FINAL Initial Geotechnical Investigation Report I-25 and Cimarron Street Design-Build Colorado Springs CDOT Region 2 Yeh Project No.: 213-207 July 23, 2014 Prepared for: Wilson and Company, Inc. 5755 Mark Dabling Boulevard, Suite 220 Colorado Springs, Colorado 80919 Prepared by: Yeh and Associates, Inc. 2000 Clay Street, Suite 200 Denver, Colorado 80211 Phone: 303-781-9590 Fax: 303-781-9583

FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

FINAL

Initial Geotechnical Investigation Report

I-25 and Cimarron Street Design-Build

Colorado Springs

CDOT Region 2

Yeh Project No.: 213-207

July 23, 2014 Prepared for:

Wilson and Company, Inc.

5755 Mark Dabling Boulevard, Suite 220 Colorado Springs, Colorado 80919

Prepared by:

Yeh and Associates, Inc. 2000 Clay Street, Suite 200

Denver, Colorado 80211

Phone: 303-781-9590 Fax: 303-781-9583

Page 2: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site
Page 3: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

i

Table of Contents

1.0  PURPOSE AND SCOPE OF WORK  1 

2.0  REGIONAL GEOLOGY  1 

3.0  SUBSURFACE INVESTIGATION  1 

4.0  LABORATORY TESTING  2 

5.0  SUBSURFACE CONDITIONS  2 

6.0  CORROSION AND SEISMICITY  4 

6.1  CORROSION  4 

6.2  SEISMIC CONSIDERATIONS  5 

7.0  LIMITATIONS  6 

8.0  REFERENCES  7 

 

Page 4: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

ii

List of Figures

FIGURE 1 SITE VICINITY MAP (USGS COLORADO SPRINGS, CO, 7.5 MINUTE QUADRANGLE, 2013)  8 

FIGURE 2 GEOLOGIC MAP OF PROJECT AREA (USGS, CARROLL, C.J., AND CRAWFORD, T.A., 2000)  9 

 

List of Tables

TABLE 1 SUMMARY OF BEDROCK AND GROUNDWATER CONDITIONS ............................................................................................ 3 

TABLE 2 SEISMIC DESIGN PARAMETERS ................................................................................................................................... 5 

APPENDIX A BORING LOCATION PLAN

APPENDIX B LEGEND AND BORING LOGS  

APPENDIX C LABORATORY TEST RESULTS 

Page 5: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207

1

1.0 PURPOSE AND SCOPE OF WORK

This report presents the results of Yeh and Associates Inc.’s geotechnical site investigation for

the I-25 and Cimarron Street Design-Build Project. The approximate limits of the project are

shown on Figure 1. The purpose of this report is to provide subsurface information for use by

Wilson and Company. Inc. and Colorado Department of Transportation (CDOT) to develop a

Design-Build bid package for the improvement of Interstate 25 (I-25) and Cimarron Street in

Colorado Springs, Colorado.

The scope of this evaluation included the following tasks:

Conduct a subsurface investigation to obtain information on the subsurface materials.

Perform laboratory testing on soil and bedrock samples obtained during the subsurface

investigation to determine the engineering characteristics of the on-site soils and

bedrock.

Prepare a geotechnical investigation report that presents the results of the field

investigation and geotechnical laboratory tests.

2.0 REGIONAL GEOLOGY

The surface deposits at the proposed project locations are mapped as Artificial fill (af) of latest

Holocene age, Colluvium (Qc) of Holocene and late Pleistocene age, Terrace alluvium one

(Qt1) of Holocene age and Sheetwash Deposits (Qsw) of Holocene and late Pleistocene age as

shown on Figure 2. These deposits are the result of geomorphic activity that has shaped the

present landforms and vary considerably in thickness. The mapped soils appear to be

consistent with the subsurface conditions encountered in the borings drilled at the project

location.

3.0 SUBSURFACE INVESTIGATION

Eleven borings (YA-B01 through YA-B11) were drilled for the proposed project. The Boring

Location Plan is presented in Appendix A. The borings were completed by Dakota Drilling, Inc.

and CDOT utilizing CME 75 and CME 55 drill rigs, equipped with 8-inch outside diameter,

hollow-stem augers. The subsurface conditions encountered in the borings were logged by a

representative of Yeh and Associates, Inc. The legend and boring logs are included in

Appendix B.

Page 6: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207

2

The boring locations were surveyed by Farnsworth Group, Inc. No temporary monitoring wells

were installed. Ground water depths were observed and recorded during drilling.

The recorded penetration resistance measurements were obtained by driving either a modified

California sampler or a standard split spoon sampler, typically at 5-foot intervals, into the

subsurface materials with a 140-pound hammer falling 30 inches and recording the number of

blows required to advance the sampler into the ground. A system that employs an automatic

trip hammer was used. The types of drill rigs, augers, samplers and hammer systems used are

noted on the boring logs. The driving procedure is similar to ASTM D1586, “Standard Test

Method for Standard Penetration Test (SPT) and Split Barrel Sampling of Soils”. The

penetration resistance values (blow counts corresponding to 12 inches of penetration or N-

values) are a useful index to the consistency, the relative density or hardness of the materials

encountered.

Groundwater observations were made during the field investigation and results are shown on

the boring logs presented in Appendix B. Year-round groundwater conditions were not

established as part of the field investigation. Groundwater conditions in the study area may vary

considerably throughout the year. Variations can occur during different seasons, following

precipitation events, irrigation, after construction and site grading, and due to changes in

surface and subsurface drainage characteristics of the surrounding area.

4.0 LABORATORY TESTING

Yeh and Associates performed laboratory testing on samples to determine the classification and

engineering characteristics of the on-site soil and bedrock. Laboratory tests performed included

natural density, natural moisture content, gradation analyses, Atterberg limits, pH, water soluble

sulfate, water soluble chloride, resistivity, swell/consolidation, one-dimensional consolidation

and unconfined compressive strength. The laboratory test results are presented in Appendix C,

Laboratory Test Results.

5.0 SUBSURFACE CONDITIONS

The existing ground surface elevations at the boring locations range from approximately 5944 to

5990 feet. The existing pavement section at the boring locations generally consisted of 7.5

inches to 8.5 inches of asphalt (borings YA-B02, YA-B03, YA-B04 and YA-B11). Fill materials

were encountered in all the borings except for boring YA-B01 and YA-B05. The fill materials

extended from 7 feet to 33 feet below the existing grade and generally consisted of medium stiff

to hard sandy clay with gravels, loose to dense silty sand and loose to medium dense clayey

Page 7: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207

3

sand. The native soils encountered in the borings generally consisted of loose to very dense

silty sand with varying amounts of gravel, cobbles and clay lenses in various mixtures.

Two consolidations tests were conducted on samples retrieved at 5 feet from Borings YA-B08

and at 10 feet from boring YA-B09. Borings YA-B08 and YA-B09 were drilled approximately

600 feet apart. In YA-B08, overburden materials (including fill and native soils) consisted

predominantly of granular soils underlain by claystone bedrock. In YA-B09, overburden

materials consisted of an 8 feet layer of highly plastic clay between layers of granular fill and

native granular soils. Foundation settlement potential is related to foundation material

properties, groundwater table elevation and the dimensions of the fill/ structure.

The native soils were underlain by bedrock at depths ranging from 11 to 47 feet below existing

grade, approximately elevation 5930 to 5949 feet. The bedrock consisted of residuum to very

hard claystone. Groundwater was observed at depths of approximately 7 to 46 feet below the

existing grade in all the borings at the time they were drilled.

Table 1 summarizes the boring locations, the existing grade elevation; the approximate depth

and elevation of the top-of-unweathered bedrock; and, the approximate depth and elevation of

groundwater surface for each of the borings.

Table 1 Summary of Bedrock and Groundwater Conditions

Approximate Depths and Elevations from Reported Borings

Boring No.

Approximate Location

Top Hole Elev.

UnweatheredBedrock

Depth

UnweatheredBedrock

Elev.

Groundwater Depth

Groundwater Elev.

(-) (-) (ft) (ft) (ft) (ft) (ft)

YA-B01 Pikes Peak

Greenway Trail, North of Cimarron

5959.8 11 5948.8 9 5950.8

YA-B02 NB I-25 Near On

Ramp, Right Lane 5989.8 47 5942.8 46 5943.8

YA-B03 EB US-24, East of I-25, Right Lane

5968.9 30 5938.9 28 5940.9

YA-B04 NB I-25 Near Off

Ramp, Right Lane 5972.7 40 5932.7 30 5942.7

YA-B05 SE of I-25 and US-24, on Bike Path

5944.3 14 5930.3 10 5934.3

YA-B06 331 South

Chestnut, South of Access Gate

5956.9 20 5936.9 8 5948.9

Page 8: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207

4

Approximate Depths and Elevations from Reported Borings

Boring No.

Approximate Location

Top Hole Elev.

UnweatheredBedrock

Depth

UnweatheredBedrock

Elev.

Groundwater Depth

Groundwater Elev.

(-) (-) (ft) (ft) (ft) (ft) (ft)

YA-B07 221 S. Chestnut, South Side of Lot

5956.7 16 5940.7 7 5949.7

YA-B08 SW of intersection of I-25 and US-24,

Nursery 5972.1 37 5935.1 24 5948.1

YA-B09 Abandoned

Nursery, East of Greenhouse

5958.7 28 5930.7 17 5941.7

YA-B10 331 South

Chestnut, West of Existing Building

5957.0 19 5938.0 8 5949.0

YA-B11 NB I-25 On Ramp,

Right Lane 5969.9 28 5941.9 25 5944.9

6.0 CORROSION AND SEISMICITY

6.1 Corrosion

Ten representative samples collected from ground surface to 12.5 feet below existing grade in

the borings were tested to determine the concentrations of water soluble sulfates, water soluble

chlorides, pH and resistivity. The test results are summarized below.

Water soluble sulfates – 0.004 to 0.138 percent

Water soluble chlorides – 0.0013 to 0.0366 percent

pH – 7.6 to 8.2

Resistivity – 481 to 3175 ohm-cm

The concentrations of water-soluble sulfate in the samples generally represent a Class 1 degree

of sulfate attack on concrete exposed to these soils in the project area as presented in Table

601-2 of Sections 601, Structural Concrete of the CDOT Standard Specifications, 2011 edition.

The pH of the soils at the site indicates that the soils are slightly basic and should represent a

mild to no corrosion potential (non-aggressive) based on Table 3.9 from Federal Highway

Administration Publication No. FHWA0-IF-03-017, Geotechnical Engineering Circular No. 7

(GEC 7).

Page 9: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207

5

The test results on the samples indicated a water–soluble chloride concentration combined with

the water soluble sulfate concentration and soil pH that correspond to a Corrosion Resistance

Level 2 (CR2), as presented in CDOT Pipe Material Selection Policy, dated May 7, 2012.

Based on Table 3.9 from GEC 7, soils that have resistivity values less than 2,000 ohm-cm are

considered to have a strong corrosion potential (aggressive). Resistivity values greater than

5,000 ohm-cm are considered to have mild to no corrosion potential (non-aggressive). The

designer should refer to CDOT Standard Specifications, Sections 603 and 624, Culvert, Sewer

and Drainage Pipe for design requirements.

6.2 Seismic Considerations

The project is located at approximate latitude 38.828 degrees north and longitude 104.835

degrees west. The site is classified as Site Class D in accordance with the Method B procedure

per AASHTO Table C3.10.3.1-1. The Peak Ground Acceleration (PGA), and the short- and

long-period spectral acceleration coefficients (SS and S1, respectively) for the project were

obtained using USGS Seismic Design Parameters Version 2.10 for an event with a 7 percent

Probability of Exceedance (PE) in 75 years and a Site Class B (reference site). An event with

the above probability of exceedance has a return period of about 1000 years. The values were

adjusted using Site Factors for Site Class D in accordance with AASHTO Section 3.10.3.2. The

seismic parameters are shown in Table 2.

Table 2 Seismic Design Parameters

For Site Class B

PGA (0.0 sec) Ss (0.2 sec) S1 (1.0 sec)

0.056 g 0.122 g 0.035 g

For Site Class D

As (0.0 sec) SDs (0.2 sec) SD1 (1.0 sec) Seismic Zone

0.090 g 0.195 g 0.085 g 1

Page 10: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207

6

7.0 LIMITATIONS

This Geotechnical Investigation Report was prepared for the exclusive use of Wilson and

Company and CDOT to develop a Design-Build bid package for the I-25 and Cimarron Street

Design-Build project. The findings presented in this report are based on the exploratory

borings, laboratory testing and field reconnaissance included in our investigation. This study

has been conducted in accordance with generally accepted geotechnical engineering practices

in this area. No warranty, expressed or implied, is made.

Page 11: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207

7

8.0 REFERENCES

American Association of State Highway and Transportation Officials, 2012, AASHTO LRFD Bridge Design Specifications, Customary U.S. Units, 6th Edition: Washington DC

Colorado Department of Transportation, Standard Specifications for Road and Bridge Construction (2011) and related Specifications

Colorado Department of Transportation, CDOT Pipe Material Selection Policy, dated May 7, 2012

Federal Highway Administration Publication No. FHWA0-IF-03-017, Geotechnical Engineering Circular No. 7 (GEC 7) Soil Nail Walls, March 2003

Carroll, C.J., and Crawford, T.A., Geologic Map of the Colorado Springs Quadrangle, El Paso County, Colorado 2000, Colorado Geological Survey Open-File Report OF-00-3, scale 1:24000

 

Page 12: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207

8

Figure 1 Site Vicinity Map (USGS Colorado Springs, CO, 7.5 Minute Quadrangle, 2013)

Page 13: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207

9

Figure 2 Geologic Map of Project Area (USGS, Carroll, C.J., and Crawford, T.A., 2000)

Page 14: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Appendix A 

BORING LOCATION PLAN

Page 15: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

M

H 559

M/

H 558

M

H 537

536

M

H 527

#3414

WAS

LAS

T

UN

D

GAS

SH

OT /

LIN

E

TO

TH

E

WES

T IS

NO

W

EX

PO

SE

D

OV

ER

CR

EE

K

O

N

LIF

T

ST

ATIO

N

O

N

LIF

T

ST

ATIO

N

M

H 572

M

H 560

M

H 563

M

H 538

C

OV

ER

ED

W/

CO

NC

MH 2504

NF

M/

H 2503

NF

M

H 565

M

H 564

E

XP

OS

ED

OV

ER

HE

AD

PIP

E

E

XP

OS

ED

OV

ER

HE

AD

PIP

E

4

CIP42 STL

AIR

VA

LV

E

VA

ULT

VA

LV

E

VA

ULT

24"

42 STL

36 STL

PL

UG

GE

D24"

OU

TLE

TP

LU

GG

ED

OU

TLE

T

42 STL

8"

2"

36 STL

8 PVC P

VT

RAW WATER

8" DESIGN

8"

FIR

ELIN

E

42 STL

36 STL

RAW WATER

8 PVC

PVT

PHASE 28" DESIG

N

RA

W

WA

TE

R

36

STL

42

STL

8

UN

K

10x8

RE

D

PV

T

10

PV

C

3"

SV

C

4x3

RE

D

8

CIP

8x4

RE

D

6

PV

C

6

PV

C6x4

RE

D

6 CIP

8

CIP

8x6

RE

DV

AC

ATE

D

6 CIP

180' SLEEVE

8x4

RE

D

6

PV

C

RE

D

AIR

6"

