Final Bms Producion

Embed Size (px)

Citation preview

  • 7/31/2019 Final Bms Producion

    1/46

  • 7/31/2019 Final Bms Producion

    2/46

    VISHAL

    YOGESH

    SEKHAR

    ROHITSAGAR

    VAIBHAVPRATHMAESH

  • 7/31/2019 Final Bms Producion

    3/46

    TYPES OF PRODUCTION

    LAYOUT OFMANUFACTURING COMPANY

    NARSINGH HOSPITAL WASTEMANAGEMENT

  • 7/31/2019 Final Bms Producion

    4/46

  • 7/31/2019 Final Bms Producion

    5/46

    TYPES OF PRODUCTION

    Intermittent

    JobBatch

    Continuous

    mass Process assembly

  • 7/31/2019 Final Bms Producion

    6/46

    INTERMITTENT

    PRODUCTION

    Job

    Production

    Batch

    Production

  • 7/31/2019 Final Bms Producion

    7/46

  • 7/31/2019 Final Bms Producion

    8/46

  • 7/31/2019 Final Bms Producion

    9/46

  • 7/31/2019 Final Bms Producion

    10/46

    BATCHPRODUCTIONOF CRICKETBATS1.Receiving a lot of willow tree 2 Cutting down into logs

    3.Logs are split into half. 4. Removing the barks

  • 7/31/2019 Final Bms Producion

    11/46

    5. Logs are converted into clefts.

    6. Inspection by supervisor.

    7. The bat Clefts are shifted to

    makers department.

  • 7/31/2019 Final Bms Producion

    12/46

    8. FINISHINGOFBATS

    9. Cutting A Wedge For The

    Handle.

    10.Shaping the bat handle. 11. inserting the handle.

    8. Finishing of bats.

  • 7/31/2019 Final Bms Producion

    13/46

    12. The completed bats are shipped to various companies.

    .

    13. bats are ready for sale.

  • 7/31/2019 Final Bms Producion

    14/46

    CONTINUOUS

    PRODUCTION

    MassProduction

    ProcessProduction

    AssemblyProduction

  • 7/31/2019 Final Bms Producion

    15/46

  • 7/31/2019 Final Bms Producion

    16/46

  • 7/31/2019 Final Bms Producion

    17/46

    CARCOMPUTER

  • 7/31/2019 Final Bms Producion

    18/46

    Manufactured High Quality

    Gold And Platinum Chain In

    Italy .Over 25 Different Styles Of

    Palladium Chain

    Bassano ,Del ,Grappa, Italy.

  • 7/31/2019 Final Bms Producion

    19/46

    1. Metals Preparation automated

    rolling, forming and annealing

    3. Weaving and Linking

    High-powered machines

    Palladium chains are

    Soldered.

    2. Alloys and its melding

  • 7/31/2019 Final Bms Producion

    20/46

    4. Solderinga wide variety of different chain

    styles.

    One technician-12 workingmachines.

    5. Annealing tube

    6. Link Soldering

    specially developed metallurgic

    powder

  • 7/31/2019 Final Bms Producion

    21/46

    7. talcum powder

    conveyor belt

    technician

    8. Here bulk chain is fed intothe conveyor oven.

    9. linking and laser welding.

  • 7/31/2019 Final Bms Producion

    22/46

    10. diamond cutting procedure

    11. Water freezing

    Cylinder with a

    chain style.

  • 7/31/2019 Final Bms Producion

    23/46

    12. cutting

    13. Cutting into pieces

    14. Use ofmicro torches to

    hand-solder .

  • 7/31/2019 Final Bms Producion

    24/46

    The final produ

    15. Base plating

  • 7/31/2019 Final Bms Producion

    25/46

    LAYOUT The way in which the parts of something are

    arranged or laid out. arranging & grouping of machines which are

    meant to produce goods.

    WHY DOES A COMPANY NEED LAYOUT Unorganized material flow?

    People bumping into each other or products?

    Having trouble finding your parts?

    Employees spending more time moving items thanactually working on them?

    Moving into a new building?

    Expecting to add more equipment or work

    stations?

  • 7/31/2019 Final Bms Producion

    26/46

    TYPES OF LAYOUT

    1.Process layoutIt involves grouping together likemachines in one department based upontheir operational characteristics.

