46
MARCH 2020 FILLING STATION FEASIBILITY STUDY ERF 37 MONTANA A.H., PRETORIA, GAUTENG C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD (Revision 0)

FILLING STATION FEASIBILITY STUDY

  • Upload
    others

  • View
    8

  • Download
    2

Embed Size (px)

Citation preview

Page 1: FILLING STATION FEASIBILITY STUDY

                          

    

 

MARCH 2020     

 FILLING STATION FEASIBILITY STUDY   

ERF 37 MONTANA A.H., PRETORIA, GAUTENG  C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD  

(Revision 0) 

Page 2: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    2 

     

                         

Issue/revision  Revision 0   Revision 1  Revision 2  Revision 3 

Remarks  For Information       

Date  March 2020       

Prepared by  J.M. van Rooyen       

Checked by  E.D. Kotze (Pr. Tech Eng)       

Signature 

 

     

Project number  20017       

File reference  Z:/PROJECTS/20001‐

20099/    

 

EDL Engineers (Pty) Ltd 1st Floor, Block D 

The Village Office Park 

c/o Glenwood Rd & Oberon Ave, 

Fearie Glen, 0043 

Cell:   +27 (0)83 564 1563 

Tel:   +27 (0)87 897 5074/5/6 

Email:   [email protected] Website:  www.edlengineers.co.za 

 

Page 3: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    3 

CONTENTS

1  Introduction & Study Area 5 

1.1  Introduction  5 

1.2  Study Area  5 

1.3  Population growth in the study area  6 

1.4  Traffic growth within the Study Area  6 

1.5  Future Roads  6 

1.6  Evaluation of the Study Site  7 

2  Impact on Existing Sites 8 

2.1  Competitor Sites  8 

2.2  Catchment Markets  8 

2.3  Competitor Sites Investigation  9 

2.4  Impact on existing sites  12 

2.5  Conclusion on Competitor Stations  13 

3  Estimated Sales of Proposed Site 14 

3.1  2020 Traffic Demand Count  14 

3.2  2020 Traffic Demand (ADT)  14 

3.3  Average Fill (F)  15 

3.4  Interception Rates (p)  15 

3.5  Full trading days in a month  17 

3.6  Expected Monthly Sales  17 

4  Feasibility of Proposed Site 19 

5  Other Traffic Engineering Considerations 20 

5.1  Impact on Traffic Flow past the site (Safety)  20 

5.2  Delivery Vehicle Path  21 

6  Conclusions 22 

   

Page 4: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    4 

  

 Tables 

Table 1  Expected Shared Traffic 

Table 2  Impact on Surrounding Sites – Lost Fuel Sales 

Table 3  Expected Interception Rates 

Table 4  Estimated Fuel Sales per Month 

 Figures 

Figure 1  Locality Plan 

Figure 2  Competitor Sites 

Figure 3  Existing 2019 (24 Hr) Traffic Volumes 

 

Drawings 

Drawing No:    20017/AL/01 Proposed Access Layout 

 

Annexures 

Annexure A:  Competitor Filling Stations Photos 

Annexure B:  Traffic Counts 

 

Page 5: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    5 

1 Introduction & Study Area 

1.1 Introduction 

EDL Engineers (Pty) Ltd have been appointed to investigate a site for the development of a filling station. An investigation was undertaken to prepare a study for the opening and  operation  of  a  filling  station  on  the  proposed  site, which  is  situated  on  Erf  37 Montana A.H., on  the north western corner at  the  intersection of Dr Van Der Merwe Road and Rooibos Road  in Montana A.H., Pretoria. The evaluation was  for a standard filling station with a canopy covered forecourt, at least 4 pump islands with a number of pumps (min. 8 x 4) selling petrol and diesel fuels as well as a modern convenience store, all  on  a  site  that  has  enough  space  to  accommodate  all  of  the  abovementioned amenities.  

The purpose of the study  is to determine whether the proposed site  is feasible for the opening and operation of a modern, benchmark filling station and to estimate the Litres of  Fuel  that will  be  sold monthly.  The  study  considers  the  development  viability  by assessing  the projected volume of  fuel  to be  sold and possible  impact on  competitor filling stations. 

This  feasibility  report  takes  certain  physical  characteristics  into  account  based  on observations during  the  site  inspection  as well  as  surveyed  traffic  volumes  and  then makes  reasonable  assumptions  on  possible  access  options.  Please  note  that  the approval of accesses, EIA,  licensing,  land use  issues, building plans etc.  is outside  the scope of  this  feasibility  report  and  therefore  these  implementation  issues  cannot  be guaranteed.  The  developer  of  the  facility  must  therefore  still  get  all  the  required approvals for the filling station development on this site,  including (but not  limited to) the items listed above.  

 

1.2 Study Area 

As shown in Figure 1, the site is located in Montana A.H., Pretoria. The site area (Erf 37) is  surrounded  mainly  by  low  density  residential  erven,  with  some  high  density residential  and  undeveloped  erven  in  the  vicinity. Hoërskool Montana  and Montana Private Hospital  is  situated 500m west of  the  site. The Kolonnade Shopping Centre  is situated  500m  to  the  south of  the  site.  The major  transit  route of  Sefako Makgatho Drive is situated approx. 500m south of the site. 

Dr Van Der Merwe Road is under jurisdiction of the Tshwane Metropolitan Municipality. This road functions as an Urban Collector Street (Class 4a). 

Rooibos Road is under jurisdiction of the Tshwane Metropolitan Municipality. This road functions as an Urban Collector Street (Class 4b). 

The location of the site is indicated on the locality map in Figure 1. 

Page 6: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    6 

1.3 Population growth in the study area 

As can be seen by the Graph below, the population growth for the area of Tshwane Region 2, has been positive every year since 2011 and from 333 083 people has grown to about 393 186 people  in 2019. This calculates to an average population growth of just over 2.095% per annum. This  is based on data  from Statistics South Africa and from the census data obtained from City of Tshwane.  

330000

340000

350000

360000

370000

380000

390000

400000

2011 2012 2013 2014 2015 2016 2017 2018 2019

  

 

1.4 Traffic growth within the Study Area 

Precise  traffic  growth  patterns were  not  analyzed  nor  calculated  in  depth  for  this report.  Due  to  the  expanding  residential  areas,  the  retail  centres  and  the  main transient  routes  in  the  area  as well  as  the  developable  land  available  in  the  area surrounding the site, an average of 3.0% annual traffic growth rate was assumed over the next 3 years for the study area.   

1.5 Future Roads 

Future road planning includes: 

The proposed  traffic  circle  conversion of  the  intersection of Dr Swanepoel Road and Rooibos Road, as proposed in the TIA done by EDL Engineers (Pty) Ltd for Erf 37 Montana A.H. 

Page 7: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    7 

1.6 Evaluation of the Study Site 

The subject site was investigated, and a qualitative assessment was made, and the site was ranked according to the following descriptions: 

 

◘ Visibility: Being  located on a collector  route between several small  residential developments and Sefako Makgatho Drive, with some natural obstructions and developments impairing the visibility, the site is visible to passing traffic from a moderate distance. The visibility can thus be described as GOOD; 

◘ Location: The study site is  located at the junction between a collector road (Dr Van Der Merwe Road) and another collector road (Rooibos Road), between the residential  areas  of Montana  A.H.  and  the  Sefako Makgatho  Drive  transient corridor. The location of the site is considered to be GOOD; 

◘ Access: Both Dr Van Der Merwe Road and Rooibos Road is under jurisdiction of the municipality. Rooibos Road is planned to be upgraded with the addition of a traffic circle at the intersection of Dr Swanepoel Road and Rooibos Road. Access to the site can potentially be provided  from Dr Van Der Merwe Road as a  full access and  from Rooibos Road as a Full access and  it can hence be concluded that this access layout can be described as VERY GOOD; 

◘ Trading Market: The trading market  is described as GOOD, as  it will consist of the daily commuters and local traffic between the residential areas and Sefako Makgatho Drive. 