OUT

OF SER

VIC

E

PL

UG

12x6

RE

D

8"

DESIG

N

PH

AS

E 1

6 UNK PVT

PHASE 2

8x6

RE

D

PHASE 1

16 DIP PVT

8" DESIG

N

6" DESIGN

6

PV

C

PV

TP

VT

8x6

RE

D

10

PV

C

16 DIP PVT

16x6

RE

D

16x8

20

DIP

8 CIP

8 CIP

4x3

RE

D

4X3

RE

D

3

UN

K

6x3

3

UN

K

RE

D

6X4

RE

D

PL

UG

GE

D

CR

OS

S

CP

LG

4

CIP

6x3

RE

D

CP

LG

8 CIP

4

CIP

8x6

RE

D

6x4

RE

D

VA

CA

TE

D

8 CIP

6

PV

C

PV

T

8"

8"

VC

P

208'

8"

202'

VC

P

VCP

32'360'VCP

18"1

41'

UC

ON

8"

18"

VCP

131'

8"

UC

ON

STP

8" 134'

314'

18"

UC

ON

85'

24" 229'

CM

PS

24"23

4'CMPS

24"

166'

CMPS

DIP

8"

VC

P

102'

60'

8"

AB

AN

8"

VC

P282'

AB

AN

AB

AN

24"

469'

CMPS

DIP

258'8"

DIP

144'8"

PVC60'

8"

246'

PV

C 8"

24"

8"

345'

VC

P

66'

STP

391'

246'

69'DIP

530'

DIP

24"

24"

19'\VCP\2

4"

ABAN 24"

ABAN

VCP15"

456'

500'

RCPL

372'

42"

VCP15"

24"

VC

P

35'

ABAN

VC

P24"

177'

AB

AN

24"

414'

VCP

496'

AB

AN

ABAN

RCPL42"

VCP

75'

24"

24"

AB

AN

319'

AB

AN

ABAN

436'

AB

AN

RCPL

42"

ABAN

ABAN

437'RCPL

42"

ABAN

24"

STP

ABAN

ABAN

254'

15"

539'RCPL42"

ABAN

15"

24"

STP

21"

AB

AN

ABAN

24"

49'\RCPL\24

"

42"

24" 3

73'VC

P

233'

RCPL

ABAN

AB

AN

15"

15"

VCP24"

15"

347'

VCP

121'

15"

6"

VC

P256'

263'

VCP15"

15"VCP

271'

295'

VC

P8"

VC

P

24"

VCP

47'

VCP

314'

24" ABAN

ABAN

15"

VCP

VCP

179'

15"

152'24"

VCP

332'24"

SLIP

484'24"

VCP

230'

91'

8"

263'

8"

VC

P

79'

VC

P

12"

VCP120'

15"

350' VC

P

15"

15"

42"

445'

VC

P12"

RCPL

ABAN

507'

VCP

236'15"

448'

VC

P15"

AB

AN

ABAN

196'RCPL42"

199'

199'

15"

VC

P

16" DIP NON-POT

16" DIP

NON-POT

NV

LV33

16" DIP NON-POT

16" DIP NON-POT

M

H 569

M

H 555

M

H 557

M

H 529

TE

LE

8 CIP

4

CIP

3

UN

K

4

CIP

4 CIP

4 CIP

3

UN

K

4 CIP

20

DIP

4

CIP

8 CIP

6 CIP

6 CIP

6"

OUT

OF SER

VIC

E

42 STL

36 STL

42 STL

42 STL

36 STL

8"

DESIG

N

PH

AS

E 1

8" DESIGN

PHASE 1

8"

FIR

ELIN

E

8" DESIGN

PHASE 1

6" DESIGN

8

UN

K

10

PV

C

PV

T

10

PV

C

42 STL

36 STL

PV

T42

STL

36

STL

8" DESIGN

PHASE 2

10 PVC

PVT

16 DIP PVT

16 DIP PVT

PV

T

6 UNK PVT 6

P

VC

4 CIP

6

PV

C

6

PV

C

PV

T

8"2"

M

H

VA

CA

TE

D

U

U

U

U

U

U

U

U

U

Numbers

Structure

No Revisions:

Revised:

Void: Sheet Subset:

Detailer:

Designer:

Sheet NumberSubset Sheets:

Init.CommentsDate:

Sheet Revisions As Constructed2/26/2014Print Date:

Horiz. Scale:

19039GEOT_Boring Location PlanFile Name:

Mik

e

Walz 1:5

1:1

7

PM

pw:\\

AB

QP

WIN

T01.wilsonco.c

om:Wilson_

Projects\

Docu

ments\

8100-

TR

N\

CD

OT\

13-100-312-01_I25_

Cim

arron_Interch\

19039\

Materials

_Geotechnic

al\

Dra

win

gs\

1903

9G

EO

T_

Borin

g

Locatio

n Pla

n

of

2/26/2014

Project No./Code

Vert. Scale:

Phone:719-634-2323 FAX:719-227-3298

Colorado Department of Transportation

Colorado Springs, CO 80906

Region 2

1480 Quail Lake Loop, Suite A

I-25 MAINLINE

Unit Information: Unit Leader: DLH

DW

H. Liu

M. Walz

GEOLOGYConsulting Engineers & Scientists

Yeh and Associates, Inc.

YA-B08

YA-B09

YA-B06

YA-B10

YA-B07

YA-B04 YA-B02

YA-B11

YA-B05 YA-B01

YA-B03

I-25 NB

I-25 SB

200'0' 100' 400'

BORING LOCATION PLAN

Boring Location

Cim

arron St

I-25 AND CIMARRON STREET

Page 16: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Appendix B 

LEGEND AND BORING LOGS

Page 17: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Date:Project Number: 213-207

Project: I-25 and Cimarron Street

Legend for Symbols Used on Borehole Logs

Soil Lithology

Lab Test Abbreviations

Sample Types

YEH AND ASSOCIATES, INC.GEOTECHNICAL ENGINEERING CONSULTANTS

Auger Cuttings Grab Sample Modified CaliforniaSampler Split Spoon

Bedrock Lithology

Asphalt Cobbles and gravel Fill with Clay asmajor soil

Fill with Sand asmajor soil

MC-Moisture ContentDD-Dry Density#200-Percent Passing #200 SieveLL-Liquid LimitPL-Plastic LimitPI-Plasticity IndexS-Sulfate ContentCL-Chloride ContentS/C-Swell/ConsolidationUCCS-Unconfined Compressive StrengthRe-ResistivityPtL-Point Load TestAASHTO-AASHTO ClassificationUSCS-USCS Classification

Silty SandClayey Sand

CLAYSTONE WEATHEREDBEDROCK

Page 18: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

5/5

2/5

50:4"

50:3"

50:3"

0.0 - 11.0 ft. silty SAND with gravel, brown toreddish brown, damp to wet, loose.

11.0 - 25.3 ft. CLAYSTONE, blue-gray, veryhard.

Bottom of Hole at 25.3 ft.

@ 0 - 5 ft.MC= 5.4 %#200= 22 %LL= 22PL= 15PI= 7pH= 7.7S= 0.005 %Re= 2053 ohms-cmAASHTO: A-2-4 (0)USCS: SM-SCCL= 0.0120%

@ 15 ft.MC= 10.6 %DD= 114.8 pcf#200= 68 %LL= 42PL= 22PI= 20UCCS= 7952 psfAASHTO: A-7-6 (12)USCS: CL@ 20 ft.MC= 11.6 %DD= 101.1 pcf#200= 90 %LL= 53PL= 23PI= 30S/C= 1.2 %AASHTO: A-7-6 (30)USCS: CH

10

7

50:4"

50:3"

50:3"

DepthDateTime

Total Depth: 25.3 ftGround Elevation: 5959.8 ftLocation: Pikes Peak Greenway Trail, N of CimarronCoordinates: N: 65,017.7 E: 191,139.5

9.0 ft--

---

---

---

Boring Began: 1/14/2014

Drilling Method: Hollow-Stem Auger

Drill: CME 55, Automatic Hammer

Driller: CDOT

Logged By: R. Beach

Final By: R. Beach

Inclination: Vertical

Completed: 1/14/2014Drill Bit:Casing:Weather: Cool, Calm, Overcast

Ground Water Notes: Observed at approximately 9' at time of drilling

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B01Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 1 of 1

5

10

15

20

25

30

5955

5950

5945

5940

5935

5930

5925

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 19: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

5/4

7/5

7/9

8/7

7/7

10/12

0.0 - 0.7 ft. Asphalt Pavement 8 inches.0.7 - 5.0 ft. silty SAND FILL with trace gravels,brown, moist, loose.

5.0 - 33.0 ft. sandy CLAY FILL with sand lensesand trace gravels, brown to light brown, moist,stiff to very stiff.

33.0 - 38.0 ft. silty SAND with trace gravel,brown to dark brown, damp, medium dense, finegrained.

@ 0 - 5 ft.MC= 4.8 %#200= 19 %LL= NVPL= NPPI= NPpH= 7.7S= 0.004 %Re= 1855 ohms-cmAASHTO: A-1-b (0)USCS: SMCL= 0.0130 %@ 5 ft.MC= 25.8 %DD= 95.9 pcf#200= 92 %LL= 60PL= 20PI= 40AASHTO: A-7-6 (40)USCS: CH

@ 15 ft.MC= 16.5 %DD= 108.9 pcf#200= 57 %LL= 49PL= 16PI= 33AASHTO: A-7-6 (15)USCS: CL

@ 30 ft.MC= 12.1 %DD= 109.6 pcf#200= 41 %LL= 49PL= 17PI= 32AASHTO: A-7-6 (7)

9

12

16

15

14

22

DepthDateTime

Total Depth: 60.5 ftGround Elevation: 5989.8 ftLocation: NB I-25 Near On Ramp, Right LaneCoordinates: N: 63,765.8 E: 190,620.3

46.0 ft--

---

---

---

Boring Began: 1/9/2014

Drilling Method: Hollow-Stem Auger

Drill: CME 75, Automatic Hammer

Driller: Dakota Drilling

Logged By: R. Beach

Final By: R. Beach

Inclination: Vertical

Completed: 1/10/2014Drill Bit:Casing:Weather: Cool, Calm

Ground Water Notes: Observed at approximately 46' at time of drilling

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B02Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 1 of 2

5

10

15

20

25

30

5985

5980

5975

5970

5965

5960

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 20: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

9/9

6/9

8/10

50:5"

70:6"

70:5"

38.0 - 47.0 ft. silty SAND with trace gravel, redto brown, moist, medium dense.

47.0 - 60.5 ft. CLAYSTONE, blue-gray, veryhard.

Bottom of Hole at 60.5 ft.

USCS: SC@ 35 ft.MC= 12.9 %DD= 94.5 pcf#200= 49 %LL= NVPL= NPPI= NPAASHTO: A-4 (0)USCS: SM

@ 45 ft.MC= 7.1 %DD= 128.1 pcf#200= 4 %LL= NVPL= NPPI= NPAASHTO: A-1-a (0)USCS: SW

MC= 17 %DD= 111.8 pcf#200= 83 %LL= 53PL= 27PI= 26AASHTO: A-7-6 (24)USCS: CH

18

15

18

50:5"

70:6"

70:5"

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B02Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 2 of 2

40

45

50

55

60

65

70

75

5950

5945

5940

5935

5930

5925

5920

5915

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 21: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

9/4

5/6/6

9/7

2/4/5

3/4/5

2/4

4/6

12/12

0.0 - 0.7 ft. Asphalt Pavement 8.5 inches.0.7 - 2.0 ft. gravelly SAND FILL, very silty,brown to red, damp.2.0 - 17.0 ft. clayey SAND FILL with gravels andsandy clay lenses, brown to red, moist, loose tomedium dense.

17.0 - 30.0 ft. silty SAND with sandy claylenses, brown to gray, damp to wet, loose.

30.0 - 40.3 ft. CLAYSTONE, blue-gray, hard tovery hard.

@ 0 - 5 ft.MC= 5.5 %#200= 15 %LL= 22PL= 13PI= 9pH= 8S= 0.01 %Re= 1490 ohms-cmAASHTO: A-2-4 (0)USCS: SCCL= 0.0163 %@ 5 ft.MC= 7.1 %DD= 117.6 pcf#200= 17 %LL= 53PL= 18PI= 35AASHTO: A-2-7 (0)USCS: SC@ 10 ft.MC= 3.3 %DD= 117.1 pcf#200= 4 %LL= NVPL= NPPI= NPAASHTO: A-1-a (0)USCS: SW@ 13 ft.MC= 19.7 %#200= 58 %LL= 47PL= 22PI= 25AASHTO: A-7-6 (12)USCS: CL@ 20 ft.MC= 19.3 %DD= 99.1 pcf#200= 68 %LL= 33PL= 22PI= 11AASHTO: A-6 (6)USCS: CL

13

12

16

9

9

6

10

24

DepthDateTime

Total Depth: 40.3 ftGround Elevation: 5968.9 ftLocation: EB US-24, E of I-25, Right LaneCoordinates: N: 63,229.5 E: 191,047.0

28.0 ft--

---

---

---

Boring Began: 1/15/2014

Drilling Method: Hollow-Stem Auger

Drill: CME 55, Automatic Hammer

Driller: CDOT

Logged By: R. Beach

Final By: R. Beach

Inclination: Vertical

Completed: 1/15/2014Drill Bit:Casing:Weather: Cool, Calm, Clear

Ground Water Notes: Observed at approximately 28' at time of drilling

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B03Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 1 of 2

5

10

15

20

25

30

5965

5960

5955

5950

5945

5940

5935

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 22: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

83:9"

50:3" Bottom of Hole at 40.3 ft.

@ 35 ft.MC= 16.9 %DD= 111.3 pcf#200= 86 %LL= 53PL= 24PI= 29UCCS= 22060 psfAASHTO: A-7-6 (18)USCS: CH

83:9"

50:3"

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B03Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 2 of 2

40

45

50

55

60

65

70

75

5930

5925

5920

5915

5910

5905

5900

5895

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 23: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

8/10

4/11

20/18

16/16/16

8/8

5/6/6

6/7/17

9/20

5/7

0.0 - 0.7 ft. Asphalt Pavement 8 inches.0.7 - 5.0 ft. silty SAND FILL with trace gravel,reddish brown, damp.

5.0 - 19.0 ft. sandy CLAY FILL with trace graveland sand lenses, brown to reddish brown, damp,stiff to hard.

19.0 - 30.0 ft. silty SAND with trace gravel andoccasional clay lenses, brown to dark brown,damp, loose to medium dense, fine grained.

30.0 - 40.0 ft. silty SAND with gravel, red tobrown, wet, loose to medium dense.

@ 0 - 5 ft.MC= 5.6 %#200= 14 %LL= NVPL= NPPI= NPpH= 7.8S= 0.005 %Re= 1099 ohms-cmAASHTO: A-1-b (0)USCS: SMCL= 0.0366 %

@ 10 ft.MC= 21.8 %DD= 101.9 pcf#200= 85 %LL= 55PL= 19PI= 36AASHTO: A-7-6 (32)USCS: CH

@ 22 ft.MC= 15.5 %#200= 51 %LL= 50PL= 20PI= 30AASHTO: A-7-6 (11)USCS: CH

@ 30 ft.MC= 18.6 %DD= 101.0 pcf#200= 8 %LL= NVPL= NPPI= NPAASHTO: A-3 (0)

18

15

38

32

16

12

24

29

12

DepthDateTime

Total Depth: 50.3 ftGround Elevation: 5972.7 ftLocation: NB I-25 Near Off Ramp, Right LaneCoordinates: N: 63,184.2 E: 190,512.2

30.0 ft--

---

---

---

Boring Began: 1/8/2014

Drilling Method: Hollow-Stem Auger

Drill: CME 75, Automatic Hammer

Driller: Dakota Drilling

Logged By: R. Beach

Final By: R. Beach

Inclination: Vertical

Completed: 1/9/2014Drill Bit:Casing:Weather: Cool, Calm

Ground Water Notes: Observed at approximately 30' at time of drilling

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B04Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 1 of 2

5

10

15

20

25

30

5970

5965

5960

5955

5950

5945

5940

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 24: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

18/8/12

50:7"50:2"

50:4"

50:3"

40.0 - 50.3 ft. CLAYSTONE, blue-gray, veryhard.

