13
1 PPP PROJECTS for 2011 Rollout Solicited NAIA Expressway (Phase II) MRT/LRT Expansion Program: Privatization of MRT 3 Operation &Maintenance MRT/LRT Expansion Program: Privatization of LRT 1 Operation & Maintenance LRT Line 2 East Extension Project DaangHari – SLEX Link Road Project MRT/LRT Expansion Program:LRT 1 South Extension Project CALA Expressway - Manila side section (27.5 km) New Bohol Airport Development Puerto Princesa Airport Development New Legaspi (Daraga) Airport Development Privatization of Laguindingan Airport Operation and Maintenance Unsolicited NLEX-SLEX Connector

FINAL 12 Projects - PPP Centerppp.gov.ph/wp-content/uploads/2011/03/FINAL_12... · PhP7,600 Million (US$168.89 Million) Project Status • Updating of FS to reconfigure the project

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FINAL 12 Projects - PPP Centerppp.gov.ph/wp-content/uploads/2011/03/FINAL_12... · PhP7,600 Million (US$168.89 Million) Project Status • Updating of FS to reconfigure the project

1

PPP PROJECTS for 2011 Rollout

Solicited

• NAIA Expressway (Phase II)

• MRT/LRT Expansion Program: Privatization of MRT 3 Operation &Maintenance

• MRT/LRT Expansion Program: Privatization of LRT 1 Operation & Maintenance

• LRT Line 2 East Extension Project

• DaangHari – SLEX Link Road Project

• MRT/LRT Expansion Program:LRT 1 South Extension Project

• CALA Expressway - Manila side section (27.5 km)

• New Bohol Airport Development

• Puerto Princesa Airport Development

• New Legaspi (Daraga) Airport Development

• Privatization of Laguindingan Airport Operation and Maintenance

Unsolicited

• NLEX-SLEX Connector

Page 2: FINAL 12 Projects - PPP Centerppp.gov.ph/wp-content/uploads/2011/03/FINAL_12... · PhP7,600 Million (US$168.89 Million) Project Status • Updating of FS to reconfigure the project

Project Title

NAIA Expressway (Phase II)

Description

The project will link Skyway and Manila-Cavite Coastal Expressway. It will provide vital access to NAIA Terminals 1, 2, & 3. Economic zones in Cavite Province will benefit through easier and faster transportation of products to NAIA as well as to Manila Port through this link and the NLEx-SLEx Link Expressway. L = 5.19 km No. of Lanes = 4 lanes

Mode PPP Implementation Schedule October 2011 –September 2014

Project Cost PhP 10,590 Million (US$235.33 Million)

Sponsoring Agency DPWH

Project Status

• Publication of Invitation to Bid - May 2011 • Detailed Design and Construction Schedule – October 2011 to September 2014

Contact Information

Name : Sec. Singson / Asec. Cabral / Dir. Firmalino / Asst. Dir. Garsuta

Designation : Secretary / Asec. for Planning / PMO BOT Director / PMO BOT Asst. Director

Agency : DPWH

Telephone no. : (63 2) 304-3300 / 304-3319 / 304-3762 / 304-3069

Fax No : (63 2) 304-3020 / 304-3033 / 304-3824 / 304-3069

Email Address : [email protected] / [email protected] /

[email protected] / [email protected]

NAIA Expressway,

Phase 2

Page 3: FINAL 12 Projects - PPP Centerppp.gov.ph/wp-content/uploads/2011/03/FINAL_12... · PhP7,600 Million (US$168.89 Million) Project Status • Updating of FS to reconfigure the project

2

Project Title DAANG HARI – SLEX LINK ROAD PROJECT

Description

The Project is a new 3.68 kilometer, 4-lane paved toll road that will pass through the New Bilibid Prison reservation that will connect Bacoor, Cavite to the South Luzon Expressway near the Susana Heights area. The proposed new linkage will complement the Cavite-Laguna-east-west highway and will address the requirement for additional access between Metro Manila and Cavite where rapid urbanization and consequent worsening of traffic situation is being experienced. Project components:

• 2 overpasses • 4 local roads • 1 undercrossing • 1 rotunda • drainage structures

