DMADV Steps
Define High level customer requirements and then Define project goals and objectives
DEFINE
Establish key Measures of project success based on the key customer requirements
MEASURE
Analyze design options
ANALYZE
Create the detailed construction design based on the chosen building design
DESIGN
Construct and verify the design process
VERIFY
8/13/2019 Final Dmadv
3/39
Business Case
As we know nowadays because of the cost energy and make a friendly environment, peoplelooking for something new. This is about consumer requesting. Constructors are also verywelcome to find a way to sell better and most profitable way to sell. So green building it s anew way to make it happens . And we are as a designer, we design green building, this will befrom first sketch up to final proposal all in all, so we can sell our design to the constructors.
I designed
Construction of a Pasig Riverside Green Building condominium in downtownManila
as 3 different ideas.
8/13/2019 Final Dmadv
4/39
8/13/2019 Final Dmadv
5/39
8/13/2019 Final Dmadv
6/39
13 Oct.
3 Nov.
17 Nov .1Dec .
22Dec .12 Jan.
11 Agu.
6 Oct. .
Timeline
Process
22 Sep .
Ti
me
8/13/2019 Final Dmadv
7/39
Description Impact
Timeprocess
Mitigation Activities
Lack of experience by the greenconstruction can lead to problemsobtaining LEED certification, delays andimproper material specifications.
High High Consultants/Subconsultantsand Subcontractors.
Financial risks low low The additional costs of greenbuildings may affectcompleting projects on timeand on budget, but must beweighed against the cost ofnot going green
Mandates regarding LEED certificationbring an increased risk of legal liabilityfor green building design andconstruction professionals.
Non Low Standard of Care/Legal
Risks
8/13/2019 Final Dmadv
8/39
8/13/2019 Final Dmadv
9/39
Identify Project Stakeholders
9
Customer Current Role & Responsibilities
ClientProvides the requirements budget, schedule, building design concept- Reviews and approves the whole project.
Focus on LEED cooling and ventilation
8/13/2019 Final Dmadv
10/39
8/13/2019 Final Dmadv
11/39
Measurable Project Success Criteria
Stakeholder Voices Success Criteria Success measure Target
Client Favorable design Compliance to LEEDcooling and ventilation
>100
11 Focus on LEED cooling and ventilation
8/13/2019 Final Dmadv
12/39
Analyze
8/13/2019 Final Dmadv
13/39
Analyze Idea Concepts
Stakeholder Voices Requirements Idea 1 Idea 2 Idea 3
Client Compliance to LEEDcooling andventilation
Useradiantcooling
NewShadingdeviceswhichabsorb theenoughsun insideof building
Useenergyefficacywindow
Focus on LEED cooling and ventilation
8/13/2019 Final Dmadv
14/39
Quality Function Deployment (QFD)
Radiant cooling (Idea 1)This method will absorb the heat inside the room and transform it to radiators under thefloor for chilled floor. The process of radiant exchange has a negligible effect on airtemperature, so this technology will absorb exceeded heat so air ventilation will be mucheasier with less energy. We have 2 options as our goal to QFD for clients:Option1 : comes with 15 radiators under the floor for every 20 square meters and that
helps reduce temperature up to 12% but absolutely cheaper than option 2.
Option 2: comes with 25 radiators under the floor for each 20 square meters and reducethe temperature up to 28%.
Shading Device (Idea 2)Shading device is one of the cheapest method that we can design in a building to keepcooling inside according to VOC, it will increase occupant thermal comfort, reduce the
glare, and increase architectural design.QFD options:Option 1 : we can do the shading devices in our design.Option 2 : we can specify each unit to use shading device for better performance butundoubtedly it will be exclusive for client and a bit expensive than option 1
8/13/2019 Final Dmadv
15/39
Energy Efficiency Window (Idea 3)Energy Efficient windows are designed to keep cold air inside and saving energy inside byeliminating the need to overcompensate for air leakage and entry during both the summer andwinter months. Also it constructed to eliminate drafts. And protecting the home against leaks,drafts, and condensation.Energy Efficient Window don t require tinting in order to perform. Tinting can reduce visible lightand obstruct views. In the same way, The sun s harmful rays can fade artwork, paper, fabric,carpet, and wood. Energy efficient coatings on glass reduce ultraviolet (UV) rays by up to 75percent.Option1 : it comes with 2 layers of glass with Arcon inside that s why this window doesn t allowedto transfer temperature.Option2 :same window with option 1 but its require to have special frame that helps us to makebig and width window for towers and apartmentsOption3 : This method can be very cheap and popular for costumers it s a thin window and reducethe ray of sun 75% and we can use it in any house by changing window.
8/13/2019 Final Dmadv
16/39
Option 2Option 3
Option 1
Performance of Energy EfficientWindow in three differentoptions(Idea 3)
8/13/2019 Final Dmadv
17/39
SITE PLAN:This is our site plan for both designs. Pasig River is running next to the site. We are going toconnect them with the main road and create easy access for our clients.
