Final OracleTOR October 2012 MK Xxxxx

Embed Size (px)

Citation preview

  • 7/28/2019 Final OracleTOR October 2012 MK Xxxxx

    1/14

    Oracle ERP (R12.1.3)

    Terms of Reference

    September 2012

  • 7/28/2019 Final OracleTOR October 2012 MK Xxxxx

    2/14

    2

    CONTENTS

    CONTENTS............................................................................................................................. 21 BACKGROUND ............................................................................................................... 31.1 Key business objectives are: ................................................................................................................... 31.2 Current version levels: ............................................................................................................................. 31.3 Current product modules installed and operating: ................................................................................... 41.4 Environments: .......................................................................................................................................... 41.5 process:.................................................................................................................................................... 42 PURPOSE OF THE REQUEST FOR TENDER (RFT) .............................................................. 53 EVALUATION CRITERIA ................................................................................................... 53.1 Evaluation ................................................................................................................................................ 53.2 Functional evaluation ............................................................................................................................... 63.2.1 Functionality Phase 1 (65 points) Threshold of 80% ............................................................................ 63.2.2 Functionality Phase 2 (35 points) Threshold of 80% ............................................................................ 74 PROJECT SCOPE OF WORK ............................................................................................ 84.1 PHASE 1 .................................................................................................................................................. 84.2 PHASE 2 AGENCY SETUP AND INTEGRATION ............................................................................... 94.3 MINIMUM IMPLEMENTATION STANDARDS ...................................................................................... 105 GENERAL REQUIREMENTS............................................................................................. 115.1 Project .................................................................................................................................................... 116 PRICING RESPONSE ..................................................................................................... 127 CONDITIONS ................................................................................................................ 137.1 Bid Documents Deliverables .................................................................................................................. 137.2 Specific Conditions ................................................................................................................................ 137.3 General Conditions ................................................................................................................................ 14

  • 7/28/2019 Final OracleTOR October 2012 MK Xxxxx

    3/14

    3

    1 BACKGROUND

    NWPL implemented the Oracle ERP E-Business Suite (EBS) and went live on 1 April 2007, withthe following main areas: Financials, Procurement and Human Resources.

    The Human Resources department is reviewing the recruitment processes and systems inlegislature. The process of information sharing and information flow both internally and externallybetween NWPL and stakeholders (internally) and services providers respectively is mostly paper-driven and not well-monitored and tracked. Opportunities exist for improving the process throughfurther automation.

    1.1 KEY BUSINESS OBJECTIVES ARE:

    1. To develop an integrated ERP solution for NWPL that can improve efficiency andeffectiveness also align to processes.

    2. To effectively improve standard operational procedures in the recruitment process.

    3. To ensure access to regularly, updated recruitment information.

    4. To ensure that appropriate procurement information is available to all users at the righttime.

    5. To ensure access to regularly, updated procurement information.

    6. To ensure that appropriate expenditure information is available to all users at the right time.

    7. To ensure access to regularly, updated expenditure information.

    Below is the technical background of the current ERP platform environment in NWPL.

    1.2 CURRENT VERSION LEVELS:

    Database Operating System (OS): Red Hat Enterprise Linux (RHEL) Server release 4.3 (-32Bit).

    iAS Operating System: RHEL Server release 5.3 (32-Bit).

    Database: Version 11g (32-Bit).

    Internet Application Server (iAS): Version iAS 10g (10.1.2.3.0)(10.1.3.5) (32-Bit).

    E-Business Suite (EBS): Version R12.1.3 (32-Bit).

    Enterprise Manager (OEM): OEM 11g Release 1 (11.1).

  • 7/28/2019 Final OracleTOR October 2012 MK Xxxxx

    4/14

    4

    1.3 CURRENT PRODUCT MODULES INSTALLED AND OPERATING:

    1.3.1 Operational:

    Finance: General Ledger, Payables, Receivables, Cash Management, Assets,Financial Statements Generator (FSG), Cost Management, Inventory

    SCM: Purchasing, I Procurement, ,

    HRMS: Payroll, HR Admin, HR Self Service, Absence Management, ,

    1.3.2 Current product modules installed and not utilised

    BI Discoverer Plus, Diagnostics, Configuration Manager, Workflow, Approvals Management

    Engine (AME), Oracle Alert, Oracle Application Manager (OAM), Oracle Enterprise Manager(OEM) Grid Control. Learn ship management Employee Relations.