Bottom of Hole at 50.3 ft.

USCS: SP-SM@ 35 ft.MC= 11.3 %#200= 5 %LL= NVPL= NPPI= NPAASHTO: A-1-b (0)USCS: SP-SM

@ 45 ft.MC= 16.4 %DD= 112.0 pcf#200= 89 %LL= 48PL= 23PI= 25S/C= 0.7 %AASHTO: A-7-6 (24)USCS: CL

20

50:7" 50:2"

50:4"

50:3"

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B04Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 2 of 2

40

45

50

55

60

65

70

75

5935

5930

5925

5920

5915

5910

5905

5900

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 25: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

50:0"

50:0"

7/20

4/8

24/50

50:5"

50:5"

0.0 - 3.0 ft. clayey SAND with gravels andcobbles, brown to gray, damp.

3.0 - 9.0 ft. COBBLES, very dense.

9.0 - 12.0 ft. silty SAND with gravel, brown tored, wet, medium dense.

12.0 - 14.0 ft. CLAYSTONE, blue-gray,moderately weathered, residuum.

14.0 - 25.5 ft. CLAYSTONE, brown-gray, veryhard, iron staining.

Bottom of Hole at 25.5 ft.

@ 0 - 5 ft.MC= 4.2 %#200= 21 %LL= 29PL= 15PI= 14pH= 8S= 0.138 %Re= 1129 ohms-cmAASHTO: A-2-6 (0)USCS: SCCL= 0.0154 %

@ 12.5 ft.MC= 28.9 %DD= 87.0 pcfpH= 8.2S= 0.03 %Re= 481 ohms-cmCL= 0.0023 %@ 15 ft.MC= 18.6 %DD= 109.6 pcf#200= 85 %LL= 51PL= 27PI= 24UCCS= 27464 psfAASHTO: A-7-6 (23)USCS: CH@ 20 ft.MC= 16.6 %DD= 106.3 pcf#200= 86 %LL= 51PL= 28PI= 23S/C= 1.3 %AASHTO: A-7-6 (22)USCS: CH

50:0"

50:0"

27

12

74

50:5"

50:5"

DepthDateTime

Total Depth: 25.5 ftGround Elevation: 5944.3 ftLocation: SE of I-25 and US-24, on Bike PathCoordinates: N: 62,614.2 E: 190,475.4

10.0 ft--

---

---

---

Boring Began: 1/15/2014

Drilling Method: Hollow-Stem Auger

Drill: CME 55, Automatic Hammer

Driller: CDOT

Logged By: R. Beach

Final By: R. Beach

Inclination: Vertical

Completed: 1/15/2014Drill Bit:Casing:Weather: Warm, Calm, Clear

Ground Water Notes: Observed at approximately 10' at time of drilling

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B05Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 1 of 1

5

10

15

20

25

30

5940

5935

5930

5925

5920

5915

5910

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 26: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

22/9

30/20

7/7/7

50:6"

50:5"

50:6"

0.0 - 8.0 ft. silty SAND FILL with gravel and claylenses, brown to dark gray, moist, dense.

8.0 - 20.0 ft. silty SAND with gravel, reddishbrown to light brown, wet, medium dense.

20.0 - 30.5 ft. CLAYSTONE, brown-gray, veryhard.

Bottom of Hole at 30.5 ft.

@ 0 - 5 ft.MC= 8.1 %#200= 28 %LL= NVPL= NPPI= NPpH= 7.7S= 0.073 %Re= 901 ohms-cmAASHTO: A-2-4 (0)USCS: SMCL= 0.0098 %@ 5 ft.MC= 18.5 %DD= 107.7 pcf#200= 35 %LL= 36PL= 20PI= 16AASHTO: A-6 (1)USCS: SCSlight petroleum odorobserved from 7 ft to 8 ft.

@ 15 ft.MC= 11 %#200= 6 %LL= NVPL= NPPI= NPAASHTO: A-1-b (0)USCS: SP-SM

@ 30 ft.MC= 13.6 %DD= 119.4 pcf#200= 86 %LL= 50PL= 22PI= 28UCCS= 31832 psfAASHTO: A-7-6 (26)USCS: CH

31

50

14

50:6"

50:5"

50:6"

DepthDateTime

Total Depth: 30.5 ftGround Elevation: 5956.9 ftLocation: 331 S. Chestnut, S of Access GateCoordinates: N: 63,812.6 E: 190,200.6

8.0 ft--

---

---

---

Boring Began: 1/23/2014

Drilling Method: Hollow-Stem Auger

Drill: CME 55, Automatic Hammer

Driller: Dakota Drilling

Logged By: R. Beach

Final By: R. Beach

Inclination: Vertical

Completed: 1/23/2014Drill Bit:Casing:Weather: Cold, Cloudy, Snow

Ground Water Notes: Observed at approximately 8' at time of drilling

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B06Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 1 of 1

5

10

15

20

25

30

5955

5950

5945

5940

5935

5930

5925

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 27: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

2/3

4/6

7/7/11

50:7"

50:6"

50:4"

0.0 - 7.0 ft. clayey SAND FILL with clay lenses,dark gray to gray, moist, loose.

7.0 - 16.0 ft. silty SAND with gravel andoccasional cobbles, tan to reddish brown, wet,loose to medium dense.

16.0 - 25.3 ft. CLAYSTONE, blue-gray, veryhard.

Bottom of Hole at 25.3 ft.

@ 0 - 5 ft.MC= 20.5 %#200= 50 %LL= 31PL= 21PI= 10AASHTO: A-4 (2)USCS: SC

@ 5 ft.MC= 45.4 %DD= 77.8 pcf#200= 94 %LL= 61PL= 27PI= 34S/C= 0.7 %AASHTO: A-7-6 (37)USCS: CH

@ 25 ft.MC= 15.3 %DD= 108.3 pcf#200= 84 %LL= 52PL= 25PI= 27S/C= 0.8 %AASHTO: A-7-6 (24)USCS: CH

5

10

14

50:7"

50:6"

50:4"

DepthDateTime

Total Depth: 25.3 ftGround Elevation: 5956.7 ftLocation: 221 S. Chestnut, S Side of LotCoordinates: N: 63,921.8 E: 190,416.0

7.0 ft--

---

---

---

Boring Began: 1/24/2014

Drilling Method: Hollow-Stem Auger

Drill: CME 55, Automatic Hammer

Driller: Dakota Drilling

Logged By: R. Beach

Final By: R. Beach

Inclination: Vertical

Completed: 1/24/2014Drill Bit:Casing:Weather: Cool, Clear

Ground Water Notes: Observed at approximately 7' at time of drilling

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B07Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 1 of 1

5

10

15

20

25

30

5955

5950

5945

5940

5935

5930

5925

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 28: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

2/4

9/12

3/6

12/9

3/2

50:0"

3/5/6

0.0 - 6.0 ft. clayey SAND FILL, red to brown,damp, loose.

6.0 - 18.0 ft. silty SAND FILL with gravel, clayand cobbles, gray to brown, moist, loose tomedium dense.

18.0 - 37.0 ft. silty SAND with gravel andcobbles, red to brown, moist to wet, loose to verydense.

@ 0 - 5 ft.MC= 12.3 %#200= 35 %LL= 33PL= 18PI= 15pH= 7.6S= 0.08 %Re= 971 ohms-cmAASHTO: A-6 (1)USCS: SCCL= 0.0018 %

@ 10 ft.MC= 9.5 %DD= 127.1 pcf#200= 26 %LL= NVPL= NPPI= NPAASHTO: A-2-4 (0)USCS: SM

@ 20 ft.MC= 3.3 %DD= 125.3 pcf#200= 6 %LL= NVPL= NPPI= NPAASHTO: A-1-a (0)USCS: SP-SM

@ 30 ft.MC= 11.8 %#200= 3 %LL= NVPL= NPPI= NPAASHTO: A-1-b (0)USCS: SW

6

21

9

21

5

50:0"

11

DepthDateTime

Total Depth: 45.3 ftGround Elevation: 5972.1 ftLocation: NW of intsection of I-25 and US-24, NurseryCoordinates: N: 63,648.8 E: 189,799.0

24.0 ft--

---

---

---

Boring Began: 1/16/2014

Drilling Method: Hollow-Stem Auger

Drill: CME 55, Automatic Hammer

Driller: CDOT

Logged By: R. Beach

Final By: R. Beach

Inclination: Vertical

Completed: 1/16/2014Drill Bit:Casing:Weather: Cool, Calm, Clear

Ground Water Notes: Observed at approximately 24' at time of drillign

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B08Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 1 of 2

5

10

15

20

25

30

5970

5965

5960

5955

5950

5945

5940

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 29: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

11/20

50:3"

37.0 - 45.3 ft. CLAYSTONE, blue-gray, mediumhard to very hard.

Bottom of Hole at 45.3 ft.

@ 40 ft.MC= 20.7 %DD= 106.2 pcf#200= 69 %LL= 51PL= 27PI= 24UCCS= 12030 psfAASHTO: A-7-6 (16)USCS: CH

31

50:3"

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B08Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 2 of 2

40

45

50

55

60

65

70

75

5935

5930

5925

5920

5915

5910

5905

5900

5895

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 30: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

4/3

3/5

11/11

3/3/3

3/1

3/11/12

50:4"

0.0 - 5.0 ft. silty SAND FILL, red to brown,damp.

5.0 - 13.0 ft. sandy CLAY FILL with trace gravel,gray to brown, moist, medium stiff.

13.0 - 28.0 ft. silty SAND with gravel andcobbles, red to brown, moist to wet, very loose tomedium dense.

28.0 - 40.3 ft. CLAYSTONE, blue-gray, veryhard.

@ 0 - 5 ft.MC= 8.5 %#200= 19 %LL= NVPL= NPPI= NPpH= 7.7S= 0.01 %Re= 3175 ohms-cmAASHTO: A-1-b (0)USCS: SMCL= 0.0013 %@ 5 ft.MC= 24.1 %DD= 97.1 pcf#200= 89 %LL= 60PL= 22PI= 38AASHTO: A-7-6 (37)USCS: CH

@ 17.5 ft.MC= 13.7 %#200= 7 %LL= NVPL= NPPI= NPAASHTO: A-1-b (0)USCS: SW-SM

@ 30 ft.MC= 16.9 %DD= 109.0 pcf#200= 88 %LL= 47PL= 23PI= 24UCCS= 27604 psf

7

8

22

6

4

23

50:4"

DepthDateTime

Total Depth: 40.3 ftGround Elevation: 5958.7 ftLocation: Abandoned Nursery, E of GreenhouseCoordinates: N: 63,089.4 E: 189,986.1

17.0 ft--

---

---

---

Boring Began: 1/16/2014

Drilling Method: Hollow-Stem Auger

Drill: CME 55, Automatic Hammer

Driller: CDOT

Logged By: R. Beach

Final By: R. Beach

Inclination: Vertical

Completed: 1/16/2014Drill Bit:Casing:Weather: Cool, Calm, Clear

Ground Water Notes: Observed at approximately 17' at time of drilling

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B09Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 1 of 2

5

10

15

20

25

30

5955

5950

5945

5940

5935

5930

5925

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 31: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

50:3"

50.3" Bottom of Hole at 40.3 ft.

AASHTO: A-7-6 (23)USCS: CL

50:3"

50.3"

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B09Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 2 of 2

40

45

50

55

60

65

70

75

5920

5915

5910

5905

5900

5895

5890

5885

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 32: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

14/8

13/13

7/7/7

50:3"

50:3"

50:2"

0.0 - 8.0 ft. clayey SAND FILL with gravel, grayto brown, moist, medium dense.

8.0 - 19.0 ft. silty SAND with gravel, reddishbrown, wet, medium dense.

19.0 - 30.2 ft. CLAYSTONE, blue-gray, veryhard.

Bottom of Hole at 30.2 ft.

@ 0 - 5 ft.MC= 6.6 %#200= 23 %LL= 23PL= 14PI= 9AASHTO: A-2-4 (0)USCS: SC

@ 10 ft.MC= 9 %DD= 129.4 pcf#200= 6 %LL= NVPL= NPPI= NPAASHTO: A-1-a (0)USCS: GP-GM@ 15 ft.MC= 9.7 %#200= 5 %LL= NVPL= NPPI= NPAASHTO: A-1-a (0)USCS: SW-SM@ 20 ft.MC= 18.3 %DD= 108.8 pcf#200= 75 %LL= 52PL= 26PI= 26S/C= 0.5 %AASHTO: A-7-6 (20)USCS: CH@ 25 ft.MC= 20.4 %DD= 106.7 pcf#200= 65 %LL= 47PL= 22PI= 25UCCS= 8941 psfAASHTO: A-7-6 (15)USCS: CL

22

26

14

50:3"

50:3"

50:2"

DepthDateTime

Total Depth: 30.2 ftGround Elevation: 5957.0 ftLocation: 331 S. Chestnut, W of Existing BuildingCoordinates: N: 63,754.6 E: 190,343.2

8.0 ft--

---

---

---

Boring Began: 1/23/2014

Drilling Method: Hollow-Stem Auger

Drill: CME 55, Automatic Hammer

Driller: Dakota Drilling

Logged By: R. Beach

Final By: R. Beach

Inclination: Vertical

Completed: 1/23/2014Drill Bit:Casing:Weather: Cold, Cloudy, Snow

Ground Water Notes: Observed at approximately 8' at time of drilling

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B10Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 1 of 1

5

10

15

20

25

30

5955

5950

5945

5940

5935

5930

5925

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 33: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

9/9

9/11

50:4"50:8"

9/9

7/8

50:5"

0.0 - 0.6 ft. Asphalt Pavement 7.5 inches.0.6 - 5.0 ft. silty SAND FILL with trace gravel,reddish brown, damp.

5.0 - 13.0 ft. clayey SAND FILL with tracegravel and occasional clay lifts, brown to darkbrown, moist, medium dense.

13.0 - 17.0 ft. silty SAND with gravel andcobbles, gray to brown, moist, very dense.

17.0 - 28.0 ft. silty SAND with trace gravel,brown to gray, moist to wet, medium dense.

28.0 - 40.5 ft. CLAYSTONE, blue-gray, veryhard.

