specific gravity test was conducted on the soil fraction passing through 425 micron
I.S.Sieve by density bottle method or by pycnometer. All weights are taken to an
accuracy of 0.001 gr. and the tests were conducted at 27°C.
g. Chemical Analysis of soil & water
Chemical Analysis for soil and water were carried out for PH value chlorides, sulphates
and organic matter and the results are enclosed in the report.
h. Consolidation tests
Consolidation tests were conducted on vertical drainage using Fixed ring cell type
consolidometer. The soil specimens were allowed to consolidate under pressure
increments of 0.01, 0.25, 0.5, 1.0, 2.0, 4.0 and 8.0 kg/cmª . The pressures were
unloaded through increments of 4.00, 2.00, 1.00, 0.50, 0.25 and 0.01 kg/cmª. Each
pressure increment was maintained constant per 24 hours. The vertical compression was
measured after the application of each pressure increment after the following elapsed
times, 0, 0.25, 1.00, 2.25, 4.00, 6.25, 9.20, 12, 25, 16.00, 20.25, 25, 36, 49, 64, 81,
100, 225, 400, 720 and 1440 minutes.
Note : The Possible tests are only conducted if samples were collected. In some case soil
samples could not be collected as rock is met at shallow depth.
J.J.ASSOCIATES (Vskp) AETP (P) LIMITED
4
6.GENERALISED GEOLOGICAL PROFILE
A generalised geological profile is prepared for individual boreholes. The description of
the various layers is based on the laboratory test results based on IS classification. For
the purpose of clarity, existing ground level is considered as 0.0m, datum for boreholes
in the individual geological profile.
6.1 Geological profile of proposed SS-6B Area(Bh-7).
Bore logs at proposed SS-6B Area shows the soil strata as per Field observation & bore
log . The geology of the proposed site is varying with respect to the thickness of each
layer. The top over burden predominantly consists of Filled up material from 0.00 to
1.00m followed by Clay with Sand, Highly Weathered rock . The ground water Level is
observed in the bore hole at shallow depth.
Soil Properties 0.00 to 1.00m 1.00m to 2.50m 2.50m & below
Gravel content % 7 to 11
Sand content % 31 to 43
Silt and Clay content % 46 to 62
Soil Classification as per
IS
Filled up
material
CL-SC
Highly Weathered
rock
Note : A layer of Clay with pebbles observed from 6.00m to 6.50m
7.Suggested Design Soil Parameters
Depth Below GL
(m)
Layer
No.
FROM TO
Soil type Average
N-Value
Cu
t/m2
Ф
degree
γ
t/m3
1 0.00 1.00 Filled up
material
- - - -
2 1.00 2.50 Clay with sand & pebbles
13 - - -
3 2.50m & below Highly weathered rock
50 - - 2.10
8. SUMMARY, ANALYSIS, CONCLUSIONS & RECOMMENDATIONS
8.1 General
The summary of the investigation is given below.
Total One (1) borehole is conducted in the proposed site.
J.J.ASSOCIATES (Vskp) AETP (P) LIMITED
5
8.2 Analysis
SAFE BERING CAPACITY FROM SHEAR CRITERIA IN BOREHOLE – 7
Safe Bearing Capacity from shear criteria at a depth of 2.50m
Qns = (2/3 CNC SC DC IC + r Df (NQ-1) SQ DQ IQ + 0.5r BNr Sr Dr Ir Wr| ) / FS
C = Cohesion intercept = 0 kg/cm2
ø = 36°
ø IF(ø <=28,(TAN-¹ (0.67*TAN ø )Else ø) = ׳
NC NQ Nr = Bearing capacity factors which are obtained by interpolation
Here NC = 51.96 NQ = 39.48 Nr = 60.31
SC SQ Sr = Shape factors which are 1.00 for Strip and 1.30 for Square
IC IQ Ir = Inclination factors
Nø = tan2(((22/7)/4) + (ø/2) )
DC = 1 + ( 0.2 x (Depth / Width) x √Nø) here it is 1.491
DQ = Dr = 1 for ø > 10˚
DQ = Dr = 1 + ( 0.1 x (Depth/Breadth) x √Nø) for ø > 10˚
Here Dr = DQ = 1.246
Qns = Safe Bearing Capacity
Factor of safety : 3.00
Safe Bearing Capacity from shear criteria at a depth of 2.50m
Net safe Bearing
Capacity in t/m2
S No. Depth (m) Width
(m)
Length (m)
Strip Square
1 2.50 2.00 2.00 115.42 126.94
2 2.50 3.00 3.00 120.46 128.76
3 2.50 4.00 4.00 128.26 133.90
4 2.50 5.00 5.00 137.16 140.36
5 2.50 6.00 6.00 146.61 147.48
Taking N = 50,
SBC Calculation as per IS:8009 (Part-I)-1976 from Settlement Criteria at a
depth of 2.50m below G.L(i:e) at R.L +2.997 in Bore Hole-7.