Mode PPP Implementation Schedule 3rdQ 2011 – 1stQ 2013

Project Cost PhP1,600 Million US$35.5 Million

Sponsoring Agency DTI /NDC/PNCC

Project Status

• Advertisement/Publication: April 2011

Contact Information

Name : Sec. Gregory Domingo/ Ma. Lourdes F. Rebueno/ Atty Luis F. Sison Designation : Secretary, DTI/General Manager, NDC/President and CEO, PNCC Agency : DTI/NDC/PNCC Telephone no. : (63 2) 899-7450/(63 2) 840-3936/(63 2) 584-6933 Fax No. : (63 2) 840 4862 Email Address : [email protected]/[email protected]/[email protected]

DAANG HARI

Page 4: FINAL 12 Projects - PPP Centerppp.gov.ph/wp-content/uploads/2011/03/FINAL_12... · PhP7,600 Million (US$168.89 Million) Project Status • Updating of FS to reconfigure the project

Project Title

Description

The project aims to integrate MRT Line 3 operation and maintenance to a private sector service provider during the interim period of 3-4 years. After this O&M period, the LRT Line 1 South Extension Project contractor is expected to assume overall responsibility for the integrated LRT Line 1 and MRT Line 3 systems.

Mode PPP

Project Cost PhP 6,300 Million (US$140 Million)

Project Status

• Due diligence review, contract packaging, consultant for MRT 3

• Publication of Invitation to Bid - March

Contact Information

Name : RUBEN S. REINOSO, JR.Designation : Undersecretary for Policy, Agency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : [email protected]

MRT/LRT Expansion Program: Privatization of MRT 3 Operation and Maintenance

MRT/LRT LINES

The project aims to integrate MRT Line 3 operation and maintenance to a private sector service provider

4 years. After this O&M period, the LRT Line 1 South Extension Project contractor is expected to assume overall responsibility for the integrated LRT Line 1 and MRT

Implementation Schedule 2011-2014

Sponsoring Agency DOTC/LRTA

Due diligence review, contract packaging, preparation of bid documents of projects for PPP to be undertakenby Systra,

March 2011

RUBEN S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications

[email protected]

2014

DOTC/LRTA

preparation of bid documents of projects for PPP to be undertakenby Systra,

Page 5: FINAL 12 Projects - PPP Centerppp.gov.ph/wp-content/uploads/2011/03/FINAL_12... · PhP7,600 Million (US$168.89 Million) Project Status • Updating of FS to reconfigure the project

Project Title

Description

The project aims to integrate LRT Line 1 operation and maintenance to a private sector service provider during the interim period of 3-4 years. After this O&M period, the LRT Line 1 South Extension Project contractor is expected to assume overall responsibility for the integrated LRT Line 1 and MRT Line 3 systems.

Mode PPP

Project Cost PhP7,700 Million (US$171.11 Million)

Project Status

• Due diligence review, contract packaging, preparation of bid documents of projects for PPP to be undertakenby Systra, consultant for MRT 3

• Publication of Invitation to Bid - March

Contact Information

Name : RUBEN S. REINOSO, JR.Designation : Undersecretary for Policy, Planning and Project ManagementAgency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : [email protected]

MRT/LRT Expansion Program: Privatization of LRT 1 Operation and Maintenance

MRT/LRT LINES

The project aims to integrate LRT Line 1 operation and maintenance to a private sector service provider

4 years. After this O&M LRT Line 1 South Extension Project

contractor is expected to assume overall responsibility for the integrated LRT Line 1 and MRT

Implementation Schedule 2011-2014

Sponsoring Agency DOTC/LRTA

Due diligence review, contract packaging, preparation of bid documents of projects for PPP to be undertakenby Systra,

March 2011

RUBEN S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications

[email protected]

2014

DOTC/LRTA

Due diligence review, contract packaging, preparation of bid documents of projects for PPP to be undertakenby Systra,

Page 6: FINAL 12 Projects - PPP Centerppp.gov.ph/wp-content/uploads/2011/03/FINAL_12... · PhP7,600 Million (US$168.89 Million) Project Status • Updating of FS to reconfigure the project

Project Title

Description

The project involves the expansion, operation and maintenance of existing LRT Line 2. Expansion covers the construction of a 4 kilometer eastern extension of LRT Line 2 from Santolan in Pasig City to Masinag Junction in Antipolo, Rizal with additional 2 passenger stations to be located at Sta. Lucia Mall and at Masinag.