◘ Competitor Stations: There are a few existing filling stations situated on Sefako Makgatho Drive, of which 3 are within 1km radius from the site. There is a total of 8  sites within  a 3km  radius. There  is  also one possible new  (future)  filling station located within 1km to the east. The study site is thus rated AVERAGE in terms of competitors. 

◘ Traffic Volumes: The survey  indicated high volumes passing  the proposed site and the exposure to traffic can thus be described as GOOD; and with the two “Full’  accesses  proposed,  traffic  will  be  able  to  access  the  site  from  all directions. 

Considering the criteria discussed above,  it can be concluded that the study site has GOOD trading potential. 

 

Very Poor  Poor  Average  Good  Very Good 

Page 8: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    8 

2 Impact on Existing Sites 

2.1 Competitor Sites 

To determine the impact on surrounding sites, it is typical to look at the filling stations sharing the same and adjacent local markets as well as filling stations located along the same routes. This guideline is used by various departments, major fuel companies and agencies.  A  radius  of  3km  is  normally  looked  at  in  an  urban  environment,  as more impact on the competitors is expected, the closer they are located to the proposed site. In the case where the site is located along a rural arterial or major arterial, it is typical to look further as the area of  influence  is stretched along a much  longer distance due to transient traffic traveling between towns and settlements.  

 

As this site is located within a portion of a metropolitan, eight (8) existing sites within a 3km  radius were  deemed  relevant  for  this  study.  Figure  2  depicts  these  competitor filling  stations  in  relation  to  the  proposed  site  as well  as  the  applicable  catchment markets. 

 

2.2 Catchment Markets 

Physical man‐made barriers (such as freeways, railways, airports etc.) or natural barriers (such as mountains,  rivers or dams)  create different markets  (catchment areas)  for a site. For this study, types of commuters (local vs transient) were also used to divide the study area into the following markets: 

◘ A: The commuter and local market of Montana A.H. 

◘ B: The commuter market of Montana 

 

 

Page 9: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    9 

2.3 Competitor Sites Investigation 

 

The exact reasons on how drivers make their decisions at which filling station to fill up is not known, but it is influenced by the same factors determining the turn‐in percentage (interception  rate)  to  be  discussed  in  Section  3.3.  Other  agencies,  such  as  the Department of Energy,  consider passing  road users’  access  to petroleum products  at existing  filling stations and not all  the  factors  influencing  the  interception  rate. These factors  will  determine  the  moving  market  factor  (i.e.  when  the  study  site  gains customers from other existing stations). 

Research  indicates  several  factors  that  influence  the  moving  market  between competing  filling  stations. Different petrol brands play  a  very  small  role  in  consumer motivations.  The  price  of  the  convenience  store  goods  plays  a  limited  role  in  re‐patronage. Aesthetic factors impact on re‐patronage and total customer experience (i.e. the  interception  rate  factors  mentioned  previously)  lead  people  to  become  more frequent patrons of a  filling  station.  In  the past  few years  rewards programs  such as Clicks Clubcard Points, e‐bucks and uCount  rewards also became more  important  for customers  and  does  influence  the  interception  rate,  when  two  filling  stations  are located  near  each  other.  In  short,  it  is  the  station  that  delivers  the  best  overall experience and service to customers that outperforms competitors. 

 

The  assessment  of  the  impact  the  proposed  filling  station will  have  on  other  filling stations in the area was mainly based on the shared traffic streams, but all other factors discussed have  also been  considered.  It  is  important  to note  that  shared  traffic only gives an indication of the daily traffic movement patterns between stations. 

The following existing filling stations have been deemed relevant for this study and the distances to the site have been measured along each road to the competitors: 

(i) SASOL Zambezi North – 740m from Site (Travel Distance) 

This older  filling  station  is  situated on  the northern  side of  Sefako Makgatho Drive,  it  can be  reached by means of  a  Left‐in and  Left‐out access on  Sefako Makgatho Drive. This site  is 350m east of the  intersection of Sefako Makgatho Drive and Dr Swanepoel Road and can be clearly seen  from Sefako Makgatho Drive. This site offers  four  (4) pump  islands selling petrol and diesel  fuels, and one (1) remote pump selling diesel exclusively. Average fills recorded at 19 litres per vehicle. This site offers a medium convenience store. Other amenities at the premises include an FNB and ABSA ATM. Nearby shops includes a car dealership and a small business park. Please refer to Photo 2 in Annexure B. 

 

(ii) SASOL Kolonnade – 760m from Site (Travel Distance) 

This older  filling  station  is  situated on  the  southern  side of  Sefako Makgatho Drive,  it  can be  reached by means of  a  Left‐in and  Left‐out access on  Sefako Makgatho Drive, no  access  is  available  from  the  Kolonnade  shopping  centre. This  site  is  320m  west  of  the  intersection  of  Sefako  Makgatho  Drive  and Enkeldoorn Avenue and can be clearly seen from Sefako Makgatho Drive. This site  offers  four  (4)  pump  islands  selling  petrol  and  diesel  fuels.  Average  fills recorded at 18  litres per vehicle. This site offers a medium convenience store. Other amenities at the premises include an FNB and ABSA ATM, as well as a car wash and Marko Stores Collection Point. Nearby shops  include  the Kolonnade Shopping Centre. Please refer to Photo 3 in Annexure B. 

Page 10: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    10 

(iii) ENGEN Montana Crossing – 1.25km from Site (Travel Distance) 

This older  filling  station  is  situated on  the northern  side of  Sefako Makgatho Drive,  it  can be  reached by means of a  Left‐in and  Left‐out access on  Sefako Makgatho Drive, no  access  is  available  from  the  shopping  centre. This  site  is 190m west  of  the  intersection  of  Sefako Makgatho  Drive  and Dr  Swanepoel Road and can be clearly seen from Sefako Makgatho Drive. This site offers four (4)  pump  islands  selling  petrol  and  diesel  fuels.  Average  fills  recorded  at  24 litres per vehicle. This site offers a medium convenience store. Other amenities at the premises include an ABSA (Cash Express) ATM. Nearby shops includes the Montana Crossing Shopping Centre, Hokaai Meat Market and a Wimpy Drive‐Thru. Please refer to Photo 4 in Annexure B. 

 

(iv) ENGEN Magalieskruin – 1.35km from Site (Travel Distance) 

This dated filling station  is situated on Braam Pretorius Street. The site can be reached by means of two (2) full accesses from Braam Pretorius Street and one access  from  the adjacent  Shops/Restaurant. This  filling  station has a medium sized  convenience  store,  car wash  and  an  FNB ATM. Other  amenities nearby include  a  Burger  Bistro  Restaurant  and  some  smaller  line  shops.  This  filling station comprise of four (4) pump islands selling petrol and diesel fuels. Average fills were measured at 27 litres per vehicle. Please refer to Photo 5 in Annexure B. 

 

(v) CALTEX Amandelboom Motors – 2.2km From Site (Travel Distance) 

This older filling station is situated on at the corner of Amandelboom Street and Crevillea Street, east of the intersection of Amandelboom Street and Dr Van Der Merwe  Road.  This  site  has  two  full  accesses.  This  site  offers  four  (4)  pump islands selling petrol and diesel  fuels, and one  (1)  remote pump selling diesel exclusively. Average fills were recorded at 15 litres per vehicle. This site offers a small sized, modern convenience store. Other amenities at the premises include an  FNB,  Standard  Bank  and  Capitec  ATM,  also  an  on‐site  car wash.  Nearby businesses include a Spar and Tops, a Pharmacy and a Burger Take Away. Please refer to Photo 6 in Annexure B. 

