FINAL
Initial Geotechnical Investigation Report
I-25 and Cimarron Street Design-Build
Colorado Springs
CDOT Region 2
Yeh Project No.: 213-207
July 23, 2014 Prepared for:
Wilson and Company, Inc.
5755 Mark Dabling Boulevard, Suite 220 Colorado Springs, Colorado 80919
Prepared by:
Yeh and Associates, Inc. 2000 Clay Street, Suite 200
Denver, Colorado 80211
Phone: 303-781-9590 Fax: 303-781-9583
i
Table of Contents
1.0 PURPOSE AND SCOPE OF WORK 1
2.0 REGIONAL GEOLOGY 1
3.0 SUBSURFACE INVESTIGATION 1
4.0 LABORATORY TESTING 2
5.0 SUBSURFACE CONDITIONS 2
6.0 CORROSION AND SEISMICITY 4
6.1 CORROSION 4
6.2 SEISMIC CONSIDERATIONS 5
7.0 LIMITATIONS 6
8.0 REFERENCES 7
ii
List of Figures
FIGURE 1 SITE VICINITY MAP (USGS COLORADO SPRINGS, CO, 7.5 MINUTE QUADRANGLE, 2013) 8
FIGURE 2 GEOLOGIC MAP OF PROJECT AREA (USGS, CARROLL, C.J., AND CRAWFORD, T.A., 2000) 9
List of Tables
TABLE 1 SUMMARY OF BEDROCK AND GROUNDWATER CONDITIONS ............................................................................................ 3
TABLE 2 SEISMIC DESIGN PARAMETERS ................................................................................................................................... 5
APPENDIX A BORING LOCATION PLAN
APPENDIX B LEGEND AND BORING LOGS
APPENDIX C LABORATORY TEST RESULTS
FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207
1
1.0 PURPOSE AND SCOPE OF WORK
This report presents the results of Yeh and Associates Inc.’s geotechnical site investigation for
the I-25 and Cimarron Street Design-Build Project. The approximate limits of the project are
shown on Figure 1. The purpose of this report is to provide subsurface information for use by
Wilson and Company. Inc. and Colorado Department of Transportation (CDOT) to develop a
Design-Build bid package for the improvement of Interstate 25 (I-25) and Cimarron Street in
Colorado Springs, Colorado.
The scope of this evaluation included the following tasks:
Conduct a subsurface investigation to obtain information on the subsurface materials.
Perform laboratory testing on soil and bedrock samples obtained during the subsurface
investigation to determine the engineering characteristics of the on-site soils and
bedrock.
Prepare a geotechnical investigation report that presents the results of the field
investigation and geotechnical laboratory tests.
2.0 REGIONAL GEOLOGY
The surface deposits at the proposed project locations are mapped as Artificial fill (af) of latest
Holocene age, Colluvium (Qc) of Holocene and late Pleistocene age, Terrace alluvium one
(Qt1) of Holocene age and Sheetwash Deposits (Qsw) of Holocene and late Pleistocene age as
shown on Figure 2. These deposits are the result of geomorphic activity that has shaped the
present landforms and vary considerably in thickness. The mapped soils appear to be
consistent with the subsurface conditions encountered in the borings drilled at the project
location.
3.0 SUBSURFACE INVESTIGATION
Eleven borings (YA-B01 through YA-B11) were drilled for the proposed project. The Boring
Location Plan is presented in Appendix A. The borings were completed by Dakota Drilling, Inc.
and CDOT utilizing CME 75 and CME 55 drill rigs, equipped with 8-inch outside diameter,
hollow-stem augers. The subsurface conditions encountered in the borings were logged by a
representative of Yeh and Associates, Inc. The legend and boring logs are included in
Appendix B.
FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207
2
The boring locations were surveyed by Farnsworth Group, Inc. No temporary monitoring wells
were installed. Ground water depths were observed and recorded during drilling.
The recorded penetration resistance measurements were obtained by driving either a modified
California sampler or a standard split spoon sampler, typically at 5-foot intervals, into the
subsurface materials with a 140-pound hammer falling 30 inches and recording the number of
blows required to advance the sampler into the ground. A system that employs an automatic
trip hammer was used. The types of drill rigs, augers, samplers and hammer systems used are
noted on the boring logs. The driving procedure is similar to ASTM D1586, “Standard Test
Method for Standard Penetration Test (SPT) and Split Barrel Sampling of Soils”. The
penetration resistance values (blow counts corresponding to 12 inches of penetration or N-
values) are a useful index to the consistency, the relative density or hardness of the materials
encountered.
Groundwater observations were made during the field investigation and results are shown on
the boring logs presented in Appendix B. Year-round groundwater conditions were not
established as part of the field investigation. Groundwater conditions in the study area may vary
considerably throughout the year. Variations can occur during different seasons, following
precipitation events, irrigation, after construction and site grading, and due to changes in
surface and subsurface drainage characteristics of the surrounding area.
4.0 LABORATORY TESTING
Yeh and Associates performed laboratory testing on samples to determine the classification and
engineering characteristics of the on-site soil and bedrock. Laboratory tests performed included
natural density, natural moisture content, gradation analyses, Atterberg limits, pH, water soluble
sulfate, water soluble chloride, resistivity, swell/consolidation, one-dimensional consolidation
and unconfined compressive strength. The laboratory test results are presented in Appendix C,
Laboratory Test Results.
5.0 SUBSURFACE CONDITIONS
The existing ground surface elevations at the boring locations range from approximately 5944 to
5990 feet. The existing pavement section at the boring locations generally consisted of 7.5
inches to 8.5 inches of asphalt (borings YA-B02, YA-B03, YA-B04 and YA-B11). Fill materials
were encountered in all the borings except for boring YA-B01 and YA-B05. The fill materials
extended from 7 feet to 33 feet below the existing grade and generally consisted of medium stiff
to hard sandy clay with gravels, loose to dense silty sand and loose to medium dense clayey
FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207
3
sand. The native soils encountered in the borings generally consisted of loose to very dense
silty sand with varying amounts of gravel, cobbles and clay lenses in various mixtures.
Two consolidations tests were conducted on samples retrieved at 5 feet from Borings YA-B08
and at 10 feet from boring YA-B09. Borings YA-B08 and YA-B09 were drilled approximately
600 feet apart. In YA-B08, overburden materials (including fill and native soils) consisted
predominantly of granular soils underlain by claystone bedrock. In YA-B09, overburden
materials consisted of an 8 feet layer of highly plastic clay between layers of granular fill and
native granular soils. Foundation settlement potential is related to foundation material
properties, groundwater table elevation and the dimensions of the fill/ structure.
The native soils were underlain by bedrock at depths ranging from 11 to 47 feet below existing
grade, approximately elevation 5930 to 5949 feet. The bedrock consisted of residuum to very
hard claystone. Groundwater was observed at depths of approximately 7 to 46 feet below the
existing grade in all the borings at the time they were drilled.
Table 1 summarizes the boring locations, the existing grade elevation; the approximate depth
and elevation of the top-of-unweathered bedrock; and, the approximate depth and elevation of
groundwater surface for each of the borings.
Table 1 Summary of Bedrock and Groundwater Conditions
Approximate Depths and Elevations from Reported Borings
Boring No.
Approximate Location
Top Hole Elev.
UnweatheredBedrock
Depth
UnweatheredBedrock
Elev.
Groundwater Depth
Groundwater Elev.
(-) (-) (ft) (ft) (ft) (ft) (ft)
YA-B01 Pikes Peak
Greenway Trail, North of Cimarron
5959.8 11 5948.8 9 5950.8
YA-B02 NB I-25 Near On
Ramp, Right Lane 5989.8 47 5942.8 46 5943.8
YA-B03 EB US-24, East of I-25, Right Lane
5968.9 30 5938.9 28 5940.9
YA-B04 NB I-25 Near Off
Ramp, Right Lane 5972.7 40 5932.7 30 5942.7
YA-B05 SE of I-25 and US-24, on Bike Path
5944.3 14 5930.3 10 5934.3
YA-B06 331 South
Chestnut, South of Access Gate
5956.9 20 5936.9 8 5948.9
FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207
4
Approximate Depths and Elevations from Reported Borings
Boring No.
Approximate Location
Top Hole Elev.
UnweatheredBedrock
Depth
UnweatheredBedrock
Elev.
Groundwater Depth
Groundwater Elev.
(-) (-) (ft) (ft) (ft) (ft) (ft)
YA-B07 221 S. Chestnut, South Side of Lot
5956.7 16 5940.7 7 5949.7
YA-B08 SW of intersection of I-25 and US-24,
Nursery 5972.1 37 5935.1 24 5948.1
YA-B09 Abandoned
Nursery, East of Greenhouse
5958.7 28 5930.7 17 5941.7
YA-B10 331 South
Chestnut, West of Existing Building
5957.0 19 5938.0 8 5949.0
YA-B11 NB I-25 On Ramp,
Right Lane 5969.9 28 5941.9 25 5944.9
6.0 CORROSION AND SEISMICITY
6.1 Corrosion
Ten representative samples collected from ground surface to 12.5 feet below existing grade in
the borings were tested to determine the concentrations of water soluble sulfates, water soluble
chlorides, pH and resistivity. The test results are summarized below.
Water soluble sulfates – 0.004 to 0.138 percent
Water soluble chlorides – 0.0013 to 0.0366 percent
pH – 7.6 to 8.2
Resistivity – 481 to 3175 ohm-cm
The concentrations of water-soluble sulfate in the samples generally represent a Class 1 degree
of sulfate attack on concrete exposed to these soils in the project area as presented in Table
601-2 of Sections 601, Structural Concrete of the CDOT Standard Specifications, 2011 edition.
The pH of the soils at the site indicates that the soils are slightly basic and should represent a
mild to no corrosion potential (non-aggressive) based on Table 3.9 from Federal Highway
Administration Publication No. FHWA0-IF-03-017, Geotechnical Engineering Circular No. 7
(GEC 7).
FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207
5
The test results on the samples indicated a water–soluble chloride concentration combined with
the water soluble sulfate concentration and soil pH that correspond to a Corrosion Resistance
Level 2 (CR2), as presented in CDOT Pipe Material Selection Policy, dated May 7, 2012.
Based on Table 3.9 from GEC 7, soils that have resistivity values less than 2,000 ohm-cm are
considered to have a strong corrosion potential (aggressive). Resistivity values greater than
5,000 ohm-cm are considered to have mild to no corrosion potential (non-aggressive). The
designer should refer to CDOT Standard Specifications, Sections 603 and 624, Culvert, Sewer
and Drainage Pipe for design requirements.
6.2 Seismic Considerations
The project is located at approximate latitude 38.828 degrees north and longitude 104.835
degrees west. The site is classified as Site Class D in accordance with the Method B procedure
per AASHTO Table C3.10.3.1-1. The Peak Ground Acceleration (PGA), and the short- and
long-period spectral acceleration coefficients (SS and S1, respectively) for the project were
obtained using USGS Seismic Design Parameters Version 2.10 for an event with a 7 percent
Probability of Exceedance (PE) in 75 years and a Site Class B (reference site). An event with
the above probability of exceedance has a return period of about 1000 years. The values were
adjusted using Site Factors for Site Class D in accordance with AASHTO Section 3.10.3.2. The
seismic parameters are shown in Table 2.
Table 2 Seismic Design Parameters
For Site Class B
PGA (0.0 sec) Ss (0.2 sec) S1 (1.0 sec)
0.056 g 0.122 g 0.035 g
For Site Class D
As (0.0 sec) SDs (0.2 sec) SD1 (1.0 sec) Seismic Zone
0.090 g 0.195 g 0.085 g 1
FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207
6
7.0 LIMITATIONS
This Geotechnical Investigation Report was prepared for the exclusive use of Wilson and
Company and CDOT to develop a Design-Build bid package for the I-25 and Cimarron Street
Design-Build project. The findings presented in this report are based on the exploratory
borings, laboratory testing and field reconnaissance included in our investigation. This study
has been conducted in accordance with generally accepted geotechnical engineering practices
in this area. No warranty, expressed or implied, is made.
FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207
7
8.0 REFERENCES
American Association of State Highway and Transportation Officials, 2012, AASHTO LRFD Bridge Design Specifications, Customary U.S. Units, 6th Edition: Washington DC
Colorado Department of Transportation, Standard Specifications for Road and Bridge Construction (2011) and related Specifications
Colorado Department of Transportation, CDOT Pipe Material Selection Policy, dated May 7, 2012
Federal Highway Administration Publication No. FHWA0-IF-03-017, Geotechnical Engineering Circular No. 7 (GEC 7) Soil Nail Walls, March 2003
Carroll, C.J., and Crawford, T.A., Geologic Map of the Colorado Springs Quadrangle, El Paso County, Colorado 2000, Colorado Geological Survey Open-File Report OF-00-3, scale 1:24000
FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207
8
Figure 1 Site Vicinity Map (USGS Colorado Springs, CO, 7.5 Minute Quadrangle, 2013)
FINAL Geotechnical Investigation Report July 23, 2014 I-25 and Cimarron Street Design-Build Yeh Project Number 213-207
9
Figure 2 Geologic Map of Project Area (USGS, Carroll, C.J., and Crawford, T.A., 2000)
Appendix A
BORING LOCATION PLAN
M
H 559
M/
H 558
M
H 537
536
M
H 527
#3414
WAS
LAS
T
UN
D
GAS
SH
OT /
LIN
E
TO
TH
E
WES
T IS
NO
W
EX
PO
SE
D
OV
ER
CR
EE
K
O
N
LIF
T
ST
ATIO
N
O
N
LIF
T
ST
ATIO
N
M
H 572
M
H 560
M
H 563
M
H 538
C
OV
ER
ED
W/
CO
NC
MH 2504
NF
M/
H 2503
NF
M
H 565
M
H 564
E
XP
OS
ED
OV
ER
HE
AD
PIP
E
E
XP
OS
ED
OV
ER
HE
AD
PIP
E
4
CIP42 STL
AIR
VA
LV
E
VA
ULT
VA
LV
E
VA
ULT
24"
42 STL
36 STL
PL
UG
GE
D24"
OU
TLE
TP
LU
GG
ED
OU
TLE
T
42 STL
8"
2"
36 STL
8 PVC P
VT
RAW WATER
8" DESIGN
8"
FIR
ELIN
E
42 STL
36 STL
RAW WATER
8 PVC
PVT
PHASE 28" DESIG
N
RA
W
WA
TE
R
36
STL
42
STL
8
UN
K
10x8
RE
D
PV
T
10
PV
C
3"
SV
C
4x3
RE
D
8
CIP
8x4
RE
D
6
PV
C
6
PV
C6x4
RE
D
6 CIP
8
CIP
8x6
RE
DV
AC
ATE
D
6 CIP
180' SLEEVE
8x4
RE
D
6
PV
C
RE
D
AIR
6"
OUT
OF SER
VIC
E
PL
UG
12x6
RE
D
8"
DESIG
N
PH
AS
E 1
6 UNK PVT
PHASE 2
8x6
RE
D
PHASE 1
16 DIP PVT
8" DESIG
N
6" DESIGN
6
PV
C
PV
TP
VT
8x6
RE
D
10
PV
C
16 DIP PVT
16x6
RE
D
16x8
20
DIP
8 CIP
8 CIP
4x3
RE
D
4X3
RE
D
3
UN
K
6x3
3
UN
K
RE
D
6X4
RE
D
PL
UG
GE
D
CR
OS
S
CP
LG
4
CIP
6x3
RE
D
CP
LG
8 CIP
4
CIP
8x6
RE
D
6x4
RE
D
VA
CA
TE
D
8 CIP
6
PV
C
PV
T
8"
8"
VC
P
208'
8"
202'
VC
P
VCP
32'360'VCP
18"1
41'
UC
ON
8"
18"
VCP
131'
8"
UC
ON
STP
8" 134'
314'
18"
UC
ON
85'
24" 229'
CM
PS
24"23
4'CMPS
24"
166'
CMPS
DIP
8"
VC
P
102'
60'
8"
AB
AN
8"
VC
P282'
AB
AN
AB
AN
24"
469'
CMPS
DIP
258'8"
DIP
144'8"
PVC60'
8"
246'
PV
C 8"
24"
8"
345'
VC
P
66'
STP
391'
246'
69'DIP
530'
DIP
24"
24"
19'\VCP\2
4"
ABAN 24"
ABAN
VCP15"
456'
500'
RCPL
372'
42"
VCP15"
24"
VC
P
35'
ABAN
VC
P24"
177'
AB
AN
24"
414'
VCP
496'
AB
AN
ABAN
RCPL42"
VCP
75'
24"
24"
AB
AN
319'
AB
AN
ABAN
436'
AB
AN
RCPL
42"
ABAN
ABAN
437'RCPL
42"
ABAN
24"
STP
ABAN
ABAN
254'
15"
539'RCPL42"
ABAN
15"
24"
STP
21"
AB
AN
ABAN
24"
49'\RCPL\24
"
42"
24" 3
73'VC
P
233'
RCPL
ABAN
AB
AN
15"
15"
VCP24"
15"
347'
VCP
121'
15"
6"
VC
P256'
263'
VCP15"
15"VCP
271'
295'
VC
P8"
VC
P
24"
VCP
47'
VCP
314'
24" ABAN
ABAN
15"
VCP
VCP
179'
15"
152'24"
VCP
332'24"
SLIP
484'24"
VCP
230'
91'
8"
263'
8"
VC
P
79'
VC
P
12"
VCP120'
15"
350' VC
P
15"
15"
42"
445'
VC
P12"
RCPL
ABAN
507'
VCP
236'15"
448'
VC
P15"
AB
AN
ABAN
196'RCPL42"
199'
199'
15"
VC
P
16" DIP NON-POT
16" DIP
NON-POT
NV
LV33
16" DIP NON-POT
16" DIP NON-POT
M
H 569
M
H 555
M
H 557
M
H 529
TE
LE
8 CIP
4
CIP
3
UN
K
4
CIP
4 CIP
4 CIP
3
UN
K
4 CIP
20
DIP
4
CIP
8 CIP
6 CIP
6 CIP
6"
OUT
OF SER
VIC
E
42 STL
36 STL
42 STL
42 STL
36 STL
8"
DESIG
N
PH
AS
E 1
8" DESIGN
PHASE 1
8"
FIR
ELIN
E
8" DESIGN
PHASE 1
6" DESIGN
8
UN
K
10
PV
C
PV
T
10
PV
C
42 STL
36 STL
PV
T42
STL
36
STL
8" DESIGN
PHASE 2
10 PVC
PVT
16 DIP PVT
16 DIP PVT
PV
T
6 UNK PVT 6
P
VC
4 CIP
6
PV
C
6
PV
C
PV
T
8"2"
M
H
VA
CA
TE
D
U
U
U
U
U
U
U
U
U
Numbers
Structure
No Revisions:
Revised:
Void: Sheet Subset:
Detailer:
Designer:
Sheet NumberSubset Sheets:
Init.CommentsDate:
Sheet Revisions As Constructed2/26/2014Print Date:
Horiz. Scale:
19039GEOT_Boring Location PlanFile Name:
Mik
e
Walz 1:5
1:1
7
PM
pw:\\
AB
QP
WIN
T01.wilsonco.c
om:Wilson_
Projects\
Docu
ments\
8100-
TR
N\
CD
OT\
13-100-312-01_I25_
Cim
arron_Interch\
19039\
Materials
_Geotechnic
al\
Dra
win
gs\
1903
9G
EO
T_
Borin
g
Locatio
n Pla
n
of
2/26/2014
Project No./Code
Vert. Scale:
Phone:719-634-2323 FAX:719-227-3298
Colorado Department of Transportation
Colorado Springs, CO 80906
Region 2
1480 Quail Lake Loop, Suite A
I-25 MAINLINE
Unit Information: Unit Leader: DLH
DW
H. Liu
M. Walz
GEOLOGYConsulting Engineers & Scientists
Yeh and Associates, Inc.
YA-B08
YA-B09
YA-B06
YA-B10
YA-B07
YA-B04 YA-B02
YA-B11
YA-B05 YA-B01
YA-B03
I-25 NB
I-25 SB
200'0' 100' 400'
BORING LOCATION PLAN
Boring Location
Cim
arron St
I-25 AND CIMARRON STREET
Appendix B
LEGEND AND BORING LOGS
Date:Project Number: 213-207
Project: I-25 and Cimarron Street
Legend for Symbols Used on Borehole Logs
Soil Lithology
Lab Test Abbreviations
Sample Types
YEH AND ASSOCIATES, INC.GEOTECHNICAL ENGINEERING CONSULTANTS
Auger Cuttings Grab Sample Modified CaliforniaSampler Split Spoon
Bedrock Lithology
Asphalt Cobbles and gravel Fill with Clay asmajor soil
Fill with Sand asmajor soil
MC-Moisture ContentDD-Dry Density#200-Percent Passing #200 SieveLL-Liquid LimitPL-Plastic LimitPI-Plasticity IndexS-Sulfate ContentCL-Chloride ContentS/C-Swell/ConsolidationUCCS-Unconfined Compressive StrengthRe-ResistivityPtL-Point Load TestAASHTO-AASHTO ClassificationUSCS-USCS Classification
Silty SandClayey Sand
CLAYSTONE WEATHEREDBEDROCK
5/5
2/5
50:4"
50:3"
50:3"
0.0 - 11.0 ft. silty SAND with gravel, brown toreddish brown, damp to wet, loose.
11.0 - 25.3 ft. CLAYSTONE, blue-gray, veryhard.
Bottom of Hole at 25.3 ft.
@ 0 - 5 ft.MC= 5.4 %#200= 22 %LL= 22PL= 15PI= 7pH= 7.7S= 0.005 %Re= 2053 ohms-cmAASHTO: A-2-4 (0)USCS: SM-SCCL= 0.0120%
@ 15 ft.MC= 10.6 %DD= 114.8 pcf#200= 68 %LL= 42PL= 22PI= 20UCCS= 7952 psfAASHTO: A-7-6 (12)USCS: CL@ 20 ft.MC= 11.6 %DD= 101.1 pcf#200= 90 %LL= 53PL= 23PI= 30S/C= 1.2 %AASHTO: A-7-6 (30)USCS: CH
10
7
50:4"
50:3"
50:3"
DepthDateTime
Total Depth: 25.3 ftGround Elevation: 5959.8 ftLocation: Pikes Peak Greenway Trail, N of CimarronCoordinates: N: 65,017.7 E: 191,139.5
9.0 ft--
---
---
---
Boring Began: 1/14/2014
Drilling Method: Hollow-Stem Auger
Drill: CME 55, Automatic Hammer
Driller: CDOT
Logged By: R. Beach
Final By: R. Beach
Inclination: Vertical
Completed: 1/14/2014Drill Bit:Casing:Weather: Cool, Calm, Overcast
Ground Water Notes: Observed at approximately 9' at time of drilling
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B01Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 1 of 1
5
10
15
20
25
30
5955
5950
5945
5940
5935
5930
5925
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
5/4
7/5
7/9
8/7
7/7
10/12
0.0 - 0.7 ft. Asphalt Pavement 8 inches.0.7 - 5.0 ft. silty SAND FILL with trace gravels,brown, moist, loose.
5.0 - 33.0 ft. sandy CLAY FILL with sand lensesand trace gravels, brown to light brown, moist,stiff to very stiff.
33.0 - 38.0 ft. silty SAND with trace gravel,brown to dark brown, damp, medium dense, finegrained.
@ 0 - 5 ft.MC= 4.8 %#200= 19 %LL= NVPL= NPPI= NPpH= 7.7S= 0.004 %Re= 1855 ohms-cmAASHTO: A-1-b (0)USCS: SMCL= 0.0130 %@ 5 ft.MC= 25.8 %DD= 95.9 pcf#200= 92 %LL= 60PL= 20PI= 40AASHTO: A-7-6 (40)USCS: CH
@ 15 ft.MC= 16.5 %DD= 108.9 pcf#200= 57 %LL= 49PL= 16PI= 33AASHTO: A-7-6 (15)USCS: CL
@ 30 ft.MC= 12.1 %DD= 109.6 pcf#200= 41 %LL= 49PL= 17PI= 32AASHTO: A-7-6 (7)
9
12
16
15
14
22
DepthDateTime
Total Depth: 60.5 ftGround Elevation: 5989.8 ftLocation: NB I-25 Near On Ramp, Right LaneCoordinates: N: 63,765.8 E: 190,620.3
46.0 ft--
---
---
---
Boring Began: 1/9/2014
Drilling Method: Hollow-Stem Auger
Drill: CME 75, Automatic Hammer
Driller: Dakota Drilling
Logged By: R. Beach
Final By: R. Beach
Inclination: Vertical
Completed: 1/10/2014Drill Bit:Casing:Weather: Cool, Calm
Ground Water Notes: Observed at approximately 46' at time of drilling
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B02Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 1 of 2
5
10
15
20
25
30
5985
5980
5975
5970
5965
5960
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
9/9
6/9
8/10
50:5"
70:6"
70:5"
38.0 - 47.0 ft. silty SAND with trace gravel, redto brown, moist, medium dense.
47.0 - 60.5 ft. CLAYSTONE, blue-gray, veryhard.
Bottom of Hole at 60.5 ft.
USCS: SC@ 35 ft.MC= 12.9 %DD= 94.5 pcf#200= 49 %LL= NVPL= NPPI= NPAASHTO: A-4 (0)USCS: SM
@ 45 ft.MC= 7.1 %DD= 128.1 pcf#200= 4 %LL= NVPL= NPPI= NPAASHTO: A-1-a (0)USCS: SW
MC= 17 %DD= 111.8 pcf#200= 83 %LL= 53PL= 27PI= 26AASHTO: A-7-6 (24)USCS: CH
18
15
18
50:5"
70:6"
70:5"
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B02Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 2 of 2
40
45
50
55
60
65
70
75
5950
5945
5940
5935
5930
5925
5920
5915
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
9/4
5/6/6
9/7
2/4/5
3/4/5
2/4
4/6
12/12
0.0 - 0.7 ft. Asphalt Pavement 8.5 inches.0.7 - 2.0 ft. gravelly SAND FILL, very silty,brown to red, damp.2.0 - 17.0 ft. clayey SAND FILL with gravels andsandy clay lenses, brown to red, moist, loose tomedium dense.
17.0 - 30.0 ft. silty SAND with sandy claylenses, brown to gray, damp to wet, loose.
30.0 - 40.3 ft. CLAYSTONE, blue-gray, hard tovery hard.
@ 0 - 5 ft.MC= 5.5 %#200= 15 %LL= 22PL= 13PI= 9pH= 8S= 0.01 %Re= 1490 ohms-cmAASHTO: A-2-4 (0)USCS: SCCL= 0.0163 %@ 5 ft.MC= 7.1 %DD= 117.6 pcf#200= 17 %LL= 53PL= 18PI= 35AASHTO: A-2-7 (0)USCS: SC@ 10 ft.MC= 3.3 %DD= 117.1 pcf#200= 4 %LL= NVPL= NPPI= NPAASHTO: A-1-a (0)USCS: SW@ 13 ft.MC= 19.7 %#200= 58 %LL= 47PL= 22PI= 25AASHTO: A-7-6 (12)USCS: CL@ 20 ft.MC= 19.3 %DD= 99.1 pcf#200= 68 %LL= 33PL= 22PI= 11AASHTO: A-6 (6)USCS: CL
13
12
16
9
9
6
10
24
DepthDateTime
Total Depth: 40.3 ftGround Elevation: 5968.9 ftLocation: EB US-24, E of I-25, Right LaneCoordinates: N: 63,229.5 E: 191,047.0
28.0 ft--
---
---
---
Boring Began: 1/15/2014
Drilling Method: Hollow-Stem Auger
Drill: CME 55, Automatic Hammer
Driller: CDOT
Logged By: R. Beach
Final By: R. Beach
Inclination: Vertical
Completed: 1/15/2014Drill Bit:Casing:Weather: Cool, Calm, Clear
Ground Water Notes: Observed at approximately 28' at time of drilling
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B03Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 1 of 2
5
10
15
20
25
30
5965
5960
5955
5950
5945
5940
5935
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
83:9"
50:3" Bottom of Hole at 40.3 ft.
@ 35 ft.MC= 16.9 %DD= 111.3 pcf#200= 86 %LL= 53PL= 24PI= 29UCCS= 22060 psfAASHTO: A-7-6 (18)USCS: CH
83:9"
50:3"
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B03Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 2 of 2
40
45
50
55
60
65
70
75
5930
5925
5920
5915
5910
5905
5900
5895
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
8/10
4/11
20/18
16/16/16
8/8
5/6/6
6/7/17
9/20
5/7
0.0 - 0.7 ft. Asphalt Pavement 8 inches.0.7 - 5.0 ft. silty SAND FILL with trace gravel,reddish brown, damp.
5.0 - 19.0 ft. sandy CLAY FILL with trace graveland sand lenses, brown to reddish brown, damp,stiff to hard.
19.0 - 30.0 ft. silty SAND with trace gravel andoccasional clay lenses, brown to dark brown,damp, loose to medium dense, fine grained.
30.0 - 40.0 ft. silty SAND with gravel, red tobrown, wet, loose to medium dense.
@ 0 - 5 ft.MC= 5.6 %#200= 14 %LL= NVPL= NPPI= NPpH= 7.8S= 0.005 %Re= 1099 ohms-cmAASHTO: A-1-b (0)USCS: SMCL= 0.0366 %
@ 10 ft.MC= 21.8 %DD= 101.9 pcf#200= 85 %LL= 55PL= 19PI= 36AASHTO: A-7-6 (32)USCS: CH
@ 22 ft.MC= 15.5 %#200= 51 %LL= 50PL= 20PI= 30AASHTO: A-7-6 (11)USCS: CH
@ 30 ft.MC= 18.6 %DD= 101.0 pcf#200= 8 %LL= NVPL= NPPI= NPAASHTO: A-3 (0)
18
15
38
32
16
12
24
29
12
DepthDateTime
Total Depth: 50.3 ftGround Elevation: 5972.7 ftLocation: NB I-25 Near Off Ramp, Right LaneCoordinates: N: 63,184.2 E: 190,512.2
30.0 ft--
---
---
---
Boring Began: 1/8/2014
Drilling Method: Hollow-Stem Auger
Drill: CME 75, Automatic Hammer
Driller: Dakota Drilling
Logged By: R. Beach
Final By: R. Beach
Inclination: Vertical
Completed: 1/9/2014Drill Bit:Casing:Weather: Cool, Calm
Ground Water Notes: Observed at approximately 30' at time of drilling
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B04Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 1 of 2
5
10
15
20
25
30
5970
5965
5960
5955
5950
5945
5940
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
18/8/12
50:7"50:2"
50:4"
50:3"
40.0 - 50.3 ft. CLAYSTONE, blue-gray, veryhard.