@ 0 - 5 ft.MC= 5.5 %#200= 15 %LL= NVPL= NPPI= NPpH= 7.9S= 0.006 %Re= 1825 ohms-cmAASHTO: A-1-b (0)USCS: SMCL= 0.0182 %@ 5 ft.MC= 8.5 %DD= 120.4 pcf#200= 21 %LL= 32PL= 14PI= 18AASHTO: A-2-6 (0)USCS: SC@ 10 ft.MC= 18.3 %DD= 93.5 pcf#200= 53 %LL= 50PL= 17PI= 33AASHTO: A-7-6 (13)USCS: CH

@ 20 ft.MC= 2.6 %#200= 4 %LL= NVPL= NPPI= NPAASHTO: A-1-a (0)USCS: SW

18

20

50:4" 50:8"

18

15

50:5"

DepthDateTime

Total Depth: 40.5 ftGround Elevation: 5969.9 ftLocation: NB I-25 On Ramp, Right LaneCoordinates: N: 63,727.3 E: 190,710.2

25.0 ft--

---

---

---

Boring Began: 1/7/2014

Drilling Method: Hollow-Stem Auger

Drill: CME 75, Automatic Hammer

Driller: Dakota Drilling

Logged By: R. Beach

Final By: R. Beach

Inclination: Vertical

Completed: 1/8/2014Drill Bit:Casing:Weather: Cool, Calm

Ground Water Notes: Observed at approximately 25' at time of drilling

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B11Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 1 of 2

5

10

15

20

25

30

5965

5960

5955

5950

5945

5940

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 34: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

70:6"

50:5"Bottom of Hole at 40.5 ft.

@ 35 ft.MC= 14.7 %DD= 113.7 pcf#200= 89 %LL= 55PL= 27PI= 28S/C= 0.5 %AASHTO: A-7-6 (28)USCS: CH

70:6"

50:5"

Rock

GEOTECHNICAL ENGINEERING CONSULTANTS

RQ

D

Rec

over

y (%

)

Blowsper6 in

YEH AND ASSOCIATES, INC.

Run

/ S

ampl

e T

ype

Dep

th(f

eet)

Ele

vatio

n(f

eet)

Boring: YA-B11Project Number: 213-207 Date:

Field Notesand

Lab Tests

Sheet 2 of 2

40

45

50

55

60

65

70

75

5930

5925

5920

5915

5910

5905

5900

5895

Soil Samples

N

Project: I-25 and Cimarron Street

Material Description

Lith

olo

gy

BO

RIN

G L

OG

213

-20

7 B

OR

ING

S.G

PJ

YE

H A

SS

OC

IAT

ES

.GD

T

3/26

/14

Page 35: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Appendix C 

LABORATORY TEST RESULTS

Page 36: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Project No: Date: 1/24/2014

YEH & ASSOCIATES, INC

I-25 and Cimarron Street

Summary of Laboratory Test Results

213-207 Project Name:

Gradation Atterberg Unconf.Chloride Comp.

% Strength(psf)

YA-B01 0-5 Bulk 5.4 _ 32 46 22 22 15 7 7.7 0.005 2053 0.0120 _ _ _ A-2-4 ( 0 ) SM-SC

CLASSIFICATIONSand (%)

Fines < #200 (%)

LLR-VALUE

PLBoring NO. USCSAASHTOPI

Water Soluble Sulfate

%

Resistivity ohm.cm

% Swell (+) / Consoli- dation (-)

pH

Sample Location

Sample Type

Natural Dry Density

(pcf)Depth (ft)Gravel > #4 (%)

Natural Moisture Content

(%)

YA-B01 15 CA 10.6 114.8 _ _ 68 42 22 20 _ _ _ _ _ 7952 _ A-7-6 ( 12 ) CL

YA-B01 20 CA 11.6 101.1 _ _ 90 53 23 30 _ _ _ _ 1.2 _ _ A-7-6 ( 30 ) CH

YA-B02 0-5 Bulk 4.8 _ 13 68 19 NV NP NP 7.7 0.004 1855 0.0130 _ _ _ A-1-b ( 0 ) SM

YA-B02 5 CA 25 8 95 9 0 8 92 60 20 40 _ _ _ _ _ _ _ A-7-6 ( 40 ) CHYA B02 5 CA 25.8 95.9 0 8 92 60 20 40 A 7 6 ( 40 ) CH

YA-B02 15 CA 16.5 108.9 14 29 57 49 16 33 _ _ _ _ _ _ _ A-7-6 ( 15 ) CL

YA-B02 30 CA 12.1 109.6 24 35 41 49 17 32 _ _ _ _ _ _ _ A-7-6 ( 7 ) SC

YA-B02 35 CA 12.9 94.5 0 51 49 NV NP NP _ _ _ _ _ _ _ A-4 ( 0 ) SM

YA-B02 45 CA 7.1 128.1 26 70 4 NV NP NP _ _ _ _ _ _ _ A-1-a ( 0 ) SW

YA-B02 60 CA 17.0 111.8 _ _ 83 53 27 26 _ _ _ _ _ _ _ A-7-6 ( 24 ) CH

YA-B03 0-5 Bulk 5.5 _ 18 67 15 22 13 9 8.0 0.01 1490 0.0163 _ _ _ A-2-4 ( 0 ) SC

YA-B03 5 CA 7.1 117.6 11 72 17 53 18 35 _ _ _ _ _ _ _ A-2-7 ( 0 ) SC

YA-B03 10 CA 3.3 117.1 28 68 4 NV NP NP _ _ _ _ _ _ _ A-1-a ( 0 ) SW

YA-B03 13 CA 19.7 _ 7 35 58 47 22 25 _ _ _ _ _ _ _ A-7-6 ( 12 ) CL

YA-B03 20 CA 19 3 99 1 0 32 68 33 22 11 _ _ _ _ _ _ _ A-6 ( 6 ) CLYA B03 20 CA 19.3 99.1 0 32 68 33 22 11 A 6 ( 6 ) CL

YA-B03 35 CA 16.9 111.3 _ _ 86 53 24 29 _ _ _ _ _ 22060 _ A-7-6 ( 18 ) CH

Rev 2 - 8/02 Page 1 of 4

Page 37: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Project No: Date: 1/24/2014

YEH & ASSOCIATES, INC

Summary of Laboratory Test Results

213-207 Project Name: I-25 and Cimarron Street

Gradation Atterberg Unconf.Chloride Comp.

% Strength(psf)

YA-B04 0-5 Bulk 5.6 _ 22 64 14 NV NP NP 7.8 0.005 1099 0.0366 _ _ _ A-1-b ( 0 ) SM

LL

Sample Location Natural Moisture Content

(%)

Natural Dry Density

(pcf)pHBoring

NO. Depth (ft) Sample Type

Gravel > #4 (%)

Sand (%)

Fines < #200 (%)

PL PI AASHTO USCS

Resistivity ohm.cm

% Swell (+) / Consoli- dation (-)

R-VALUECLASSIFICATIONWater

Soluble Sulfate

%

YA-B04 10 CA 21.8 101.9 1 14 85 55 19 36 _ _ _ _ _ _ _ A-7-6 ( 32 ) CH

YA-B04 22 CA 15.5 _ 7 42 51 50 20 30 _ _ _ _ _ _ _ A-7-6 ( 11 ) CH

YA-B04 30 CA 18.6 101.0 10 82 8 NV NP NP _ _ _ _ _ _ _ A-3 ( 0 ) SP-SM

YA-B04 35 CA 11 3 _ 20 75 5 NV NP NP _ _ _ _ _ _ _ A-1-b ( 0 ) SP-SMYA B04 35 CA 11.3 20 75 5 NV NP NP A 1 b ( 0 ) SP SM

YA-B04 45 CA 16.4 112.0 _ _ 89 48 23 25 _ _ _ _ 0.7 _ _ A-7-6 ( 24 ) CL

YA-B05 0-5 Bulk 4.2 _ 26 53 21 29 15 14 8.0 0.138 1129 0.0154 _ _ _ A-2-6 ( 0 ) SC

YA-B05 12.5 CA 28.9 87.0 _ _ _ _ _ _ 8.2 0.030 481 0.0023 _ _ _ _ _

YA-B05 15 CA 18.6 109.6 _ _ 85 51 27 24 _ _ _ _ _ 27464 _ A-7-6 ( 23 ) CH

YA-B05 20 CA 16.6 106.3 _ _ 86 51 28 23 _ _ _ _ 1.3 _ _ A-7-6 ( 22 ) CH

YA-B06 0-5 Bulk 8.1 _ 15 57 28 NV NP NP 7.7 0.073 901 0.0098 _ _ _ A-2-4 ( 0 ) SM

YA-B06 5 CA 18.5 107.7 10 55 35 36 20 16 _ _ _ _ _ _ _ A-6 ( 1 ) SC

YA-B06 15 CA 11.0 _ 24 70 6 NV NP NP _ _ _ _ _ _ _ A-1-b ( 0 ) SP-SM

YA-B06 30 CA 13.6 119.4 _ _ 86 50 22 28 _ _ _ _ _ 31832 _ A-7-6 ( 26 ) CH

YA-B07 0-5 Bulk 20 5 _ 4 46 50 31 21 10 _ _ _ _ _ _ _ A-4 ( 2 ) SCYA B07 0 5 Bulk 20.5 4 46 50 31 21 10 A 4 ( 2 ) SC

YA-B07 5 CA 45.4 77.8 _ _ 94 61 27 34 _ _ _ _ 0.7 _ _ A-7-6 ( 37 ) CH

Rev 2 - 8/02 Page 2 of 4

Page 38: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Project No: Date: 1/24/2014

YEH & ASSOCIATES, INC

Summary of Laboratory Test Results

213-207 Project Name: I-25 and Cimarron Street

Gradation Atterberg Unconf.Chloride Comp.

% Strength(psf)

YA-B07 25 CA 15.3 108.3 _ _ 84 52 25 27 _ _ _ _ 0.8 _ _ A-7-6 ( 24 ) CH

Sample Location Natural Moisture Content

(%)

Natural Dry Density

(pcf)pHBoring

NO. Depth (ft) Sample Type

Gravel > #4 (%)

Sand (%)

Fines < #200 (%)

PL PILL

Water Soluble Sulfate

% AASHTO USCS

Resistivity ohm.cm

% Swell (+) / Consoli- dation (-)

R-VALUECLASSIFICATION

YA-B08 0-5 Bulk 12.3 _ 10 55 35 33 18 15 7.6 0.080 971 0.0018 _ _ _ A-6 ( 1 ) SC

YA-B08 10 CA 9.5 127.1 10 64 26 NV NP NP _ _ _ _ _ _ _ A-2-4 ( 0 ) SM

YA-B08 20 CA 3.3 125.3 37 57 6 NV NP NP _ _ _ _ _ _ _ A-1-a ( 0 ) SP-SM

YA-B08 30 CA 11 8 _ 19 78 3 NV NP NP _ _ _ _ _ _ _ A-1-b ( 0 ) SWYA B08 30 CA 11.8 19 78 3 NV NP NP A 1 b ( 0 ) SW

YA-B08 40 CA 20.7 106.2 _ _ 69 51 27 24 _ _ _ _ _ 12030 _ A-7-6 ( 16 ) CH

YA-B09 0-5 Bulk 8.5 _ 14 67 19 NV NP NP 7.7 0.010 3175 0.0013 _ _ _ A-1-b ( 0 ) SM

YA-B09 5 CA 24.1 97.1 _ _ 89 60 22 38 _ _ _ _ _ _ _ A-7-6 ( 37 ) CH

YA-B09 17.5 CA 13.7 _ 20 73 7 NV NP NP _ _ _ _ _ _ _ A-1-b ( 0 ) SW-SM

YA-B09 30 CA 16.9 109.0 _ _ 88 47 23 24 _ _ _ _ _ 27604 _ A-7-6 ( 23 ) CL

YA-B10 0-5 Bulk 6.6 _ 15 62 23 23 14 9 _ _ _ _ _ _ _ A-2-4 ( 0 ) SC

YA-B10 10 CA 9.0 129.4 53 41 6 NV NP NP . _ _ _ _ _ _ A-1-a ( 0 ) GP-GM

YA-B10 15 Bulk 9.7 _ 33 62 5 NV NP NP _ _ _ _ _ _ _ A-1-a ( 0 ) SW-SM

YA-B10 20 CA 18.3 108.8 _ _ 75 52 26 26 _ _ _ _ 0.5 _ _ A-7-6 ( 20 ) CH

YA-B10 25 CA 20 4 106 7 _ _ 65 47 22 25 _ _ _ _ _ 8941 _ A-7-6 ( 15 ) CLYA B10 25 CA 20.4 106.7 65 47 22 25 8941 A 7 6 ( 15 ) CL

YA-B11 0-5 Bulk 5.5 _ 16 69 15 NV NP NP 7.9 0.006 1825 0.0182 _ _ _ A-1-b ( 0 ) SM

Rev 2 - 8/02 Page 3 of 4

Page 39: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Project No: Date: 1/24/2014

YEH & ASSOCIATES, INC

Summary of Laboratory Test Results

213-207 Project Name: I-25 and Cimarron Street

Gradation Atterberg Unconf.Chloride Comp.

% Strength(psf)

YA-B11 5 CA 8.5 120.4 25 54 21 32 14 18 _ _ _ _ _ _ _ A-2-6 ( 0 ) SC

Sample Location Natural Moisture Content

(%)

Natural Dry Density

(pcf)pH

Water Soluble Sulfate

%

Boring NO. Depth (ft) Sample

Type

Gravel > #4 (%)

Sand (%)

Fines < #200 (%)

LL PL PI AASHTO USCS

Resistivity ohm.cm

% Swell (+) / Consoli- dation (-)

R-VALUECLASSIFICATION

YA-B11 10 CA 18.3 93.5 7 40 53 50 17 33 _ _ _ _ _ _ _ A-7-6 ( 13 ) CH

YA-B11 20 CA 2.6 _ 20 76 4 NV NP NP _ _ _ _ _ _ _ A-1-a ( 0 ) SW

YA-B11 35 CA 14.7 113.7 _ _ 89 55 27 28 _ _ _ _ 0.5 _ _ A-7-6 ( 28 ) CH

5 3 _ 22 64 14 NV NP NP _ _ _ _ _ _ _ A-1-b ( 0 ) SMMix YA-B02,YA-B04 Bulk 5.3 22 64 14 NV NP NP A 1 b ( 0 ) SMMix YA B02,YA B04 Bulk

Rev 2 - 8/02 Page 4 of 4

Page 40: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/16/13

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-2-4 (0) / SM-SC

Project No.: 213-207

Figure No.: -

Fines (%) 22 PI 7

I-25 and Cimarron Street Project Name:

Sample ID: YA-B01

Sample Depth (ft.):

0-5

Gravel (%)

Sand (%)

32

46

LL

PL

¾ "

½"

22

15

100

99

51

35

96

88

82

68

#200 22

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 41: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/16/13

¾ "

½"

NV

NP

-

-

67

36

100

100

97

87

#200 19

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

13

68

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B02

Sample Depth (ft.):

0-5

Sample Description: A-1-b (0) / SM

Project No.: 213-207

Figure No.: -

Fines (%) 19 PI NP

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 42: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/16/13

¾ "

½"

60

20

-

-

99

96

-

-

100

100

#200 91

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

0

9

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B02

Sample Depth (ft.):

5

Sample Description: A-7-6 (40) / CH

Project No.: 213-207

Figure No.: -

Fines (%) 91 PI 40

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 43: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

Sieve Size

% Passing

Checked By: Jere

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-7-6 (15) /CL

Project No.:

Figure No.: -

Fines (%) 57 PI 33

I-25 and Cimarron Street Project Name:

Sample ID: YA-B02

Sample Depth (ft.):

15

Gravel (%)

Sand (%)

14

29

LL

PL

¾ "

½"

49

16

-

-

75

65

100

92

91

86

#200 57

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 44: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

¾ "

½"

49

17

100

90

65

54

90

85

84

76

#200 41

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

24

35

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B02

Sample Depth (ft.):