 

(vi) ENGEN Zambezi Junction – 3.1km from Site (Travel Distance) 

This filling station  is currently being rebuilt. The BP franchise  is being replaced by  an  ENGEN  franchise.  This  filling  station  is  on  the  northern  side  of  Sefako Makgatho Drive, it can be reached by means of a Left‐in and Left‐out access on Sefako Makgatho Drive. Nearby shops  include the centres of Zambezi Junction and Montana Value Centre, no access  to either of  these centres can be taken from the filling station. Please refer to Photo 7 in Annexure B. 

Page 11: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    11 

(vii) SHELL Montana Park – 3.1km from Site (Travel Distance) 

This older  filling  station  is  situated on  the  southern  side of  Sefako Makgatho Drive,  it  can be  reached by means of  a  Left‐in and  Left‐out access on  Sefako Makgatho Drive, no access is available from the adjacent retail centres. This site offers three (3) pump  islands selling petrol and diesel fuels, and one (1) pump selling diesel exclusively. Average fills recorded at 23 litres per vehicle. This site offers a medium convenience store. Other amenities at the premises include an FNB  and  ABSA  ATM  and  a  Torrador  Coffee  Shop.  Nearby  shops  include  a Builder’s Warehouse, Bathroom Bizarre and a Hyundai Dealership. Please refer to Photo 8 in Annexure B. 

 

(viii) Possible Future Station – 1.4km from Site (Travel Distance) 

There is a filling station planned on the south eastern side of the intersection of Enkeldoorn  Avenue  and  Bougainvillea  Drive.  This  filling  station  is  still  in  the early planning phase and only a future possibility, but will be a modern site and will have a  small  impact on  the  subject  site  (refer  to Table 1 and 2) as  it will have access from two different roads. 

Page 12: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    12 

2.4 Impact on existing sites 

An  estimation of  the  shared  traffic between  the  study  site  and  the  abovementioned existing competitor stations  is summarised  in Table 1. Shared traffic can be accurately calculated by  conducting  traffic  counts at  intersections  closest  to  competitor  stations and  other  intersections where  traffic  can  be  diverted.  In  lieu  of  such  information,  a percentage  of  shared  traffic  is  calculated  from  previous  counts  and  reasonable assumptions are made, based on EDL’s experience with  conducting  feasibility  studies and knowledge regarding the area and traffic movement in the study area. 

Table 1: Expected Shared Traffic 

SITE  FILLING STATION 

POTENTIAL 

PASS‐BY 

TRAFFIC 

(VEH/DAY) 

POTENTIAL TRAFFIC 

SHARED WITH NEW 

FILLING STATION 

(VEH/DAY) 

PERCENTAGE OF 

TOTAL TRAFFIC 

SHARED (%) 

GENERAL 

COMMENTS 

1  SASOL Zambezi North  20 000  2 000  10 Older Filling Station on main transient 

route 

2  SASOL Kolonnade  20 000  1 600  8 Older Filling Station on main transient 

route 

3  ENGEN Montana Crossing  20 000  2 200  11 Older Filling Station on main transient 

route 

4  ENGEN Magalieskruin  14500  300  <5 Older filling station with number of shops nearby 

5  CALTEX Amandelboom Motors  16000  1 100  7 Older Filling Station with small shop and 

nearby Spar 

6  ENGEN Zambezi Junction  20 000  1 000  5 

Filling Station (under construction) on main transient 

route 

7  SHELL Montana Park  20 000  500  <5 Older Filling Station on main transient 

route 

Future Montana Gardens 

Filling Station 

Enkeldoorn Avenue & 

Bougainvillea Drive 

16500  1650  10  Planned Filling Station 

 Note that the traffic shared between existing stations and the study site does not imply the  same or  proportional  percentage  of  lost  fuel  sales.  Passing  road  users  are more likely  to  purchase  fuel  or  turn  into  a  filling  station  based  on  the  overall  aesthetic perception of  the  facility and  the quality of  service offered. The  station’s  location,  its accesses,  available  amenities,  visibility,  site  layout  and  overall  convenience  offered influence  the  loss of  fuel sales when competing against a new, modern competitor. A summary of the potential loss in fuel sales is indicated in Table 2. 

Page 13: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    13 

Table 2: Impact on Surrounding Sites – Lost of Fuel Sales 

SITE  FILLING STATION MOVING MARKET 

FACTOR (%) 

1  SASOL Zambezi North  7 

2  SASOL Kolonnade  5 

3 ENGEN Montana 

Crossing 7.5 

4  ENGEN Magalieskruin  <5 

5 CALTEX Amandelboom 

Motors 5 

6  ENGEN Zambezi Junction  <5 

7  SHELL Montana Park  <5 

Future Montana 

Gardens Filling Station 

(Enkeldoorn Ave & 

Bougainvillea Dr) 

 

The  development  and  operation  of  the  proposed  filling  station  will  have  an  initial impact  on  a  number of  filling  stations  in  the  study  area, but  considering  the  shared traffic and different markets catered for by each one of these competitor stations, this impact should not irreparably jeopardise these businesses as they have a large transient market and this development mainly caters for a different portion of the local market.  

The  subject  site will mainly  serve  traffic within  the  area of Montana A.H.  and  traffic travelling north, and south along Dr Van Der Merwe Road  

 

2.5 Conclusion on Competitor Stations 

From Table 2, it can be concluded that the impact of the competitors will be low, mainly to  the  competitor  sites  serving  different markets.  The  existing  SASOL  Zambezi North and ENGEN Montana Crossing will be the most affected (7% to 7.5% impact) but will be able  to  recover most  of  the  lost  sales within  3  to  4  years  after  the  proposed  filling station  is constructed. The balance of  the expected  fuel  sales  in a month,  that  is not gained  from  the  mentioned  competitors  will  be  gained  from  the  residential  area surrounding the site, specifically Montana A.H. and also from passing vehicles on Dr Van Der Merwe Road that currently fill‐up elsewhere (outside the study area). 

Page 14: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    14 

 

3 Estimated Sales of Proposed Site 

The  following  empirical  formula  is  used  by  the  fuel  industry  to  calculate  the  expected average Liters of fuel to be sold in a month: 

L = ADT × F × p × d  

Liters per month (L)  =  [Vehicles per day passing the site (ADT)] 

              x 

[Average fuel fill per vehicle (F.)]  

             x 

[Percentage  vehicles  of  pass‐by  traffic  turning  into  the site(p)] 

             x  

[Average full normal trading days in a month (d)] 

Each of the factors used in the calculation formula for fuel sales shown above, are discussed in the following subsections of this chapter.  

3.1 2019 Traffic Demand Count 

Traffic Counts were used  to determine the  traffic demand and  traffic volumes  for  the study  area.  A  classified  count  was  conducted  by  EDL  in  February  2019,  at  the intersection of Dr Van Der Merwe Road and Rooibos Road as indicated in Figure 1. 

The detailed (classified) traffic count report is attached as Annexure C. 

The  Average  Daily  Traffic  (ADT)  currently  travelling  through  this  intersection  is approximately 16 444 vehicles per day, with heavy vehicles constituting approximately 1.5% of the daily traffic and Taxi’s about 1.5% of the daily traffic. 

The daily  traffic  flows were broken down  in  the different directions, as  shown  in  the next Sub‐chapter. 

