DEVELOPMENT PLAN: BETHANY PARK, KANSAS CITY KANSAS UNIVERSITY OF KANSAS PROFESSOR MATT KLEINMANN MAY 9, 2014 LUKE MCELWAIN KANSAS CITY CENTER FOR HEALTH AND LEARNING

Final Book Bethany Park

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Final Book Bethany Park

DEVELOPMENT PLAN:

BETHANY PARK, KANSAS CITY KANSAS

UNIVERSITY OF KANSAS PROFESSOR MATT KLEINMANN

MAY 9, 2014LUKE MCELWAIN

KANSAS CITY CENTER FOR HEALTH AND LEARNING

Page 2: Final Book Bethany Park

TABLE OF CONTENTS

2...................RESEARCH TOPIC

5...................WATER COLLECTION POSSIBILITIES

6...................SITE PLAN

7...................SECTION OF WATER STORAGE TANK

9...................MARKET RENDERINGS

10.................CORNER STORE HALF OPEN

11.................CORNER STOREFULL OPEN

12.................CORNER STORE PLANS

13.................BUILDING DESIGN SKETCHES

14.................3D MASSING

15.................SECTION CUT IDEAS

16.................LABLED SITE PLAN

17.................FIRST FLOOR PLAN

18.................SECOND FLOOR PLAN

19.................ELEVATIONS

21.................SITE SECTION

23.................RENDERINGS OF BUILDING

Page 3: Final Book Bethany Park

WATER MANAGEMENT

50-60% EFFICIENT

USING MODERN TECHNOLOGY TO WATER AND COLLECT WATER FOR YOUR CROPS IS A HUGE EFFICIENCY BOOSTER ON THE WHOLE SITE BUT THERE ARE WAYS TO USE THESE NEW TECHNOL-OGIES IN A SMART WAY AND THERE ARE SPECIFIC USES FOR EACH TYPE OF WATERING THAT YOU PLAN ON DOING. USING A SPRINKLER SYSTEM IS ABOUT 50-60% EFFICIENT AND IT WILL SPRAY INTO THE AIR AND COVER EVERYTHING WITH WATER. IF YOU’RE DOING SMALLER INSTIL-LATIONS OR SPREAD OUT PLANTS THEN A DRIP IRRIGATION SYSTEM IS THE WAY TO GO. DRIP IRRIGATION SYSTEMS CAN BE ABOUT 90% EFFICIENT. THIS MEANS THAT YOU CAN WATER YOUR CROP MORE EFFICIENTLY AND CHEAPER.

2

Page 4: Final Book Bethany Park

90% EFFICIENTI FOUND THAT USING THE CORRECT CROPS FOR YOUR REGION IS ALSO VERY IMPORTANT. THERE ARE CERTAIN CROPS THAT GROW BETTER IN DIFFERENT CLIMATES AND WITH DIFFERENT LEVELS OF CARE NEEDED. FOR INSTANCE, TOMATOES GROW BETTER IN THE MIDWEST THAN THEY DO IN THE NORTH EAST AND BEATS GROW BETTER IN THE NORTH EAST THAN THEY DO IN THE MIDWEST. THE USAGE OF THE CORRECT CROPS AND THE KEY TIMING OF THEIR PLANTING ARE ESSENTIAL FOR A SUCCESSFUL CROP HARVEST BECAUSE USING THE CORRECT CROPS WILL TAKE LESS WATER THUS MAKING THE CROP CHEAPER AND IT WILL GROW STRONGER BECAUSE THEY ARE NOT BEING FORCED TO GROW IN A CLIMATE THAT THEY AREN’T MEANT FOR. IN THE AREA OF BETHANY PARK SOME OF THE BEST PLANTS ARE; TOMATOES, GREEN BEANS, CUCUM-BERS, ONIONS, JALAPENOS, AND LETTUCE JUST TO NAME A FEW. ORIENTING THE CROPS TO THE SOUTH WITH THE TALLEST BEING MOST NORTHERN WILL GIVE YOU BE BEST YIELD BECAUSE THIS WILL ALLOW THE NORTHERN MOST PLANTS SUNLIGHT WHILE NOT BLOCKING THE SMALLER PLANTS THAT ARE IN FRONT OF THEM THUS ALLOWING ALL OF THE PLANTS TO GET AN EQUAL AMOUNT OF LIGHT AND GROW AT AN EVEN RATE. THIS SAME THING APPLIES TO WATER AND ELEVATION PLANNING. PLANTING THE MORE WATER DEPENDENT PLANTS AT THE BOTTOM OF THE TOPOGRAPHY WILL HELP CONSERVE MORE WATER BECAUSE ALL THE WATER WILL DRAIN TO THE BOTTOM OF THE HILL FROM THE PLANTS THAT DIDN’T SOAK UP ALL THE WATER ON THE TOP OF THE HILL.