30

Sample Description: A-7-6 (7) /SC

Project No.:

Figure No.: -

Fines (%) 41 PI 32

Sieve Size

% Passing

Checked By: Jere

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 45: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

¾ "

½"

NV

NP

-

-

100

99

-

-

-

100

#200 49

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

0

51

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B02

Sample Depth (ft.):

35

Sample Description: A-4 (0) /SM

Project No.:

Figure No.: -

Fines (%) 49 PI NP

Sieve Size

% Passing

Checked By: Jere

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 46: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

¾ "

½"

NV

NP

88

88

47

14

88

86

83

74

#200 4

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

26

70

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B02

Sample Depth (ft.):

45

Sample Description: A-1-a (0) /SW

Project No.:

Figure No.: -

Fines (%) 4 PI NP

Sieve Size

% Passing

Checked By: Jere

-

-

100

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 47: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/16/13

¾ "

½"

22

13

-

-

59

30

100

98

95

82

#200 15

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

18

67

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B03

Sample Depth (ft.):

0-5

Sample Description: A-2-4 (0) / SC

Project No.: 213-207

Figure No.: -

Fines (%) 15 PI 9

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 48: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

Sieve Size

% Passing

Checked By: Jere

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-2-7 (0) /SC

Project No.:

Figure No.: -

Fines (%) 17 PI 35

I-25 and Cimarron Street Project Name:

Sample ID: YA-B03

Sample Depth (ft.):

5

Gravel (%)

Sand (%)

11

72

LL

PL

¾ "

½"

53

18

-

-

60

28

-

100

98

89

#200 17

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 49: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

Sieve Size

% Passing

Checked By: Jere

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-1-a (0) /SW

Project No.:

Figure No.: -

Fines (%) 4 PI NP

I-25 and Cimarron Street Project Name:

Sample ID: YA-B03

Sample Depth (ft.):

10

Gravel (%)

Sand (%)

28

68

LL

PL

¾ "

½"

NV

NP

-

-

47

17

100

95

91

72

#200 4

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 50: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 02/03/14

¾ "

½"

47

22

-

-

86

72

100

98

98

93

#200 58

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

7

35

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B03

Sample Depth (ft.):

13

Sample Description: A-7-6 (12) / CL

Project No.: 213-207

Figure No.: -

Fines (%) 58 PI 25

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 51: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

Sieve Size

% Passing

Checked By: Jere

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-6 (6) /CL

Project No.:

Figure No.: -

Fines (%) 68 PI 11

I-25 and Cimarron Street Project Name:

Sample ID: YA-B03

Sample Depth (ft.):

20

Gravel (%)

Sand (%)

0

32

LL

PL

¾ "

½"

33

22

-

-

99

98

-

-

-

100

#200 68

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 52: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/16/13

¾ "

½"

NV

NP

-

100

56

28

95

93

90

78

#200 14

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

22

64

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B04

Sample Depth (ft.):

0-5

Sample Description: A-1-b (0) / SM

Project No.: 213-207

Figure No.: -

Fines (%) 14 PI NP

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 53: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

Sieve Size

% Passing

Checked By: Jere

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-7-6 (32) /CH

Project No.:

Figure No.: -

Fines (%) 85 PI 36

I-25 and Cimarron Street Project Name:

Sample ID: YA-B04

Sample Depth (ft.):

10

Gravel (%)

Sand (%)

1

14

LL

PL

¾ "

½"

55

19

-

-

96

89

-

-

100

99

#200 85

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 54: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/16/13

¾ "

½"

50

20

-

-

85

71

100

99

98

93

#200 51

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

7

42

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B04

Sample Depth (ft.):

22

Sample Description: A-7-6 (11) / CH

Project No.: 213-207

Figure No.: -

Fines (%) 51 PI 30

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 55: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

Sieve Size

% Passing

Checked By: Jere

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-3 (0) /SP-SM

Project No.:

Figure No.: -

Fines (%) 8 PI NP

I-25 and Cimarron Street Project Name:

Sample ID: YA-B04

Sample Depth (ft.):

30

Gravel (%)

Sand (%)

10

82

LL

PL

¾ "

½"

NV

NP

-

-

84

63

100

98

93

90

#200 8

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 56: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/16/13

¾ "

½"

NV

NP

-

100

59

23

97

91

89

80

#200 5

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

20

75

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B04

Sample Depth (ft.):

35

Sample Description: A-1-b (0) / SP-SM

Project No.: 213-207

Figure No.: -

Fines (%) 5 PI NP

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 57: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/16/13

¾ "

½"

29

15

100

96

56

35

93

90

86

74

#200 21

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

26

53

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B05

Sample Depth (ft.):

0-5

Sample Description: A-2-6 (0) / SC

Project No.: 213-207

Figure No.: -

Fines (%) 21 PI 14

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 58: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/29/14

¾ "

½"

NV

NP

-

100

69

49

99

98

94

85

#200 28

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

15

57

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B06

Sample Depth (ft.):

0-5

Sample Description: A-2-4 (0) / SM

Project No.: 213-207

Figure No.: -

Fines (%) 28 PI NP

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 59: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Sieve Size

% Passing

-

-

-

3"

2 ½"

2"

⅜"

#4

1 ½"

1"

¾ "

½"

-

-

100

97

95

9030

40

50

60

70

80

90

100

Per

cen

t P

assi

ng

20040103/8" 41/2"3/4"3"12" 6" 1" 30 508 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

1002"

Drawn By: MA

Date: 10/12/11Checked By: Jere

#4

#10

#40

Sample Description: A-6 (1) /SC

Project No.:

Figure No.: -

Fines (%) 35 PI 16

I-25 and Cimarron Street Project Name:

Sample ID: YA-B06

Sample Depth (ft.):

5

Gravel (%)

Sand (%)

10

55

LL

PL

36

20

82

68

90

#200 35

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

0.010.11101001000Particle Size (mm)

Revised 04/27/2004

Page 60: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/29/14

¾ "

½"

NV

NP

100

87

63

23

84

82

81

76

#200 6

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

24

70

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B06

Sample Depth (ft.):

15

Sample Description: A-1-b (0) / SP-SM

Project No.: 213-207

Figure No.: -

Fines (%) 6 PI NP

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 61: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/29/14

¾ "

½"

31

21

-

-

88

74

-

100

99

96

#200 50

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

4

46

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B07

Sample Depth (ft.):

0-5

Sample Description: A-4 (2) / SC

Project No.: 213-207

Figure No.: -

Fines (%) 50 PI 10

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 62: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/16/13

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-6 (1) / SC

Project No.: 213-207

Figure No.: -

Fines (%) 35 PI 15

I-25 and Cimarron Street Project Name:

Sample ID: YA-B08

Sample Depth (ft.):

0-5

Gravel (%)

Sand (%)

10

55

LL

PL

¾ "

½"

33

18

100

99

77

57

98

97

96

90

#200 35

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 63: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

Sieve Size

% Passing

Checked By: Jere

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-2-4 (0) /SM

Project No.:

Figure No.: -

Fines (%) 26 PI NP

I-25 and Cimarron Street Project Name:

Sample ID: YA-B08

Sample Depth (ft.):

10

Gravel (%)

Sand (%)

10

64

LL

PL

¾ "

½"

NV

NP

-

-

74

49

-

100

97

90

#200 26

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 64: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

Sieve Size

% Passing

Checked By: Jere

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-1-a (0) /SP-SM

Project No.:

Figure No.: -

Fines (%) 6 PI NP

I-25 and Cimarron Street Project Name:

Sample ID: YA-B08

Sample Depth (ft.):

20

Gravel (%)

Sand (%)

37

57

LL

PL

¾ "

½"

NV

NP

-

100

43

25

90

85

81

63

#200 6

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 65: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/16/13

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-1-b (0) / SW

Project No.: 213-207

Figure No.: -

Fines (%) 3 PI NP

I-25 and Cimarron Street Project Name:

Sample ID: YA-B08

Sample Depth (ft.):

30

Gravel (%)

Sand (%)

19

78

LL

PL

¾ "

½"

NV

NP

-

100

51

13

99

97

94

81

#200 3

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 66: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/16/13

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-1-b (0) / SM

Project No.: 213-207

Figure No.: -

Fines (%) 19 PI NP

I-25 and Cimarron Street Project Name:

Sample ID: YA-B09

Sample Depth (ft.):

0-5

Gravel (%)

Sand (%)

14

67

LL

PL

¾ "

½"

NV

NP

-

-

68

40

100

98

96

86

#200 19

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 67: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/16/13

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-1-b (0) / SW-SM

Project No.: 213-207

Figure No.: -

Fines (%) 7 PI NP

I-25 and Cimarron Street Project Name:

Sample ID: YA-B09

Sample Depth (ft.):

17.5

Gravel (%)

Sand (%)

20

73

LL

PL

¾ "

½"

NV

NP

-

100

66

30

97

95

92

80

#200 7

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 68: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/29/14

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-2-4 (0) / SC

Project No.: 213-207

Figure No.: -

Fines (%) 23 PI 9

I-25 and Cimarron Street Project Name:

Sample ID: YA-B10

Sample Depth (ft.):

0-5

Gravel (%)

Sand (%)

15

62

LL

PL

¾ "

½"

23

14

100

99

65

40

98

97

96

85

#200 23

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 69: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

Sieve Size

% Passing

Checked By: Jere

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-1-a (0) /GP-GM

Project No.:

Figure No.: -

Fines (%) 6 PI NP

I-25 and Cimarron Street Project Name:

Sample ID: YA-B10

Sample Depth (ft.):

10

Gravel (%)

Sand (%)

53

41

LL

PL

¾ "

½"

NV

NP

100

87

34

21

74

67

63

47

#200 6

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 70: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/29/14

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-1-a (0) / SW-SM

Project No.: 213-207

Figure No.: -

Fines (%) 5 PI NP

I-25 and Cimarron Street Project Name:

Sample ID: YA-B10

Sample Depth (ft.):

15

Gravel (%)

Sand (%)

33

62

LL

PL

¾ "

½"

NV

NP

-

100

41

13

96

86

80

67

#200 5

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 71: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 01/16/13

¾ "

½"

NV

NP

-

100

61

29

99

97

95

84

#200 15

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

Gravel (%)

Sand (%)

16

69

LL

PL

I-25 and Cimarron Street Project Name:

Sample ID: YA-B11

Sample Depth (ft.):

0-5

Sample Description: A-1-b (0) / SM

Project No.: 213-207

Figure No.: -

Fines (%) 15 PI NP

Sieve Size

% Passing

Checked By: Dr. Liu

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 72: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

Sieve Size

% Passing

Checked By: Jere

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-2-6 (0) /SC

Project No.:

Figure No.: -

Fines (%) 21 PI 18

I-25 and Cimarron Street Project Name:

Sample ID: YA-B11

Sample Depth (ft.):

5

Gravel (%)

Sand (%)

25

54

LL

PL

¾ "

½"

32

14

-

-

56

33

100

92

86

75

#200 21

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 73: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

Sieve Size

% Passing

Checked By: Jere

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-7-6 (13) /CH

Project No.:

Figure No.: -

Fines (%) 53 PI 33

I-25 and Cimarron Street Project Name:

Sample ID: YA-B11

Sample Depth (ft.):

10

Gravel (%)

Sand (%)

7

40

LL

PL

¾ "

½"

50

17

-

-

82

65

-

100

98

93

#200 53

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 74: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Revised 04/27/2004

Drawn By: MA

Date: 10/12/11

Sieve Size

% Passing

Checked By: Jere

-

-

-

3"

2 ½"

2"

⅜"

#4

#10

#40

1 ½"

1"

Sample Description: A-1-a (0) /SW

Project No.:

Figure No.: -

Fines (%) 4 PI NP

I-25 and Cimarron Street Project Name:

Sample ID: YA-B11

Sample Depth (ft.):

20

Gravel (%)

Sand (%)

20

76

LL

PL

¾ "

½"

NV

NP

-

100

50

13

96

92

92

80

#200 4

Yeh & Associates, Inc. Geotechnical Engineering Consultants

SIEVE ANALYSIS

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100 1000

Perc

ent P

assi

ng

Particle Size (mm)

200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16

Sieve Analysis Hydrometer Analysis

Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm

100 2"

Page 75: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Applied Normal Pressure, ksf

20

Job No:

Consolidation(-) /Swell(+), % Soil Description

SWELL / CONSOLIDATION

GRAPH101.1 11.6% 1.2 CH Drawn By:

Natural Dry

Density, pcf

Moisture Content,

%

M.A

Boring Number Depth, ft

Dr. Liu

YEH & ASSOCIATES, INC

213-207 Project Name: I-25 and Cimarron Street Checked By:

YA-B01

-8.0

-6.0

-4.0

-2.0

0.0

2.0

4.0

6.0

8.0

0.1 1 10 100

Con

solid

atio

n(-)

/Sw

ell(+

), %

WATER ADDED

Page 76: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Applied Normal Pressure, ksf

45

Job No:

Consolidation(-) /Swell(+), % Soil Description

SWELL / CONSOLIDATION

GRAPH112.0 16.4% 0.7 CL Drawn By:

Natural Dry

Density, pcf

Moisture Content,

%

M.A

Boring Number Depth, ft

Dr. Liu

YEH & ASSOCIATES, INC

213-207 Project Name: I-25 and Cimarron Street Checked By:

YA-B04

-8.0

-6.0

-4.0

-2.0

0.0

2.0

4.0

6.0

8.0

0.1 1 10 100

Con

solid

atio

n(-)

/Sw

ell(+

), %

WATER ADDED

Page 77: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Applied Normal Pressure, ksf

20

Job No:

M.A

Boring Number Depth, ft

Dr. Liu

YEH & ASSOCIATES, INC

213-207 Project Name: I-25 and Cimarron Street Checked By:

YA-B05 106.3 16.6% 1.3 CH Drawn By:

Natural Dry

Density, pcf

Moisture Content,

%

Consolidation(-) /Swell(+), % Soil Description

SWELL / CONSOLIDATION

GRAPH

-8.0

-6.0

-4.0

-2.0

0.0

2.0

4.0

6.0

8.0

0.1 1 10 100

Con

solid

atio

n(-)

/Sw

ell(+

), %

WATER ADDED

Page 78: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Applied Normal Pressure, ksf

5

Job No:

Consolidation(-) /Swell(+), % Soil Description

SWELL / CONSOLIDATION

GRAPH77.8 45.4% 0.7 CH Drawn By:

Natural Dry

Density, pcf

Moisture Content,

%

M.A

Boring Number Depth, ft

Dr. Liu

YEH & ASSOCIATES, INC

213-207 Project Name: I-25 and Cimarron Street Checked By:

YA-B07

-8.0

-6.0

-4.0

-2.0

0.0

2.0

4.0

6.0

8.0

0.1 1 10 100

Con

solid

atio

n(-)

/Sw

ell(+

), %

WATER ADDED

Page 79: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Applied Normal Pressure, ksf

25

Job No:

M.A

Boring Number Depth, ft

Dr. Liu

YEH & ASSOCIATES, INC

213-207 Project Name: I-25 and Cimarron Street Checked By:

YA-B07 108.3 15.3% 0.8 CH Drawn By:

Natural Dry

Density, pcf

Moisture Content,

%

Consolidation(-) /Swell(+), % Soil Description

SWELL / CONSOLIDATION

GRAPH

-8.0

-6.0

-4.0

-2.0

0.0

2.0

4.0

6.0

8.0

0.1 1 10 100

Con

solid

atio

n(-)

/Sw

ell(+

), %

WATER ADDED

Page 80: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Applied Normal Pressure, ksf

20

Job No:

M.A

Boring Number Depth, ft

Dr. Liu

YEH & ASSOCIATES, INC

213-207 Project Name: I-25 and Cimarron Street Checked By:

YA-B10 108.8 18.3% 0.5 CH Drawn By:

Natural Dry

Density, pcf

Moisture Content,

%

Consolidation(-) /Swell(+), % Soil Description

SWELL / CONSOLIDATION

GRAPH

-8.0

-6.0

-4.0

-2.0

0.0

2.0

4.0

6.0

8.0

0.1 1 10 100

Con

solid

atio

n(-)

/Sw

ell(+

), %

WATER ADDED

Page 81: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Applied Normal Pressure, ksf

35

Job No:

Consolidation(-) /Swell(+), % Soil Description

SWELL / CONSOLIDATION

GRAPH113.7 14.7% 0.5 CH Drawn By:

Natural Dry

Density, pcf

Moisture Content,

%

M.A

Boring Number Depth, ft

Dr. Liu

YEH & ASSOCIATES, INC

213-207 Project Name: I-25 and Cimarron Street Checked By:

YA-B11

-8.0

-6.0

-4.0

-2.0

0.0

2.0

4.0

6.0

8.0

0.1 1 10 100

Con

solid

atio

n(-)

/Sw

ell(+

), %

WATER ADDED

Page 82: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Tested By: RMV Checked By: DAB

Particle Size Distribution ReportP

ER

CE

NT

FIN

ER

0

10

20

30

40

50

60

70

80

90

100

GRAIN SIZE - mm.