Mode PPP

Project Cost PhP 11,300 Million (US$251.11 Million)

Project Status

• Pre-FS on Manila LRT Line 2 Extension Project by • FS thru JICA technical assistance to reconfigure the project into PPP commence

extension options, scope of work and project costs• Publication of Invitation to Bid - November 2011

Contact Information

Name : RUBEN S. REINOSO, JR.Designation : Undersecretary for Policy, Planning and Project ManagementAgency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : [email protected]

LRT Line 2 East Extension Project

LINE 2 EAST EXTENSION ALIGNMENT

The project involves the expansion, operation and Expansion

covers the construction of a 4 kilometer eastern extension of LRT Line 2 from Santolan in Pasig City to Masinag Junction in Antipolo, Rizal with additional 2 passenger stations to be located at Sta. Lucia Mall

Implementation Schedule 2011-2014

Sponsoring Agency DOTC/LRTA

FS on Manila LRT Line 2 Extension Project by Japan External Trade Organization (JETRO) completed in March 2010JICA technical assistance to reconfigure the project into PPP commenced in January 2011. FS will validate

extension options, scope of work and project costs November 2011

S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications

[email protected]

LINE 2 EAST EXTENSION ALIGNMENT

2014

DOTC/LRTA

completed in March 2010 in January 2011. FS will validate

Page 7: FINAL 12 Projects - PPP Centerppp.gov.ph/wp-content/uploads/2011/03/FINAL_12... · PhP7,600 Million (US$168.89 Million) Project Status • Updating of FS to reconfigure the project

Project Title

Description

The project involves the extension of the existing 15kilometer LRT Line 1 system southward to Bacoor, Cavite by additional 11.7 kilometers which includes 8 passenger stations with provision for 2 additional future passenger stations, a satellite depot for light maintenance to be located at the southern end of the proposed line, and intermodal facilities installed at high-demand stations, including the provision of additional rolling stocks to meet the current demand and additional load requirements once the MRT Line 3 and LRT Line 1 are integrated.

Mode PPP

Project Cost PhP70,000 Million (US$1,555.55 Million)

Project Status

• Due diligence review, contract packaging, preparation of bid documents of projects for PPP Systra

December 2010 • Publication of Invitation to Bid - July 2011

Contact Information

Name : RUBEN S. REINOSO, JR.Designation : Undersecretary for Policy, Planning and Project ManagementAgency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : [email protected]

MRT/LRT Expansion Program: LRT 1 South Extension Project

MRT/LRT LINES

The project involves the extension of the existing 15-kilometer LRT Line 1 system southward to Bacoor,

kilometers which includes 8 passenger stations with provision for 2 additional future passenger stations, a satellite depot for light maintenance to be located at the southern end of the proposed line, and intermodal facilities installed at

ations, including the provision of additional rolling stocks to meet the current demand and additional load requirements once the MRT Line

Implementation Schedule 2011-2015

Sponsoring Agency DOTC/LRTA

Due diligence review, contract packaging, preparation of bid documents of projects for PPP Systra commenced in

July 2011

RUBEN S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications

[email protected]

2015

DOTC/LRTA

commenced in

Page 8: FINAL 12 Projects - PPP Centerppp.gov.ph/wp-content/uploads/2011/03/FINAL_12... · PhP7,600 Million (US$168.89 Million) Project Status • Updating of FS to reconfigure the project

Project Title CALA Expressway - Manila side section (27.5 km)

Description

The project will provide vital access between various economic zones in Cavite Province and NAIA, Manila Port and Batangas Port, and contribute to the economic development and decongestion of traffic along Cavite roads, particularly Aguinaldo Highway. This is the extension of the ongoing Manila-Cavite Coastal Expressway Extension and ends at Silang, Cavite Province. It is an at-grade expressway. L = 27.5 km No. of Lanes = 6 lanes

Mode PPP Implementation Schedule May 2012 - June 2016

Project Cost PhP10,500 Million

(US$233.33 Million) Sponsoring Agency DPWH

Project Status

• Publication of Invitation to Bid: December 2011 • Detailed Design and Construction Schedule – May 2012 – December 2015

Contact Information

Name : Sec. Singson / Asec. Cabral / Dir. Firmalino / Asst. Dir. Garsuta

Designation : Secretary / Asec. for Planning / PMO BOT Director / PMO BOT Asst. Director

