    QUESTION 1a) List the characteristics of a project.

    b) Briefly describe the services provided by the Project Ma nagem ent Institute.(5 marks)

    (10 marks)c) Acco rding to Arc hibald (1992), checklists are useful at all stages of a project includingduring project closure. Discuss at least FIVE (5) benefits of a check list for projectclosure. (10 marks)

    QUESTION 2a) Draw an activity netwo rk using precede nce diagram to represent the project of digginga well using the information provided in Table Q2-1. The precedence relationships areall direct finish-to-start relationships with no lag except for the following: Activity A to B : SS lag 3 Activity B to C : FF (2 marks)

    ACTIVITYIDENTIFIERABCDEFGH

    ACTIVITYClear siteObtain materialsObtain pumpPrepare apronDig wellInstall pumpTrain maintainersRun trials

    PREDECESSORS---

    A,BDC,ECF,G

    DURATIONDAYS )12425122

    Table Q2-1

    SUN5121926

    MON6132027

    September 201TUES7142128

    WED18152229

    0 THURS29162330

    FRI310172431

    SAT4111825

    Table Q2-2

    Hak Cipta Universi t i Teknologi MARA CONFIDENTIAL

  • 8/12/2019 final ecm527-april

    3/5

    CONFIDENTIAL 3 EC/APR 2010/ECM527

    Assum e the project will start on 1 September 2010, based on the calendar provided inTable Q2-2.Mondays to Saturdays will be working days, while Sunday will be considered asnon working day. Public holidays will remain as working days. Based on the giveninformation, answer the following que stions:i) Gen erate the values for the earliest and latest start dates: and earliest and latest finishdates for each activity. (16 marks)ii) Calculate the Free Float values for activity A and B. (4 marks)iii) Differentiate Tota l Float and Free Float. (3 marks)

    QUESTION 3a) Prepare the questions that should be asked by you , as a Project Manager, to theclient and key stakeholders during the Project Definition phase in a project. (14 marks)b) A road cons truction project is reported as date to be having the progress as follows:

    Planned Value (PV) = RM 150, 000Earned Value (EV) = RM 170, 000Actual Cost (AC) = RM 190, 000Budget at Com pletion (BAC) = RM 500, 000Prepare an Earned Value Analysis for the project based on the information givenabove. (11 marks)

    QUESTION 4a) List out the midd le manage r's respon sibilities.

    (5 marks)b) Osman is considering investing some money that he inherited. The following payoffTable Q4-1 gives the profits that would be realized during the next year for each ofthree investment alternatives O sman is considering :

    DECISIONALTERNATIVEStock marketBondsDo nothing

    STATE OF NATUREGOOD ECONOMYRM 80,000.00RM 30,000.00RM 23,000.00

    POOR ECONOMYRM -20,000.00RM 20,000.00RM 23,000.00Table Q4-1

    Hak Cipta Universit i Teknologi MARA C O N F ID E N T IA L

  • 8/12/2019 final ecm527-april

    4/5

    CONFIDENTIAL 4 EC/APR 2010/ECM527

    i) The Maximax criterion. (5 marks)ii) The Max imin criterion. (5 marks)

    c) Com pare the alternatives of excavating machine shown below on the basis of PresentWorth (PW ) analysis. The cost and benefits of the alternatives are as shown inTable Q4-2. Calculations can be done using the Table of Interest Factors for DiscreteCompo unding of 12 , as given inTable Q4-3. (10 marks)

    First Cost ( RM )Monthly op erating cost ( RM )Salvage value ( RM )Li fe (years)

    Machine Y70,000.001 200.007,000.003

    Machine Z90,000.00900.0010,000.003Table Q4-2

    Hak Cipta Universi t i Teknologi MARA CONFIDENTIAL

  • 8/12/2019 final ecm527-april

    5/5

    5 EC/APRSingle Paym ent Equ al Paym ent Ser ies Gra dien t Scr ies

    N12345

    ComparandAmountFactorFSPJJi)

    1 12001 25441 40491 57351.762 J

    Presentorth

    Factorf/VRWI0.89290.79720.71180 63550.5674

    C o m p o u n dAmountFactorF/Ajji)

    1 00002.12003 37444.77936 3528

    SinkingF u n d

    Factorwww1 00000.47170 29630.20920.1574

    PresentWor thFactorP/A,iN)0.89291 69012.40183 03733 6048

    Capi talRecovery

    FactorAWJi)1 12000.59170 41630.32920.2774

    GradientUniform

    Series

    0.00000.47170.92461 35891 7746

    GradientPresentWorthmttiv)0.00000.79722.22084.12736 3970

    JV1

    T345

    6789

    10

    1.97382.21072.47602.77313.1058

    0.50660.45230.40390.36060.3220

    8.1152IO.O89012.299714.775717.5487

    0.12320.09910.08130.06770.0570

    4.11144.56384.96765.32825.6502

    0.24320.21910.20130.18770.1770

    2 .17202.55152.91313.25743.5847

    8.930211.644314.471417.356320.2541

    6789

    101112131415

    3 47853 89604.36354.88715 4736

    0 28750.25670.22920.20460.1827

    20.654624.133128.029132.392637.2797

    0.04840.04140.03570.03090.0268

    5 93776 19446 42356 62826 8109

    0.16840.16140.15570.15090.1468

    3 89534.18974.46834.73174.9803

    23.128825.952328.702431.362433.92021

    II12131415

    1617181920

    6.13046.86607.69008.61289.6463

    0.16310.14560.13000.11610.1037

    42.753348.883755.749763.439772.0524

    0.0234O.02O50.01790.01580.0139

    6 97407 11967 24977 36587 4694

    0.14340 14050.13790.13580.1339

    5 21475 43535 64275 83756 0202

    36.367038.697340.908042.997944.9676

    1617SI1920

    2122232425

    10.803812.100313.552315.178617.0001

    0.09260.08260.07380.06590.0588

    81.698792.5026104.6029118.1552133.3339

    0.01220.01080.00960 00850 0075

    7 56207 64467 71847 78437 8431

    0.13220.13080.12960 12850 1275

    6 19136 35146 50106 64066 7708

    46.818848.554350.177651.692953.1046

    2122232425

    2627282930

    19.040121.324923.883926.749929.9599

    0 05250.04690.O4190.03740.0334

    150.3339169.3740190.6989214.5828241.3327

    0.00670.00590.00520.00470 0041

    7 89577 94267 98448 02188 0552

    0.12670.12590.12520.12470 1241

    6 89217 00497 10987 20717 2974

    54.417755.636956.767457,814158.7821

    2627282930

    3132333435

    33.555137.581742.091547.142552.7996

    0.02980.02660.02380.02120.0189

    271 .2926304.8477342.4294384.5210431 .6635

    0.00370.00330.00290.00260.0023

    8.08508.11168.13548.15668.1755

    0.12370.12330.12290.12260.1223

    7.38117.45867.53027.59657.6577

    59.676160.501061.261261.961262.6052

    3132333435

    4 045505560

    93.05IO163.9876289.0022509.3206897.5969

    0.01070 00610 00350.00200 0011

    767.09141358.23002400.01824236.00507471.6411

    0 00130.00070.00040.00020 0001

    8 24388 28258 30458 31708 3240

    0 12130.12070.12040.12020 1201

    7 89888 05728 15978 22518 2664

    65.115966.734267.762468.408268.8100

    4045505560

    Table Q4-3 Interest Factors for Discrete Co m pu nd ing of 12

    END OF QUESTION PAPER Hak Cipta Universit i Teknologi MARA C O N FI D E N TI A L