Bottom of Hole at 50.3 ft.
USCS: SP-SM@ 35 ft.MC= 11.3 %#200= 5 %LL= NVPL= NPPI= NPAASHTO: A-1-b (0)USCS: SP-SM
@ 45 ft.MC= 16.4 %DD= 112.0 pcf#200= 89 %LL= 48PL= 23PI= 25S/C= 0.7 %AASHTO: A-7-6 (24)USCS: CL
20
50:7" 50:2"
50:4"
50:3"
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B04Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 2 of 2
40
45
50
55
60
65
70
75
5935
5930
5925
5920
5915
5910
5905
5900
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
50:0"
50:0"
7/20
4/8
24/50
50:5"
50:5"
0.0 - 3.0 ft. clayey SAND with gravels andcobbles, brown to gray, damp.
3.0 - 9.0 ft. COBBLES, very dense.
9.0 - 12.0 ft. silty SAND with gravel, brown tored, wet, medium dense.
12.0 - 14.0 ft. CLAYSTONE, blue-gray,moderately weathered, residuum.
14.0 - 25.5 ft. CLAYSTONE, brown-gray, veryhard, iron staining.
Bottom of Hole at 25.5 ft.
@ 0 - 5 ft.MC= 4.2 %#200= 21 %LL= 29PL= 15PI= 14pH= 8S= 0.138 %Re= 1129 ohms-cmAASHTO: A-2-6 (0)USCS: SCCL= 0.0154 %
@ 12.5 ft.MC= 28.9 %DD= 87.0 pcfpH= 8.2S= 0.03 %Re= 481 ohms-cmCL= 0.0023 %@ 15 ft.MC= 18.6 %DD= 109.6 pcf#200= 85 %LL= 51PL= 27PI= 24UCCS= 27464 psfAASHTO: A-7-6 (23)USCS: CH@ 20 ft.MC= 16.6 %DD= 106.3 pcf#200= 86 %LL= 51PL= 28PI= 23S/C= 1.3 %AASHTO: A-7-6 (22)USCS: CH
50:0"
50:0"
27
12
74
50:5"
50:5"
DepthDateTime
Total Depth: 25.5 ftGround Elevation: 5944.3 ftLocation: SE of I-25 and US-24, on Bike PathCoordinates: N: 62,614.2 E: 190,475.4
10.0 ft--
---
---
---
Boring Began: 1/15/2014
Drilling Method: Hollow-Stem Auger
Drill: CME 55, Automatic Hammer
Driller: CDOT
Logged By: R. Beach
Final By: R. Beach
Inclination: Vertical
Completed: 1/15/2014Drill Bit:Casing:Weather: Warm, Calm, Clear
Ground Water Notes: Observed at approximately 10' at time of drilling
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B05Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 1 of 1
5
10
15
20
25
30
5940
5935
5930
5925
5920
5915
5910
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
22/9
30/20
7/7/7
50:6"
50:5"
50:6"
0.0 - 8.0 ft. silty SAND FILL with gravel and claylenses, brown to dark gray, moist, dense.
8.0 - 20.0 ft. silty SAND with gravel, reddishbrown to light brown, wet, medium dense.
20.0 - 30.5 ft. CLAYSTONE, brown-gray, veryhard.
Bottom of Hole at 30.5 ft.
@ 0 - 5 ft.MC= 8.1 %#200= 28 %LL= NVPL= NPPI= NPpH= 7.7S= 0.073 %Re= 901 ohms-cmAASHTO: A-2-4 (0)USCS: SMCL= 0.0098 %@ 5 ft.MC= 18.5 %DD= 107.7 pcf#200= 35 %LL= 36PL= 20PI= 16AASHTO: A-6 (1)USCS: SCSlight petroleum odorobserved from 7 ft to 8 ft.
@ 15 ft.MC= 11 %#200= 6 %LL= NVPL= NPPI= NPAASHTO: A-1-b (0)USCS: SP-SM
@ 30 ft.MC= 13.6 %DD= 119.4 pcf#200= 86 %LL= 50PL= 22PI= 28UCCS= 31832 psfAASHTO: A-7-6 (26)USCS: CH
31
50
14
50:6"
50:5"
50:6"
DepthDateTime
Total Depth: 30.5 ftGround Elevation: 5956.9 ftLocation: 331 S. Chestnut, S of Access GateCoordinates: N: 63,812.6 E: 190,200.6
8.0 ft--
---
---
---
Boring Began: 1/23/2014
Drilling Method: Hollow-Stem Auger
Drill: CME 55, Automatic Hammer
Driller: Dakota Drilling
Logged By: R. Beach
Final By: R. Beach
Inclination: Vertical
Completed: 1/23/2014Drill Bit:Casing:Weather: Cold, Cloudy, Snow
Ground Water Notes: Observed at approximately 8' at time of drilling
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B06Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 1 of 1
5
10
15
20
25
30
5955
5950
5945
5940
5935
5930
5925
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
2/3
4/6
7/7/11
50:7"
50:6"
50:4"
0.0 - 7.0 ft. clayey SAND FILL with clay lenses,dark gray to gray, moist, loose.
7.0 - 16.0 ft. silty SAND with gravel andoccasional cobbles, tan to reddish brown, wet,loose to medium dense.
16.0 - 25.3 ft. CLAYSTONE, blue-gray, veryhard.
Bottom of Hole at 25.3 ft.
@ 0 - 5 ft.MC= 20.5 %#200= 50 %LL= 31PL= 21PI= 10AASHTO: A-4 (2)USCS: SC
@ 5 ft.MC= 45.4 %DD= 77.8 pcf#200= 94 %LL= 61PL= 27PI= 34S/C= 0.7 %AASHTO: A-7-6 (37)USCS: CH
@ 25 ft.MC= 15.3 %DD= 108.3 pcf#200= 84 %LL= 52PL= 25PI= 27S/C= 0.8 %AASHTO: A-7-6 (24)USCS: CH
5
10
14
50:7"
50:6"
50:4"
DepthDateTime
Total Depth: 25.3 ftGround Elevation: 5956.7 ftLocation: 221 S. Chestnut, S Side of LotCoordinates: N: 63,921.8 E: 190,416.0
7.0 ft--
---
---
---
Boring Began: 1/24/2014
Drilling Method: Hollow-Stem Auger
Drill: CME 55, Automatic Hammer
Driller: Dakota Drilling
Logged By: R. Beach
Final By: R. Beach
Inclination: Vertical
Completed: 1/24/2014Drill Bit:Casing:Weather: Cool, Clear
Ground Water Notes: Observed at approximately 7' at time of drilling
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B07Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 1 of 1
5
10
15
20
25
30
5955
5950
5945
5940
5935
5930
5925
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
2/4
9/12
3/6
12/9
3/2
50:0"
3/5/6
0.0 - 6.0 ft. clayey SAND FILL, red to brown,damp, loose.
6.0 - 18.0 ft. silty SAND FILL with gravel, clayand cobbles, gray to brown, moist, loose tomedium dense.
18.0 - 37.0 ft. silty SAND with gravel andcobbles, red to brown, moist to wet, loose to verydense.
@ 0 - 5 ft.MC= 12.3 %#200= 35 %LL= 33PL= 18PI= 15pH= 7.6S= 0.08 %Re= 971 ohms-cmAASHTO: A-6 (1)USCS: SCCL= 0.0018 %
@ 10 ft.MC= 9.5 %DD= 127.1 pcf#200= 26 %LL= NVPL= NPPI= NPAASHTO: A-2-4 (0)USCS: SM
@ 20 ft.MC= 3.3 %DD= 125.3 pcf#200= 6 %LL= NVPL= NPPI= NPAASHTO: A-1-a (0)USCS: SP-SM
@ 30 ft.MC= 11.8 %#200= 3 %LL= NVPL= NPPI= NPAASHTO: A-1-b (0)USCS: SW
6
21
9
21
5
50:0"
11
DepthDateTime
Total Depth: 45.3 ftGround Elevation: 5972.1 ftLocation: NW of intsection of I-25 and US-24, NurseryCoordinates: N: 63,648.8 E: 189,799.0
24.0 ft--
---
---
---
Boring Began: 1/16/2014
Drilling Method: Hollow-Stem Auger
Drill: CME 55, Automatic Hammer
Driller: CDOT
Logged By: R. Beach
Final By: R. Beach
Inclination: Vertical
Completed: 1/16/2014Drill Bit:Casing:Weather: Cool, Calm, Clear
Ground Water Notes: Observed at approximately 24' at time of drillign
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B08Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 1 of 2
5
10
15
20
25
30
5970
5965
5960
5955
5950
5945
5940
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
11/20
50:3"
37.0 - 45.3 ft. CLAYSTONE, blue-gray, mediumhard to very hard.
Bottom of Hole at 45.3 ft.
@ 40 ft.MC= 20.7 %DD= 106.2 pcf#200= 69 %LL= 51PL= 27PI= 24UCCS= 12030 psfAASHTO: A-7-6 (16)USCS: CH
31
50:3"
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B08Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 2 of 2
40
45
50
55
60
65
70
75
5935
5930
5925
5920
5915
5910
5905
5900
5895
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
4/3
3/5
11/11
3/3/3
3/1
3/11/12
50:4"
0.0 - 5.0 ft. silty SAND FILL, red to brown,damp.
5.0 - 13.0 ft. sandy CLAY FILL with trace gravel,gray to brown, moist, medium stiff.
13.0 - 28.0 ft. silty SAND with gravel andcobbles, red to brown, moist to wet, very loose tomedium dense.
28.0 - 40.3 ft. CLAYSTONE, blue-gray, veryhard.
@ 0 - 5 ft.MC= 8.5 %#200= 19 %LL= NVPL= NPPI= NPpH= 7.7S= 0.01 %Re= 3175 ohms-cmAASHTO: A-1-b (0)USCS: SMCL= 0.0013 %@ 5 ft.MC= 24.1 %DD= 97.1 pcf#200= 89 %LL= 60PL= 22PI= 38AASHTO: A-7-6 (37)USCS: CH
@ 17.5 ft.MC= 13.7 %#200= 7 %LL= NVPL= NPPI= NPAASHTO: A-1-b (0)USCS: SW-SM
@ 30 ft.MC= 16.9 %DD= 109.0 pcf#200= 88 %LL= 47PL= 23PI= 24UCCS= 27604 psf
7
8
22
6
4
23
50:4"
DepthDateTime
Total Depth: 40.3 ftGround Elevation: 5958.7 ftLocation: Abandoned Nursery, E of GreenhouseCoordinates: N: 63,089.4 E: 189,986.1
17.0 ft--
---
---
---
Boring Began: 1/16/2014
Drilling Method: Hollow-Stem Auger
Drill: CME 55, Automatic Hammer
Driller: CDOT
Logged By: R. Beach
Final By: R. Beach
Inclination: Vertical
Completed: 1/16/2014Drill Bit:Casing:Weather: Cool, Calm, Clear
Ground Water Notes: Observed at approximately 17' at time of drilling
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B09Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 1 of 2
5
10
15
20
25
30
5955
5950
5945
5940
5935
5930
5925
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
50:3"
50.3" Bottom of Hole at 40.3 ft.
AASHTO: A-7-6 (23)USCS: CL
50:3"
50.3"
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B09Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 2 of 2
40
45
50
55
60
65
70
75
5920
5915
5910
5905
5900
5895
5890
5885
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
14/8
13/13
7/7/7
50:3"
50:3"
50:2"
0.0 - 8.0 ft. clayey SAND FILL with gravel, grayto brown, moist, medium dense.
8.0 - 19.0 ft. silty SAND with gravel, reddishbrown, wet, medium dense.
19.0 - 30.2 ft. CLAYSTONE, blue-gray, veryhard.
Bottom of Hole at 30.2 ft.
@ 0 - 5 ft.MC= 6.6 %#200= 23 %LL= 23PL= 14PI= 9AASHTO: A-2-4 (0)USCS: SC
@ 10 ft.MC= 9 %DD= 129.4 pcf#200= 6 %LL= NVPL= NPPI= NPAASHTO: A-1-a (0)USCS: GP-GM@ 15 ft.MC= 9.7 %#200= 5 %LL= NVPL= NPPI= NPAASHTO: A-1-a (0)USCS: SW-SM@ 20 ft.MC= 18.3 %DD= 108.8 pcf#200= 75 %LL= 52PL= 26PI= 26S/C= 0.5 %AASHTO: A-7-6 (20)USCS: CH@ 25 ft.MC= 20.4 %DD= 106.7 pcf#200= 65 %LL= 47PL= 22PI= 25UCCS= 8941 psfAASHTO: A-7-6 (15)USCS: CL
22
26
14
50:3"
50:3"
50:2"
DepthDateTime
Total Depth: 30.2 ftGround Elevation: 5957.0 ftLocation: 331 S. Chestnut, W of Existing BuildingCoordinates: N: 63,754.6 E: 190,343.2
8.0 ft--
---
---
---
Boring Began: 1/23/2014
Drilling Method: Hollow-Stem Auger
Drill: CME 55, Automatic Hammer
Driller: Dakota Drilling
Logged By: R. Beach
Final By: R. Beach
Inclination: Vertical
Completed: 1/23/2014Drill Bit:Casing:Weather: Cold, Cloudy, Snow
Ground Water Notes: Observed at approximately 8' at time of drilling
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B10Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 1 of 1
5
10
15
20
25
30
5955
5950
5945
5940
5935
5930
5925
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
9/9
9/11
50:4"50:8"
9/9
7/8
50:5"
0.0 - 0.6 ft. Asphalt Pavement 7.5 inches.0.6 - 5.0 ft. silty SAND FILL with trace gravel,reddish brown, damp.
5.0 - 13.0 ft. clayey SAND FILL with tracegravel and occasional clay lifts, brown to darkbrown, moist, medium dense.
13.0 - 17.0 ft. silty SAND with gravel andcobbles, gray to brown, moist, very dense.
17.0 - 28.0 ft. silty SAND with trace gravel,brown to gray, moist to wet, medium dense.
28.0 - 40.5 ft. CLAYSTONE, blue-gray, veryhard.
@ 0 - 5 ft.MC= 5.5 %#200= 15 %LL= NVPL= NPPI= NPpH= 7.9S= 0.006 %Re= 1825 ohms-cmAASHTO: A-1-b (0)USCS: SMCL= 0.0182 %@ 5 ft.MC= 8.5 %DD= 120.4 pcf#200= 21 %LL= 32PL= 14PI= 18AASHTO: A-2-6 (0)USCS: SC@ 10 ft.MC= 18.3 %DD= 93.5 pcf#200= 53 %LL= 50PL= 17PI= 33AASHTO: A-7-6 (13)USCS: CH
@ 20 ft.MC= 2.6 %#200= 4 %LL= NVPL= NPPI= NPAASHTO: A-1-a (0)USCS: SW
18
20
50:4" 50:8"
18
15
50:5"
DepthDateTime
Total Depth: 40.5 ftGround Elevation: 5969.9 ftLocation: NB I-25 On Ramp, Right LaneCoordinates: N: 63,727.3 E: 190,710.2
25.0 ft--
---
---
---
Boring Began: 1/7/2014
Drilling Method: Hollow-Stem Auger
Drill: CME 75, Automatic Hammer
Driller: Dakota Drilling
Logged By: R. Beach
Final By: R. Beach
Inclination: Vertical
Completed: 1/8/2014Drill Bit:Casing:Weather: Cool, Calm
Ground Water Notes: Observed at approximately 25' at time of drilling
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B11Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 1 of 2
5
10
15
20
25
30
5965
5960
5955
5950
5945
5940
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
70:6"
50:5"Bottom of Hole at 40.5 ft.
