3

Filling the Void - tamarwilner.files.wordpress.com · (Windpower Monthly, April 2010), and has signed a 600MW supply deal with Texas-based developer Cielo Wind Power. Goldwind, China's

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Filling the Void - tamarwilner.files.wordpress.com · (Windpower Monthly, April 2010), and has signed a 600MW supply deal with Texas-based developer Cielo Wind Power. Goldwind, China's
Page 2: Filling the Void - tamarwilner.files.wordpress.com · (Windpower Monthly, April 2010), and has signed a 600MW supply deal with Texas-based developer Cielo Wind Power. Goldwind, China's
Page 3: Filling the Void - tamarwilner.files.wordpress.com · (Windpower Monthly, April 2010), and has signed a 600MW supply deal with Texas-based developer Cielo Wind Power. Goldwind, China's