FINAL DESIGN APPROVAL REQUEST ZA-DC-F-04 Issue 10 DOCUMENTS REQUIRED PLOT NUMBER PRELIMINARY DESIGN REQUEST NO. (IF ANY) New Renewal APPLICATION DETAILS (TICK APPROPRIATE BOX) Sub-Structure Final 1. Structural Design Drawing (as per Circular No. 229 ) 2. RC Structural Design Review Checklist (Form No. ZA- DC-F-83) 3. Structural calculations and structural model (soft copy) 4. Peer review report (as per Structural Guidelines) (If applicable) For Final (New Submission Only): 1. Architectural, Structural and MechanicalDesign Drawings (as per Circular No.229 ) 2. Project Details Sheet stamped and signed by consultant 3. Dubai Universal Code Checklist 4. Green Building Deceleration stamped and signed by consultant 5. Green Building Code Checklist stamped and signed by consultant 6. NOC from Department of Civil Aviation (if applicable) 7. NOC and stamped drawings from Ministry of Awqaf & Religious Affairs (for religious purpose) 8. DM Environmental Department approval for swimming pools, industrial use (industrial/manufacturing ), gray water treatment plant 9. NOC from DM - Coastal Zone & Waterways Management Section 10. Approved vehicle access and traffic impact study from RTA 11. Undertaking Letter by consultant (Template No. ZA-DC-T-106) 12. RC Structural Design Review Checklist (Form No. ZA-DC-F-83) 13. Structural calculations and structural model (soft copy) 14. Peer review report (as per Structural Guidelines) (If applicable) 15. District cooling service provider NOC (if applicable) 16. Valid NOC from DEWA (Electricity&Water) 17. Civil Defence final design approval 18. NOC from Telecom Operator (Du/Etisalat) 19. Sewerage Connection Confirmation from Master Developer/infrastructure consultant 20. Undertaking letter from consultant for adherence to DM Administrative Resolution No. (66) of 2003 & (161) 21. Mechanical Design Review Checklist (ZA-DC-F-117 SUBMISSION DETAILS (TICK APPROPRIATE BOX) Initial Submission Re-submission NAME TEL MOBILE EMAIL DATE SIGNATURE & STAMP REQUESTER DETAILS I hereby certify that the information, data and documents provided with this application are true, genuine and correct to the best of my knowledge. In case of default/failure to comply with any of the aforesaid conditions or the documents submitted by us is found false/forged, our application will be rejected forfeiting any applicable fees paid SUBMITTAL TYPE (TICK APPROPRIATE BOX) CONSULTANT For Sub-Structure (New Submission Only): Notes: PO Box 478844, Dubai, UAE T +971 800-4-DDA (332) F +971 4 427 2449 dda.gov.ae - Request will be accepted only if Site Plan is valid. - No documents are required for design renewal application - Design must comply with Accessibility Code for the built environment in the clusters. - Soil Investigation Report (Form No. ZA-DC-F-07B) must be approved by DDA before applying for this service. Terms and Conditions

FINAL DESIGN APPROVAL REQUEST · 17.Civil Defence final design approval 18.NOC from Telecom Operator (Du/Etisalat) 19.Sewerage Connection Confirmation from Master Developer/infrastructure

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FINAL DESIGN APPROVAL REQUEST · 17.Civil Defence final design approval 18.NOC from Telecom Operator (Du/Etisalat) 19.Sewerage Connection Confirmation from Master Developer/infrastructure

FINAL DESIGN APPROVAL REQUEST

ZA-DC-F-04 Issue 10

DOCUMENTS REQUIRED

PLOT NUMBERPRELIMINARY DESIGN REQUEST NO. (IF ANY)

NewRenewal

APPLICATION DETAILS(TICK APPROPRIATE BOX)

Sub-StructureFinal

1. Structural Design Drawing (as per Circular No. 229 )2. RC Structural Design Review Checklist (Form No. ZA-

DC-F-83)3. Structural calculations and structural model (soft copy)4. Peer review report (as per Structural Guidelines) (If

applicable)

For Final (New Submission Only):

1. Architectural, Structural and Mechanical Design Drawings (as perCircular No.229 )2. Project Details Sheet stamped and signed by consultant3. Dubai Universal Code Checklist4. Green Building Deceleration stamped and signed by consultant5. Green Building Code Checklist stamped and signed by consultant6. NOC from Department of Civil Aviation (if applicable)7. NOC and stamped drawings from Ministry of Awqaf & Religious

Affairs (for religious purpose)8. DM Environmental Department approval for swimming pools,

industrial use (industrial/manufacturing ), gray water treatment plant9. NOC from DM - Coastal Zone & Waterways Management Section10. Approved vehicle access and traffic impact study from RTA11. Undertaking Letter by consultant (Template No. ZA-DC-T-106)12. RC Structural Design Review Checklist (Form No. ZA-DC-F-83)13. Structural calculations and structural model (soft copy)14. Peer review report (as per Structural Guidelines) (If applicable)

15. District cooling service provider NOC (if applicable)16. Valid NOC from DEWA (Electricity&Water)17. Civil Defence final design approval18. NOC from Telecom Operator (Du/Etisalat)19. Sewerage Connection Confirmation from MasterDeveloper/infrastructure consultant20. Undertaking letter from consultant for adherence toDM Administrative Resolution No. (66) of 2003 & (161)21. Mechanical Design Review Checklist (ZA-DC-F-117

SUBMISSION DETAILS(TICK APPROPRIATE BOX)

Initial Submission Re-submission

NAME

TEL

MOBILE

EMAIL

DATE

SIGNATURE &STAMP

REQUESTER DETAILS

• I hereby certify that the information, data and documents provided with this application are true, genuine and correct to the bestof my knowledge. In case of default/failure to comply with any of the aforesaid conditions or the documents submitted by us isfound false/forged, our application will be rejected forfeiting any applicable fees paid

SUBMITTAL TYPE(TICK APPROPRIATE BOX)

CONSULTANT

For Sub-Structure (New Submission Only):

Notes:

PO Box 478844, Dubai, UAET +971 800-4-DDA (332) F +971 4 427 2449

dda.gov.ae

- Request will be accepted only if Site Plan is valid.- No documents are required for design renewal application- Design must comply with Accessibility Code for the built environment in the clusters.- Soil Investigation Report (Form No. ZA-DC-F-07B) must be approved by DDA before applying for this service. Terms and Conditions