3.2 2019 Traffic Demand (ADT) 

The 13‐hour classified traffic count that was conducted by EDL was done on the 7th of February 2019 at the intersection of Dr Van Der Merwe Road and Rooibos Road, as indicated in Figure 1. These counts were converted to 24‐hour counts and broken up into different traffic streams as shown below: 

◘ 3 333 veh/day northbound on Dr Van Der Merwe Road past the site;  

◘ 4 097 veh/day westbound on Rooibos Road past the site (Negative);  

◘ 3 422 veh/day eastbound on Rooibos Road past the site; 

◘ 4 040veh/day southbound on Dr Van Der Merwe Road past the site (Negative) 

◘ 1 552veh/day not passing the site. 

From the traffic count (2020), the site is exposed to an ADT of approx. 14 892 veh/day travelling  in  all  directions  along  Dr  Van  Der Merwe  Road  and  Rooibos  Road  at  the intersection where the filling station is proposed. 

 

Page 15: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    15 

3.3 Average Fill (F) 

The average  fill at a site varies depending on  the  type of  traffic  it  is exposed  to, with higher  fills generally encountered at sites exposed to more transient traffic and  lower fills for  local traffic. Lower fills can also be expected for sites situated  in  lower  income areas, for older sites and higher fills in more affluent (high income) areas.  

In order to get an indication of the average fill in die study area, a survey was conducted at  the  relevant  sites where  fill  volumes were  recorded, and  the  facilities provided at each station recorded. The survey indicated an average fill at nearby stations in higher income  areas  of  approximately  15  –  27  litres  per  vehicle. Due  to  the  slightly  lower density  housing  in  the  area  of Montana  A.H.  and  for  the  purpose  of  the  study,  an average  fill  of  20  litres  per  vehicle  was  deemed  appropriate  and  adopted  for  the calculations of the subject site. 

 

3.4 Interception Rates (p) 

The turn‐in percentages (interception rates) are determined  inter alia by the following factors: 

◘ Convenience (clean new facility and easily accessible); 

◘ Visibility (good/long time to decide whether to use the facility or not); 

◘ The amount of passer‐by traffic (as per traffic count); 

◘ Type of  traffic  (transient,  commuter or  local;  income  level of  the  area  also  a factor); 

◘ Other nearby filling stations (distances to competitor sites); 

◘ Service provided to public (car wash, convenience shop, A.T.M. etc); 

◘ Good accesses (proper deceleration and acceleration lanes); 

◘ Location (homebound and work bound and surrounding area); 

◘ Site layout (large enough to provide easy site circulation) 

◘ Fuel Rewards Programs 

 

From  previous  site  surveys  and  experience  with  existing  and  new  filling  station developments,  it  has  been  determined  that  there  is  a  relationship  between  the interception rate and the passing traffic volumes of a site. This relationship is illustrated by the graph below. The expected interception rates for the proposed development are also indicated on the graph and tabulated in Table 3 on the next page. The interception rates for traffic flow on the opposite side of the road from the filling station is lower as vehicles need to cross traffic to enter the filling station. 

 

 

 

 

 

 

Page 16: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    16 

 

 

 

Table 3: Expected Interception Rates 

ADT = 16 248 VEH/DAY PASSING THE SITE 

ROAD AND DIRECTION TRAFFIC VOLUME 

(VEH/DAY) 

ADOPTED INTERCEPTION 

RATE  

Northbound on Dr Van Der Merwe past the site (Positive Traffic) 

3 333  5.5% 

Westbound on Rooibos Road past the site (Negative Traffic) 

4 097  3.5% 

Eastbound on Rooibos Road past the site (Positive Traffic) 

3 422  6.5% 

Southbound on Dr Van Der Merwe past the site (Negative Traffic) 

4 040  4.0% 

 

As can be seen on the Interception Rate vs ADT graph, the interception rates expected for  the  subject  site  varies  on  Dr  Van  Der  Merwe  Road  and  Rooibos  Road.  Lower interception  rates  are  expected  for  the  traffic  travelling  on  the  opposite  side  of  the street, which will have to turn across oncoming traffic (negative traffic).  

 

 

 

 

 

DR VAN DER MERWE ROAD NORTHBOUND ROOIBOS ROAD EASTBOUND

ROOIBOS ROAD WESTBOUND DR VAN DER MERWE SOUTHBOUND 

Page 17: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    17 

3.5 Full trading days in a month 

The definition of full (normal) trading days in a month is the number of typical weekday sales  in a month. A  typical weekday  is a Tuesday, Wednesday or a Thursday during a week with no school holidays or public holidays. If there was no variation in the traffic, there  would  have  been  30.5  (365/12)  full  normal  trading  days  in  a  month.  If,  for example,  the weekend  traffic demand  is  lower  than during  the week,  the  full normal trading days in a month becomes less. It is thus wrong to assume that a default value of 30.5  days  should  be  used  since  a  24‐hour  facility will  be  operated  each  day  of  the month.  

Traffic  patterns  in  the  study  area  largely  determine  the  number  of  trading  days  per month. For filling stations situated in areas largely exposed to commuter traffic, 26 full trading  days  in  a month  can  be  expected.  The  26  days  is  based  on  the  fact  that  a Saturday and Sunday each only count for only half a trade day, resulting  in only 6  full days of trading each week.  

With  no  nearby  large  developments  and  attractions  generating  higher  traffic  on Saturdays and Sundays.  It  is expected  that 26  trading days per month  is appropriate and was therefore assumed for the proposed filling station.  

 

3.6 Expected Monthly Sales 

For new developments a general guideline is used when estimating fuel sales for future years.  It  is commonly found that the full potential of a filling station’s fuel sales  is not reached during  the  first year of operation. Only during  the  third  year  the  full  (100%) potential is normally reached.  

In‐depth calculations for diesel sales were not conducted separately for this study. The average fills on diesel is more than that of petrol, but the profit per litre is lower. It was thus assumed that the typical profit on diesel transactions will be similar to the profit on petrol transactions. Diesel sales normally constitute only 5 – 20% of the total fuel sales, depending  on  the  %  Heavy  Vehicles  and  there  are  usually  other  competitors  that already cater for the diesel market, by offering reward programs and discounts as well as 30‐day accounts.  

For  the purpose of  this study and considering  the  surrounding area and  the very  low percentage of heavy vehicles passing the site, it was estimated that diesel transactions will account  for approximately only 10% of  the monthly  fuel sales. A summary of  the estimated fuel sales is presented in Table 4 on the next page. 

 

Page 18: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    18 

 Table 4: Estimated Fuel Sales per month 

Erf 37 Montana A.H. (Dr Van Der Merwe Rd/ Rooibos Rd)

N OR T H SOU TH EA ST W EST

Traffic Flow (Vehic les per Day) 3,333 4,040 3,422 4,097

Average Fill (Litres per Day) 20.0 20.0 20.0 20.0

Trading Days (Days per Month) 26 26 26 26

Interception Rate (%) 5.00% 3.50% 6.00% 3.00%

SUB -T OT A L 86,658 73,528 106,766 63,913

SA LES P OT EN T IA L

330,866

ANNUAL FORECAST - MONTHLY SALES POTENTIAL

T OT A L

P ercentageo f P o tent ia l

Gro wthR ate

P etro l D ieselLIT R ES

P ER M ON T H

1 2020 90% 3.00% 276,041 30,671 306,712

2 2021 95% 3.00% 300,118 33,346 333,465

3 2022 100% 3.00% 325,391 36,155 361,546

160,186 170,680

YEA R

P ER IOD P OT EN T IA L GR OWT H EST IM A T ED LIT R ES

M ON T H LY SA LES P OT EN T IA L

MOVEMENT

ALL VEHICLESR o o ibo s R dD r Van D er M erwe R d

  

Major  fuel  companies  generally  regard  a  new  site  feasible  if  the  fuel  sales  volume forecast  indicates  that  more  than  300  000  litres  of  fuel  will  be  sold  per  month. Considering  the expected  fuel sales  tabulated  in Table 4  to  just over 360 000  litres  in the 3rd year of operations, it can be concluded that the proposed site will be feasible for the development of a  filling  station  for all  the  larger  fuel companies,  (such as SASOL, TOTAL, ENGEN, BP, SHELL, etc.) on the corner of Dr Van Der Merwe Road and Rooibos Road, Montana  A.H.,  Pretoria.  Please  note  that  the  feasibility will  be  dependent  on obtaining direct ‘Full’ access approval from both Dr Van Der Merwe Road and Rooibos Road. 