J.J.ASSOCIATES (Vskp) AETP (P) LIMITED
6
S No. Depth of
Foundation
(m)
Width of
Foundation
(m)
Settlement
Pressure for
10t/m2
Allowable bearing
pressure for 25mm
settlement(t/m2)
1 2.50 2.00 4.70 53.19
2 2.50 3.00 5.20 48.08
3 2.50 4.00 5.50 45.45
4 2.50 5.00 5.60 44.64
Recommendations: Considering the subsoil conditions prevailing at the site and based
on field and laboratory investigation results, the following recommendations have been
made for foundations of proposed constructions.
1. Shallow Foundations
a) As Hard strata is met at shallow depth and taking both shear criteria & settlement
criteria into consideration raft foundation/ isolated column footings should be
adopted at the depths mentioned below with the following safe bearing capacities.
BH No. Location Depth of foundation (m) SBC from shear
criteria (t/m2)
7 SS-6B Area 2.50m & below 30
Note:
1. Filled up material if any should be removed and foundation should be from
the natural ground level
2. Plinth beams are to be provided to safeguard the structure against differential
settlements if any.
b ) Due to presence of sulphates in water necessary precautions should be taken as
per IS 456-2000.
c) Back Filling material should be Rubble Soling and well compacted in layers of
150mm below PCC.
For J.J.ASSOCIATES(VSKP) AETP (P) LTD.,
J.J. ASSOCIATES(VISAKHAPATNAM)AETP(P) LIMITED 11-6-3,RockDale Layout, Maharanipeta,
Visakhapatnam – 530 002.
Project : Proposed DHT project at Visakh Refinery. Date of Commencement : 1/4/2010 Location : SS-6B Date of completion : 6/4/2010 Bore hole : 7 Ground RL : +5.497 Ground Water Table : 1.93m
Coordinates : N 556.394 E 1673.212
UDS – Undisturbed Sample DS – Disturbed Sample SPT – Standard Penetration Test pen. – Penetration 1
BORELOG
Ground R.L. Depth Below
G.L. (m)
RL & Depth at which sample
collected (m)
RL & Depth at which SPT
conducted (m) SPT
From To From To
Visual Description
of strata
Thickness of Strata
(m)
Type of
sample GRL GL
(m) GRL GL (m)
15 cm
30 cm
45 cm
N-Value
Core recovery
%
RQD % Remarks
+5.497
+4.497
0.00
1.00 Filled up soil & boulders 1.00 DS-1 +4.497 1.00
+4.497
+2.997
1.00
2.50
Reddish clay with pebbles 1.50 SPT-1
DS-2
+2.997
2.50 +3.997
1.50
3
5
8
13
+2.997
-0.503
2.50
6.00
Highly weathered
rock 3.50
SPT-2 DS-3 SPT-3 DS-4
+1.497
-0.503
4.00
6.00
+2.497
+0.997
3.00
4.50
8 49 52(5 cm pen.)
58(5cm pen.)
>50
>50
-0.503
-1.003
6.00
6.50
Reddish clay with pebbles 0.50 DS-5 -1.003 6.50
J.J. ASSOCIATES(VISAKHAPATNAM)AETP(P) LIMITED 11-6-3,RockDale Layout, Maharanipeta,
Visakhapatnam – 530 002.