@ 35 ft.MC= 14.7 %DD= 113.7 pcf#200= 89 %LL= 55PL= 27PI= 28S/C= 0.5 %AASHTO: A-7-6 (28)USCS: CH
70:6"
50:5"
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
RQ
D
Rec
over
y (%
)
Blowsper6 in
YEH AND ASSOCIATES, INC.
Run
/ S
ampl
e T
ype
Dep
th(f
eet)
Ele
vatio
n(f
eet)
Boring: YA-B11Project Number: 213-207 Date:
Field Notesand
Lab Tests
Sheet 2 of 2
40
45
50
55
60
65
70
75
5930
5925
5920
5915
5910
5905
5900
5895
Soil Samples
N
Project: I-25 and Cimarron Street
Material Description
Lith
olo
gy
BO
RIN
G L
OG
213
-20
7 B
OR
ING
S.G
PJ
YE
H A
SS
OC
IAT
ES
.GD
T
3/26
/14
Appendix C
LABORATORY TEST RESULTS
Project No: Date: 1/24/2014
YEH & ASSOCIATES, INC
I-25 and Cimarron Street
Summary of Laboratory Test Results
213-207 Project Name:
Gradation Atterberg Unconf.Chloride Comp.
% Strength(psf)
YA-B01 0-5 Bulk 5.4 _ 32 46 22 22 15 7 7.7 0.005 2053 0.0120 _ _ _ A-2-4 ( 0 ) SM-SC
CLASSIFICATIONSand (%)
Fines < #200 (%)
LLR-VALUE
PLBoring NO. USCSAASHTOPI
Water Soluble Sulfate
%
Resistivity ohm.cm
% Swell (+) / Consoli- dation (-)
pH
Sample Location
Sample Type
Natural Dry Density
(pcf)Depth (ft)Gravel > #4 (%)
Natural Moisture Content
(%)
YA-B01 15 CA 10.6 114.8 _ _ 68 42 22 20 _ _ _ _ _ 7952 _ A-7-6 ( 12 ) CL
YA-B01 20 CA 11.6 101.1 _ _ 90 53 23 30 _ _ _ _ 1.2 _ _ A-7-6 ( 30 ) CH
YA-B02 0-5 Bulk 4.8 _ 13 68 19 NV NP NP 7.7 0.004 1855 0.0130 _ _ _ A-1-b ( 0 ) SM
YA-B02 5 CA 25 8 95 9 0 8 92 60 20 40 _ _ _ _ _ _ _ A-7-6 ( 40 ) CHYA B02 5 CA 25.8 95.9 0 8 92 60 20 40 A 7 6 ( 40 ) CH
YA-B02 15 CA 16.5 108.9 14 29 57 49 16 33 _ _ _ _ _ _ _ A-7-6 ( 15 ) CL
YA-B02 30 CA 12.1 109.6 24 35 41 49 17 32 _ _ _ _ _ _ _ A-7-6 ( 7 ) SC
YA-B02 35 CA 12.9 94.5 0 51 49 NV NP NP _ _ _ _ _ _ _ A-4 ( 0 ) SM
YA-B02 45 CA 7.1 128.1 26 70 4 NV NP NP _ _ _ _ _ _ _ A-1-a ( 0 ) SW
YA-B02 60 CA 17.0 111.8 _ _ 83 53 27 26 _ _ _ _ _ _ _ A-7-6 ( 24 ) CH
YA-B03 0-5 Bulk 5.5 _ 18 67 15 22 13 9 8.0 0.01 1490 0.0163 _ _ _ A-2-4 ( 0 ) SC
YA-B03 5 CA 7.1 117.6 11 72 17 53 18 35 _ _ _ _ _ _ _ A-2-7 ( 0 ) SC
YA-B03 10 CA 3.3 117.1 28 68 4 NV NP NP _ _ _ _ _ _ _ A-1-a ( 0 ) SW
YA-B03 13 CA 19.7 _ 7 35 58 47 22 25 _ _ _ _ _ _ _ A-7-6 ( 12 ) CL
YA-B03 20 CA 19 3 99 1 0 32 68 33 22 11 _ _ _ _ _ _ _ A-6 ( 6 ) CLYA B03 20 CA 19.3 99.1 0 32 68 33 22 11 A 6 ( 6 ) CL
YA-B03 35 CA 16.9 111.3 _ _ 86 53 24 29 _ _ _ _ _ 22060 _ A-7-6 ( 18 ) CH
Rev 2 - 8/02 Page 1 of 4
Project No: Date: 1/24/2014
YEH & ASSOCIATES, INC
Summary of Laboratory Test Results
213-207 Project Name: I-25 and Cimarron Street
Gradation Atterberg Unconf.Chloride Comp.
% Strength(psf)
YA-B04 0-5 Bulk 5.6 _ 22 64 14 NV NP NP 7.8 0.005 1099 0.0366 _ _ _ A-1-b ( 0 ) SM
LL
Sample Location Natural Moisture Content
(%)
Natural Dry Density
(pcf)pHBoring
NO. Depth (ft) Sample Type
Gravel > #4 (%)
Sand (%)
Fines < #200 (%)
PL PI AASHTO USCS
Resistivity ohm.cm
% Swell (+) / Consoli- dation (-)
R-VALUECLASSIFICATIONWater
Soluble Sulfate
%
YA-B04 10 CA 21.8 101.9 1 14 85 55 19 36 _ _ _ _ _ _ _ A-7-6 ( 32 ) CH
YA-B04 22 CA 15.5 _ 7 42 51 50 20 30 _ _ _ _ _ _ _ A-7-6 ( 11 ) CH
YA-B04 30 CA 18.6 101.0 10 82 8 NV NP NP _ _ _ _ _ _ _ A-3 ( 0 ) SP-SM
YA-B04 35 CA 11 3 _ 20 75 5 NV NP NP _ _ _ _ _ _ _ A-1-b ( 0 ) SP-SMYA B04 35 CA 11.3 20 75 5 NV NP NP A 1 b ( 0 ) SP SM
YA-B04 45 CA 16.4 112.0 _ _ 89 48 23 25 _ _ _ _ 0.7 _ _ A-7-6 ( 24 ) CL
YA-B05 0-5 Bulk 4.2 _ 26 53 21 29 15 14 8.0 0.138 1129 0.0154 _ _ _ A-2-6 ( 0 ) SC
YA-B05 12.5 CA 28.9 87.0 _ _ _ _ _ _ 8.2 0.030 481 0.0023 _ _ _ _ _
YA-B05 15 CA 18.6 109.6 _ _ 85 51 27 24 _ _ _ _ _ 27464 _ A-7-6 ( 23 ) CH
YA-B05 20 CA 16.6 106.3 _ _ 86 51 28 23 _ _ _ _ 1.3 _ _ A-7-6 ( 22 ) CH
YA-B06 0-5 Bulk 8.1 _ 15 57 28 NV NP NP 7.7 0.073 901 0.0098 _ _ _ A-2-4 ( 0 ) SM
YA-B06 5 CA 18.5 107.7 10 55 35 36 20 16 _ _ _ _ _ _ _ A-6 ( 1 ) SC
YA-B06 15 CA 11.0 _ 24 70 6 NV NP NP _ _ _ _ _ _ _ A-1-b ( 0 ) SP-SM
YA-B06 30 CA 13.6 119.4 _ _ 86 50 22 28 _ _ _ _ _ 31832 _ A-7-6 ( 26 ) CH
YA-B07 0-5 Bulk 20 5 _ 4 46 50 31 21 10 _ _ _ _ _ _ _ A-4 ( 2 ) SCYA B07 0 5 Bulk 20.5 4 46 50 31 21 10 A 4 ( 2 ) SC
YA-B07 5 CA 45.4 77.8 _ _ 94 61 27 34 _ _ _ _ 0.7 _ _ A-7-6 ( 37 ) CH
Rev 2 - 8/02 Page 2 of 4
Project No: Date: 1/24/2014
YEH & ASSOCIATES, INC
Summary of Laboratory Test Results
213-207 Project Name: I-25 and Cimarron Street
Gradation Atterberg Unconf.Chloride Comp.
% Strength(psf)
YA-B07 25 CA 15.3 108.3 _ _ 84 52 25 27 _ _ _ _ 0.8 _ _ A-7-6 ( 24 ) CH
Sample Location Natural Moisture Content
(%)
Natural Dry Density
(pcf)pHBoring
NO. Depth (ft) Sample Type
Gravel > #4 (%)
Sand (%)
Fines < #200 (%)
PL PILL
Water Soluble Sulfate
% AASHTO USCS
Resistivity ohm.cm
% Swell (+) / Consoli- dation (-)
R-VALUECLASSIFICATION
YA-B08 0-5 Bulk 12.3 _ 10 55 35 33 18 15 7.6 0.080 971 0.0018 _ _ _ A-6 ( 1 ) SC
YA-B08 10 CA 9.5 127.1 10 64 26 NV NP NP _ _ _ _ _ _ _ A-2-4 ( 0 ) SM
YA-B08 20 CA 3.3 125.3 37 57 6 NV NP NP _ _ _ _ _ _ _ A-1-a ( 0 ) SP-SM
YA-B08 30 CA 11 8 _ 19 78 3 NV NP NP _ _ _ _ _ _ _ A-1-b ( 0 ) SWYA B08 30 CA 11.8 19 78 3 NV NP NP A 1 b ( 0 ) SW
YA-B08 40 CA 20.7 106.2 _ _ 69 51 27 24 _ _ _ _ _ 12030 _ A-7-6 ( 16 ) CH
YA-B09 0-5 Bulk 8.5 _ 14 67 19 NV NP NP 7.7 0.010 3175 0.0013 _ _ _ A-1-b ( 0 ) SM
YA-B09 5 CA 24.1 97.1 _ _ 89 60 22 38 _ _ _ _ _ _ _ A-7-6 ( 37 ) CH
YA-B09 17.5 CA 13.7 _ 20 73 7 NV NP NP _ _ _ _ _ _ _ A-1-b ( 0 ) SW-SM
YA-B09 30 CA 16.9 109.0 _ _ 88 47 23 24 _ _ _ _ _ 27604 _ A-7-6 ( 23 ) CL
YA-B10 0-5 Bulk 6.6 _ 15 62 23 23 14 9 _ _ _ _ _ _ _ A-2-4 ( 0 ) SC
YA-B10 10 CA 9.0 129.4 53 41 6 NV NP NP . _ _ _ _ _ _ A-1-a ( 0 ) GP-GM
YA-B10 15 Bulk 9.7 _ 33 62 5 NV NP NP _ _ _ _ _ _ _ A-1-a ( 0 ) SW-SM
YA-B10 20 CA 18.3 108.8 _ _ 75 52 26 26 _ _ _ _ 0.5 _ _ A-7-6 ( 20 ) CH
YA-B10 25 CA 20 4 106 7 _ _ 65 47 22 25 _ _ _ _ _ 8941 _ A-7-6 ( 15 ) CLYA B10 25 CA 20.4 106.7 65 47 22 25 8941 A 7 6 ( 15 ) CL
YA-B11 0-5 Bulk 5.5 _ 16 69 15 NV NP NP 7.9 0.006 1825 0.0182 _ _ _ A-1-b ( 0 ) SM
Rev 2 - 8/02 Page 3 of 4
Project No: Date: 1/24/2014
YEH & ASSOCIATES, INC
Summary of Laboratory Test Results
213-207 Project Name: I-25 and Cimarron Street
Gradation Atterberg Unconf.Chloride Comp.