Agency : DPWH

Telephone no. : (63 2) 304-3300 / 304-3319 / 304-3762 / 304-3069

Fax No : (63 2) 304-3020 / 304-3033 / 304-3824 / 304-3069

Email Address : [email protected] / [email protected] /

[email protected] / [email protected]

CALA Expressway –

Manila side Section

Page 9: FINAL 12 Projects - PPP Centerppp.gov.ph/wp-content/uploads/2011/03/FINAL_12... · PhP7,600 Million (US$168.89 Million) Project Status • Updating of FS to reconfigure the project

Project Title

Description

The project involves the construction of a new airport of international standards with 2,500m X 45m runway to replace the existing Tagbilaran Airport.

Mode PPP

Project Cost PhP7,600 Million (US$168.89 Million)

Project Status

• Updating of FS to reconfigure the project into PPP and validate project scope, costs and structure• Preparation of PPP structure and bid documents

Agency (JICA) • Publication of Invitation to Bid: August 2011

Contact Information

Name : RUBEN S. REINOSO, JR.Designation : Undersecretary for Policy, Planning and Project ManagementAgency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : [email protected]

New Bohol Airport Development

The project involves the construction of a new airport standards with 2,500m X 45m runway

Implementation Schedule 2012-2014

Sponsoring Agency DOTC/MIAA/CAAP

the project into PPP and validate project scope, costs and structure bid documents through technical assistance from Japan International Cooperation

: August 2011

RUBEN S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications

[email protected]

New Bohol

Airport

2014

DOTC/MIAA/CAAP

Japan International Cooperation

Page 10: FINAL 12 Projects - PPP Centerppp.gov.ph/wp-content/uploads/2011/03/FINAL_12... · PhP7,600 Million (US$168.89 Million) Project Status • Updating of FS to reconfigure the project

Project Title

Description

The Project involves the rehabilitation/ improvement of the existing Puerto Princesa Airport to meet the standards of the International Civil Aviation Organization (ICAO).through the construction of new landside facilities in the north western side of the existing runway such as passenger terminal building, control tower, administration & operation building, cargo terminal building, rescue & fire fighting building and other support facilities, the construction of new apron and connecting taxiways, upgrading of the existing 2.6 km runway and its strip, and the provisof new navigational and traffic control equipment.

Mode PPP

Project Cost PhP4,400 Million (US$97.78 Million)

Project Status

• Updating of FS to reconfigure the project into PPP and • Preparation of PPP structure and bid documents • Publication of Invitation to Bid: August 2011

Contact Information

Name : RUBEN S. REINOSO, Designation : Undersecretary for Policy, Planning and Project ManagementAgency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : [email protected]

Puerto Princesa Airport Development

PROJECT LOCATION

The Project involves the rehabilitation/ improvement existing Puerto Princesa Airport to meet the

standards of the International Civil Aviation Organization (ICAO).through the construction of new landside facilities in the north western side of the existing runway such as passenger terminal building,

tower, administration & operation building, cargo terminal building, rescue & fire fighting building and other support facilities, the construction of new apron and connecting taxiways, upgrading of the existing 2.6 km runway and its strip, and the provision of new navigational and traffic control equipment.

Implementation Schedule 2012-2014

Sponsoring Agency DOTC/CAAP

Updating of FS to reconfigure the project into PPP and validate project scope, costs and structure bid documents through technical assistance from Singapore Government

August 2011

RUBEN S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications

[email protected]

Puerto Princesa Airport

2014

DOTC/CAAP

from Singapore Government

Page 11: FINAL 12 Projects - PPP Centerppp.gov.ph/wp-content/uploads/2011/03/FINAL_12... · PhP7,600 Million (US$168.89 Million) Project Status • Updating of FS to reconfigure the project

Project Title

Description

The project involves the preparation of the detailed engineering design, and construction of airport facilities. It also includes land acquisition of about 180 hectares. Project components are the following: Landside - Passenger Terminal, Cargo Building, Control Tower, Administration Building, Vehicle Parking Area 9VPA), and other site development; Airside - Runway Strip/Runway, Taxiway, Apron, Air Traffic/navigation Equipment.