Project : Proposed DHT project at Visakh Refinery. Date of Commencement : 1/4/2010 Location : SS-6B Date of completion : 6/4/2010 Bore hole : 7 Ground RL : +5.497 Ground Water Table : 1.93m
Coordinates : N 556.394 E 1673.212
UDS – Undisturbed Sample DS – Disturbed Sample SPT – Standard Penetration Test pen. – Penetration 2
Ground R.L. Depth Below
G.L. (m)
RL & Depth at which sample
collected (m)
RL & Depth at which SPT
conducted (m) SPT
From To From To
Visual Description
of strata
Thickness of Strata
(m)
Type of
sample GRL GL
(m) GRL GL (m)
15 cm
30 cm
45 cm
N-Value
Core recovery
%
RQD % Remarks
-1.003 -2.003
6.50 7.50
SPT-4 DS-6
-2.003
7.50
-1.003
6.50
53(10cm pen.)
>53 Nil Nil
-2.003 -3.003 7.50 8.50 DS-7 -3.003 8.50 Nil Nil -3.003
-4.503 8.50
10.00 SPT-5 DS-8
-4.503
10.00
-3.003
8.50
56(5cm pen.)
>50 Nil Nil
-4.503 -6.003 10.00 11.50 DS-9 -6.003 11.50 3 Nil -6.003 -6.503 11.50 12.00 SPT-6 -6.003 11.50 73(10cm pen.) >73 2 Nil -6.503 -7.503 12.00 13.00 DS-10 -7.503 13.00 Nil Nil -7.503 -9.003 13.00 14.50 SPT-7 -7.503 13.00 81(8cm pen.) >81 Nil Nil -9.003 -9.853 14.50 15.35
Highly weathered
rock 9.03
SPT-8 -9.853 15.35 100(no pen.) >100 Nil Nil
Borehole terminated at 15.35m below G.L. (i.e.) at R.L -9.853
J.J. ASSOCIATES(VISAKHAPATNAM) AETP(P) LIMITED #11-6-3, RockDale Layout, MaharaniPeta,
Visakhapatnam – 530 002.
IDENTIFICATION & ENGINEERING PROPERTIES OF SOIL
Project : Proposed DHT project at HPCL, Visakh Refinery at Visakhapatnam Location : Proposed SS-6B Site.
Triaxial Test
Gradation Analysis Consistency Limits UU
FINES
RL & Depth at which sample
collected Sl No. BH No
Sample No.
Type of sample
GRL GL (m)
Natural moisture content
(%)
Bulk Density (g/cc)
Dry Density (g/cc) Gravel
(%) Sand (%) Silt Clay
Liquid Limit (%)
Plastic Limit (%)
Plasticity
Index (%)
C (kg/cm²)
φ degree
Specific gravity ISC
1 7 1 SPT +3.997 1.50 9.76 - - 10.00 35.00 42.00 13.00 34 19 15 - - - CL
2 7 2 DS +2.997 2.50 16.22 - - 0.00 61.00 32.00 7.00 24 13 11 - - 2.64 SC
3 7 3 DS +1.497 4.00 - - - 0.00 90.00 10.00 ◄▬NP▬► - - - -
J.J. ASSOCIATES (VISAKHAPATNAM) (P) LIMITED #11-6-3, Rock Dale Layout, Maharanipeta,
Visakhapatnam – 530 002.
Project : Proposed DHT Project at Visakh Refinery. Location : SS-6B Area.
CHEMICAL ANALYSIS OF SOIL
Depth at which sample collected S.No. BH
No. G.R.L. G.L (m)
Pн Sulphates %
Chlorides %
Organic Matter
%
1 7 +2.997 2.50 7.20 0.002 0.005 nil
CHEMICAL ANALYSIS OF WATER
Depth at which sample collected S.No. BH
No. G.R.L. G.L (m)
Pн Sulphates mg/l
Chlorides mg/l
Organic Matter
mg/l
1 7 +3.567 1.93 7.40 320 118 11
J.J. ASSOCIATES(VISAKHAPATNAM) AETP (P) LIMITED #11-6-3, Rock Dale Layout, Maharanipeta,
Visakhapatnam – 530 002.
BORE LOG DETAILS
Project : Proposed DHT Project at Visakh Refinery. Location : At Proposed SS-6B Site.
BH-7
0.00 +5.497 Filled up soil &
boulders
1.00 +4.497 Reddish clay
with pebbles N=13@+3.997
2.50 +2.997 Highly
weathered rock N>50@+2.497 N>50@+0.997
6.00 -0.503 Reddish clay
with pebbles
6.50 -1.003 Highly
weathered rock N>[email protected] N>[email protected] N>[email protected] N>[email protected] N>[email protected]
15.35 -9.853