3

Page 5: Final Book Bethany Park

THIS PROJECT WAS SPLIT INTO PHASES AND PARTNERED FOR THE SITE DESIGN PHASE. WE BOTH HAD RESEARCH TOPICS AND HERS WAS HEALTHCARE COSTS RELATING TO DIET. THIS INFLUENCED BOTH OUR CORNER STORE DESIGN AS WELL AS THE FILM STUDIO DE-SIGN. WE TOOK ON THE CHALLENGE OF FOCUSING OUR EFFORTS TOWARDS M.E. PEAR-SON ELEMENTARY SCHOOL LOCATED JUST NORTH OF BETHANY PARK IN WYANDOTTE COUNTY, KS. WHILE THE STUDENTS ARE NOT GIVEN THE NECESSARY NUTRIENTS DURING LUNCH AND LACK THE PROPER OUTDOOR SPACE FOR RECESS, WE DESIGNED OUR PARK AROUND THIS IDEA. OUR SITE WOULD ALLOW THE STUDENTS TO WALK JUST A FEW BLOCKS DURING AND AFTER SCHOOL HOURS TO GET THEIR DAILY EXERCISE BY PLAYING SOC-CER AND BEING OUTDOORS. IT WOULD ALSO GIVE THEM THE OPPORTUNITY TO USE OUR URBAN FARMS IN WAYS THAT WOULD BENEFIT BOTH KNOWLEDGE AND HEALTH, AS THEY WOULD BE ABLE TO BRING THE FOODS BACK TO SCHOOL TO EAT FOR LUNCH. OUTSIDE OF BENEFITTING THE NEIGHBORING CHILDREN, OUR SITE ALSO WOULD ATTRACT ADULTS AND SMALL BUSINESS OWNERS. BETHANY PARK IS LOCATED ON A PRIME CORRIDOR IN THE KANSAS CITY AREA TO BE A MARKET PLAZA THAT COULD FEATURE FRESHLY GROWN PLANTS, ARTISTS' WORK, OR PRESENTATION SPACES FOR COMPANIES TO PROMOTE THEIR PRODUCTS AND SERVICES AND OFFER A LEGAL WAY TO SELL HOME-GROWN VEGETA-BLES. THE CORNER STORE WILL PUMP THE WATER FROM THE WATER COLLECTION SYSTEM AND PROVIDE BASIC MEDICAL CHECKUPS, SUCH AS BLOOD PRESSURE CHECKS.

4

HEALTHCARE RELATED TO DIET

Page 6: Final Book Bethany Park

FUTSOL COURT- 790940 GALLONS PER YEAR

2636 MEALS PER YEAR

SOCCER FIELD- 1752237 GALLONS PER YEAR

5841 MEALS PER YEAR

SITE- 5015170 GALLONS PER YEAR

16717 MEALS PER YEAR5

Page 7: Final Book Bethany Park

SITE PLAN 1/64” = 1’ - 0”

6

Page 8: Final Book Bethany Park

THIS IS A SECTION CUT THROUGH THE WATER STORAGE UNDER THE FUTSAL COURT.

THE STRUCTURE OF THE CORNER STORE IS PAINTED JAYHAWK BLUE BECAUSE IT COULD BE POTENTIALLY SPONSORED BY MEDICAL CENTERS SUCH AS KU MEDICAL CENTER. THE STRUCTURE CAN BE CLOSED UP AND TRANSPORTED VIA TRUCK TO THE SITE WITH NO SPECIAL CARE. THERE WILL BE A COMPLETE SIDE OPEN TO ALLOW EASY ACCESS AND AN AWNING TO PROVIDE SHADE FOR PEOPLE WAITING IN LINE TO BE SEEN BY A PRACTITIONER.

7

Page 9: Final Book Bethany Park

ONE OF THE FUTSAL COURTS IS DUG INTO THE GROUND AND MADE INTO A WATER STORAGE TANK FOR THE SITE. THE HEALTHY CORNER STORE PROTOTYPE INCLUDES PUMPS FOR THE IN-GROUND STORAGE TANK. IF ALL OF THE FUTSAL COURTS AND SOCCER FIELDS ARE MADE INTO WATER COLLECTION SYSTEMS THAT FUNNEL INTO THE FUTSAL COURT WE CAN COLLECT OVER 5 MILLION GALLONS PER YEAR THAT WILL WATER THE ENTIRE SITE THUS MAKING THE WATER NEEDS FOR THE SITE ZERO.