0.0010.010.1110100

% +3"Coarse

% Gravel

Fine Coarse Medium

% Sand

Fine Silt

% Fines

Clay

0.0 0.0 0.0 28.8 38.7 17.3 15.2

6 in

.

3 in

.

2 in

.

in

.

1 in

.

¾ in

.

½ in

.

3/8

in

.

#4

#1

0

#2

0

#3

0

#4

0

#6

0

#1

00

#1

40

#2

00

SIEVE PERCENT SPEC.* PASS?

SIZE FINER PERCENT (X=NO)

Soil Description

Atterberg Limits

Coefficients

Classification

Remarks

Sample No.: Source of Sample: Date:Location: Elev./Depth:

Client:

Project:

Project No: Figure

#4#10#20#40#60

#100#200

100.071.246.632.525.119.915.2 3.5389 3.0503 1.3898

0.9703 0.3628

2/11/14Mix B2, B4

Yeh & Associates

I-25/Cimarron Street Y&A# 213-207

108-195-06

PL= LL= PI=

D90= D85= D60=D50= D30= D15=D10= Cu= Cc=

USCS= AASHTO=

* (no specification provided)

Page 83: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Tested By: RMV Checked By: DAB

Particle Size Distribution ReportP

ER

CE

NT

FIN

ER

0

10

20

30

40

50

60

70

80

90

100

GRAIN SIZE - mm.

0.0010.010.1110100

% +3"Coarse

% Gravel

Fine Coarse Medium

% Sand

Fine Silt

% Fines

Clay

0.0 0.0 10.1 7.7 15.8 22.3 44.1

6 in

.

3 in

.

2 in

.

in

.

1 in

.

¾ in

.

½ in

.

3/8

in

.

#4

#1

0

#2

0

#3

0

#4

0

#6

0

#1

00

#1

40

#2

00

SIEVE PERCENT SPEC.* PASS?

SIZE FINER PERCENT (X=NO)

Soil Description

Atterberg Limits

Coefficients

Classification

Remarks

Sample No.: Source of Sample: Date:Location: Elev./Depth:

Client:

Project:

Project No: Figure

clayey sand

.75.5

.375#4#10#20#40#60

#100#200

100.099.395.789.982.273.966.460.253.144.1

13 36 23

4.8330 2.6936 0.24660.1195

SC A-6(5)

2/11/2014B-8 @ 5'

Yeh & Associates

I-25/Cimarron Street Y&A# 213-207

108-195-06

PL= LL= PI=

D90= D85= D60=D50= D30= D15=D10= Cu= Cc=

USCS= AASHTO=

* (no specification provided)

Page 84: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

Tested By: RMV Checked By: DAB

Particle Size Distribution ReportP

ER

CE

NT

FIN

ER

0

10

20

30

40

50

60

70

80

90

100

GRAIN SIZE - mm.

0.0010.010.1110100

% +3"Coarse

% Gravel

Fine Coarse Medium

% Sand

Fine Silt

% Fines

Clay

0.0 5.1 12.7 8.7 11.1 22.5 39.9

6 in

.

3 in

.

2 in

.

in

.

1 in

.

¾ in

.

½ in

.

3/8

in

.

#4

#1

0

#2

0

#3

0

#4

0

#6

0

#1

00

#1

40

#2

00

SIEVE PERCENT SPEC.* PASS?

SIZE FINER PERCENT (X=NO)

Soil Description

Atterberg Limits

Coefficients

Classification

Remarks

Sample No.: Source of Sample: Date:Location: Elev./Depth:

Client:

Project:

Project No: Figure

clayey sand with gravel

1.75.5

.375#4#10#20#40#60

#100#200

100.094.992.189.182.273.566.762.459.053.839.9

13 36 23

10.3405 6.3875 0.28950.1199

SC A-6(4)

2/11/2014B-9 @ 10'

Yeh & Associates

I-25/Cimarron Street Y&A# 213-207

108-195-06

PL= LL= PI=

D90= D85= D60=D50= D30= D15=D10= Cu= Cc=

USCS= AASHTO=

* (no specification provided)

Page 85: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

%Gr.Moist.Sat.eo

Swell Press.CcPcOverburdenSp.

PILLDry Dens.Natural

Project:

Remarks:Client:Project No.

AASHTOUSCSMATERIAL DESCRIPTION

CONSOLIDATION TEST REPORT

.1 .2 .5 1 2 5 10 20.040

.036

.032

.028

.024

.020

.016

.012

.008

.004

.000

Change I

n H

eig

ht

- in

.

Applied Pressure - ksf

Coefficients of Consolidation and Secondary Consolidation

No.Load(ksf)

Cv(ft.2/day)

Cα No.

Load(ksf)

Cv(ft.2/day)

Cα No.

Load(ksf)

Cv(ft.2/day)

2 0.62 0.08 0.0033 1.24 0.17 0.0014 2.48 0.00 0.0015 4.96 0.01 0.0016 9.92 0.00 0.0017 19.84 0.01 0.0008 39.68 0.07 0.000

(ksf)(ksf)(ksf)(pcf)HeaveCr

Specific Gravity is assumed.

Specimen was not saturated nor

inundated.

I-25/Cimarron Street Y&A# 213-207

Yeh & Associates108-195-06

0.5240.000.0521.572.65114.010.8 %54.4 %

Figure

Location: Mix B2, B4

Page 86: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

=

=D100

=

=D0

Load=

Load No.=

Project:Project No.:

Dial Reading vs. Time

= 0.003

Cv @ T50

0.08 ft.2/day

T50

D50

Location: Mix B2, B4

3.49 min.

0.15120

0.14980

0.14839

0.62 ksf

2

I-25/Cimarron Street Y&A# 213-207108-195-06

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.14725

.14800

.14875

.14950

.15025

.15100

.15175

.15250

.15325

.15400

.15475

t0 4t0

FigureKnight Piesold Geotechnical Lab.

= 0.001

Cv @ T50

0.17 ft.2/day

=T50

=D100

=D50

=D0

Load=

Load No.=

Location: Mix B2, B4

1.54 min.

0.15338

0.15324

0.15310

1.24 ksf

3

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.1524

.1528

.1532

.1536

.1540

.1544

.1548

.1552

.1556

.1560

.1564

t0 4t0

Page 87: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

=

=D100

=

=D0

Load=

Load No.=

Project:Project No.:

Dial Reading vs. Time

= 0.001

Cv @ T50

0.00 ft.2/day

T50

D50

Location: Mix B2, B4

82.60 min.

0.15829

0.15704

0.15580

2.48 ksf

4

I-25/Cimarron Street Y&A# 213-207108-195-06

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.1550

.1554

.1558

.1562

.1566

.1570

.1574

.1578

.1582

.1586

.1590

t0 4t0

FigureKnight Piesold Geotechnical Lab.

= 0.001

Cv @ T50

0.01 ft.2/day

=T50

=D100

=D50

=D0

Load=

Load No.=

Location: Mix B2, B4

41.68 min.

0.16194

0.16105

0.16016

4.96 ksf

5

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.16009

.16034

.16059

.16084

.16109

.16134

.16159

.16184

.16209

.16234

.16259

t0 4t0

Page 88: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

=

=D100

=

=D0

Load=

Load No.=

Project:Project No.:

Dial Reading vs. Time

= 0.001

Cv @ T50

0.00 ft.2/day

T50

D50

Location: Mix B2, B4

154.02 min.

0.16259

0.16208

0.16158

9.92 ksf

6

I-25/Cimarron Street Y&A# 213-207108-195-06

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.1611

.1613

.1615

.1617

.1619

.1621

.1623

.1625

.1627

.1629

.1631

t0 4t0

FigureKnight Piesold Geotechnical Lab.

= 0.000

Cv @ T50

0.01 ft.2/day

=T50

=D100

=D50

=D0

Load=

Load No.=

Location: Mix B2, B4

51.93 min.

0.16334

0.16295

0.16257

19.84 ksf

7

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.16225

.16240

.16255

.16270

.16285

.16300

.16315

.16330

.16345

.16360

.16375

t0 4t0

Page 89: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

=

=D100

=

=D0

Load=

Load No.=

Project:Project No.:

Dial Reading vs. Time

= 0.000

Cv @ T50

0.07 ft.2/day

T50

D50

Location: Mix B2, B4

3.54 min.

0.17096

0.16991

0.16886

39.68 ksf

8

I-25/Cimarron Street Y&A# 213-207108-195-06

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.16895

.16920

.16945

.16970

.16995

.17020

.17045

.17070

.17095

.17120

.17145

t0 4t0

FigureKnight Piesold Geotechnical Lab.

Page 90: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

CONSOLIDATION TEST DATA

Client: Yeh & AssociatesProject: I-25/Cimarron Street Y&A# 213-207Project Number: 108-195-06

Sample Data

Source: Liquid Limit: Plasticity Index: USCS: AASHTO: Figure No.: Testing Remarks: Specific Gravity is assumed. Specimen was not saturated nor

inundated.

Test Specimen Data

TOTAL SAMPLE BEFORE TEST AFTER TESTWet w+t = 363.98 g. Consolidometer # = 3 Wet w+t = 184.32 g.Dry w+t = 340.26 g. Dry w+t = 184.02 g.Tare Wt. = 119.72 g. Spec. Gravity = 2.65 Tare Wt. = 120.86 g.Height = .75 in. Height = .75 in.Diameter = 1.90 in. Diameter = 1.94 in.Weight = 70.33 g. Defl. Table = 2013 ST7 1.9

Moisture = 10.8 % Ht. Solids = 0.4920 in. Moisture = 0.5 %Wet Den. = 126.3 pcf Dry Wt. = 66.34 g. Dry Wt. = 63.16 g.*Dry Den. = 114.0 pcf Void Ratio = 0.524 Void Ratio = 0.474

Saturation = 54.4 %

* Final dry weight used in calculations

End-of-Load Summary

Pressure(ksf)

FinalDial (in.)

MachineDefl. (in.)

Cv(ft.2/day)

Cαααα

VoidRatio

% Compression/Swell

start 0.14210 0.524

0.16 0.14780 0.00000 0.513 0.8 Comprs.

0.62 0.15555 0.00230 0.08 0.003 0.502 1.5 Comprs.

1.24 0.15990 0.00410 0.17 0.001 0.496 1.8 Comprs.

2.48 0.16470 0.00610 0.00 0.001 0.491 2.2 Comprs.

4.96 0.17020 0.00820 0.01 0.001 0.484 2.7 Comprs.

9.92 0.17350 0.01090 0.00 0.001 0.483 2.7 Comprs.

19.84 0.17665 0.01320 0.01 0.000 0.481 2.8 Comprs.

39.68 0.18690 0.01590 0.07 0.000 0.466 3.9 Comprs.

0.62 0.18000 0.01320 0.474 3.3 Comprs.

Cc = 0.05 Pc = 21.57 ksf Cr = 0.00

Knight Piesold Geotechnical Lab.

Page 91: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

TEST READINGSPressure: 0.62 ksf Load No. 2

No. Elapsed Dial Time Reading 1 0.00 0.14780

2 0.10 0.15105

3 0.25 0.15130

4 0.50 0.15150

5 1.00 0.15170

6 2.00 0.15195

7 5.00 0.15220

8 10.00 0.15240

9 20.00 0.15270

10 30.00 0.15290

No. Elapsed Dial Time Reading11 60.00 0.15320

12 120.00 0.15350

13 240.00 0.15400

14 480.00 0.15445

15 1413.00 0.15555

.1 .5 1 2 5 20 200

.14725

.14800

.14875

.14950

.15025

.15100

.15175

.15250

.15325

.15400

.15475

t0 4t0

Void Ratio = 0.502 Compression = 1.5 % D0 = 0.14839 D50 = 0.14980 D100 = 0.15120 Cv at 3.5 min. = 0.08 ft.2/day Cαααα

= 0.003

TEST READINGSPressure: 1.24 ksf Load No. 3

No. Elapsed Dial Time Reading 1 0.00 0.15555

2 0.10 0.15700

3 0.25 0.15710

4 0.50 0.15715

5 1.00 0.15725

6 2.00 0.15740

7 5.00 0.15760

8 10.00 0.15780

9 20.00 0.15800

10 30.00 0.15810

No. Elapsed Dial Time Reading11 60.00 0.15830

12 120.00 0.15860

13 240.00 0.15900

14 480.00 0.15940

15 1478.00 0.15990

.1 .5 1 2 5 20 200

.1524

.1528

.1532

.1536

.1540

.1544

.1548

.1552

.1556

.1560

.1564

t0 4t0

Void Ratio = 0.496 Compression = 1.8 % D0 = 0.15310 D50 = 0.15324 D100 = 0.15338 Cv at 1.5 min. = 0.17 ft.2/day Cαααα

= 0.001

TEST READINGSPressure: 2.48 ksf Load No. 4

No. Elapsed Dial Time Reading 1 0.00 0.15990

2 0.10 0.16160

3 0.25 0.16170

4 0.50 0.16185

5 1.00 0.16200

6 2.00 0.16210

7 5.00 0.16230

8 10.00 0.16250

9 20.00 0.16265

10 30.00 0.16280

No. Elapsed Dial Time Reading11 60.00 0.16300

12 119.00 0.16320

13 240.00 0.16350

14 480.00 0.16400

15 4381.00 0.16470

.1 .5 1 2 5 20 200 5000

.1550

.1554

.1558

.1562

.1566

.1570

.1574

.1578

.1582

.1586

.1590

t0 4t0

Void Ratio = 0.491 Compression = 2.2 % D0 = 0.15580 D50 = 0.15704 D100 = 0.15829 Cv at 82.6 min. = 0.00 ft.2/day Cαααα

= 0.001

Knight Piesold Geotechnical Lab.