% Strength(psf)
YA-B11 5 CA 8.5 120.4 25 54 21 32 14 18 _ _ _ _ _ _ _ A-2-6 ( 0 ) SC
Sample Location Natural Moisture Content
(%)
Natural Dry Density
(pcf)pH
Water Soluble Sulfate
%
Boring NO. Depth (ft) Sample
Type
Gravel > #4 (%)
Sand (%)
Fines < #200 (%)
LL PL PI AASHTO USCS
Resistivity ohm.cm
% Swell (+) / Consoli- dation (-)
R-VALUECLASSIFICATION
YA-B11 10 CA 18.3 93.5 7 40 53 50 17 33 _ _ _ _ _ _ _ A-7-6 ( 13 ) CH
YA-B11 20 CA 2.6 _ 20 76 4 NV NP NP _ _ _ _ _ _ _ A-1-a ( 0 ) SW
YA-B11 35 CA 14.7 113.7 _ _ 89 55 27 28 _ _ _ _ 0.5 _ _ A-7-6 ( 28 ) CH
5 3 _ 22 64 14 NV NP NP _ _ _ _ _ _ _ A-1-b ( 0 ) SMMix YA-B02,YA-B04 Bulk 5.3 22 64 14 NV NP NP A 1 b ( 0 ) SMMix YA B02,YA B04 Bulk
Rev 2 - 8/02 Page 4 of 4
Revised 04/27/2004
Drawn By: MA
Date: 01/16/13
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-2-4 (0) / SM-SC
Project No.: 213-207
Figure No.: -
Fines (%) 22 PI 7
I-25 and Cimarron Street Project Name:
Sample ID: YA-B01
Sample Depth (ft.):
0-5
Gravel (%)
Sand (%)
32
46
LL
PL
¾ "
½"
22
15
100
99
51
35
96
88
82
68
#200 22
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/16/13
¾ "
½"
NV
NP
-
-
67
36
100
100
97
87
#200 19
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
13
68
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B02
Sample Depth (ft.):
0-5
Sample Description: A-1-b (0) / SM
Project No.: 213-207
Figure No.: -
Fines (%) 19 PI NP
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/16/13
¾ "
½"
60
20
-
-
99
96
-
-
100
100
#200 91
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
0
9
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B02
Sample Depth (ft.):
5
Sample Description: A-7-6 (40) / CH
Project No.: 213-207
Figure No.: -
Fines (%) 91 PI 40
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
Sieve Size
% Passing
Checked By: Jere
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-7-6 (15) /CL
Project No.:
Figure No.: -
Fines (%) 57 PI 33
I-25 and Cimarron Street Project Name:
Sample ID: YA-B02
Sample Depth (ft.):
15
Gravel (%)
Sand (%)
14
29
LL
PL
¾ "
½"
49
16
-
-
75
65
100
92
91
86
#200 57
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
¾ "
½"
49
17
100
90
65
54
90
85
84
76
#200 41
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
24
35
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B02
Sample Depth (ft.):
30
Sample Description: A-7-6 (7) /SC
Project No.:
Figure No.: -
Fines (%) 41 PI 32
Sieve Size
% Passing
Checked By: Jere
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
¾ "
½"
NV
NP
-
-
100
99
-
-
-
100
#200 49
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
0
51
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B02
Sample Depth (ft.):
35
Sample Description: A-4 (0) /SM
Project No.:
Figure No.: -
Fines (%) 49 PI NP
Sieve Size
% Passing
Checked By: Jere
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
¾ "
½"
NV
NP
88
88
47
14
88
86
83
74
#200 4
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
26
70
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B02
Sample Depth (ft.):
45
Sample Description: A-1-a (0) /SW
Project No.:
Figure No.: -
Fines (%) 4 PI NP
Sieve Size
% Passing
Checked By: Jere
-
-
100
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/16/13
¾ "
½"
22
13
-
-
59
30
100
98
95
82
#200 15
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
18
67
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B03
Sample Depth (ft.):
0-5
Sample Description: A-2-4 (0) / SC
Project No.: 213-207
Figure No.: -
Fines (%) 15 PI 9
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
Sieve Size
% Passing
Checked By: Jere
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-2-7 (0) /SC
Project No.:
Figure No.: -
Fines (%) 17 PI 35
I-25 and Cimarron Street Project Name:
Sample ID: YA-B03
Sample Depth (ft.):
5
Gravel (%)
Sand (%)
11
72
LL
PL
¾ "
½"
53
18
-
-
60
28
-
100
98
89
#200 17
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
Sieve Size
% Passing
Checked By: Jere
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-1-a (0) /SW
Project No.:
Figure No.: -
Fines (%) 4 PI NP
I-25 and Cimarron Street Project Name:
Sample ID: YA-B03
Sample Depth (ft.):
10
Gravel (%)
Sand (%)
28
68
LL
PL
¾ "
½"
NV
NP
-
-
47
17
100
95
91
72
#200 4
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 02/03/14
¾ "
½"
47
22
-
-
86
72
100
98
98
93
#200 58
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
7
35
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B03
Sample Depth (ft.):
13
Sample Description: A-7-6 (12) / CL
Project No.: 213-207
Figure No.: -
Fines (%) 58 PI 25
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
Sieve Size
% Passing
Checked By: Jere
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-6 (6) /CL
Project No.:
Figure No.: -
Fines (%) 68 PI 11
I-25 and Cimarron Street Project Name:
Sample ID: YA-B03
Sample Depth (ft.):
20
Gravel (%)
Sand (%)
0
32
LL
PL
¾ "
½"
33
22
-
-
99
98
-
-
-
100
#200 68
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/16/13
¾ "
½"
NV
NP
-
100
56
28
95
93
90
78
#200 14
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
22
64
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B04
Sample Depth (ft.):
0-5
Sample Description: A-1-b (0) / SM
Project No.: 213-207
Figure No.: -
Fines (%) 14 PI NP
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
Sieve Size
% Passing
Checked By: Jere
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-7-6 (32) /CH
Project No.:
Figure No.: -
Fines (%) 85 PI 36
I-25 and Cimarron Street Project Name:
Sample ID: YA-B04
Sample Depth (ft.):
10
Gravel (%)
Sand (%)
1
14
LL
PL
¾ "
½"
55
19
-
-
96
89
-
-
100
99
#200 85
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/16/13
¾ "
½"
50
20
-
-
85
71
100
99
98
93
#200 51
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
7
42
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B04
Sample Depth (ft.):
22
Sample Description: A-7-6 (11) / CH
Project No.: 213-207
Figure No.: -
Fines (%) 51 PI 30
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
Sieve Size
% Passing
Checked By: Jere
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-3 (0) /SP-SM
Project No.:
Figure No.: -
Fines (%) 8 PI NP
I-25 and Cimarron Street Project Name:
Sample ID: YA-B04
Sample Depth (ft.):
30
Gravel (%)
Sand (%)
10
82
LL
PL
¾ "
½"
NV
NP
-
-
84
63
100
98
93
90
#200 8
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/16/13
¾ "
½"
NV
NP
-
100
59
23
97
91
89
80
#200 5
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
20
75
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B04
Sample Depth (ft.):
35
Sample Description: A-1-b (0) / SP-SM
Project No.: 213-207
Figure No.: -
Fines (%) 5 PI NP
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/16/13
¾ "
½"
29
15
100
96
56
35
93
90
86
74
#200 21
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
26
53
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B05
Sample Depth (ft.):
0-5
Sample Description: A-2-6 (0) / SC
Project No.: 213-207
Figure No.: -
Fines (%) 21 PI 14
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/29/14
¾ "
½"
NV
NP
-
100
69
49
99
98
94
85
#200 28
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
15
57
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B06
Sample Depth (ft.):
0-5
Sample Description: A-2-4 (0) / SM
Project No.: 213-207
Figure No.: -
Fines (%) 28 PI NP
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Sieve Size
% Passing
-
-
-
3"
2 ½"
2"
⅜"
#4
1 ½"
1"
¾ "
½"
-
-
100
97
95
9030
40
50
60
70
80
90
100
Per
cen
t P
assi
ng
20040103/8" 41/2"3/4"3"12" 6" 1" 30 508 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
1002"
Drawn By: MA
Date: 10/12/11Checked By: Jere
#4
#10
#40
Sample Description: A-6 (1) /SC
Project No.:
Figure No.: -
Fines (%) 35 PI 16
I-25 and Cimarron Street Project Name:
Sample ID: YA-B06
Sample Depth (ft.):
5
Gravel (%)
Sand (%)
10
55
LL
PL
36
20
82
68
90
#200 35
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
0.010.11101001000Particle Size (mm)
Revised 04/27/2004
Revised 04/27/2004
Drawn By: MA
Date: 01/29/14
¾ "
½"
NV
NP
100
87
63
23
84
82
81
76
#200 6
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
24
70
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B06
Sample Depth (ft.):
15
Sample Description: A-1-b (0) / SP-SM
Project No.: 213-207
Figure No.: -
Fines (%) 6 PI NP
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/29/14
¾ "
½"
31
21
-
-
88
74
-
100
99
96
#200 50
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
4
46
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B07
Sample Depth (ft.):
0-5
Sample Description: A-4 (2) / SC
Project No.: 213-207
Figure No.: -
Fines (%) 50 PI 10
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/16/13
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-6 (1) / SC
Project No.: 213-207
Figure No.: -
Fines (%) 35 PI 15
I-25 and Cimarron Street Project Name:
Sample ID: YA-B08
Sample Depth (ft.):
0-5
Gravel (%)
Sand (%)
10
55
LL
PL
¾ "
½"
33
18
100
99
77
57
98
97
96
90
#200 35
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
Sieve Size
% Passing
Checked By: Jere
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-2-4 (0) /SM
Project No.:
Figure No.: -
Fines (%) 26 PI NP
I-25 and Cimarron Street Project Name:
Sample ID: YA-B08
Sample Depth (ft.):
10
Gravel (%)
Sand (%)
10
64
LL
PL
¾ "
½"
NV
NP
-
-
74
49
-
100
97
90
#200 26
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
Sieve Size
% Passing
Checked By: Jere
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-1-a (0) /SP-SM
Project No.:
Figure No.: -
Fines (%) 6 PI NP
I-25 and Cimarron Street Project Name:
Sample ID: YA-B08
Sample Depth (ft.):
20
Gravel (%)
Sand (%)
37
57
LL
PL
¾ "
½"
NV
NP
-
100
43
25
90
85
81
63
#200 6
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/16/13
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-1-b (0) / SW
Project No.: 213-207
Figure No.: -
Fines (%) 3 PI NP
I-25 and Cimarron Street Project Name:
Sample ID: YA-B08
Sample Depth (ft.):
30
Gravel (%)
Sand (%)
19
78
LL
PL
¾ "
½"
NV
NP
-
100
51
13
99
97
94
81
#200 3
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/16/13
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-1-b (0) / SM
Project No.: 213-207
Figure No.: -
Fines (%) 19 PI NP
I-25 and Cimarron Street Project Name:
Sample ID: YA-B09
Sample Depth (ft.):
0-5
Gravel (%)
Sand (%)
14
67
LL
PL
¾ "
½"
NV
NP
-
-
68
40
100
98
96
86
#200 19
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/16/13
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-1-b (0) / SW-SM
Project No.: 213-207
Figure No.: -
Fines (%) 7 PI NP
I-25 and Cimarron Street Project Name:
Sample ID: YA-B09
Sample Depth (ft.):
17.5
Gravel (%)
Sand (%)
20
73
LL
PL
¾ "
½"
NV
NP
-
100
66
30
97
95
92
80
#200 7
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/29/14
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-2-4 (0) / SC
Project No.: 213-207
Figure No.: -
Fines (%) 23 PI 9
I-25 and Cimarron Street Project Name:
Sample ID: YA-B10
Sample Depth (ft.):
0-5
Gravel (%)
Sand (%)
15
62
LL
PL
¾ "
½"
23
14
100
99
65
40
98
97
96
85
#200 23
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
Sieve Size
% Passing
Checked By: Jere
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-1-a (0) /GP-GM
Project No.:
Figure No.: -
Fines (%) 6 PI NP
I-25 and Cimarron Street Project Name:
Sample ID: YA-B10
Sample Depth (ft.):
10
Gravel (%)
Sand (%)
53
41
LL
PL
¾ "
½"
NV
NP
100
87
34
21
74
67
63
47
#200 6
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/29/14
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-1-a (0) / SW-SM
Project No.: 213-207
Figure No.: -
Fines (%) 5 PI NP
I-25 and Cimarron Street Project Name:
Sample ID: YA-B10
Sample Depth (ft.):
15
Gravel (%)
Sand (%)
33
62
LL
PL
¾ "
½"
NV
NP
-
100
41
13
96
86
80
67
#200 5
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 01/16/13
¾ "
½"
NV
NP
-
100
61
29
99
97
95
84
#200 15
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
Gravel (%)
Sand (%)
16
69
LL
PL
I-25 and Cimarron Street Project Name:
Sample ID: YA-B11
Sample Depth (ft.):
0-5
Sample Description: A-1-b (0) / SM
Project No.: 213-207
Figure No.: -
Fines (%) 15 PI NP
Sieve Size
% Passing
Checked By: Dr. Liu
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
Sieve Size
% Passing
Checked By: Jere
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-2-6 (0) /SC
Project No.:
Figure No.: -
Fines (%) 21 PI 18
I-25 and Cimarron Street Project Name:
Sample ID: YA-B11
Sample Depth (ft.):
5
Gravel (%)
Sand (%)
25
54
LL
PL
¾ "
½"
32
14
-
-
56
33
100
92
86
75
#200 21
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
Sieve Size
% Passing
Checked By: Jere
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-7-6 (13) /CH
Project No.:
Figure No.: -
Fines (%) 53 PI 33
I-25 and Cimarron Street Project Name:
Sample ID: YA-B11
Sample Depth (ft.):
10
Gravel (%)
Sand (%)
7
40
LL
PL
¾ "
½"
50
17
-
-
82
65
-
100
98
93
#200 53
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Revised 04/27/2004
Drawn By: MA
Date: 10/12/11
Sieve Size
% Passing
Checked By: Jere
-
-
-
3"
2 ½"
2"
⅜"
#4
#10
#40
1 ½"
1"
Sample Description: A-1-a (0) /SW
Project No.:
Figure No.: -
Fines (%) 4 PI NP
I-25 and Cimarron Street Project Name:
Sample ID: YA-B11
Sample Depth (ft.):
20
Gravel (%)
Sand (%)
20
76
LL
PL
¾ "
½"
NV
NP
-
100
50
13
96
92
92
80
#200 4
Yeh & Associates, Inc. Geotechnical Engineering Consultants
SIEVE ANALYSIS
0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100 1000
Perc
ent P
assi
ng
Particle Size (mm)
200 40 10 3/8" 4 1/2" 3/4" 3" 12" 6" 1" 30 50 8 16
Sieve Analysis Hydrometer Analysis
Sieve Opening in Inches U.S. Standard Sieves Size of Particles in mm
100 2"
Applied Normal Pressure, ksf
20
Job No:
Consolidation(-) /Swell(+), % Soil Description
SWELL / CONSOLIDATION
GRAPH101.1 11.6% 1.2 CH Drawn By:
Natural Dry
Density, pcf
Moisture Content,
%
M.A
Boring Number Depth, ft
Dr. Liu
YEH & ASSOCIATES, INC
213-207 Project Name: I-25 and Cimarron Street Checked By:
YA-B01
-8.0
-6.0
-4.0
-2.0
0.0
2.0
4.0
6.0
8.0
0.1 1 10 100
Con
solid
atio
n(-)
/Sw
ell(+
), %
WATER ADDED
Applied Normal Pressure, ksf
45
Job No:
Consolidation(-) /Swell(+), % Soil Description
SWELL / CONSOLIDATION
GRAPH112.0 16.4% 0.7 CL Drawn By:
Natural Dry
Density, pcf
Moisture Content,
%
M.A
Boring Number Depth, ft
Dr. Liu
YEH & ASSOCIATES, INC
213-207 Project Name: I-25 and Cimarron Street Checked By:
YA-B04
-8.0
-6.0
-4.0
-2.0
0.0
2.0
4.0
6.0
8.0
0.1 1 10 100
Con
solid
atio
n(-)
/Sw
ell(+
), %
WATER ADDED
Applied Normal Pressure, ksf
20
Job No:
M.A
Boring Number Depth, ft
Dr. Liu
YEH & ASSOCIATES, INC
213-207 Project Name: I-25 and Cimarron Street Checked By:
YA-B05 106.3 16.6% 1.3 CH Drawn By:
Natural Dry
Density, pcf
Moisture Content,
%
Consolidation(-) /Swell(+), % Soil Description
SWELL / CONSOLIDATION
GRAPH
-8.0
-6.0
-4.0
-2.0
0.0
2.0
4.0
6.0
8.0
0.1 1 10 100
Con
solid
atio
n(-)
/Sw
ell(+
), %
WATER ADDED
Applied Normal Pressure, ksf
5
Job No:
Consolidation(-) /Swell(+), % Soil Description
SWELL / CONSOLIDATION
GRAPH77.8 45.4% 0.7 CH Drawn By:
Natural Dry
Density, pcf
Moisture Content,
%
M.A
Boring Number Depth, ft
Dr. Liu
YEH & ASSOCIATES, INC
213-207 Project Name: I-25 and Cimarron Street Checked By:
YA-B07
-8.0
-6.0
-4.0
-2.0
0.0
2.0
4.0
6.0
8.0
0.1 1 10 100
Con
solid
atio
n(-)
/Sw
ell(+
), %
WATER ADDED
Applied Normal Pressure, ksf
25
Job No:
M.A
Boring Number Depth, ft
Dr. Liu
YEH & ASSOCIATES, INC
213-207 Project Name: I-25 and Cimarron Street Checked By:
YA-B07 108.3 15.3% 0.8 CH Drawn By:
Natural Dry
Density, pcf
Moisture Content,
%
Consolidation(-) /Swell(+), % Soil Description
SWELL / CONSOLIDATION
GRAPH
-8.0
-6.0
-4.0
-2.0
0.0
2.0
4.0
6.0
8.0
0.1 1 10 100
Con
solid
atio
n(-)
/Sw
ell(+
), %
WATER ADDED
Applied Normal Pressure, ksf
20
Job No:
M.A
Boring Number Depth, ft
Dr. Liu
YEH & ASSOCIATES, INC
213-207 Project Name: I-25 and Cimarron Street Checked By:
YA-B10 108.8 18.3% 0.5 CH Drawn By:
Natural Dry
Density, pcf
Moisture Content,
%
Consolidation(-) /Swell(+), % Soil Description
SWELL / CONSOLIDATION
GRAPH
-8.0
-6.0
-4.0
-2.0
0.0
2.0
4.0
6.0
8.0
0.1 1 10 100
Con
solid
atio
n(-)
/Sw
ell(+
), %
WATER ADDED
Applied Normal Pressure, ksf
35
Job No:
Consolidation(-) /Swell(+), % Soil Description
SWELL / CONSOLIDATION
GRAPH113.7 14.7% 0.5 CH Drawn By:
Natural Dry
Density, pcf
Moisture Content,
%
M.A
Boring Number Depth, ft
Dr. Liu
YEH & ASSOCIATES, INC
213-207 Project Name: I-25 and Cimarron Street Checked By:
YA-B11
-8.0
-6.0
-4.0
-2.0
0.0
2.0
4.0
6.0
8.0
0.1 1 10 100
Con
solid
atio
n(-)
/Sw
ell(+
), %
WATER ADDED
Tested By: RMV Checked By: DAB
Particle Size Distribution ReportP
ER
CE
NT
FIN
ER
0
10
20
30
40
50
60
70
80
90
100
GRAIN SIZE - mm.