    Inventory.

    1.4 ENVIRONMENTS:

    NWPLs Oracle ERP operates on the following platforms:

    1.4.1 Servers8 x Fujitsu Siemens RX200 S3 4x RX200 S3 Servers on a Storage AreaNetwork (SAN) environment8GB Memory per server.2 x Intel Xeon Dual Core 3.0GHz CPU per server.

    Production (PROD) Instances (2 x Servers) Database Server and the Application (Web) Server.

    Development (2 x Servers)

    DEV (Development) Training Instances (2 x TEST Servers)

    UAT (User Acceptance Testing / Quality Assessment) DEV (Development) Training (Accessible by all employees)

    .

    1.5 PROCESS:

    The current as is for implementation processes will be made available to the successful bidder.

  • 7/28/2019 Final OracleTOR October 2012 MK Xxxxx

    5/14

    5

    2 PURPOSE OF THE REQUEST FOR TENDER (RFT)

    North West Provincial Legislature seeks to identify and appoint a suitable Service Provider (OracleCertified Partner) to assist in the implementation of the following Oracle iProcurement, iExpense,Oracle Learning Management..

    In addition to the implementation the appointed service provider will provide support services to thefollowing existing Oracle E-Business suite modules and Oracle database

    Functional Modules

    o General ledger

    o Accounts Payables

    o Fixed Assets (Not Fully Utilised)

    o Inventory

    o Cash Management

    o Payroll

    o HRMS

    o HRMS self Service

    o SCM - Purchasing

    o System Administration

    Oracle Database support

    Oracle Application server support

    Oracle health check on Application and Database

    3 EVALUATION CRITERIA

    3.1 EVALUATION

    Evaluation Criteria 90/10

    (a) The evaluation is based on the 90/10 criteria where, 10 points is for BBBEE as

    required by PPPFA.

  • 7/28/2019 Final OracleTOR October 2012 MK Xxxxx

    6/14

    6

    3.2 FUNCTIONAL EVALUATION

    The threshold for all functional evaluation is set at 80%. Any service provider that scores below

    the threshold will not proceed further in the evaluation process.

    3.2.1 Functionality Phase 1 (65 points) Threshold of 80%

    A: Company History, Experience and Background: [20 points]

    - Years in operation [5 points]:

    o 6 years and more (5 points),

    o Up to 5 years (4 points),

    o Up to 4 years (3 points),

    o Up to 3 years (2 points),

    o Up to 2 years (1 point),

    o Up to 1 year (0 points).

    - Oracle Certified Partner Type[5 points]:

    o Diamond/Oracle (5 points),

    o Platinum (4 points),

    o Gold (2 points),

    o Silver (1 point).

    - Financial strength [5 points]:

    o Good/Strong (5 points),

    o Average (3 points),

    o Weak (1 point),

    o Liabilities exceed assets and/or annual net loss in the last few years (0

    points).

    - Oracle EBS Projects completed, specifically Oracle HRMS and iRecruitment

    projects[5 points]:

    o Quantity HRMS and iRecruitment implemented (5 points).

  • 7/28/2019 Final OracleTOR October 2012 MK Xxxxx

    7/14

    7

    B: Consultants Functional, Technical Experience and Background: [30 points]

    - CV of both Functional and Technical Consultants to be used both in the implementation

    and support service of the Oracle modules indicated

    o Their CV must include qualifications, proof of certification, proficiency, and

    experience in specified modules (support and implementation)

    C: Quality and feedback of Reference: [15 points]

    - Attach signed and certified letter (5) from previous and current clients indicating service

    rendered, if implementation indicate project time, cost and support indicate which

    module where supported.

    NB: Any service provider that does meet the above threshold will not proceed further.