 

 

Access Road West 

Page 19: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    19 

 

4 Feasibility of Proposed Site 

We  have  previously  consulted with  filling  station  developers  and  considered  several  new filling  station  development  cases  for  minimum  monthly  fuel  sales  thresholds  and  for development costs. Table 4 below provides a summary of the typical costs associated with a new, modern  filling station development  located on a site roughly  like  the proposed  filling station.  

Table 5: Typical Costs of a New Filling Station 

COST ITEM  COST  COST 

1.  ZONED PROPERTY    R 4 500 000.00 

1.1 Rights, EIA, Licenses, etc.  R 900 000.00   

1.2 Land Cost  R 2 500 000.00   

1.3 Developer Profit  R 500 000.00   

1.4 Bulk Service Contribution  R 350 000.00   

2.  CIVIL ENGINEERING CONTRACT    R 4 400 000.00 

2.1 Access (External Roads)  R 2 000 000.00   

2.2 Internal Roads (incl. paving & kerbs) 

R 1 500 000.00   

2.3 Earthworks  R 750 000.00   

2.4 Services  R 150 000.00   

3.  BUILDER’S CONTRACT    R4 300 000.00 

3.1 Building  R 1 350 000.00   

3.2 Canopy  R 1 000 000.00   

3.3 Signage  R 120 000.00   

3.4 Shop Fitting  R 350 000.00   

3.5 Computer & CCTV System  R 230 000.00   

3.6 Generator  R 250 000.00   

4.  OTHER    R 1 450 000.00 

4.1 Franchise Fee  R 250 000.00   

4.2 Professional Fees  R 950 000.00   

4.3 Gardens, Irrigation and Fencing  R 250 000.00   

TOTAL  R 14 650 000.00  

The  cost variation of a  filling  station development  is  largely  influenced by  the  cost of  the zoned property, the size of the site and the civil engineering works (mainly the cost of the earthworks and the accesses). Major fuel companies generally regard such a site feasible  if the projected fuel sales are in the region of 300 000 liters per month, depending on several factors, but this is not cast in stone and various fuel companies have different views on the required minimum fuel sales thresholds.   Given the expected fuel sales  in year 3, tabulated  in Table 4  (361 000  liters per month),  it can  be  concluded  that  the  proposed  filling  station  will  be  feasible  for  the  larger  fuel companies as the projected fuel sales are more than 300 00 litres per month. 

Page 20: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    20 

 

5 Other Traffic Engineering Considerations 

5.1 Impact on Traffic Flow past the site (Safety) 

Road authorities have in the past identified the possible negative impact a filling station can have on the traffic flow past a site. After proper research and the input from various experienced  traffic  engineers,  the  BB2  design manual  and  Guidelines  for  Access  to Filling Stations were compiled to ensure the construction of proper and safe accesses to filling stations.  

As negotiated with the Tshwane Metropolitan Municipality, a  ‘Full’ access  is proposed on Dr Van Der Merwe Road  at  approx. 85m north of  the  intersection of Dr Van Der Merwe Road and Rooibos Road. 

A ‘Full’ access is proposed on Rooibos Road at approx. 75m west of the intersection of De Van Der Merwe Road and Rooibos Road. 

The impact of the proposed filling station on the existing traffic flow must be considered for the following two phases:  

(i) During the Construction Phase 

During  the  construction  phase,  construction  vehicles  or  even  abnormal  vehicles  or delivery  vehicles  could  affect  and/or  disrupt  current  traffic  flows.  During  this  phase possible  traffic  congestion  or  increase  in  congestion,  temporary  obstructions  in  the roadway and the influence on adjacent developments must be considered. 

 

(ii) During the Operational Phase 

During  the  operational  phase  the  existing  traffic  flow  patterns  on  the  roadways adjacent  to  the  proposed  site  are  expected  to  vary  and  change  over  time.    Filling stations are developments that  intercept trips from the background traffic as opposed to other developments that generate additional trips. The  interception of traffic could cause minor disruptions if not considered thoroughly. 

 

The  following  issues  should be  considered  to minimize  the possible negative  impacts that the proposed filling station might have on the passing traffic during the operational phase: 

 

◘ The detail design of the proposed filling station should adhere to the prescribed specifications (and subsequent approvals) of the applicable road authorities; 

◘ Care  should be  taken pertaining  to  the placing of  signage  in  the proximity of access points to the proposed filling station; 

 

◘ Issues  pertaining  to  surface  damage  and  poor  condition  of  the  roads  in proximity  of  the  site  should  be  reported  to  the  applicable  authority  and custodian of the respective roads; and 

◘ Appropriate road signs and traffic markings should be  implemented at the site to ensure safe and convenient access for passing traffic on both roads. 

 

Page 21: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    21 

It  can  be  concluded  that  the  existing  traffic  passing  the  site  will  not  be  negatively affected by the proposed filling station’s operations, as the issues mentioned above will be addressed by proper access design standards, turning and deceleration lanes (where applicable) as well as appropriate signage. 

 

5.2 Delivery Vehicle Path 

Like road safety, the path of the delivery vehicle is also evaluated by the road authority. The geometric standards adopted in the design manuals allow for a fuel delivery vehicle to enter and exit a site safely. Typically, the entrance lane width should be at least 5m wide,  to  accommodate  a  Single  Unit  +  Trailer  Heavy  Vehicle.  For  light  vehicles  a minimum width of only 3.5m is required. 

It  can  be  concluded  that  the  proposed  site will  be  able  to  accommodate  such  fuel delivery vehicles. 

 

Page 22: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    22 

 

6 Conclusions 

The following conclusions were made regarding the proposed filling station: 

◘ The expected fuel sales for the proposed filling station development  is summarized in Table 4. The estimated  fuel  sales  for  the proposed  filling  station’s  third year of operation is approximately 361 000 litres per month. 

◘ The proposed  filling station  is expected to take between 5% and 7.5%  from  five(5) competitor sites (Table 2), with 3 sites expected to be impacted less than a 5%. The proposed  site  will  have  an  initial  negative  impact  (between  5%  and  7.5%)  on  a number of existing  filling  stations  in  the  study  area, but  considering  the different markets and traffic streams catered for, by each of the existing filling stations as well as  the  distances  away  from  the  proposed  filling  station,  the  impact  should  not irreparably  jeopardize  these businesses and with  the positive  traffic growth  in  the area, will  be  able  to  recover within  3  –  4  years  of  the  new  Filling  Station  being implemented. 

As Per Tshwane Metropolitan Municipality negotiations, a  ‘Full’ access  is proposed on Dr Van Der Merwe Road and a  ‘Full’ access  is also proposed on Rooibos Road, details are shown on Drawing 20017/AL/01. 

 

General Conclusion 

Major fuel companies generally regard a new site feasible if the fuel sales are more than 300 000 litres sold per month. Regarding the proposed site, as the passing traffic is over 16,400 vehicles per day and the monthly volume as summarized in Table 4 is estimated at  361  000  litres  per month  by  the  3rd  year  of  operation,  the  proposed  site will  be feasible for all of the fuel companies. 

 

Considering the expected  fuel sales tabulated  in Table 4,  it can be concluded that the proposed site will indeed be feasible for the development of a filling station, subject to obtaining access approval from Dr Van Der Merwe Road and Rooibos Road. 