8

Page 10: Final Book Bethany Park

DESIGNING THE PARK IN THE NORTHERN PART OF BETHANY PARK ON CHWC LAND IS BENEFITING THE COMMUNITY BECAUSE THIS IS A CURRENTLY UNUSED SITE AND THIS DEVELOPMENT IS SEMI PERMINATE THUS IT WILL BE AVALABLE FOR FUTURE DEVELOP-MENT. ANOTHER MAJOR BENEFIT TO PLACING THE BUILDING TO THE NORTH IS THE DIRECT CONNECTION TO THE ELEMENTARY SCHOOL THAT IS LESS THAN A BLOCK TO THE NORTH. M. E. PEARSON ELEMENTARY SCHOOL HAS A LARGELY PAVED PLAY-GROUND THUS THERE IS A NEED FOR A PLACE FOR THEM TO BE ACTIVE. THE SITE INCLUDES 3 FUTSAL COURTS AND 2 FULL SIZED SOCCER FIELDS. THE ONE FUTSAL COURT WILL BECOME AN UNDERGROUND CISTERN THAT HOLDS 350,000 GALLONS OF WATER THAT IS PURIFIED BY THE FIELD SYSTEM TO BE USED FOR DRINKING AND WATERING. THE SITE ALSO CONTAINS URBAN FARMS THAT WILL PROVIDE THE STUDENTS WITH AN OPPORTUNITY TO LEARN ABOUT NATURALLY GROWN FOOD AND GIVE THEM EASY ACCESS TO NATURALLY GROWN FOODS THUS REDUCING THE OBESITY RATE. WE HAVE PROPOSED THAT THERE WILL ALSO BE A PLAZA THAT WILL HOUSE LOCAL ARTISTS AND LOCAL FARMERS FOR THEM TO HAVE A LEGAL OUTLET FOR THE SALE OF THEIR GOODS. THE “CORNER STORE” THAT WE ARE PROPOSING IS A PUMP HOUSE AND A SMALL CLINIC THAT WILL BE ADDRESSING SMALL POR-TIONS OF WHAT A NORMAL DOCTOR’S OFFICE WOULD AND THIS WILL HOPEFULLY HELP PREVENT EASILY CURABLE DISEASES.

THIS IS THE MARKET AREA THAT THE FARMERS AND ARTISTS CAN USE TO SELL THEIR PRODUCTS.

9

Page 11: Final Book Bethany Park

10

Page 12: Final Book Bethany Park

11

Page 13: Final Book Bethany Park

101012

Page 14: Final Book Bethany Park

INITIAL SKETCHES N.T.S.11

13

Page 15: Final Book Bethany Park

I SEPERATED FLOORS BY PROGRAM TYPE SO THAT THE MORE PRIVATE SPACE IS ON TOP WHILE THE MORE PUBLIC SPACES ARE ON THE MAIL LEVEL. THUS SEPARATES THE PUBLIC AND PRIVATE SPACES TO CREATE A PERSONAL FEEL IN THE SPACE. THE MODULAR FORM COMES FROM THE SHIPPING CONTAINERS THAT WE USED IN OUT PROTOTYPE BECAUSE THEY ARE VERY UNIFORM.

14

Page 16: Final Book Bethany Park

TIERED CLASSROOM IDEA

BUILDING SECTION

15

Page 17: Final Book Bethany Park

1 2

3

45

5 5

6

6

7

SITE PLAN

1- KANSAS CITY CENTER FOR HEALTH AND LEARNING (PROPOSED BUILDING)2- PROPOSED PARKING 3- URBAN FARMS4- MARKET PLACE AND HEALTHY CORNER STORE5- FUTSAL COURT6- SOCCER FIELD7- EXISTING BETHANY MEDICAL BUILDING 16

Page 18: Final Book Bethany Park

UP

DNUP

1/32" = 1'-0"1 Level 1

1 23

4 4 5

6

7 8

9 10

1011

12

13

14

FIRST FLOOR KEY

1- WOMEN’S OUTDOOR ACCESS BATHROOM2- WOMEN’S OUTDOOR ACCESS LOCKERS3- GALLERY/OPEN ATRIUM4- TIERED CLASSROOM5- TIERED COMPUTER LAB6- DEMO KITCHEN 7- PANTRY8- WALK-IN REFRIGERATOR9- STORAGE AND SERVER ROOM10- CHANGING ROOM11- GREEN ROOM12- WOMEN’S BATHROOM13- MEN’S BATHROOM14- LOADING DOCK/MECHANICAL ROOM15- MEN’S OUTDOOR ACCESS BATHROOMS16- MEN’S OUTDOOR ACCESS LOCKERS17- DEMO KITCHEN TASTING AREA