0.0010.010.1110100
% +3"Coarse
% Gravel
Fine Coarse Medium
% Sand
Fine Silt
% Fines
Clay
0.0 0.0 0.0 28.8 38.7 17.3 15.2
6 in
.
3 in
.
2 in
.
1½
in
.
1 in
.
¾ in
.
½ in
.
3/8
in
.
#4
#1
0
#2
0
#3
0
#4
0
#6
0
#1
00
#1
40
#2
00
SIEVE PERCENT SPEC.* PASS?
SIZE FINER PERCENT (X=NO)
Soil Description
Atterberg Limits
Coefficients
Classification
Remarks
Sample No.: Source of Sample: Date:Location: Elev./Depth:
Client:
Project:
Project No: Figure
#4#10#20#40#60
#100#200
100.071.246.632.525.119.915.2 3.5389 3.0503 1.3898
0.9703 0.3628
2/11/14Mix B2, B4
Yeh & Associates
I-25/Cimarron Street Y&A# 213-207
108-195-06
PL= LL= PI=
D90= D85= D60=D50= D30= D15=D10= Cu= Cc=
USCS= AASHTO=
* (no specification provided)
Tested By: RMV Checked By: DAB
Particle Size Distribution ReportP
ER
CE
NT
FIN
ER
0
10
20
30
40
50
60
70
80
90
100
GRAIN SIZE - mm.
0.0010.010.1110100
% +3"Coarse
% Gravel
Fine Coarse Medium
% Sand
Fine Silt
% Fines
Clay
0.0 0.0 10.1 7.7 15.8 22.3 44.1
6 in
.
3 in
.
2 in
.
1½
in
.
1 in
.
¾ in
.
½ in
.
3/8
in
.
#4
#1
0
#2
0
#3
0
#4
0
#6
0
#1
00
#1
40
#2
00
SIEVE PERCENT SPEC.* PASS?
SIZE FINER PERCENT (X=NO)
Soil Description
Atterberg Limits
Coefficients
Classification
Remarks
Sample No.: Source of Sample: Date:Location: Elev./Depth:
Client:
Project:
Project No: Figure
clayey sand
.75.5
.375#4#10#20#40#60
#100#200
100.099.395.789.982.273.966.460.253.144.1
13 36 23
4.8330 2.6936 0.24660.1195
SC A-6(5)
2/11/2014B-8 @ 5'
Yeh & Associates
I-25/Cimarron Street Y&A# 213-207
108-195-06
PL= LL= PI=
D90= D85= D60=D50= D30= D15=D10= Cu= Cc=
USCS= AASHTO=
* (no specification provided)
Tested By: RMV Checked By: DAB
Particle Size Distribution ReportP
ER
CE
NT
FIN
ER
0
10
20
30
40
50
60
70
80
90
100
GRAIN SIZE - mm.
0.0010.010.1110100
% +3"Coarse
% Gravel
Fine Coarse Medium
% Sand
Fine Silt
% Fines
Clay
0.0 5.1 12.7 8.7 11.1 22.5 39.9
6 in
.
3 in
.
2 in
.
1½
in
.
1 in
.
¾ in
.
½ in
.
3/8
in
.
#4
#1
0
#2
0
#3
0
#4
0
#6
0
#1
00
#1
40
#2
00
SIEVE PERCENT SPEC.* PASS?
SIZE FINER PERCENT (X=NO)
Soil Description
Atterberg Limits
Coefficients
Classification
Remarks
Sample No.: Source of Sample: Date:Location: Elev./Depth:
Client:
Project:
Project No: Figure
clayey sand with gravel
1.75.5
.375#4#10#20#40#60
#100#200
100.094.992.189.182.273.566.762.459.053.839.9
13 36 23
10.3405 6.3875 0.28950.1199
SC A-6(4)
2/11/2014B-9 @ 10'
Yeh & Associates
I-25/Cimarron Street Y&A# 213-207
108-195-06
PL= LL= PI=
D90= D85= D60=D50= D30= D15=D10= Cu= Cc=
USCS= AASHTO=
* (no specification provided)
%Gr.Moist.Sat.eo
Swell Press.CcPcOverburdenSp.
PILLDry Dens.Natural
Project:
Remarks:Client:Project No.
AASHTOUSCSMATERIAL DESCRIPTION
CONSOLIDATION TEST REPORT
.1 .2 .5 1 2 5 10 20.040
.036
.032
.028
.024
.020
.016
.012
.008
.004
.000
Change I
n H
eig
ht
- in
.
Applied Pressure - ksf
Coefficients of Consolidation and Secondary Consolidation
No.Load(ksf)
Cv(ft.2/day)
Cα No.
Load(ksf)
Cv(ft.2/day)
Cα No.
Load(ksf)
Cv(ft.2/day)
Cα
2 0.62 0.08 0.0033 1.24 0.17 0.0014 2.48 0.00 0.0015 4.96 0.01 0.0016 9.92 0.00 0.0017 19.84 0.01 0.0008 39.68 0.07 0.000
(ksf)(ksf)(ksf)(pcf)HeaveCr
Specific Gravity is assumed.
Specimen was not saturated nor
inundated.
I-25/Cimarron Street Y&A# 213-207
Yeh & Associates108-195-06
0.5240.000.0521.572.65114.010.8 %54.4 %
Figure
Location: Mix B2, B4
=
=D100
=
=D0
Load=
Load No.=
Project:Project No.:
Dial Reading vs. Time
Cα
= 0.003
Cv @ T50
0.08 ft.2/day
T50
D50
Location: Mix B2, B4
3.49 min.
0.15120
0.14980
0.14839
0.62 ksf
2
I-25/Cimarron Street Y&A# 213-207108-195-06
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.14725
.14800
.14875
.14950
.15025
.15100
.15175
.15250
.15325
.15400
.15475
t0 4t0
FigureKnight Piesold Geotechnical Lab.
Cα
= 0.001
Cv @ T50
0.17 ft.2/day
=T50
=D100
=D50
=D0
Load=
Load No.=
Location: Mix B2, B4
1.54 min.
0.15338
0.15324
0.15310
1.24 ksf
3
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.1524
.1528
.1532
.1536
.1540
.1544
.1548
.1552
.1556
.1560
.1564
t0 4t0
=
=D100
=
=D0
Load=
Load No.=
Project:Project No.:
Dial Reading vs. Time
Cα
= 0.001
Cv @ T50
0.00 ft.2/day
T50
D50
Location: Mix B2, B4
82.60 min.
0.15829
0.15704
0.15580
2.48 ksf
4
I-25/Cimarron Street Y&A# 213-207108-195-06
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.1550
.1554
.1558
.1562
.1566
.1570
.1574
.1578
.1582
.1586
.1590
t0 4t0
FigureKnight Piesold Geotechnical Lab.
Cα
= 0.001
Cv @ T50
0.01 ft.2/day
=T50
=D100
=D50
=D0
Load=
Load No.=
Location: Mix B2, B4
41.68 min.
0.16194
0.16105
0.16016
4.96 ksf
5
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.16009
.16034
.16059
.16084
.16109
.16134
.16159
.16184
.16209
.16234
.16259
t0 4t0
=
=D100
=
=D0
Load=
Load No.=
Project:Project No.:
Dial Reading vs. Time
Cα
= 0.001
Cv @ T50
0.00 ft.2/day
T50
D50
Location: Mix B2, B4
154.02 min.
0.16259
0.16208
0.16158
9.92 ksf
6
I-25/Cimarron Street Y&A# 213-207108-195-06
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.1611
.1613
.1615
.1617
.1619
.1621
.1623
.1625
.1627
.1629
.1631
t0 4t0
FigureKnight Piesold Geotechnical Lab.
Cα
= 0.000
Cv @ T50
0.01 ft.2/day
=T50
=D100
=D50
=D0
Load=
Load No.=
Location: Mix B2, B4
51.93 min.
0.16334
0.16295
0.16257
19.84 ksf
7
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.16225
.16240
.16255
.16270
.16285
.16300
.16315
.16330
.16345
.16360
.16375
t0 4t0
=
=D100
=
=D0
Load=
Load No.=
Project:Project No.:
Dial Reading vs. Time
Cα
= 0.000
Cv @ T50
0.07 ft.2/day
T50
D50
Location: Mix B2, B4
3.54 min.
0.17096
0.16991
0.16886
39.68 ksf
8
I-25/Cimarron Street Y&A# 213-207108-195-06
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.16895
.16920
.16945
.16970
.16995
.17020
.17045
.17070
.17095
.17120
.17145
t0 4t0
FigureKnight Piesold Geotechnical Lab.
CONSOLIDATION TEST DATA
Client: Yeh & AssociatesProject: I-25/Cimarron Street Y&A# 213-207Project Number: 108-195-06
Sample Data
Source: Liquid Limit: Plasticity Index: USCS: AASHTO: Figure No.: Testing Remarks: Specific Gravity is assumed. Specimen was not saturated nor
inundated.
Test Specimen Data
TOTAL SAMPLE BEFORE TEST AFTER TESTWet w+t = 363.98 g. Consolidometer # = 3 Wet w+t = 184.32 g.Dry w+t = 340.26 g. Dry w+t = 184.02 g.Tare Wt. = 119.72 g. Spec. Gravity = 2.65 Tare Wt. = 120.86 g.Height = .75 in. Height = .75 in.Diameter = 1.90 in. Diameter = 1.94 in.Weight = 70.33 g. Defl. Table = 2013 ST7 1.9
Moisture = 10.8 % Ht. Solids = 0.4920 in. Moisture = 0.5 %Wet Den. = 126.3 pcf Dry Wt. = 66.34 g. Dry Wt. = 63.16 g.*Dry Den. = 114.0 pcf Void Ratio = 0.524 Void Ratio = 0.474
Saturation = 54.4 %
* Final dry weight used in calculations
End-of-Load Summary
Pressure(ksf)
FinalDial (in.)
MachineDefl. (in.)
Cv(ft.2/day)
Cαααα
VoidRatio
% Compression/Swell
start 0.14210 0.524
0.16 0.14780 0.00000 0.513 0.8 Comprs.
0.62 0.15555 0.00230 0.08 0.003 0.502 1.5 Comprs.
1.24 0.15990 0.00410 0.17 0.001 0.496 1.8 Comprs.
2.48 0.16470 0.00610 0.00 0.001 0.491 2.2 Comprs.
4.96 0.17020 0.00820 0.01 0.001 0.484 2.7 Comprs.
9.92 0.17350 0.01090 0.00 0.001 0.483 2.7 Comprs.
19.84 0.17665 0.01320 0.01 0.000 0.481 2.8 Comprs.
39.68 0.18690 0.01590 0.07 0.000 0.466 3.9 Comprs.
0.62 0.18000 0.01320 0.474 3.3 Comprs.
Cc = 0.05 Pc = 21.57 ksf Cr = 0.00
Knight Piesold Geotechnical Lab.
TEST READINGSPressure: 0.62 ksf Load No. 2
No. Elapsed Dial Time Reading 1 0.00 0.14780
2 0.10 0.15105
3 0.25 0.15130
4 0.50 0.15150
5 1.00 0.15170
6 2.00 0.15195
7 5.00 0.15220
8 10.00 0.15240
9 20.00 0.15270
10 30.00 0.15290
No. Elapsed Dial Time Reading11 60.00 0.15320
12 120.00 0.15350
13 240.00 0.15400
14 480.00 0.15445
15 1413.00 0.15555
.1 .5 1 2 5 20 200
.14725
.14800
.14875
.14950
.15025
.15100
.15175
.15250
.15325
.15400
.15475
t0 4t0
Void Ratio = 0.502 Compression = 1.5 % D0 = 0.14839 D50 = 0.14980 D100 = 0.15120 Cv at 3.5 min. = 0.08 ft.2/day Cαααα
= 0.003
TEST READINGSPressure: 1.24 ksf Load No. 3
No. Elapsed Dial Time Reading 1 0.00 0.15555
2 0.10 0.15700
3 0.25 0.15710
4 0.50 0.15715
5 1.00 0.15725
6 2.00 0.15740
7 5.00 0.15760
8 10.00 0.15780
9 20.00 0.15800
10 30.00 0.15810
No. Elapsed Dial Time Reading11 60.00 0.15830
12 120.00 0.15860
13 240.00 0.15900
14 480.00 0.15940
15 1478.00 0.15990
.1 .5 1 2 5 20 200
.1524
.1528
.1532
.1536
.1540
.1544
.1548
.1552
.1556
.1560
.1564
t0 4t0
Void Ratio = 0.496 Compression = 1.8 % D0 = 0.15310 D50 = 0.15324 D100 = 0.15338 Cv at 1.5 min. = 0.17 ft.2/day Cαααα
= 0.001
TEST READINGSPressure: 2.48 ksf Load No. 4
No. Elapsed Dial Time Reading 1 0.00 0.15990
2 0.10 0.16160
3 0.25 0.16170
4 0.50 0.16185
5 1.00 0.16200
6 2.00 0.16210
7 5.00 0.16230
8 10.00 0.16250
9 20.00 0.16265
10 30.00 0.16280
No. Elapsed Dial Time Reading11 60.00 0.16300
12 119.00 0.16320
13 240.00 0.16350
14 480.00 0.16400
15 4381.00 0.16470
.1 .5 1 2 5 20 200 5000
.1550
.1554
.1558
.1562
.1566
.1570
.1574
.1578
.1582
.1586
.1590
t0 4t0
Void Ratio = 0.491 Compression = 2.2 % D0 = 0.15580 D50 = 0.15704 D100 = 0.15829 Cv at 82.6 min. = 0.00 ft.2/day Cαααα
= 0.001
Knight Piesold Geotechnical Lab.