 

Page 23: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    23 

 

  Figures  

Figure 1  Locality Plan  

Figure 2  Competitor Sites 

Figure 3  Existing 2019 (24 Hr) Traffic Volumes 

Page 24: FILLING STATION FEASIBILITY STUDY

ERF 37 MONTANA A.H. LOCALITY

20017

FIG 1

EDL ENGINEERS

SITE

AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SITE:
Page 25: FILLING STATION FEASIBILITY STUDY

1 KM3 KM

MONTANA

PARK

MONTANA

GARDENS

T

O

J

O

H

A

N

N

E

S

B

U

R

G

TO

P

OL

OK

WA

NE

EN

KE

LD

OO

RN

A

VE

NU

E

BO

UG

AIN

VIL

LE

A D

RIV

E

N1

MONTANA A.H.

S

E

F

A

K

O

M

A

K

G

A

T

H

O

D

R

IV

E

MONTANA

CHRISTIAANVILLE A.H.

WONDERBOOM

AIRPORT

MONDUSTRIA

DOORNPOORT

ZAMBEZI COUNTRY ESTATE

(MONTANA GARDENS)

DR

S

WA

NE

PO

EL

R

OA

D

BR

AA

M

PR

ET

OR

IUS

ST

RE

ET

MAGALIESKRUIN

PUMULANI A.H.

2

13

4

6

7

8

B

A

SITE

SINOVILLE

DR

V

AN

D

ER

M

ER

W

E R

OA

D

RO

OIB

OS

RO

AD

5

EDL CONSULTING ENGINEERS

1st Floor, Block D

The Village Office Park

C/O Glenwood Rd & Oberon Ave,

Fearie Glen, 0043

Tel: 087 897 5074/5/6

[email protected]

www.edlengineers.co.za

ERF 37 MONTANA A.H.

MAIN ROUTES AND COMPETITOR SITES

FIGURE 2 20017 27/02/2020

1:20000 JMvR E.D. KOTZE 0

COMPETITOR SITES

NO. SITE TRAVEL DISTANCE

1 SASOL ZAMBEZI NORTH 740m

2 SASOL KOLONNADE 760m

3 ENGEN MONTANA CROSSING 1.25km

4 ENGEN MAGALIESKRUIN 1.35km

5 CALTEX AMANDELBOOM MOTORS 2.2km

6

ENGEN (BP) ZAMBEZI JUNCTION 3.1km

7 SHELL MONTANA PARK 3.1km

8 POSSIBLE FUTURE STATION 1.4km

A LOCAL MARKET OF MONTANA A.H.

B COMMUTER MARKET OF MONTANA

AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE.
AutoCAD SHX Text
REVISION.
AutoCAD SHX Text
CHECKED.
AutoCAD SHX Text
DRAWN.
AutoCAD SHX Text
SCALE AT A3.
Page 26: FILLING STATION FEASIBILITY STUDY

ERF 37 MONTANA A.H. EXISTING 2019 24-HOUR TRAFFIC

20017

FIG 3

EDL ENGINEERS

DR

S

WA

NE

PO

EL

R

D

SEFAKO MAKGATHO DRIVE (ZAMBESI)

SITE

RO

OIB

OS

RO

AD

DR

V

AN

D

ER

M

ER

W

E R

D

2542392776

322

2596

1122

1138

2390

724

9432959828

TO N1

AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SITE:
Page 27: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    24 

   Drawings  

 

Drawing No:    20017/AL/01 Proposed Access Layout  

 

 

 

Page 28: FILLING STATION FEASIBILITY STUDY

RO

O

IBO

S R

O

AD

DR

V

AN

D

ER

M

ER

W

E R

O

AD

7

.

5

5

4

I

S

L

A

N

D

C

A

N

O

P

Y

2

.

0

0

5

.

5

0

1

0

.

2

0

8

.

4

4

7

.

5

5

7

.

5

5

45,0

5,0

75,0

85,0

45,0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

141

142

143

144

145

146

147

148

149

150

151

152

153

154

155

156

157

158

159

160

161

162

163

164

165

166

167

168

169

170

171

172

173

174

175

176

177

178

179

180

181

182

183

184

185

186

187

188

189

190

191

192

193

194

195

196

197

198

199

200

201

202

203

204

205

206

207

208

209

210

211

212

213

214

215

216

217

218

219

220

221

222

223

224

225

226

227

228

229

230

231

232

233

234

235

236

237

238

239

240

241

242

243

244

245

246

247

248

249

250

251

252

253

254

255

256

257

258

259

260

261

262

263

264

265

266

267

268

269

270

271

272

273

274

275

276

277

278

279

280

281

282

283

284

285

286

287

288

289

290

291

292

293

294

295

296

297

298

299

300

301

302

303

ER

F R

/37 M

onta

na A

H

90 0

90m

m

Erf B

oundary

ER

F 1

/37 M

onta

na A

H

Resid

ent

Vis

itor

Entra

nce

Exit

Gate

house

1

5

,

0

1

5

,

0

1

5

,

0

1

5

,

0

4.5m

B

UIL

DIN

G L

IN

E

4.5

m

BU

ILD

ING

LIN

E

45,0

PAINTED ISLAND TO BE REMOVED

REPAINT PEDESTRIAN

CROSSING LINES

INSTALL PEDESTRIAN

RAMPS

5,0

PROPOSED 1.5m SIDEWALK

LEGEND

EXISTING ROAD

PROPOSED ACCESS UPGRADES

UPGRADES PROPOSED FOR

RESIDENTIAL DEVELOPMENT

EDL CONSULTING ENGINEERS

1st Floor, Block D

The Village Office Park

c/o Glenwood & Oberon Ave,

Fearie Glen, 0043

www.edlengineers.co.za

[email protected]

+27 (0) 87 897 5074/5/6

ERF 37 MONTANA A.H.

PROPOSED ACCESS LAYOUTS

20017/AL/01 20017 28/02/2020

1:1000 JMvR E.D. KOTZE 0

AutoCAD SHX Text
FILLERS
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
17
AutoCAD SHX Text
19
AutoCAD SHX Text
18
AutoCAD SHX Text
TANKER ROUTE
AutoCAD SHX Text
TITLE:
AutoCAD SHX Text
SITE:
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE.
AutoCAD SHX Text
REVISION.
AutoCAD SHX Text
CHECKED.
AutoCAD SHX Text
DRAWN.
AutoCAD SHX Text
SCALE AT A3.
Page 29: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    25 

   Annexures  

Annexure A  Competitor Filling Station Photos 

Annexure B  Traffic Count Report 

Page 30: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    26 

   Annexure A  

Competitor Filling Station Photos 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 31: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    27 

Photo 1: SITE 

 

 

 

 

 

 

 

 

 

Photo 2: SASOL ZAMBEZI NORTH 

 

 

 

 

 

 

 

 

 

Photo 3: SASOL KOLONNADE 

 

 

 

 

 

 

 

 

 

Page 32: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    28 

Photo 4: ENGEN MONTANA CROSSING 

 

 

 

 

 

 

 

 

 

Photo 5: ENGEN MAGALIESKRUIN 

 

 

 

 

 

 

 

 

 

Photo 6: CALTEX AMANDELBOOM MOTORS 

 

 

 

 

 

 

 

 

 

Page 33: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    29 

Photo 7: BP ZAMBEZI JUNCTION 

 

 

 

 

 

 

 

 

 

Photo 8: SHELL MONTANA PARK 

 

 

 

 

 

 

 

 

 

Page 34: FILLING STATION FEASIBILITY STUDY

FILLING STATION FEASIBILITY STUDY (Rev 0) ERF 37 MONTANA A.H., PRETORIA, GAUTENG (C/O DR VAN DER MERWE ROAD & ROOIBOS ROAD) 