    3.2.2 Functionality Phase 2 (35 points) Threshold of 80%

    a) Perform a presentation and/or demonstration on all required module and its major

    functionalities and benefits this module offers.

    b) Presentation on past implementations. What, When, How implemented and Where.

    c) Major / Key benefits achieved for such organisation.

    d) Major / Key customisation performed for such implementations.

    NB: Any service provider that does not meet the above threshold will not proceed further.

  • 7/28/2019 Final OracleTOR October 2012 MK Xxxxx

    8/14

    8

    4 PROJECT SCOPE OF WORK

    4.1 PHASE1

    1A:Standard implementation required.

    Implementation of Oracle EBS Oracle iRecruitment,

    Implementation of Oracle EBS Oracle iExpense,

    Implementation of Oracle EBS Oracle Learning Management as explained and required under theProject Scope of Work.

    In addition to the implementation the will require to render support services on Oracle E-BusinessSuite, (R12 and Oracle Database 11g Administration)

    Implement latest available patches for 12.1.3. Configuration of iProcurement using all OA Framework capabilities where necessary. (All applicable

    available functionalities.)

    Configuration of iRecruitment using all OA Framework capabilities where necessary. (All applicableavailable functionalities.)

    Configuration of iExpense using all OA Framework capabilities where necessary. (All applicableavailable functionalities.)

    Configuration of Oracle Learning Management using all OA Framework capabilities wherenecessary. (All applicable available functionalities.)

    Deliver all the standard content and functionalities of the module. (Except the listed implementationsteps not required, as listed below).

    All applicable standard available workflows and notifications. (using AME.B)

    All applicable standard available reports. (using XML Publisher)

    All applicable standards available Alerts / Lookups / Functions / Menus / Messages.

    Implement, configure and setup iProcurement standard agency responsibilities, menus, functions,access and security.

    Secure link from NWPL Website to iProcurement Site, so that externalEmployees/Candidates/Agencies can access the external iProcurement site. (NWPL E-BusinessSuite servers run currently on SSL Certificates.) (DMZ configuration is not required).

    1B: Standard Customization IRecruitment / Personalisation required.

    Personalize/Customize for local and culture requirements.

    Configure of custom approval rules in the current standard workflows.

    3 x new User/Extensible Lookups.

    5 x new customised workflows.

    8 x new customised XML reports.

    4 x new customised Oracle Alerts/Notifications.

    10 new letters using WEB ADI (e.g. acknowledgement, invite to interview, unsuccessful,etc.)

    2 x Customised CV/Resume templates. Concurrent program to import scanned and stored CVs (i.e. stored in PDF format)

  • 7/28/2019 Final OracleTOR October 2012 MK Xxxxx

    9/14

    9

    1C: Training / Skills transfer required.

    Full knowledge transfer to be self-operating and self-supportive.

    Training approach Train the trainer.

    2 day (or more) Oracle University Certified Training for R12 HRMS iRecruitment ,iProcurement, iExpense Fundamentals and Learning Management for up to 16 delegates.Class Room based training at NWPL premises training room. (Training venueaccommodates up to 20 seats with own laptops on the network).

    Prepare a customised End-User Training Manual for Self-Service End-User and for HRBack-office staff and a FAQ list.

    All Training Materials must preferably be developed on Oracle UPK Professional (Onbidders own UPK Licence).

    Prepare a System Business Process Flow Chart Manual.

    Training on responsibilities, menus and functions. Training target group:o 4 Mphatlalatsane support staff users. (As end-users, support and trainers).o 5 Managers (SMEs & end-users) (The respective Section & Unit Managers as

    end-users and trainers).o 6 Operational HR staff (SMEs, Recruiters and administrators as end-users and

    trainers).o 12 Operational Finance staff (SMEs, Procurer and administrators as end-users

    and trainers).o

    The HR Operational staff will roll-out the applicable iRecruitement Self Service to allManagers and staff.

    The Finance Operational staff will roll-out the applicable iProcurement and iExpense SelfService to all Managers and staff

    4.2 PHASE2AGENCYSETUPANDINTEGRATION

    2A: Standard Customization / Configure required (To commence after appointment of3rd Party e-Recruitment Agency).

    NWPL will appoint a 3rd Party e-Recruitment Portal / Agency.