TEST READINGSPressure: 4.96 ksf Load No. 5
No. Elapsed Dial Time Reading 1 0.00 0.16470
2 0.10 0.16855
3 0.25 0.16865
4 0.50 0.16870
5 1.00 0.16875
6 2.00 0.16885
7 5.00 0.16895
8 10.00 0.16900
9 20.00 0.16910
10 30.00 0.16915
No. Elapsed Dial Time Reading11 60.00 0.16930
12 120.00 0.16950
13 240.00 0.16970
14 480.00 0.17000
15 1338.00 0.17020
.1 .5 1 2 5 20 200
.16009
.16034
.16059
.16084
.16109
.16134
.16159
.16184
.16209
.16234
.16259
t0 4t0
Void Ratio = 0.484 Compression = 2.7 % D0 = 0.16016 D50 = 0.16105 D100 = 0.16194 Cv at 41.7 min. = 0.01 ft.2/day Cαααα
= 0.001
TEST READINGSPressure: 9.92 ksf Load No. 6
No. Elapsed Dial Time Reading 1 0.00 0.17020
2 0.10 0.17220
3 0.25 0.17225
4 0.50 0.17230
5 1.00 0.17235
6 2.00 0.17240
7 5.00 0.17245
8 10.00 0.17250
9 20.00 0.17260
10 30.00 0.17265
No. Elapsed Dial Time Reading11 60.00 0.17280
12 120.00 0.17295
13 240.00 0.17310
14 461.00 0.17320
15 1436.00 0.17350
.1 .5 1 2 5 20 200
.1611
.1613
.1615
.1617
.1619
.1621
.1623
.1625
.1627
.1629
.1631
t0 4t0
Void Ratio = 0.483 Compression = 2.7 % D0 = 0.16158 D50 = 0.16208 D100 = 0.16259 Cv at 154.0 min. = 0.00 ft.2/day Cαααα
= 0.001
TEST READINGSPressure: 19.84 ksf Load No. 7
No. Elapsed Dial Time Reading 1 0.00 0.17350
2 0.10 0.17560
3 0.25 0.17570
4 0.50 0.17575
5 1.00 0.17580
6 2.00 0.17585
7 5.00 0.17590
8 10.00 0.17595
9 20.00 0.17605
10 30.00 0.17610
No. Elapsed Dial Time Reading11 60.00 0.17615
12 118.00 0.17625
13 240.00 0.17640
14 480.00 0.17650
15 1428.00 0.17665
.1 .5 1 2 5 20 200
.16225
.16240
.16255
.16270
.16285
.16300
.16315
.16330
.16345
.16360
.16375
t0 4t0
Void Ratio = 0.481 Compression = 2.8 % D0 = 0.16257 D50 = 0.16295 D100 = 0.16334 Cv at 51.9 min. = 0.01 ft.2/day Cαααα
= 0.000
Knight Piesold Geotechnical Lab.
TEST READINGSPressure: 39.68 ksf Load No. 8
No. Elapsed Dial Time Reading 1 0.00 0.17665
2 0.10 0.18510
3 0.25 0.18530
4 0.50 0.18545
5 1.00 0.18560
6 2.00 0.18570
7 5.00 0.18590
8 10.00 0.18600
9 20.00 0.18610
10 30.00 0.18620
No. Elapsed Dial Time Reading11 60.00 0.18630
12 120.00 0.18645
13 240.00 0.18655
14 480.00 0.18680
15 1503.00 0.18690
.1 .5 1 2 5 20 200
.16895
.16920
.16945
.16970
.16995
.17020
.17045
.17070
.17095
.17120
.17145
t0 4t0
Void Ratio = 0.466 Compression = 3.9 % D0 = 0.16886 D50 = 0.16991 D100 = 0.17096 Cv at 3.5 min. = 0.07 ft.2/day Cαααα
= 0.000
Knight Piesold Geotechnical Lab.
%Gr.Moist.Sat.eo
Swell Press.CcPcOverburdenSp.
PILLDry Dens.Natural
Project:
Remarks:Client:Project No.
AASHTOUSCSMATERIAL DESCRIPTION
CONSOLIDATION TEST REPORT
.1 .2 .5 1 2 5 10 20.045
.041
.037
.033
.029
.025
.021
.017
.013
.009
.005
Change I
n H
eig
ht
- in
.
Applied Pressure - ksf
Coefficients of Consolidation and Secondary Consolidation
No.Load(ksf)
Cv(ft.2/day)
Cα No.
Load(ksf)
Cv(ft.2/day)
Cα No.
Load(ksf)
Cv(ft.2/day)
Cα
2 0.62 0.08 0.0033 1.24 0.57 0.0034 2.48 0.02 0.0075 4.96 0.09 0.0016 9.92 0.04 0.0037 19.84 0.02 0.0038 39.68 0.10 0.003
(ksf)(ksf)(ksf)(pcf)HeaveCr
Specific Gravity is assumed.
Specimen was not saturated or
inundated.
I-25/Cimarron Street Y&A# 213-207
Yeh & Associates108-195-06
0.4650.010.031.442.652336110.419.6 %111.5 %
Figure
Location: B-8 @ 5'
=
=D100
=
=D0
Load=
Load No.=
Project:Project No.:
Dial Reading vs. Time
Cα
= 0.003
Cv @ T50
0.08 ft.2/day
T50
D50
Location: B-8 @ 5'
3.24 min.
0.12019
0.11987
0.11956
0.62 ksf
2
I-25/Cimarron Street Y&A# 213-207108-195-06
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.11784
.11909
.12034
.12159
.12284
.12409
.12534
.12659
.12784
.12909
.13034
t0 4t0
FigureKnight Piesold Geotechnical Lab.
Cα
= 0.003
Cv @ T50
0.57 ft.2/day
=T50
=D100
=D50
=D0
Load=
Load No.=
Location: B-8 @ 5'
0.46 min.
0.12260
0.12189
0.12119
1.24 ksf
3
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.12010
.12085
.12160
.12235
.12310
.12385
.12460
.12535
.12610
.12685
.12760
t0 4t0
=
=D100
=
=D0
Load=
Load No.=
Project:Project No.:
Dial Reading vs. Time
Cα
= 0.007
Cv @ T50
0.02 ft.2/day
T50
D50
Location: B-8 @ 5'
11.54 min.
0.12414
0.12386
0.12358
2.48 ksf
4
I-25/Cimarron Street Y&A# 213-207108-195-06
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.12184
.12309
.12434
.12559
.12684
.12809
.12934
.13059
.13184
.13309
.13434
t0 4t0
FigureKnight Piesold Geotechnical Lab.
Cα
= 0.001
Cv @ T50
0.09 ft.2/day
=T50
=D100
=D50
=D0
Load=
Load No.=
Location: B-8 @ 5'
2.78 min.
0.13147
0.13133
0.13120
4.96 ksf
5
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.1304
.1309
.1314
.1319
.1324
.1329
.1334
.1339
.1344
.1349
.1354
t0 4t0
=
=D100
=
=D0
Load=
Load No.=
Project:Project No.:
Dial Reading vs. Time
Cα
= 0.003
Cv @ T50
0.04 ft.2/day
T50
D50
Location: B-8 @ 5'
6.79 min.
0.13792
0.13723
0.13654
9.92 ksf
6
I-25/Cimarron Street Y&A# 213-207108-195-06
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.1361
.1366
.1371
.1376
.1381
.1386
.1391
.1396
.1401
.1406
.1411
t0 4t0
FigureKnight Piesold Geotechnical Lab.
Cα
= 0.003
Cv @ T50
0.02 ft.2/day
=T50
=D100
=D50
=D0
Load=
Load No.=
Location: B-8 @ 5'
13.53 min.
0.14155
0.14098
0.14041
19.84 ksf
7
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.1396
.1401
.1406
.1411
.1416
.1421
.1426
.1431
.1436
.1441
.1446
t0 4t0
=
=D100
=
=D0
Load=
Load No.=
Project:Project No.:
Dial Reading vs. Time
Cα
= 0.003
Cv @ T50
0.10 ft.2/day
T50
D50
Location: B-8 @ 5'
2.47 min.
0.14583
0.14525
0.14468
39.68 ksf
8
I-25/Cimarron Street Y&A# 213-207108-195-06
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.14304
.14379
.14454
.14529
.14604
.14679
.14754
.14829
.14904
.14979
.15054
t0 4t0
FigureKnight Piesold Geotechnical Lab.
CONSOLIDATION TEST DATA
Client: Yeh & AssociatesProject: I-25/Cimarron Street Y&A# 213-207Project Number: 108-195-06
Sample Data
Source: Liquid Limit: 36 Plasticity Index: 23USCS: AASHTO: Figure No.: Testing Remarks: Specific Gravity is assumed. Specimen was not saturated or
inundated.
Test Specimen Data
TOTAL SAMPLE BEFORE TEST AFTER TESTWet w+t = 252.21 g. Consolidometer # = 3 Wet w+t = 186.50 g.Dry w+t = 230.53 g. Dry w+t = 185.02 g.Tare Wt. = 119.69 g. Spec. Gravity = 2.65 Tare Wt. = 119.29 g.Height = .75 in. Height = .75 in.Diameter = 1.93 in. Diameter = 1.94 in.Weight = 75.92 g. Defl. Table = 2013 ST5 1.9
Moisture = 19.6 % Ht. Solids = 0.5121 in. Moisture = 2.3 %Wet Den. = 132.0 pcf Dry Wt. = 64.23 g. Dry Wt. = 65.73 g.*Dry Den. = 110.4 pcf Void Ratio = 0.465 Void Ratio = 0.396
Saturation = 111.5 %
* Final dry weight used in calculations
End-of-Load Summary
Pressure(ksf)
FinalDial (in.)
MachineDefl. (in.)
Cv(ft.2/day)
Cαααα
VoidRatio
% Compression/Swell
start 0.10840 0.465
0.16 0.11840 0.00010 0.445 1.3 Comprs.
0.62 0.13000 0.00210 0.08 0.003 0.427 2.6 Comprs.
1.24 0.13505 0.00910 0.57 0.003 0.430 2.3 Comprs.
2.48 0.14380 0.01250 0.02 0.007 0.420 3.1 Comprs.
4.96 0.15150 0.01700 0.09 0.001 0.414 3.5 Comprs.
9.92 0.15900 0.01880 0.04 0.003 0.403 4.2 Comprs.
19.84 0.16550 0.02140 0.02 0.003 0.395 4.8 Comprs.
39.68 0.17280 0.02410 0.10 0.003 0.386 5.4 Comprs.
0.62 0.16475 0.02110 0.396 4.7 Comprs.
Cc = 0.03 Pc = 1.44 ksf Cr = 0.01
Knight Piesold Geotechnical Lab.
TEST READINGSPressure: 0.62 ksf Load No. 2
No. Elapsed Dial Time Reading 1 0.00 0.11840
2 0.10 0.12120
3 0.25 0.12140
4 0.50 0.12150
5 1.00 0.12160
6 2.00 0.12180
7 5.00 0.12205
8 10.00 0.12230
9 20.00 0.12260
10 30.00 0.12280
No. Elapsed Dial Time Reading11 60.00 0.12330
12 120.00 0.12400
13 240.00 0.12490
14 480.00 0.12640
15 1413.00 0.13000
.1 .5 1 2 5 20 200
.11784
.11909
.12034
.12159
.12284
.12409
.12534
.12659
.12784
.12909
.13034
t0 4t0
Void Ratio = 0.427 Compression = 2.6 % D0 = 0.11956 D50 = 0.11987 D100 = 0.12019 Cv at 3.2 min. = 0.08 ft.2/day Cαααα
= 0.003
TEST READINGSPressure: 1.24 ksf Load No. 3
No. Elapsed Dial Time Reading 1 0.00 0.13000
2 0.10 0.13070
3 0.25 0.13080
4 0.50 0.13090
5 1.00 0.13100
6 2.00 0.13150
7 5.00 0.13155
8 10.00 0.13160
9 20.00 0.13170
10 30.00 0.13190
No. Elapsed Dial Time Reading11 60.00 0.13215
12 120.00 0.13250
13 240.00 0.13310
14 480.00 0.13410
15 1479.00 0.13505
.1 .5 1 2 5 20 200
.12010
.12085
.12160
.12235
.12310
.12385
.12460
.12535
.12610
.12685
.12760
t0 4t0
Void Ratio = 0.430 Compression = 2.3 % D0 = 0.12119 D50 = 0.12189 D100 = 0.12260 Cv at 0.5 min. = 0.57 ft.2/day Cαααα
= 0.003
TEST READINGSPressure: 2.48 ksf Load No. 4
No. Elapsed Dial Time Reading 1 0.00 0.13505
2 0.10 0.13560
3 0.25 0.13565
4 0.50 0.13580
5 1.00 0.13600
6 5.00 0.13620
7 10.00 0.13645
8 20.00 0.13645
9 30.00 0.13665
10 60.00 0.13700
No. Elapsed Dial Time Reading11 120.00 0.13740
12 240.00 0.13815
13 480.00 0.13910
14 4382.00 0.14380
.1 .5 1 2 5 20 200 5000
.12184
.12309
.12434
.12559
.12684
.12809
.12934
.13059
.13184
.13309
.13434
t0 4t0
Void Ratio = 0.420 Compression = 3.1 % D0 = 0.12358 D50 = 0.12386 D100 = 0.12414 Cv at 11.5 min. = 0.02 ft.2/day Cαααα
= 0.007
Knight Piesold Geotechnical Lab.
TEST READINGSPressure: 4.96 ksf Load No. 5
No. Elapsed Dial Time Reading 1 0.00 0.14380
2 0.10 0.14800
3 0.25 0.14810
4 0.50 0.14815
5 1.00 0.14820
6 2.00 0.14830
7 5.00 0.14840
8 10.00 0.14850
9 20.00 0.14860
10 30.00 0.14870
No. Elapsed Dial Time Reading11 60.00 0.14885
12 120.00 0.14920
13 240.00 0.14960
14 480.00 0.15020
15 1338.00 0.15150
.1 .5 1 2 5 20 200
.1304
.1309
.1314
.1319
.1324
.1329
.1334
.1339
.1344
.1349
.1354
t0 4t0
Void Ratio = 0.414 Compression = 3.5 % D0 = 0.13120 D50 = 0.13133 D100 = 0.13147 Cv at 2.8 min. = 0.09 ft.2/day Cαααα
= 0.001
TEST READINGSPressure: 9.92 ksf Load No. 6
No. Elapsed Dial Time Reading 1 0.00 0.15150
2 0.10 0.15545
3 0.25 0.15560
4 0.50 0.15565
5 1.00 0.15570
6 2.00 0.15580
7 5.00 0.15595
8 10.00 0.15610
9 20.00 0.15630
10 30.00 0.15640
No. Elapsed Dial Time Reading11 60.00 0.15660
12 120.00 0.15690
13 240.00 0.15730
14 467.00 0.15780
15 1437.00 0.15900
.1 .5 1 2 5 20 200
.1361
.1366
.1371
.1376
.1381
.1386
.1391
.1396
.1401
.1406
.1411
t0 4t0
Void Ratio = 0.403 Compression = 4.2 % D0 = 0.13654 D50 = 0.13723 D100 = 0.13792 Cv at 6.8 min. = 0.04 ft.2/day Cαααα
= 0.003
TEST READINGSPressure: 19.84 ksf Load No. 7
No. Elapsed Dial Time Reading 1 0.00 0.15900
2 0.10 0.16155
3 0.25 0.16165
4 0.50 0.16175
5 1.00 .1618.5
6 2.00 0.16200
7 5.00 0.16220
8 10.00 0.16230
9 20.00 0.16250
10 30.00 0.16260
No. Elapsed Dial Time Reading11 63.00 0.16290
12 120.00 0.16330
13 240.00 0.16370
14 480.00 0.16440
15 1429.00 0.16550
.1 .5 1 2 5 20 200
.1396
.1401
.1406
.1411
.1416
.1421
.1426
.1431
.1436
.1441
.1446
t0 4t0
Void Ratio = 0.395 Compression = 4.8 % D0 = 0.14041 D50 = 0.14098 D100 = 0.14155 Cv at 13.5 min. = 0.02 ft.2/day Cαααα
= 0.003
Knight Piesold Geotechnical Lab.