 

  EDL ENGINEERS (PTY) LTD    30 

 

   Annexure B  

Traffic Count Report 

 

Page 35: FILLING STATION FEASIBILITY STUDY

TRAFFIC COUNT REPORT

ONE DAY CLASSIFIED 1 INTERSECTION

PROPOSED FILLING STATION

COUNT DATE THURSDAY 07 FEBRUARY 2019

DATE APPROVED TUESDAY 3 MARCH 2020

PROJECT ENGINEERS EBEN KOTZE

PR. TECH

JOHN M. VAN ROOYENB.Eng

PROJECT NUMBER 20017

MONTANA, PRETORIA, GAUTENG

Dr Van Der Merwe Rd & Rooibos Rd Traffic Count

EDL Engineers (Pty) Ltd1st Floor, Block DThe Village Office ParkC/o Glenwood Rd & Oberon Ave,Fearie Glen, 0043Cell: +27 (0)83 564 1563Tel: +27 (0)87 897 5074/5/6Email: [email protected]

Page 36: FILLING STATION FEASIBILITY STUDY

PROJECT INFORMATION

PROJECT DETAILS

EDL PROJECT NAME Dr Van Der Merwe Rd & Rooibos Rd Traffic Count

PROJECT TYPE PROPOSED FILLING STATION

SITE LOCATION MONTANA, PRETORIA, GAUTENG

TRAFFIC COUNT INFORMATION 1 INTERSECTION COUNTED :

INTERSECTION 1 Dr Van Der Merwe Rd & Rooibos Rd

TYPE OF SURVEY 13 HOURS CLASSIFIED

COUNT DATE THURSDAY 07 FEBRUARY 2019

PROJECT TEAM

MANAGING DIRECTOR EBEN KOTZE

PR. TECH

E-MAIL ADDRESS [email protected]

DATE APPROVED TUESDAY 3 MARCH 2020

DIRECTOR SIGNATURE

PROJECT ENGINEER JOHN M. VAN ROOYEN

B.Eng

PROJECT NUMBER 20017

DATA COUNT REFERENCE EDL-PTA-1

CLIENT DETAILS

CLIENT NAME

Project Information Page 2 of 12

Page 37: FILLING STATION FEASIBILITY STUDY

1. SITE LOCATION 4

FIGURE 1 : LOCALITY PLAN ............................................................................ 4

2. TRAFFIC COUNT : INTERSECTION 1 5

Dr Van Der Merwe Rd & Rooibos Rd

FIGURE 2 A : TRAFFIC MOVEMENT ................................................................. 6

Summary of All Vehicles ....................................................................................... 7

Light Vehicles ...................................................................................................... 8

Taxis ................................................................................................................... 9

Heavy Vehicles .................................................................................................... 10

Summary Chart of All Vehicles ............................................................................ 11

0

FIGURE 2 C : TRAFFIC MOVEMENT ................................................................. 23

Summary of All Vehicles ....................................................................................... 24

Light Vehicles ...................................................................................................... 25

Taxis ................................................................................................................... 26

Heavy Vehicles .................................................................................................... 27

Summary Chart of All Vehicles ............................................................................ 28

Page 38: FILLING STATION FEASIBILITY STUDY

INTERSECTION 1 FIGURE NUMBER

LOCALITY PLAN 1

PROJECT CHECKED BY PROJECT

EBEN KOTZE 20017Dr Van Der Merwe Rd & Rooibos Rd Traffic Count

Dr Van Der Merwe Rd & Rooibos Rd

SITE LOCATION

LEGEND:

TRAFFIC COUNT POSITIONS

FIG 1 Locality Plan Page 4 of 12

Page 39: FILLING STATION FEASIBILITY STUDY

PROJECT NAME Dr Van Der Merwe Rd & Rooibos Rd Traffic Count

INTERSECTION 1 Dr Van Der Merwe Rd & Rooibos Rd

COUNT DATE THURSDAY 07 FEBRUARY 2019

TYPE OF SURVEY 13 HOURS CLASSIFIED

INT

ER

SE

CT

ION

1D

r V

an D

er M

erw

e R

d &

Roo

ibos

Rd

Page 40: FILLING STATION FEASIBILITY STUDY

20017

FIGURE

TRAFFIC MOVEMENT

CHECKED BY

EBEN KOTZE

NUMBERINTERSECTION 1

Dr Van Der Merwe Rd & Rooibos Rd

PROJECT

Dr Van Der Merwe Rd & Rooibos Rd Traffic Count

ESTIMATED 24HR TRAFFIC

943

2,959

828

TRAFFIC MOVEMENT

322

2,596

1,122

16,444

254

2,392

BOUGIANVILLEA 

DRIVE

776

1

PROJECT

ENKELDOORN 

AVENUE

1,138

ENKELDOORN 

AVENUE

724

2,390

FIG 2A Traffic Movement Page 6 of 12

Page 41: FILLING STATION FEASIBILITY STUDY

TRAFFIC COUNT Dr Van Der Merwe Rd & Rooibos Rd Traffic CountINTERSECTION 1 Dr Van Der Merwe Rd & Rooibos Rd