15 16

17

17

Page 19: Final Book Bethany Park

DN

DN

1/32" = 1'-0"1 Level 2

1

2 3 3

3

45

6

7

89

10

11

11

11

12

13

SECOND FLOOR KEY

1- PHARMACISTS OFFICE2- DOCTORS OFFICE3- EXAM ROOM4- CONFERENCE ROOM5- WAITING AREA FOR PHARMACY AND DOCTOR6- PHARMACY7- MEN’S BATHROOM8- WOMEN’S BATHROOM9- SOFT BREAKOUT SPACE 10- PRESENTATION ROOM11- OFFICE12- OUTDOOR BAR FOR THE SCREENING OF FILMS13- FILM SCREENING AREA

18

Page 20: Final Book Bethany Park

Level 10' - 0"

Roof30' - 0"

Level 215' - 0"

T.O.P.32' - 0"

Stair Landing SW4' - 8"

1/32" = 1'-0"1 East

Level 10' - 0"

Roof30' - 0"Level 215' - 0"

T.O.P.32' - 0"

Stair Landing SW4' - 8"

1/32" = 1'-0"1 West

Level 10' - 0"

Roof30' - 0"Level 215' - 0"

T.O.P.32' - 0"

1/32" = 1'-0"North

Level 10' - 0"

Roof30' - 0"Level 215' - 0"

T.O.P.32' - 0"

1/32" = 1'-0"1 South

ELEVATIONS 1/32” = 1’ - 0”

EAST

WEST

SOUTH

NORTH

19

Page 21: Final Book Bethany Park

18

SITE SECTION

1818181818188

SOUTH WEST CORNER

20

Page 22: Final Book Bethany Park

PRESENTATION ROOM

21

Page 23: Final Book Bethany Park

THE KANSAS CITY KANSAS CENTER FOR HEALTH AND LEARNING IS LOCATED ON THE NORTH SIDE OF BETHANY PARK ON COMMUNITY HOUSING OF WYNDOTTE COUNTY (CHWC) PROP-ERTY. THIS PROPERTY USED TO BE THE LOCATION OF BETHANY MEDICAL CENTER AND IS CUR-RENTLY UN-USED. THE SITE IS DIRECTLY SOUTH OF M.E, PEARSON ELEMENTARY SCHOOL. M.E. PEARSON ELEMENTARY SCHOOL HAS AN ENTIRELY HARD SCAPE PLAYGROUND AND PRO-VIDING THIS PLAYGROUND AREA FOR THE COMMUNITY HAS THE POSSIBLILITY OF BEING USED BY THE SCHOOL AS WELL TO SUPLIMENT THEIR LACK OF SOFTSCAPE FOR THE KIDS TO PLAY ON. THIS TIES BACK TO MY PARTNERS RESEARCH TOPIC OF HEALTHCARE. THEY WILL ALSO HAVE ACCESS TO THE BUILDING THAT I AM PLACING ON THE SITE FOR THE FILM STUDIO THAT INCLUDES CLASSROOM SPACES, COMPUTER LABS, PRESENTATION SPACES, AND DEMO KITCH-ENS THAT THE SCHOOL WILL HAVE BE ENCOURAGED TO USE TO HELP FURTHER THE EDUCATION OF THEIR STUDENTS. THE BUILDING IS PLACED ON THE SITE SO THAT THE TOPOGRAPHICAL SUR-FACE IS USED TO THE BEST OF THE ABILITY BY MAKING THE CLASSROOMS TEIRED ON THE BACK SIDE OF THE BUILDING BY INTEGRATING THEM INTO THE LANDSCAPE.

22

Page 24: Final Book Bethany Park

DEMO KITCHEN

STAIRS TO SOCCER FIELD

23

Page 25: Final Book Bethany Park

22

TIERED CLASSROOM

PERSPECTIVE BUILDING SECTION

24

Page 26: Final Book Bethany Park

FIRST FLOOR GALLERY

SECOND STORY ATRIUM

25

Page 27: Final Book Bethany Park

TIERED COMPUTY LAB

FRONT ENTRY

26

Page 28: Final Book Bethany Park

SECOND FLOOR ATRIUM 27

Page 29: Final Book Bethany Park
Page 30: Final Book Bethany Park
Page 31: Final Book Bethany Park
Page 32: Final Book Bethany Park

LUKE MCELWAIN

UNIVERSITY OF KANSAS

SCHOOL OF ARCHITECTURE