TEST READINGSPressure: 39.68 ksf Load No. 8
No. Elapsed Dial Time Reading 1 0.00 0.16550
2 0.10 0.16865
3 0.25 0.16885
4 0.50 0.16900
5 1.00 0.16920
6 2.00 0.16930
7 5.00 0.16955
8 10.00 0.16970
9 20.00 0.17000
10 30.00 0.17010
No. Elapsed Dial Time Reading11 60.00 0.17050
12 120.00 0.17085
13 240.00 0.17130
14 480.00 0.17185
15 1507.00 0.17280
.1 .5 1 2 5 20 200
.14304
.14379
.14454
.14529
.14604
.14679
.14754
.14829
.14904
.14979
.15054
t0 4t0
Void Ratio = 0.386 Compression = 5.4 % D0 = 0.14468 D50 = 0.14525 D100 = 0.14583 Cv at 2.5 min. = 0.10 ft.2/day Cαααα
= 0.003
Knight Piesold Geotechnical Lab.
%Gr.Moist.Sat.eo
Swell Press.CcPcOverburdenSp.
PILLDry Dens.Natural
Project:
Remarks:Client:Project No.
AASHTOUSCSMATERIAL DESCRIPTION
CONSOLIDATION TEST REPORT
.1 .2 .5 1 2 5 10 20.040
.036
.032
.028
.024
.020
.016
.012
.008
.004
.000
Change I
n H
eig
ht
- in
.
Applied Pressure - ksf
Coefficients of Consolidation and Secondary Consolidation
No.Load(ksf)
Cv(ft.2/day)
Cα No.
Load(ksf)
Cv(ft.2/day)
Cα No.
Load(ksf)
Cv(ft.2/day)
Cα
2 0.62 0.22 0.0033 1.24 0.04 0.0034 2.48 0.05 0.0025 4.96 0.02 0.0036 9.92 0.03 0.0037 19.84 0.06 0.0028 39.68 0.31 0.002
(ksf)(ksf)(ksf)(pcf)HeaveCr
Specific Gravity is assumed.
Specimen was not saturated or
inundated.
I-25/Cimarron Street Y&A# 213-207
Yeh & Associates108-195-06
0.4700.000.045.502.652336115.614.4 %81.2 %
Figure
Location: B-9 @ 10'
=
=D100
=
=D0
Load=
Load No.=
Project:Project No.:
Dial Reading vs. Time
Cα
= 0.003
Cv @ T50
0.22 ft.2/day
T50
D50
Location: B-9 @ 10'
1.22 min.
0.12883
0.12809
0.12735
0.62 ksf
2
I-25/Cimarron Street Y&A# 213-207108-195-06
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.12684
.12759
.12834
.12909
.12984
.13059
.13134
.13209
.13284
.13359
.13434
t0 4t0
FigureKnight Piesold Geotechnical Lab.
Cα
= 0.003
Cv @ T50
0.04 ft.2/day
=T50
=D100
=D50
=D0
Load=
Load No.=
Location: B-9 @ 10'
6.50 min.
0.13333
0.13311
0.13290
1.24 ksf
3
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.13099
.13174
.13249
.13324
.13399
.13474
.13549
.13624
.13699
.13774
.13849
t0 4t0
=
=D100
=
=D0
Load=
Load No.=
Project:Project No.:
Dial Reading vs. Time
Cα
= 0.002
Cv @ T50
0.05 ft.2/day
T50
D50
Location: B-9 @ 10'
4.85 min.
0.13765
0.13745
0.13725
2.48 ksf
4
I-25/Cimarron Street Y&A# 213-207108-195-06
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.136
.137
.138
.139
.140
.141
.142
.143
.144
.145
.146
t0 4t0
FigureKnight Piesold Geotechnical Lab.
Cα
= 0.003
Cv @ T50
0.02 ft.2/day
=T50
=D100
=D50
=D0
Load=
Load No.=
Location: B-9 @ 10'
16.33 min.
0.14621
0.14587
0.14553
4.96 ksf
5
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.1450
.1454
.1458
.1462
.1466
.1470
.1474
.1478
.1482
.1486
.1490
t0 4t0
=
=D100
=
=D0
Load=
Load No.=
Project:Project No.:
Dial Reading vs. Time
Cα
= 0.003
Cv @ T50
0.03 ft.2/day
T50
D50
Location: B-9 @ 10'
7.72 min.
0.14835
0.14816
0.14798
9.92 ksf
6
I-25/Cimarron Street Y&A# 213-207108-195-06
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.1477
.1480
.1483
.1486
.1489
.1492
.1495
.1498
.1501
.1504
.1507
t0 4t0
FigureKnight Piesold Geotechnical Lab.
Cα
= 0.002
Cv @ T50
0.06 ft.2/day
=T50
=D100
=D50
=D0
Load=
Load No.=
Location: B-9 @ 10'
4.25 min.
0.15092
0.15067
0.15042
19.84 ksf
7
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.1496
.1500
.1504
.1508
.1512
.1516
.1520
.1524
.1528
.1532
.1536
t0 4t0
=
=D100
=
=D0
Load=
Load No.=
Project:Project No.:
Dial Reading vs. Time
Cα
= 0.002
Cv @ T50
0.31 ft.2/day
T50
D50
Location: B-9 @ 10'
0.83 min.
0.15610
0.15553
0.15496
39.68 ksf
8
I-25/Cimarron Street Y&A# 213-207108-195-06
Dia
l R
eadin
g (
in.)
Elapsed Time (min.).1 .2 .5 1 2 5 10 20 50 200 500 2000
.1548
.1552
.1556
.1560
.1564
.1568
.1572
.1576
.1580
.1584
.1588
t0 4t0
FigureKnight Piesold Geotechnical Lab.
CONSOLIDATION TEST DATA
Client: Yeh & AssociatesProject: I-25/Cimarron Street Y&A# 213-207Project Number: 108-195-06
Sample Data
Source: Liquid Limit: 36 Plasticity Index: 23USCS: AASHTO: Figure No.: Testing Remarks: Specific Gravity is assumed. Specimen was not saturated or
inundated.
Test Specimen Data
TOTAL SAMPLE BEFORE TEST AFTER TESTWet w+t = 265.29 g. Consolidometer # = 3 Wet w+t = 186.90 g.Dry w+t = 247.11 g. Dry w+t = 185.18 g.Tare Wt. = 120.86 g. Spec. Gravity = 2.65 Tare Wt. = 119.69 g.Height = .75 in. Height = .75 in.Diameter = 1.93 in. Diameter = 1.94 in.Weight = 76.32 g. Defl. Table = 2013 ST6 1.9
Moisture = 14.4 % Ht. Solids = 0.5102 in. Moisture = 2.6 %Wet Den. = 132.2 pcf Dry Wt. = 67.27 g. Dry Wt. = 65.49 g.*Dry Den. = 115.6 pcf Void Ratio = 0.470 Void Ratio = 0.402
Saturation = 81.2 %
* Final dry weight used in calculations
End-of-Load Summary
Pressure(ksf)
FinalDial (in.)
MachineDefl. (in.)
Cv(ft.2/day)
Cαααα
VoidRatio
% Compression/Swell
start 0.12200 0.470
0.16 0.12600 0.00000 0.462 0.5 Comprs.
0.62 0.13430 0.00070 0.22 0.003 0.447 1.5 Comprs.
1.24 0.13930 0.00280 0.04 0.003 0.442 1.9 Comprs.
2.48 0.14810 0.00400 0.05 0.002 0.427 2.9 Comprs.
4.96 0.15485 0.00650 0.02 0.003 0.418 3.5 Comprs.
9.92 0.15940 0.00900 0.03 0.003 0.414 3.8 Comprs.
19.84 0.16550 0.01250 0.06 0.002 0.409 4.1 Comprs.
39.68 0.17420 0.01590 0.31 0.002 0.399 4.8 Comprs.
0.62 0.16710 0.01030 0.402 4.6 Comprs.
Cc = 0.04 Pc = 5.50 ksf Cr = 0.00
Knight Piesold Geotechnical Lab.
TEST READINGSPressure: 0.62 ksf Load No. 2
No. Elapsed Dial Time Reading 1 0.00 0.12600
2 0.10 0.12830
3 0.25 0.12840
4 0.50 0.12860
5 1.00 0.12875
6 2.00 0.12890
7 5.00 0.12910
8 10.00 0.12930
9 20.00 0.12940
10 30.00 0.12960
No. Elapsed Dial Time Reading11 60.00 0.13000
12 120.00 0.13030
13 240.00 0.13090
14 480.00 0.13190
15 1414.00 0.13430
.1 .5 1 2 5 20 200
.12684
.12759
.12834
.12909
.12984
.13059
.13134
.13209
.13284
.13359
.13434
t0 4t0
Void Ratio = 0.447 Compression = 1.5 % D0 = 0.12735 D50 = 0.12809 D100 = 0.12883 Cv at 1.2 min. = 0.22 ft.2/day Cαααα
= 0.003
TEST READINGSPressure: 1.24 ksf Load No. 3
No. Elapsed Dial Time Reading 1 0.00 0.13430
2 0.10 0.13530
3 0.25 0.13540
4 0.50 0.13550
5 1.00 0.13560
6 2.00 0.13570
7 5.00 0.13590
8 10.00 0.13605
9 20.00 0.13625
10 30.00 0.13630
No. Elapsed Dial Time Reading11 60.00 0.13660
12 120.00 0.13700
13 240.00 0.13750
14 480.00 0.13820
15 1478.00 0.13930
.1 .5 1 2 5 20 200
.13099
.13174
.13249
.13324
.13399
.13474
.13549
.13624
.13699
.13774
.13849
t0 4t0
Void Ratio = 0.442 Compression = 1.9 % D0 = 0.13290 D50 = 0.13311 D100 = 0.13333 Cv at 6.5 min. = 0.04 ft.2/day Cαααα
= 0.003
TEST READINGSPressure: 2.48 ksf Load No. 4
No. Elapsed Dial Time Reading 1 0.00 0.13930
2 0.10 0.14080
3 0.25 0.14100
4 0.50 0.14110
5 1.00 0.14115
6 2.00 0.14125
7 5.00 0.14140
8 10.00 0.14150
9 20.00 0.14180
10 30.00 0.14190
No. Elapsed Dial Time Reading11 60.00 0.14215
12 120.00 0.14240
13 240.00 0.14290
14 480.00 0.14360
15 4381.00 0.14810
.1 .5 1 2 5 20 200 5000
.136
.137
.138
.139
.140
.141
.142
.143
.144
.145
.146
t0 4t0
Void Ratio = 0.427 Compression = 2.9 % D0 = 0.13725 D50 = 0.13745 D100 = 0.13765 Cv at 4.9 min. = 0.05 ft.2/day Cαααα
= 0.002
Knight Piesold Geotechnical Lab.
TEST READINGSPressure: 4.96 ksf Load No. 5
No. Elapsed Dial Time Reading 1 0.00 0.15010
2 0.10 0.15190
3 0.25 0.15195
4 0.50 0.15200
5 1.00 0.15205
6 2.00 0.15210
7 5.00 0.15220
8 10.00 0.15230
9 20.00 0.15240
10 30.00 0.15250
No. Elapsed Dial Time Reading11 60.00 0.15270
12 120.00 0.15300
13 240.00 0.15335
14 480.00 0.15390
15 1338.00 0.15485
.1 .5 1 2 5 20 200
.1450
.1454
.1458
.1462
.1466
.1470
.1474
.1478
.1482
.1486
.1490
t0 4t0
Void Ratio = 0.418 Compression = 3.5 % D0 = 0.14553 D50 = 0.14587 D100 = 0.14621 Cv at 16.3 min. = 0.02 ft.2/day Cαααα
= 0.003
TEST READINGSPressure: 9.92 ksf Load No. 6
No. Elapsed Dial Time Reading 1 0.00 0.15485
2 0.10 0.15680
3 0.25 0.15685
4 0.50 0.15690
5 1.00 0.15700
6 2.00 0.15705
7 5.00 0.15715
8 10.00 0.15720
9 20.00 0.15730
10 30.00 0.15735
No. Elapsed Dial Time Reading11 61.00 0.15750
12 120.00 0.15780
13 240.00 0.15810
14 464.00 0.15850
15 1436.00 0.15940
.1 .5 1 2 5 20 200
.1477
.1480
.1483
.1486
.1489
.1492
.1495
.1498
.1501
.1504
.1507
t0 4t0
Void Ratio = 0.414 Compression = 3.8 % D0 = 0.14798 D50 = 0.14816 D100 = 0.14835 Cv at 7.7 min. = 0.03 ft.2/day Cαααα
= 0.003
TEST READINGSPressure: 19.84 ksf Load No. 7
No. Elapsed Dial Time Reading 1 0.00 0.15940
2 0.10 0.16260
3 0.25 0.16270
4 0.50 0.16285
5 1.00 0.16300
6 2.00 0.16310
7 5.00 0.16320
8 10.00 0.16330
9 20.00 0.16350
10 30.00 0.16360
No. Elapsed Dial Time Reading11 61.00 0.16385
12 120.00 0.16410
13 240.00 0.16440
14 480.00 0.16490
15 1428.00 0.16550
.1 .5 1 2 5 20 200
.1496
.1500
.1504
.1508
.1512
.1516
.1520
.1524
.1528
.1532
.1536
t0 4t0
Void Ratio = 0.409 Compression = 4.1 % D0 = 0.15042 D50 = 0.15067 D100 = 0.15092 Cv at 4.3 min. = 0.06 ft.2/day Cαααα
= 0.002
Knight Piesold Geotechnical Lab.
TEST READINGSPressure: 39.68 ksf Load No. 8
No. Elapsed Dial Time Reading 1 0.00 0.16550
2 0.10 0.17110
3 0.25 0.17125
4 0.50 0.17130
5 1.00 0.17145
6 2.00 0.17160
7 5.00 0.17180
8 10.00 0.17195
9 20.00 0.17210
10 30.00 0.17220
No. Elapsed Dial Time Reading11 60.00 0.17245
12 120.00 0.17270
13 240.00 0.17310
14 480.00 0.17355
15 1505.00 0.17420
.1 .5 1 2 5 20 200
.1548
.1552
.1556
.1560
.1564
.1568
.1572
.1576
.1580
.1584
.1588
t0 4t0
Void Ratio = 0.399 Compression = 4.8 % D0 = 0.15496 D50 = 0.15553 D100 = 0.15610 Cv at 0.8 min. = 0.31 ft.2/day Cαααα
= 0.002
Knight Piesold Geotechnical Lab.