Mode PPP

Project Cost PhP3,200 Million (US$71.11 Million)

Project Status

• Updating of FS to reconfigure the project into PPP and • Preparation of PPP structure and bid documents • Publication of Invitation to Bid: August 2011

Contact Information

Name : RUBEN S. REINOSO,Designation : Undersecretary for Policy, Planning and Project ManagementAgency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : [email protected]

New Legaspi (Daraga) Airport Development

PROJECT LOCATION

The project involves the preparation of the detailed engineering design, and construction of airport

includes land acquisition of about 180 hectares. Project components are the following:

Passenger Terminal, Cargo Building, Control Tower, Administration Building, Vehicle Parking Area 9VPA), and other site development;

unway, Taxiway, Apron, Air

Implementation Schedule 2012-2014

Sponsoring Agency DOTC/CAAP

Updating of FS to reconfigure the project into PPP and validate project scope, costs and structure. bid documents through technical assistance from Singapore Government

August 2011

RUBEN S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications

[email protected]

2014

DOTC/CAAP

from Singapore Government

Page 12: FINAL 12 Projects - PPP Centerppp.gov.ph/wp-content/uploads/2011/03/FINAL_12... · PhP7,600 Million (US$168.89 Million) Project Status • Updating of FS to reconfigure the project

Project Title Privatization of Laguindingan Airport Operation and Maintenance

Description

The project involves the privatization of the operation and maintenance of the Laguindingan Airport to reduce government expenditure and increase current and future service levels of the airport. The operation and maintenance through concession covers the newly constructed airport on a 393hectare property complete with facilities of international standards. The airport canaccommodate 1.2 million passenger per year based on its Master Plan.

Mode PPP

Project Cost PhP 1,500 million (US$33.33 Million)

Project Status

• Preparation of business case and tender documents for the privatization of the airport operation assistance from United Stated trade and Development Agency (

• Publication of Invitation to Bid: June 2011 Contact Information Name : RUBEN S. REINOSO, JR.Designation : Undersecretary for Policy, Planning and Project ManagementAgency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : [email protected]

Privatization of Laguindingan Airport Operation and Maintenance

The project involves the privatization of the operation and maintenance of the Laguindingan Airport to

expenditure and increase current

through concession covers the newly constructed airport on a 393-hectare property complete with facilities of international standards. The airport can accommodate 1.2 million passenger per year based

Implementation Schedule 2011-2013

Sponsoring Agency DOTC/CAAP

Preparation of business case and tender documents for the privatization of the airport operation through technical assistance from United Stated trade and Development Agency (USTDA) assistance

: June 2011

RUBEN S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications

[email protected]

Laguindingan Airport

Privatization of Laguindingan Airport Operation and Maintenance

2013

DOTC/CAAP

through technical

Page 13: FINAL 12 Projects - PPP Centerppp.gov.ph/wp-content/uploads/2011/03/FINAL_12... · PhP7,600 Million (US$168.89 Million) Project Status • Updating of FS to reconfigure the project

12

Unsolicited

Project Title NLEX-SLEX CONNECTOR

Description

The project involves the construction of 13.4 km.

4-lane elevated expressway over the Philippine

National Railway (PNR) right of way which starts

at Caloocan City and ends at Makati City.

The project aims to close the gap and complete

the north-south Luzon industrial beltway transport

axis by connecting NLEx and SLEx. The project

will contribute to decongest Metro Manila traffic,

particularly EDSA and provide a 24-hour access

to Manila ports by providing faster, safer and

comfortable means of transport facility. It starts at

Caloocan City and ends at Makati City. It is an

elevated expressway over PNR right-of-way

Mode PPP Implementation Schedule Jan. 2012 – Dec. 2013

Project Cost PhP21,000 Million (US$ 477 Million)

Sponsoring Agency DPWH

Project Status

• Advertisement/Publication: Advertisement/Publication: June 2011

Contact Information

Name : Sec. Singson / Asec. Cabral / Dir. Firmalino / Asst. Dir. Garsuta

Designation : Secretary / Asec. for Planning / PMO BOT Director / PMO BOT Asst. Director

Agency : DPWH

Telephone no. : (63 2) 304-3300 / 304-3319 / 304-3762 / 304-3069

Fax No : (63 2) 304-3020 / 304-3033 / 304-3824 / 304-3069

Email Address : [email protected] / [email protected] /

[email protected] / [email protected]