    2.Product layoutIt involves the arrangements of machinesin one line, depending upon sequence ofoperations. In product layout, if there is amore than one line of production, thereare as many lines of machines.

    3 Fi d l

  • 7/31/2019 Final Bms Producion

    27/46

    3.FixedlayoutFixed position layout involves the movement ofmen & machines to the product which remainsstationary. In this type of layout, the materials or

    major components remains in a fixed location, &tools, machinery & men as well as other piecesofmaterial are brought to this location.

    4.Combined layoutA combination of process & product layout is

    known as combined layout

    5. Cellular layout

    Machines are grouped in to a cells &cells function somewhat like product layoutwithin a larger shop or process layout.

  • 7/31/2019 Final Bms Producion

    28/46

    NARSINGH HOSPITAL

  • 7/31/2019 Final Bms Producion

    29/46

    NARSINGH HOSPITAL

  • 7/31/2019 Final Bms Producion

    30/46

  • 7/31/2019 Final Bms Producion

    31/46

    MOTO OF OUR PROJECT STUDY

    Waste survey

    Waste segregationWaste handling

    Waste transportation

    Scrap Control

  • 7/31/2019 Final Bms Producion

    32/46

    WASTE SURVEY

  • 7/31/2019 Final Bms Producion

    33/46

    Categories Of Bio Medical Waste

  • 7/31/2019 Final Bms Producion

    34/46

  • 7/31/2019 Final Bms Producion

    35/46

  • 7/31/2019 Final Bms Producion

    36/46

    WASTE

    SEGREGATION

  • 7/31/2019 Final Bms Producion

    37/46

    WASTE HANDLING

    Needle and syringes

  • 7/31/2019 Final Bms Producion

    38/46

  • 7/31/2019 Final Bms Producion

    39/46

  • 7/31/2019 Final Bms Producion

    40/46

    Li id t

  • 7/31/2019 Final Bms Producion

    41/46

    Liquid Waste-hospital Generate Liquid Waste-infectious Or Chemical. The Liquid Pathological

    Waste Should Be Treated With A ChemicalDisinfectant. The Solution Should Be Treated With AChemical Disinfectant. The Solution Should BeTreated With A Reagent To Neutralize It. This Can Be

    Flushed Into The Sewer System.

    For Blood ,Serum Sample And Body Fluids Of

    Laboratory Should Be Collected In Red Bags FromPenicillin Bulbs And Send It To Incinerator.

    Put Empty Penicillin Bulbs Into Sodium HypochloriteSolution.

    Liquid waste

  • 7/31/2019 Final Bms Producion

    42/46

    WASTE TRANSPORTATION

  • 7/31/2019 Final Bms Producion

    43/46

    On site transportation

    Segregated waste have to be transported within the facilityfrom the point of generation to the final waste disposal site.All bags should be fastened and small trolleys can be used inlarge facilities. Trolleys and carts should be large enough sothat the waste is not piled up on them in an unsafe way. they

    should be stable to minimize the risk of propping overhazardous waste even after decontamination should never betransported with general municipal waste.

    Biomedical waste should collected and deposited withsanitary inspectorate 11:30 a.m and send to the incinerator.

    Waste from surgery wards and hospital wards should becollected and send to the incinerator by 11:30 a.m

    The biomedical waste shall be transported only in vehicleswhich may be authorized.

    WASTE TRANSPORTATION

  • 7/31/2019 Final Bms Producion

    44/46

    SCRAPOFHOSPITAL

    They have two type of scrap

    1. Regular scrap item

    2. Engineering item

    For the regular scrap item they have a ScrapRoom which is situated near the hospital itself.

    A scrap note prepared by user department.

    Valuation of the scrap item.Hierarchy for sanction of scrap.

    Freezing the rates depending on the period of

    time

  • 7/31/2019 Final Bms Producion

    45/46

    Preparing The Scrap Sale Note, Which Include

    Description Of Item, Rates , Quantity, Units,

    Amount.

    Finally , The Scrap Are Gate Passed; They Are

    Approved By Authority To Sale.

    For The Engineering Scrap Item They Have A

    Godan At Sion, Where There Item Are

    Accumulated Over The Period And The SameProcedure Is Followed To Sell Them.

    On The Other Hand , The Wastage Are Written

    Off From The Balance Sheet Of The Hospital.

  • 7/31/2019 Final Bms Producion

    46/46