    Develop and implement an interface with the appointed Portal Company. (HR XML API).

    Quote for one Portal interface. (Export vacancies and import candidate applications, etc.). Skills transfer to Mphatlalatsane Functional and Technical staff.

    Production interface link to 3rd Agency. (Switch on).

  • 7/28/2019 Final OracleTOR October 2012 MK Xxxxx

    10/14

    10

    4.3 MINIMUMIMPLEMENTATIONSTANDARDS

    The following minimum implementation standards must be adhered to:

    Implement on R12.1.3

    One DEV/TEST/TRAINING instance will solely be made available to the implementationteam.

    Utilise Oracle ABF (AIM for Business Flows and/or Oracle Unified Method (OUM))method for implementation methodology, with all required documentations for changecontrol, etc.

    Configure only. No additional application customisation, except as listed specificallyabove.

    Utilise and implement leading best business practice.

    Only experienced consultants to be utilised for the implementation. (If additionaltrainees/Interns are utilised then only at the cost of the service company).

    Utilise Approval Management Engine (AME.B) for all workflows processes. Utilise XML Publisher (BI Publisher) for all current standard and new customised reports.

    Utilise NWPLS Metalink (My Oracle Support) Support Identifier for any logged SRs.

    Implementation warranty of 6 months for all required setups, configurations, interfaces,customisation, etc. from date of Production implementation (Go-Live) as per this Terms ofReference (TOR) and/or sign-off Business Requirements. (MD050, etc.). - The Serviceprovider must take corrective actions to remedy the effects of any failure (identified over aperiod of 6 months from date of implementation Go Live) on the implementationconfiguration immediately after the failure has been determined and at no additional costto NWPL.

  • 7/28/2019 Final OracleTOR October 2012 MK Xxxxx

    11/14

    11

    5 GENERAL REQUIREMENTS

    5.1 PROJECT

    5.1.1 Implementation Phases proposed:

    Phase 1

    Internal (HR Division) iRecruitment and Internal Self Service iRecruitment only:Administrators/Recruiters to capture internal employees and external candidatesmanually for the first month. (E.g. pilot to internal HR Division back-office staff only). HR

    Division, then to roll-out and decentralise the Self Service Functionality to the rest ofNWPL internal managers, supervisors and staff.

    Internal (HR Division) Learning Management and Internal Self Service Learningmanagement only: Administrators/Recruiters to capture internal employees andexternal candidates manually for the first month. (E.g. pilot to internal HR Division back-office staff only). HR Division, then to roll-out and decentralise the Self ServiceFunctionality to the rest of NWPL internal managers, supervisors and staff.

    Internal (Finance Division) iProcurement, iExpense and Internal Self ServiceiProcurement, iExpense only: Administrators/Procurers to capture internal employeesand external candidates manually for the first month. (E.g. pilot to internal FinanceDivision back-office staff only). Finance Division, then to roll-out and decentralise theSelf Service Functionality to the rest of NWPL internal managers, supervisors and staff.

    When Phase 1 is bedded down and a greater understanding of the product and how tobrand this then proceed with Phase 2 roll-out.

    Phase 2 is to extend this to the outside world External Employee and Candidate access,contracting with 3rd party Agencies, Portal Interface build and test, secure access, etc.

    5.1.2 Implementation Periods proposed:

    Phase 1 - Implementation (scope of work) period to be planned for a maximum of around15 weeks (90 Business days). Implementation is earmarked to commence as soon aspossible after tender award.

    The support will be based on a 36 months contract then will be reviewed or terminateddepending on the assessment of the NWPL competency.

    Phase 2 - Implementation (scope of work) period to be planned for a maximum of around 5weeks (25 Business days).

  • 7/28/2019 Final OracleTOR October 2012 MK Xxxxx

    12/14

    12

    6 PRICING RESPONSE

    RFT Response Pricing Proposal

    Pricing to cater for the full scope of work specified, at a high quality implementation performancedelivery.

    Pricing breakdown to be as follows:

    Phase 1 (Inclusive of VAT)

    Phase 1A pricing for requested standard implementation required (See 1A).