Page 92: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

TEST READINGSPressure: 4.96 ksf Load No. 5

No. Elapsed Dial Time Reading 1 0.00 0.16470

2 0.10 0.16855

3 0.25 0.16865

4 0.50 0.16870

5 1.00 0.16875

6 2.00 0.16885

7 5.00 0.16895

8 10.00 0.16900

9 20.00 0.16910

10 30.00 0.16915

No. Elapsed Dial Time Reading11 60.00 0.16930

12 120.00 0.16950

13 240.00 0.16970

14 480.00 0.17000

15 1338.00 0.17020

.1 .5 1 2 5 20 200

.16009

.16034

.16059

.16084

.16109

.16134

.16159

.16184

.16209

.16234

.16259

t0 4t0

Void Ratio = 0.484 Compression = 2.7 % D0 = 0.16016 D50 = 0.16105 D100 = 0.16194 Cv at 41.7 min. = 0.01 ft.2/day Cαααα

= 0.001

TEST READINGSPressure: 9.92 ksf Load No. 6

No. Elapsed Dial Time Reading 1 0.00 0.17020

2 0.10 0.17220

3 0.25 0.17225

4 0.50 0.17230

5 1.00 0.17235

6 2.00 0.17240

7 5.00 0.17245

8 10.00 0.17250

9 20.00 0.17260

10 30.00 0.17265

No. Elapsed Dial Time Reading11 60.00 0.17280

12 120.00 0.17295

13 240.00 0.17310

14 461.00 0.17320

15 1436.00 0.17350

.1 .5 1 2 5 20 200

.1611

.1613

.1615

.1617

.1619

.1621

.1623

.1625

.1627

.1629

.1631

t0 4t0

Void Ratio = 0.483 Compression = 2.7 % D0 = 0.16158 D50 = 0.16208 D100 = 0.16259 Cv at 154.0 min. = 0.00 ft.2/day Cαααα

= 0.001

TEST READINGSPressure: 19.84 ksf Load No. 7

No. Elapsed Dial Time Reading 1 0.00 0.17350

2 0.10 0.17560

3 0.25 0.17570

4 0.50 0.17575

5 1.00 0.17580

6 2.00 0.17585

7 5.00 0.17590

8 10.00 0.17595

9 20.00 0.17605

10 30.00 0.17610

No. Elapsed Dial Time Reading11 60.00 0.17615

12 118.00 0.17625

13 240.00 0.17640

14 480.00 0.17650

15 1428.00 0.17665

.1 .5 1 2 5 20 200

.16225

.16240

.16255

.16270

.16285

.16300

.16315

.16330

.16345

.16360

.16375

t0 4t0

Void Ratio = 0.481 Compression = 2.8 % D0 = 0.16257 D50 = 0.16295 D100 = 0.16334 Cv at 51.9 min. = 0.01 ft.2/day Cαααα

= 0.000

Knight Piesold Geotechnical Lab.

Page 93: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

TEST READINGSPressure: 39.68 ksf Load No. 8

No. Elapsed Dial Time Reading 1 0.00 0.17665

2 0.10 0.18510

3 0.25 0.18530

4 0.50 0.18545

5 1.00 0.18560

6 2.00 0.18570

7 5.00 0.18590

8 10.00 0.18600

9 20.00 0.18610

10 30.00 0.18620

No. Elapsed Dial Time Reading11 60.00 0.18630

12 120.00 0.18645

13 240.00 0.18655

14 480.00 0.18680

15 1503.00 0.18690

.1 .5 1 2 5 20 200

.16895

.16920

.16945

.16970

.16995

.17020

.17045

.17070

.17095

.17120

.17145

t0 4t0

Void Ratio = 0.466 Compression = 3.9 % D0 = 0.16886 D50 = 0.16991 D100 = 0.17096 Cv at 3.5 min. = 0.07 ft.2/day Cαααα

= 0.000

Knight Piesold Geotechnical Lab.

Page 94: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

%Gr.Moist.Sat.eo

Swell Press.CcPcOverburdenSp.

PILLDry Dens.Natural

Project:

Remarks:Client:Project No.

AASHTOUSCSMATERIAL DESCRIPTION

CONSOLIDATION TEST REPORT

.1 .2 .5 1 2 5 10 20.045

.041

.037

.033

.029

.025

.021

.017

.013

.009

.005

Change I

n H

eig

ht

- in

.

Applied Pressure - ksf

Coefficients of Consolidation and Secondary Consolidation

No.Load(ksf)

Cv(ft.2/day)

Cα No.

Load(ksf)

Cv(ft.2/day)

Cα No.

Load(ksf)

Cv(ft.2/day)

2 0.62 0.08 0.0033 1.24 0.57 0.0034 2.48 0.02 0.0075 4.96 0.09 0.0016 9.92 0.04 0.0037 19.84 0.02 0.0038 39.68 0.10 0.003

(ksf)(ksf)(ksf)(pcf)HeaveCr

Specific Gravity is assumed.

Specimen was not saturated or

inundated.

I-25/Cimarron Street Y&A# 213-207

Yeh & Associates108-195-06

0.4650.010.031.442.652336110.419.6 %111.5 %

Figure

Location: B-8 @ 5'

Page 95: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

=

=D100

=

=D0

Load=

Load No.=

Project:Project No.:

Dial Reading vs. Time

= 0.003

Cv @ T50

0.08 ft.2/day

T50

D50

Location: B-8 @ 5'

3.24 min.

0.12019

0.11987

0.11956

0.62 ksf

2

I-25/Cimarron Street Y&A# 213-207108-195-06

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.11784

.11909

.12034

.12159

.12284

.12409

.12534

.12659

.12784

.12909

.13034

t0 4t0

FigureKnight Piesold Geotechnical Lab.

= 0.003

Cv @ T50

0.57 ft.2/day

=T50

=D100

=D50

=D0

Load=

Load No.=

Location: B-8 @ 5'

0.46 min.

0.12260

0.12189

0.12119

1.24 ksf

3

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.12010

.12085

.12160

.12235

.12310

.12385

.12460

.12535

.12610

.12685

.12760

t0 4t0

Page 96: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

=

=D100

=

=D0

Load=

Load No.=

Project:Project No.:

Dial Reading vs. Time

= 0.007

Cv @ T50

0.02 ft.2/day

T50

D50

Location: B-8 @ 5'

11.54 min.

0.12414

0.12386

0.12358

2.48 ksf

4

I-25/Cimarron Street Y&A# 213-207108-195-06

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.12184

.12309

.12434

.12559

.12684

.12809

.12934

.13059

.13184

.13309

.13434

t0 4t0

FigureKnight Piesold Geotechnical Lab.

= 0.001

Cv @ T50

0.09 ft.2/day

=T50

=D100

=D50

=D0

Load=

Load No.=

Location: B-8 @ 5'

2.78 min.

0.13147

0.13133

0.13120

4.96 ksf

5

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.1304

.1309

.1314

.1319

.1324

.1329

.1334

.1339

.1344

.1349

.1354

t0 4t0

Page 97: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

=

=D100

=

=D0

Load=

Load No.=

Project:Project No.:

Dial Reading vs. Time

= 0.003

Cv @ T50

0.04 ft.2/day

T50

D50

Location: B-8 @ 5'

6.79 min.

0.13792

0.13723

0.13654

9.92 ksf

6

I-25/Cimarron Street Y&A# 213-207108-195-06

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.1361

.1366

.1371

.1376

.1381

.1386

.1391

.1396

.1401

.1406

.1411

t0 4t0

FigureKnight Piesold Geotechnical Lab.

= 0.003

Cv @ T50

0.02 ft.2/day

=T50

=D100

=D50

=D0

Load=

Load No.=

Location: B-8 @ 5'

13.53 min.

0.14155

0.14098

0.14041

19.84 ksf

7

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.1396

.1401

.1406

.1411

.1416

.1421

.1426

.1431

.1436

.1441

.1446

t0 4t0

Page 98: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

=

=D100

=

=D0

Load=

Load No.=

Project:Project No.:

Dial Reading vs. Time

= 0.003

Cv @ T50

0.10 ft.2/day

T50

D50

Location: B-8 @ 5'

2.47 min.

0.14583

0.14525

0.14468

39.68 ksf

8

I-25/Cimarron Street Y&A# 213-207108-195-06

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.14304

.14379

.14454

.14529

.14604

.14679

.14754

.14829

.14904

.14979

.15054

t0 4t0

FigureKnight Piesold Geotechnical Lab.

Page 99: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

CONSOLIDATION TEST DATA

Client: Yeh & AssociatesProject: I-25/Cimarron Street Y&A# 213-207Project Number: 108-195-06

Sample Data

Source: Liquid Limit: 36 Plasticity Index: 23USCS: AASHTO: Figure No.: Testing Remarks: Specific Gravity is assumed. Specimen was not saturated or

inundated.

Test Specimen Data

TOTAL SAMPLE BEFORE TEST AFTER TESTWet w+t = 252.21 g. Consolidometer # = 3 Wet w+t = 186.50 g.Dry w+t = 230.53 g. Dry w+t = 185.02 g.Tare Wt. = 119.69 g. Spec. Gravity = 2.65 Tare Wt. = 119.29 g.Height = .75 in. Height = .75 in.Diameter = 1.93 in. Diameter = 1.94 in.Weight = 75.92 g. Defl. Table = 2013 ST5 1.9

Moisture = 19.6 % Ht. Solids = 0.5121 in. Moisture = 2.3 %Wet Den. = 132.0 pcf Dry Wt. = 64.23 g. Dry Wt. = 65.73 g.*Dry Den. = 110.4 pcf Void Ratio = 0.465 Void Ratio = 0.396

Saturation = 111.5 %

* Final dry weight used in calculations

End-of-Load Summary

Pressure(ksf)

FinalDial (in.)

MachineDefl. (in.)

Cv(ft.2/day)

Cαααα

VoidRatio

% Compression/Swell

start 0.10840 0.465

0.16 0.11840 0.00010 0.445 1.3 Comprs.

0.62 0.13000 0.00210 0.08 0.003 0.427 2.6 Comprs.

1.24 0.13505 0.00910 0.57 0.003 0.430 2.3 Comprs.

2.48 0.14380 0.01250 0.02 0.007 0.420 3.1 Comprs.

4.96 0.15150 0.01700 0.09 0.001 0.414 3.5 Comprs.

9.92 0.15900 0.01880 0.04 0.003 0.403 4.2 Comprs.

19.84 0.16550 0.02140 0.02 0.003 0.395 4.8 Comprs.

39.68 0.17280 0.02410 0.10 0.003 0.386 5.4 Comprs.

0.62 0.16475 0.02110 0.396 4.7 Comprs.

Cc = 0.03 Pc = 1.44 ksf Cr = 0.01

Knight Piesold Geotechnical Lab.

Page 100: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

TEST READINGSPressure: 0.62 ksf Load No. 2

No. Elapsed Dial Time Reading 1 0.00 0.11840

2 0.10 0.12120

3 0.25 0.12140

4 0.50 0.12150

5 1.00 0.12160

6 2.00 0.12180

7 5.00 0.12205

8 10.00 0.12230

9 20.00 0.12260

10 30.00 0.12280

No. Elapsed Dial Time Reading11 60.00 0.12330

12 120.00 0.12400

13 240.00 0.12490

14 480.00 0.12640

15 1413.00 0.13000

.1 .5 1 2 5 20 200

.11784

.11909

.12034

.12159

.12284

.12409

.12534

.12659

.12784

.12909

.13034

t0 4t0

Void Ratio = 0.427 Compression = 2.6 % D0 = 0.11956 D50 = 0.11987 D100 = 0.12019 Cv at 3.2 min. = 0.08 ft.2/day Cαααα

= 0.003

TEST READINGSPressure: 1.24 ksf Load No. 3

No. Elapsed Dial Time Reading 1 0.00 0.13000

2 0.10 0.13070

3 0.25 0.13080

4 0.50 0.13090

5 1.00 0.13100

6 2.00 0.13150

7 5.00 0.13155

8 10.00 0.13160

9 20.00 0.13170

10 30.00 0.13190

No. Elapsed Dial Time Reading11 60.00 0.13215

12 120.00 0.13250

13 240.00 0.13310

14 480.00 0.13410

15 1479.00 0.13505

.1 .5 1 2 5 20 200

.12010

.12085

.12160

.12235

.12310

.12385

.12460

.12535

.12610

.12685

.12760

t0 4t0

Void Ratio = 0.430 Compression = 2.3 % D0 = 0.12119 D50 = 0.12189 D100 = 0.12260 Cv at 0.5 min. = 0.57 ft.2/day Cαααα

= 0.003

TEST READINGSPressure: 2.48 ksf Load No. 4

No. Elapsed Dial Time Reading 1 0.00 0.13505

2 0.10 0.13560

3 0.25 0.13565

4 0.50 0.13580

5 1.00 0.13600

6 5.00 0.13620

7 10.00 0.13645

8 20.00 0.13645

9 30.00 0.13665

10 60.00 0.13700

No. Elapsed Dial Time Reading11 120.00 0.13740

12 240.00 0.13815

13 480.00 0.13910

14 4382.00 0.14380

.1 .5 1 2 5 20 200 5000

.12184

.12309

.12434

.12559

.12684

.12809

.12934

.13059

.13184

.13309

.13434

t0 4t0

Void Ratio = 0.420 Compression = 3.1 % D0 = 0.12358 D50 = 0.12386 D100 = 0.12414 Cv at 11.5 min. = 0.02 ft.2/day Cαααα

= 0.007

Knight Piesold Geotechnical Lab.

Page 101: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

TEST READINGSPressure: 4.96 ksf Load No. 5

No. Elapsed Dial Time Reading 1 0.00 0.14380

2 0.10 0.14800

3 0.25 0.14810

4 0.50 0.14815

5 1.00 0.14820

6 2.00 0.14830

7 5.00 0.14840

8 10.00 0.14850

9 20.00 0.14860

10 30.00 0.14870

No. Elapsed Dial Time Reading11 60.00 0.14885

12 120.00 0.14920

13 240.00 0.14960

14 480.00 0.15020

15 1338.00 0.15150

.1 .5 1 2 5 20 200

.1304

.1309

.1314

.1319

.1324

.1329

.1334

.1339

.1344

.1349

.1354

t0 4t0

Void Ratio = 0.414 Compression = 3.5 % D0 = 0.13120 D50 = 0.13133 D100 = 0.13147 Cv at 2.8 min. = 0.09 ft.2/day Cαααα

= 0.001

TEST READINGSPressure: 9.92 ksf Load No. 6

No. Elapsed Dial Time Reading 1 0.00 0.15150

2 0.10 0.15545

3 0.25 0.15560

4 0.50 0.15565

5 1.00 0.15570

6 2.00 0.15580

7 5.00 0.15595

8 10.00 0.15610

9 20.00 0.15630

10 30.00 0.15640

No. Elapsed Dial Time Reading11 60.00 0.15660

12 120.00 0.15690

13 240.00 0.15730

14 467.00 0.15780

15 1437.00 0.15900

.1 .5 1 2 5 20 200

.1361

.1366

.1371

.1376

.1381

.1386

.1391

.1396

.1401

.1406

.1411

t0 4t0

Void Ratio = 0.403 Compression = 4.2 % D0 = 0.13654 D50 = 0.13723 D100 = 0.13792 Cv at 6.8 min. = 0.04 ft.2/day Cαααα

= 0.003

TEST READINGSPressure: 19.84 ksf Load No. 7

No. Elapsed Dial Time Reading 1 0.00 0.15900

2 0.10 0.16155

3 0.25 0.16165

4 0.50 0.16175

5 1.00 .1618.5

6 2.00 0.16200

7 5.00 0.16220

8 10.00 0.16230

9 20.00 0.16250

10 30.00 0.16260

No. Elapsed Dial Time Reading11 63.00 0.16290

12 120.00 0.16330

13 240.00 0.16370

14 480.00 0.16440

15 1429.00 0.16550

.1 .5 1 2 5 20 200

.1396

.1401

.1406

.1411

.1416

.1421

.1426

.1431

.1436

.1441

.1446

t0 4t0

Void Ratio = 0.395 Compression = 4.8 % D0 = 0.14041 D50 = 0.14098 D100 = 0.14155 Cv at 13.5 min. = 0.02 ft.2/day Cαααα

= 0.003

Knight Piesold Geotechnical Lab.

