Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Rapid City Area Metropolitan Planning Organizationidddddd CiCiiCiCiCiCiCiCiCiCitttttytytytytytytyty AAAAAAAAAA Arerererererereaaaaaa MMMetrtrrrropopopopopopop llolololololololiiii ti tane PPlalalannnnnininingg Orn rgagaaaaannininininizzatio
lsa associates, inc.
Catalyst, Inc. September 2010
M A P A P P E N D I X
SEPTEMBER
Chap
2010
pter 3: Growthh in thee Regionn
Figuure 3-2: Residential Gro
owth (2000 t
RA
to 2008)
APIDTRIP 2035 - THE LONG RARANGE TRANSPOORTATION PLANN FOR THE RAPID CITY AREA –
– MAP APPENDDIX
SEPTEMBER
Chap
2010
pter 3: Growthh in thee Regionn
Figuure 3-3: Residential Gro
owth (2008 t
RA
to 2035)
APIDTRIP 2035 - THE LONG RARANGE TRANSPOORTATION PLANN FOR THE RAPID CITY AREA –
– MAP APPENDDIX
SEPTEMBER
Chap
2010
pter 3: Growthh in thee Regionn
Figure 3-5: Retail Emp
loyment Gro
RA
owth
APIDTRIP 2035 - THE LONG RARANGE TRANSPOORTATION PLANN FOR THE RAPID CITY AREA –
– MAP APPENDDIX
SEPTEMBER
Chap
2010
pter 3: Growthh in thee Regionn
Figuure 3-6: Office/Service
Employment
RA
t Growth
APIDTRIP 2035 - THE LONG RARANGE TRANSPOORTATION PLANN FOR THE RAPID CITY AREA –
– MAP APPENDDIX
SEPTEMBER
Chap
2010
pter 3: Growthh in thee Regionn
Fi igure 3-7: In
ndustrial Emmployment G
RA
Growth
APIDTRIP 2035 - THE LONG RARANGE TRANSPOORTATION PLANN FOR THE RAPID CITY AREA –
– MAP APPENDDIX
SEPTEMBER
Chap
2010
pter 3: Growthh in thee Regionn
Figuure 3-8: Pubblic Sector E
Employment
RA
Growth
APIDTRIP 2035 - THE LONG RARANGE TRANSPOORTATION PLANN FOR THE RAPID CITY AREA –
– MAP APPENDDIX
SEPTEMBER
Ch
2010
hapter 55: Bicyccle andd Pedesstrian PPlan
FFigure 5-2: Bicycle Netw
work Alterna
RA
atives
APIDTRIP 2035 - THE LONG RARANGE TRANSPOORTATION PLANN FOR THE RAPID CITY AREA –
– MAP APPENDDIX
SEPTEMBER
Ch
2010
hapter 55: Bicyccle andd Pedesstrian PPlan
Figure 5--3: Financiaally-Constrai
ned Non-M
RA
Motorized Pla
APIDTRIP 2035
an
- THE LONG RARANGE TRANSPOORTATION PLANN FOR THE RAPID CITY AREA –
– MAP APPENDDIX
SEPTEMBER
Ch
2010
hapter 77: Road
dway Plan
Figure 77-2: Existing and Comm
mitted Roadw
RA
way Network
APIDTRIP 2035
k
- THE LONG RARANGE TRANSPOORTATION PLANN FOR THE RAPID CITY AREA –
– MAP APPENDDIX
SEPTEMBER
Ch
2010
hapter 77: Road
dway Plan
Figure 7-4: Roadway Alternative
RA
es
APIDTRIP 2035 - THE LONG RARANGE TRANSPOORTATION PLANN FOR THE RAPID CITY AREA –
– MAP APPENDDIX
SEPTEMBER
Ch
2010
hapter 77: Roaddway Plan
Figgure 7-5: Recommendeed Financially Constrain
RA
ned Roadwa
APIDTRIP 2035
ay Plan
- THE LONG RARANGE TRANSPOORTATION PLANN FOR THE RAPID CITY AREA –
– MAP APPENDDIX