8/13/2019 Final Dmadv
18/39
8/13/2019 Final Dmadv
19/39
Design 2: Shading Devices
New Shading devices which absorb the enough sun inside of building and distributethe light in the room
8/13/2019 Final Dmadv
20/39
Design 3: Energy Efficacy Window
Energy efficient window are designed to keep cold air and those types of windowsare multiple-glazed and they have low- E coatings. High quality edge spacers andframes are also common with energy efficient windows.
8/13/2019 Final Dmadv
21/39
Comparison of SolutionsPugh Matrix
21
.
Pugh Selection
Matrix Idea Options
StakeholderVoice
Rating(1-10)
E-EW(Opt.1)
E-EW(Opt.2)
E-EW(Opt.3) Shading
(Opt.1)Shading(Opt.2)
Radiant
(Opt.1)
Radiant(Opt.2) AS-IS
Compliance toLEED coolingand ventilation
10 + + + + + s s s
Reduce TheRay Of Sun 7 s s + s s s s s
Sum ofPositives 4 1 1 2 0 0 0
Sum ofNegatives 0 0 0 0 0 0 0
Sum ofSames 2 0 0 0 1 1 1
WeightedSum ofPositives
10 10 17 10 10 0 0 0
WeightedSum ofNegatives
0 0 0 0 0 0 0
8/13/2019 Final Dmadv
22/39
Comparison of Features vs. NeedsQuality Functional Deployment for Idea 03
Idea 3: EnergyEfficiency Window
(Option 3)
I m p o r t a n c e R a t i n g
( 1 t o 5
)
L e s s
d a m a g e t o
f u r n i t u r e
L e s s w e i g
h t a n
d L e s s
c o n
d e n s a t i o n
B e t t e r c o m
f o r t a n
d N o
d r a
f t s
I n c r e a s e
d l i g h
t a n
d v i e w s
E n e r g y C o s t S a v i n g s
C u s
t o m
e r
N e e
d sCompliance to LEED cooling
and ventilation 4 6 5 6 8 9
Raw score 24 20 24 32 36Relative % 18% 15% 18% 24% 26%
Importance Rank 2 3 3 3 3
8/13/2019 Final Dmadv
23/39
8/13/2019 Final Dmadv
24/39
Design for LEEDCompliance
SustainableDesign (ss)
Comply Social,Economic, and
EcologicalSustainability
eliminate negativeenvironmental
impact
create projects thatare meaningful
innovations
Material andResources(MR)
Manpower andtraining program
Process automationrequirements
IndoorEnvironmental
Quality(IEQ)
Environmentalfilter Reuse water supply
Energy Efficient
Window
Innovation inDesign(IN)
Informationrequirements
New high techequipment
IT systems &solutions
Cost / RevenuePlan
Design for LEED Compliance
Focus on LEED cooling and ventilation
We should show our window to engineer before installation so they will know this special window needspecial frame according to the options that we proposed so we don t have any other special task forthem.
8/13/2019 Final Dmadv
25/39
8/13/2019 Final Dmadv
26/39
How engineers will produce the window:
1.ConceptualizationThe project team comes together at the earliest stage, they will talk about the size,form, thickness, length, width etc. of the window and they will predict the climateand the form of the building then according to that they will make decision.
2.DesignCollaboration between the architect, contractor, and engineers allows for betterdecision making, helping to improve quality and better cooling and ventilation.
3.implementation docs.Precise virtual models are automatically part of the design, helping to reduceuncertainty in documents and chose the best design of the window.
4.ProduceBecause of careful early planning, team members are able to use best option ofthe windows according to plan, climate , budget etc. Construction can becompleted on schedule and on budget.
8/13/2019 Final Dmadv
27/39
8/13/2019 Final Dmadv
28/39
Energy-Efficient Window savingCompression of Energy-Efficient Window
For Option 3
8/13/2019 Final Dmadv
29/39
8/13/2019 Final Dmadv
30/39
Window Material Comparison
conventional windows Energy-Efficient Window
8/13/2019 Final Dmadv
31/39
8/13/2019 Final Dmadv
32/39
I want the building windows to look like these
Glazed systems that occur on the ground floor, and typically include aluminum entrances.
Installed between floor slabs, or between a floor slab and building structure above.
Front Elevation
8/13/2019 Final Dmadv
33/39
Building Faade
8/13/2019 Final Dmadv
34/39
Building Movement
8/13/2019 Final Dmadv
35/39
8/13/2019 Final Dmadv
36/39
VERIFY
How we will check the effectiveness of our design?
8/13/2019 Final Dmadv
37/39
How we will check the effectiveness of our design?
We divide it to 5 phases:
8/13/2019 Final Dmadv
38/39
What I appreciate are
six sigma is customer driven
Six Sigma addresses the entire process behind the production of an item orcompletion of a service, rather than just the final outcome
What should improve:
Six sigma is base on the statics or data so many people would fail to use real life experiences orcases to improve their own business.