Page 102: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

TEST READINGSPressure: 39.68 ksf Load No. 8

No. Elapsed Dial Time Reading 1 0.00 0.16550

2 0.10 0.16865

3 0.25 0.16885

4 0.50 0.16900

5 1.00 0.16920

6 2.00 0.16930

7 5.00 0.16955

8 10.00 0.16970

9 20.00 0.17000

10 30.00 0.17010

No. Elapsed Dial Time Reading11 60.00 0.17050

12 120.00 0.17085

13 240.00 0.17130

14 480.00 0.17185

15 1507.00 0.17280

.1 .5 1 2 5 20 200

.14304

.14379

.14454

.14529

.14604

.14679

.14754

.14829

.14904

.14979

.15054

t0 4t0

Void Ratio = 0.386 Compression = 5.4 % D0 = 0.14468 D50 = 0.14525 D100 = 0.14583 Cv at 2.5 min. = 0.10 ft.2/day Cαααα

= 0.003

Knight Piesold Geotechnical Lab.

Page 103: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

%Gr.Moist.Sat.eo

Swell Press.CcPcOverburdenSp.

PILLDry Dens.Natural

Project:

Remarks:Client:Project No.

AASHTOUSCSMATERIAL DESCRIPTION

CONSOLIDATION TEST REPORT

.1 .2 .5 1 2 5 10 20.040

.036

.032

.028

.024

.020

.016

.012

.008

.004

.000

Change I

n H

eig

ht

- in

.

Applied Pressure - ksf

Coefficients of Consolidation and Secondary Consolidation

No.Load(ksf)

Cv(ft.2/day)

Cα No.

Load(ksf)

Cv(ft.2/day)

Cα No.

Load(ksf)

Cv(ft.2/day)

2 0.62 0.22 0.0033 1.24 0.04 0.0034 2.48 0.05 0.0025 4.96 0.02 0.0036 9.92 0.03 0.0037 19.84 0.06 0.0028 39.68 0.31 0.002

(ksf)(ksf)(ksf)(pcf)HeaveCr

Specific Gravity is assumed.

Specimen was not saturated or

inundated.

I-25/Cimarron Street Y&A# 213-207

Yeh & Associates108-195-06

0.4700.000.045.502.652336115.614.4 %81.2 %

Figure

Location: B-9 @ 10'

Page 104: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

=

=D100

=

=D0

Load=

Load No.=

Project:Project No.:

Dial Reading vs. Time

= 0.003

Cv @ T50

0.22 ft.2/day

T50

D50

Location: B-9 @ 10'

1.22 min.

0.12883

0.12809

0.12735

0.62 ksf

2

I-25/Cimarron Street Y&A# 213-207108-195-06

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.12684

.12759

.12834

.12909

.12984

.13059

.13134

.13209

.13284

.13359

.13434

t0 4t0

FigureKnight Piesold Geotechnical Lab.

= 0.003

Cv @ T50

0.04 ft.2/day

=T50

=D100

=D50

=D0

Load=

Load No.=

Location: B-9 @ 10'

6.50 min.

0.13333

0.13311

0.13290

1.24 ksf

3

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.13099

.13174

.13249

.13324

.13399

.13474

.13549

.13624

.13699

.13774

.13849

t0 4t0

Page 105: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

=

=D100

=

=D0

Load=

Load No.=

Project:Project No.:

Dial Reading vs. Time

= 0.002

Cv @ T50

0.05 ft.2/day

T50

D50

Location: B-9 @ 10'

4.85 min.

0.13765

0.13745

0.13725

2.48 ksf

4

I-25/Cimarron Street Y&A# 213-207108-195-06

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.136

.137

.138

.139

.140

.141

.142

.143

.144

.145

.146

t0 4t0

FigureKnight Piesold Geotechnical Lab.

= 0.003

Cv @ T50

0.02 ft.2/day

=T50

=D100

=D50

=D0

Load=

Load No.=

Location: B-9 @ 10'

16.33 min.

0.14621

0.14587

0.14553

4.96 ksf

5

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.1450

.1454

.1458

.1462

.1466

.1470

.1474

.1478

.1482

.1486

.1490

t0 4t0

Page 106: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

=

=D100

=

=D0

Load=

Load No.=

Project:Project No.:

Dial Reading vs. Time

= 0.003

Cv @ T50

0.03 ft.2/day

T50

D50

Location: B-9 @ 10'

7.72 min.

0.14835

0.14816

0.14798

9.92 ksf

6

I-25/Cimarron Street Y&A# 213-207108-195-06

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.1477

.1480

.1483

.1486

.1489

.1492

.1495

.1498

.1501

.1504

.1507

t0 4t0

FigureKnight Piesold Geotechnical Lab.

= 0.002

Cv @ T50

0.06 ft.2/day

=T50

=D100

=D50

=D0

Load=

Load No.=

Location: B-9 @ 10'

4.25 min.

0.15092

0.15067

0.15042

19.84 ksf

7

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.1496

.1500

.1504

.1508

.1512

.1516

.1520

.1524

.1528

.1532

.1536

t0 4t0

Page 107: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

=

=D100

=

=D0

Load=

Load No.=

Project:Project No.:

Dial Reading vs. Time

= 0.002

Cv @ T50

0.31 ft.2/day

T50

D50

Location: B-9 @ 10'

0.83 min.

0.15610

0.15553

0.15496

39.68 ksf

8

I-25/Cimarron Street Y&A# 213-207108-195-06

Dia

l R

eadin

g (

in.)

Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000

.1548

.1552

.1556

.1560

.1564

.1568

.1572

.1576

.1580

.1584

.1588

t0 4t0

FigureKnight Piesold Geotechnical Lab.

Page 108: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

CONSOLIDATION TEST DATA

Client: Yeh & AssociatesProject: I-25/Cimarron Street Y&A# 213-207Project Number: 108-195-06

Sample Data

Source: Liquid Limit: 36 Plasticity Index: 23USCS: AASHTO: Figure No.: Testing Remarks: Specific Gravity is assumed. Specimen was not saturated or

inundated.

Test Specimen Data

TOTAL SAMPLE BEFORE TEST AFTER TESTWet w+t = 265.29 g. Consolidometer # = 3 Wet w+t = 186.90 g.Dry w+t = 247.11 g. Dry w+t = 185.18 g.Tare Wt. = 120.86 g. Spec. Gravity = 2.65 Tare Wt. = 119.69 g.Height = .75 in. Height = .75 in.Diameter = 1.93 in. Diameter = 1.94 in.Weight = 76.32 g. Defl. Table = 2013 ST6 1.9

Moisture = 14.4 % Ht. Solids = 0.5102 in. Moisture = 2.6 %Wet Den. = 132.2 pcf Dry Wt. = 67.27 g. Dry Wt. = 65.49 g.*Dry Den. = 115.6 pcf Void Ratio = 0.470 Void Ratio = 0.402

Saturation = 81.2 %

* Final dry weight used in calculations

End-of-Load Summary

Pressure(ksf)

FinalDial (in.)

MachineDefl. (in.)

Cv(ft.2/day)

Cαααα

VoidRatio

% Compression/Swell

start 0.12200 0.470

0.16 0.12600 0.00000 0.462 0.5 Comprs.

0.62 0.13430 0.00070 0.22 0.003 0.447 1.5 Comprs.

1.24 0.13930 0.00280 0.04 0.003 0.442 1.9 Comprs.

2.48 0.14810 0.00400 0.05 0.002 0.427 2.9 Comprs.

4.96 0.15485 0.00650 0.02 0.003 0.418 3.5 Comprs.

9.92 0.15940 0.00900 0.03 0.003 0.414 3.8 Comprs.

19.84 0.16550 0.01250 0.06 0.002 0.409 4.1 Comprs.

39.68 0.17420 0.01590 0.31 0.002 0.399 4.8 Comprs.

0.62 0.16710 0.01030 0.402 4.6 Comprs.

Cc = 0.04 Pc = 5.50 ksf Cr = 0.00

Knight Piesold Geotechnical Lab.

Page 109: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

TEST READINGSPressure: 0.62 ksf Load No. 2

No. Elapsed Dial Time Reading 1 0.00 0.12600

2 0.10 0.12830

3 0.25 0.12840

4 0.50 0.12860

5 1.00 0.12875

6 2.00 0.12890

7 5.00 0.12910

8 10.00 0.12930

9 20.00 0.12940

10 30.00 0.12960

No. Elapsed Dial Time Reading11 60.00 0.13000

12 120.00 0.13030

13 240.00 0.13090

14 480.00 0.13190

15 1414.00 0.13430

.1 .5 1 2 5 20 200

.12684

.12759

.12834

.12909

.12984

.13059

.13134

.13209

.13284

.13359

.13434

t0 4t0

Void Ratio = 0.447 Compression = 1.5 % D0 = 0.12735 D50 = 0.12809 D100 = 0.12883 Cv at 1.2 min. = 0.22 ft.2/day Cαααα

= 0.003

TEST READINGSPressure: 1.24 ksf Load No. 3

No. Elapsed Dial Time Reading 1 0.00 0.13430

2 0.10 0.13530

3 0.25 0.13540

4 0.50 0.13550

5 1.00 0.13560

6 2.00 0.13570

7 5.00 0.13590

8 10.00 0.13605

9 20.00 0.13625

10 30.00 0.13630

No. Elapsed Dial Time Reading11 60.00 0.13660

12 120.00 0.13700

13 240.00 0.13750

14 480.00 0.13820

15 1478.00 0.13930

.1 .5 1 2 5 20 200

.13099

.13174

.13249

.13324

.13399

.13474

.13549

.13624

.13699

.13774

.13849

t0 4t0

Void Ratio = 0.442 Compression = 1.9 % D0 = 0.13290 D50 = 0.13311 D100 = 0.13333 Cv at 6.5 min. = 0.04 ft.2/day Cαααα

= 0.003

TEST READINGSPressure: 2.48 ksf Load No. 4

No. Elapsed Dial Time Reading 1 0.00 0.13930

2 0.10 0.14080

3 0.25 0.14100

4 0.50 0.14110

5 1.00 0.14115

6 2.00 0.14125

7 5.00 0.14140

8 10.00 0.14150

9 20.00 0.14180

10 30.00 0.14190

No. Elapsed Dial Time Reading11 60.00 0.14215

12 120.00 0.14240

13 240.00 0.14290

14 480.00 0.14360

15 4381.00 0.14810

.1 .5 1 2 5 20 200 5000

.136

.137

.138

.139

.140

.141

.142

.143

.144

.145

.146

t0 4t0

Void Ratio = 0.427 Compression = 2.9 % D0 = 0.13725 D50 = 0.13745 D100 = 0.13765 Cv at 4.9 min. = 0.05 ft.2/day Cαααα

= 0.002

Knight Piesold Geotechnical Lab.

Page 110: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

TEST READINGSPressure: 4.96 ksf Load No. 5

No. Elapsed Dial Time Reading 1 0.00 0.15010

2 0.10 0.15190

3 0.25 0.15195

4 0.50 0.15200

5 1.00 0.15205

6 2.00 0.15210

7 5.00 0.15220

8 10.00 0.15230

9 20.00 0.15240

10 30.00 0.15250

No. Elapsed Dial Time Reading11 60.00 0.15270

12 120.00 0.15300

13 240.00 0.15335

14 480.00 0.15390

15 1338.00 0.15485

.1 .5 1 2 5 20 200

.1450

.1454

.1458

.1462

.1466

.1470

.1474

.1478

.1482

.1486

.1490

t0 4t0

Void Ratio = 0.418 Compression = 3.5 % D0 = 0.14553 D50 = 0.14587 D100 = 0.14621 Cv at 16.3 min. = 0.02 ft.2/day Cαααα

= 0.003

TEST READINGSPressure: 9.92 ksf Load No. 6

No. Elapsed Dial Time Reading 1 0.00 0.15485

2 0.10 0.15680

3 0.25 0.15685

4 0.50 0.15690

5 1.00 0.15700

6 2.00 0.15705

7 5.00 0.15715

8 10.00 0.15720

9 20.00 0.15730

10 30.00 0.15735

No. Elapsed Dial Time Reading11 61.00 0.15750

12 120.00 0.15780

13 240.00 0.15810

14 464.00 0.15850

15 1436.00 0.15940

.1 .5 1 2 5 20 200

.1477

.1480

.1483

.1486

.1489

.1492

.1495

.1498

.1501

.1504

.1507

t0 4t0

Void Ratio = 0.414 Compression = 3.8 % D0 = 0.14798 D50 = 0.14816 D100 = 0.14835 Cv at 7.7 min. = 0.03 ft.2/day Cαααα

= 0.003

TEST READINGSPressure: 19.84 ksf Load No. 7

No. Elapsed Dial Time Reading 1 0.00 0.15940

2 0.10 0.16260

3 0.25 0.16270

4 0.50 0.16285

5 1.00 0.16300

6 2.00 0.16310

7 5.00 0.16320

8 10.00 0.16330

9 20.00 0.16350

10 30.00 0.16360

No. Elapsed Dial Time Reading11 61.00 0.16385

12 120.00 0.16410

13 240.00 0.16440

14 480.00 0.16490

15 1428.00 0.16550

.1 .5 1 2 5 20 200

.1496

.1500

.1504

.1508

.1512

.1516

.1520

.1524

.1528

.1532

.1536

t0 4t0

Void Ratio = 0.409 Compression = 4.1 % D0 = 0.15042 D50 = 0.15067 D100 = 0.15092 Cv at 4.3 min. = 0.06 ft.2/day Cαααα

= 0.002

Knight Piesold Geotechnical Lab.

Page 111: FINAL Initial Geotechnical Investigation Report I-25 and ... … · The project is located at approximate latitude 38.828 degrees north and longitude 104.835 degrees west. The site

TEST READINGSPressure: 39.68 ksf Load No. 8

No. Elapsed Dial Time Reading 1 0.00 0.16550

2 0.10 0.17110

3 0.25 0.17125

4 0.50 0.17130

5 1.00 0.17145

6 2.00 0.17160

7 5.00 0.17180

8 10.00 0.17195

9 20.00 0.17210

10 30.00 0.17220

No. Elapsed Dial Time Reading11 60.00 0.17245

12 120.00 0.17270

13 240.00 0.17310

14 480.00 0.17355

15 1505.00 0.17420

.1 .5 1 2 5 20 200

.1548

.1552

.1556

.1560

.1564

.1568

.1572

.1576

.1580

.1584

.1588

t0 4t0

Void Ratio = 0.399 Compression = 4.8 % D0 = 0.15496 D50 = 0.15553 D100 = 0.15610 Cv at 0.8 min. = 0.31 ft.2/day Cαααα

= 0.002

Knight Piesold Geotechnical Lab.