    Phase 1Bpricing for requested customisation required (See 1B).

    Phase 1C pricing for skills transfer/training required (See 1C).

    o Specify separately the Oracle University R12 HRMS iRecruitment Fundamentals

    course. (Rate per day Classroom based at NWPL).

    o Specify separately the Oracle University R12 iProcurement Fundamentals course.

    (Rate per day Classroom based at NWPL).

    o Specify separately the Oracle University R12 iExpense Fundamentals course. (Rate

    per day Classroom based at NWPL).

    o Specify separately the Oracle University R12 Learning Management Fundamentals

    course. (Rate per day Classroom based at NWPL).

    o Specify pricing separately required for training days and pricing for HRMS Back-

    Office staff / Managers / Recruiters and training materials

    o Specify pricing separately required for training days and pricing for All modules

    specified above Back-Office staff / Managers and training materials

    S&T - Flights and accommodation (S&T) for each consultant x period (If applicable).

    Phase 2 (Inclusive of VAT)

    Phase 2A - Pricing for requested customisation required (See 2A). S&T - Flights and accommodation (S&T) for each consultant x period (If applicable).

    Total

    Vat inclusive total - Please specify fixed pricing amount for Phase 1 and 2 combined.

    Bidders must end up with one fixed price for all work in scope. (Fixed Price not to beexceeded).

  • 7/28/2019 Final OracleTOR October 2012 MK Xxxxx

    13/14

    13

    7 CONDITIONS

    7.1 BID DOCUMENTS DELIVERABLES

    Compulsory Compliance Documents

    (a) Valid Tax Clearance Certificate YES NO

    (b) Proof of Business Registration YES NO

    (c) ID copies of the Business Owners YES NO

    (d) This signed RFT (All pages initialled) (supplied) YES NO

    (e) SAF Supplier Accreditation Form (supplied) YES NO

    (f) Declaration of Interest (supplied) YES NO

    (g) Proof of VAT registration if VAT is charged YES NO

    (h) Pricing (ceiling max pricing) YES NO

    Evaluation Documents

    (a) BEE Certificate YES NO

    (b) Draft Project Plan YES NO

    (c) Latest Audited Financial Statements. YES NO

    (d) Oracle Certified Partner Certificate. YES NO

    (e) CVs (Resumes) of Consultants to be used. YES NO

    (f) Solution References YES NO

    7.2 SPECIFIC CONDITIONS

    a) This proposal and all supplied documents (Refer 7.1) will serve as the part of the Service

    Level. Agreement (SLA).

    b) Implementation warranty - The Service provider must take corrective actions to remedythe effects of any failure (identified over a period of 6 months from date of implementationGo Live) on the implementation configuration immediately after the failure has beendetermined and at no additional cost to NWPL.

  • 7/28/2019 Final OracleTOR October 2012 MK Xxxxx

    14/14

    14

    7.3 GENERAL CONDITIONS

    The following information applies:

    a. All proposals in response to this RFT, whether successful or unsuccessful, will

    become the property of NWPL.

    b. Companies are prohibited from using NWPLs Logo on their proposals.

    c. Tender/Quotes should be on letterheads, indicating the VAT registration number,

    and where possible include samples of previous similar work.

    d. A current list of references where similar work was undertaken should be supplied

    e. Copyright remains that of NWPL and all copies of material used in the project

    should be returned to NWPL.

    f. NWPL reserves the right not to award this contract.

    g. NWPL required a project plan as part of the proposal documents.

    h. Preferential Procurement Policy Framework Act (PPPFA) is applicable.

    i. The Financial Management Act of NWPL is applicable

    j. All submissions must be valid for a period of 90 days after the closing date.

    k. The service provider may be required to make presentation, to seek clarification.

    l. SLAs will be concluded with the successful service provider.

    m. The Service Provider will accept and follow direction and instructions from NWPL for

    the management of services.

    n. All responses must conform to instructions. Failure to provide relevant information,

    signatures or any other requirements of this RFT will result in disqualification.

    o. Any costs incurred by the service providers in preparing and submitting their

    response to the RFT will be the sole responsibility of the service provider.