TYPE OF SURVEY

COUNT DATE THURSDAY 07 FEBRUARY 2019 Project No. 20017

START END 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL

06:00 06:15 3 16 7 13 28 6 33 44 1 2 33 3 189

06:15 06:30 14 14 7 20 43 17 36 50 7 6 32 6 252

06:30 06:45 19 28 9 24 57 16 36 61 9 5 37 6 307

06:45 07:00 26 44 8 34 93 18 29 85 14 4 58 6 419

07:00 07:15 36 58 13 26 81 23 29 84 11 6 70 11 448

07:15 07:30 26 57 15 15 85 17 49 95 6 9 57 13 444

07:30 07:45 24 43 9 20 48 18 27 68 7 9 51 13 337

07:45 08:00 20 43 14 11 65 25 23 76 15 4 34 11 341

08:00 08:15 14 40 8 12 44 18 25 48 8 4 35 9 265

08:15 08:30 12 33 10 22 38 7 20 38 6 5 34 11 236

08:30 08:45 20 16 9 19 31 8 20 52 1 1 28 13 218

08:45 09:00 11 19 8 12 23 9 20 46 5 3 37 17 210

09:00 09:15 20 25 3 6 26 7 12 30 2 7 38 9 185

09:15 09:30 14 21 5 5 41 14 15 23 2 1 24 18 183

09:30 09:45 18 14 7 14 37 12 12 60 3 3 30 16 226

09:45 10:00 20 25 8 21 34 14 6 37 1 1 42 16 225

10:00 10:15 17 27 11 25 36 8 17 37 2 4 31 9 224

10:15 10:30 18 30 10 15 44 10 20 41 4 3 35 10 240

10:30 10:45 14 35 8 16 31 14 10 38 4 1 24 16 211

10:45 11:00 11 30 14 12 30 16 8 22 2 3 32 21 201

11:00 11:15 10 31 10 9 35 13 12 39 3 3 29 14 208

11:15 11:30 20 37 7 5 39 14 6 43 7 5 31 16 230

11:30 11:45 18 31 9 10 41 5 12 34 1 2 36 11 210

11:45 12:00 17 30 10 9 38 8 13 31 3 6 37 20 222

12:00 12:15 20 33 11 11 30 13 11 24 2 1 36 21 213

12:15 12:30 16 39 6 13 37 8 13 41 5 5 43 17 243

12:30 12:45 26 30 17 15 36 14 17 31 2 6 30 14 238

12:45 13:00 17 31 9 13 51 12 6 33 5 2 35 12 226

13:00 13:15 13 42 11 15 42 14 14 50 8 4 34 11 258

13:15 13:30 14 39 9 15 41 6 14 45 2 0 37 17 239

13:30 13:45 19 40 17 18 47 10 12 33 4 8 39 14 261

13:45 14:00 34 41 14 14 56 10 18 35 1 2 35 17 277

14:00 14:15 23 54 12 6 67 9 22 41 3 11 68 19 335

14:15 14:30 18 44 18 12 43 15 15 35 3 5 55 12 275

14:30 14:45 21 47 17 13 63 19 11 42 6 4 35 14 292

14:45 15:00 20 48 16 10 54 16 24 39 4 6 52 17 306

15:00 15:15 20 49 21 16 52 21 19 43 6 3 51 22 323

15:15 15:30 21 47 16 9 54 12 19 36 9 3 52 12 290

15:30 15:45 13 47 13 13 56 21 18 43 9 4 49 20 306

15:45 16:00 24 41 15 13 55 21 19 33 4 6 36 15 282

16:00 16:15 19 75 14 14 68 36 21 39 7 3 53 20 369

16:15 16:30 24 79 17 11 72 26 28 45 9 8 55 18 392

16:30 16:45 24 77 28 19 67 18 27 81 10 10 54 13 428

16:45 17:00 31 65 26 9 83 34 31 48 13 7 55 14 416

17:00 17:15 28 90 22 19 100 44 27 45 7 3 54 13 452

17:15 17:30 28 78 15 12 79 35 34 43 15 7 52 5 403

17:30 17:45 23 55 21 13 77 29 16 32 5 5 52 6 334

17:45 18:00 30 54 19 12 68 26 9 44 5 2 36 9 314

18:00 18:15 29 56 16 11 58 20 10 56 7 2 34 22 321

18:15 18:30 22 60 15 12 55 18 27 56 10 6 47 33 360

18:30 18:45 18 62 16 13 62 22 50 44 10 13 66 22 397

18:45 19:00 18 61 19 14 73 29 39 35 8 11 66 10 384

948 1,992 603 690 2,466 786 935 2,163 268 212 1,993 647 13,703

1,138 2,390 724 828 2,959 943 1,122 2,596 322 254 2,392 776 16,444

TOTALEST. 24 HR

13 HOURS CLASSIFIED

SUMMARY OF ALL VEHICLEST I M E NORTHBOUND WESTBOUND SOUTHBOUND EASTBOUND

IC1 All Vehicles Page 7 of 12

Page 42: FILLING STATION FEASIBILITY STUDY

TRAFFIC COUNT Dr Van Der Merwe Rd & Rooibos Rd Traffic CountINTERSECTION 1 Dr Van Der Merwe Rd & Rooibos Rd

TYPE OF SURVEY

COUNT DATE THURSDAY 07 FEBRUARY 2019 Project No. 20017

TRAFFIC MOVEMENT : LIGHT VEHICLES

START END 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL

06:00 06:15 2 15 7 13 25 6 29 43 1 2 33 3 179

06:15 06:30 13 14 4 20 40 15 35 49 7 6 31 6 240

06:30 06:45 19 28 9 24 56 15 35 61 9 5 33 6 300

06:45 07:00 22 44 7 34 91 17 29 83 14 4 57 6 408

07:00 07:15 34 58 13 25 79 22 29 83 11 6 69 11 440

07:15 07:30 25 56 15 15 84 17 49 93 6 9 56 13 438

07:30 07:45 24 42 9 20 48 18 26 65 6 9 49 13 329

07:45 08:00 20 42 14 11 65 22 23 76 15 4 33 11 336

08:00 08:15 13 39 8 12 42 17 24 47 8 4 34 9 257

08:15 08:30 12 30 10 22 37 7 20 37 6 5 31 11 228

08:30 08:45 20 16 8 19 30 8 19 50 1 1 27 13 212

08:45 09:00 10 19 8 12 23 8 20 46 5 3 36 17 207

09:00 09:15 19 23 3 5 23 6 12 30 2 7 35 9 174

09:15 09:30 14 21 5 5 40 14 14 22 2 1 23 18 179

09:30 09:45 18 14 7 14 37 12 12 58 3 3 28 16 222

09:45 10:00 20 23 8 21 34 14 6 36 1 1 42 15 221

10:00 10:15 17 27 11 24 36 7 17 37 2 4 30 8 220

10:15 10:30 17 28 10 15 44 10 20 41 3 3 34 9 234

10:30 10:45 14 34 8 15 31 14 9 36 4 1 24 16 206

10:45 11:00 11 26 14 12 30 16 8 22 2 3 32 18 194

11:00 11:15 10 28 7 9 35 13 12 38 3 3 29 14 201

11:15 11:30 19 36 7 5 38 14 6 41 7 5 31 15 224

11:30 11:45 18 30 9 10 40 5 12 34 1 2 36 11 208

11:45 12:00 17 30 9 9 38 6 13 29 3 6 36 20 216

12:00 12:15 19 32 11 11 30 12 11 24 2 1 36 21 210

12:15 12:30 16 39 6 13 36 8 13 39 5 5 41 16 237

12:30 12:45 25 28 14 13 34 14 17 30 2 6 30 14 227

12:45 13:00 17 31 9 13 48 12 6 32 5 2 34 11 220

13:00 13:15 13 38 11 12 41 14 14 50 7 4 33 11 248

13:15 13:30 14 38 8 14 39 6 13 44 2 0 37 17 232

13:30 13:45 19 39 17 17 46 9 11 33 4 7 36 13 251

13:45 14:00 33 39 13 14 55 10 17 34 1 2 35 17 270

14:00 14:15 22 53 12 6 66 9 20 40 3 11 67 19 328

14:15 14:30 16 43 18 12 39 14 15 33 3 4 52 12 261

14:30 14:45 19 45 16 13 61 18 10 40 6 4 32 12 276

14:45 15:00 20 47 15 10 52 13 23 36 4 6 52 17 295

15:00 15:15 19 49 21 14 51 18 18 42 6 3 50 22 313

15:15 15:30 21 44 16 8 51 12 18 35 9 3 52 11 280

15:30 15:45 13 46 12 13 56 20 15 41 8 4 48 19 295

15:45 16:00 24 41 14 13 53 20 18 33 4 6 36 14 276

16:00 16:15 19 73 13 14 68 35 20 37 7 3 50 19 358

16:15 16:30 23 76 14 10 70 26 28 45 9 8 55 18 382

16:30 16:45 24 74 26 18 65 18 26 79 10 10 54 12 416

16:45 17:00 30 62 26 9 77 34 31 48 13 7 54 14 405

17:00 17:15 28 88 21 18 100 44 25 45 7 3 52 13 444

17:15 17:30 28 76 15 12 79 34 34 42 15 7 52 5 399

17:30 17:45 23 55 20 13 75 28 16 31 5 5 52 6 329

17:45 18:00 29 54 19 12 67 25 8 41 5 2 36 9 307

18:00 18:15 29 56 16 11 57 20 10 55 7 2 34 22 318

18:15 18:30 22 60 15 12 55 18 27 56 10 6 47 33 359

18:30 18:45 18 62 16 13 61 22 50 43 10 13 66 22 396

18:45 19:00 18 61 19 14 73 29 39 34 8 11 66 10 382

922 1,933 577 673 2,405 756 906 2,111 264 210 1,945 630 13,332

1,106 2,320 692 808 2,886 907 1,087 2,533 317 252 2,334 756 15,998EST. 24 HR

TOTAL

EASTBOUND

13 HOURS CLASSIFIED

T I M E NORTHBOUND WESTBOUND SOUTHBOUND

IC1 Light Vehicles Page 8 of 12

Page 43: FILLING STATION FEASIBILITY STUDY

TRAFFIC COUNT Dr Van Der Merwe Rd & Rooibos Rd Traffic CountINTERSECTION 1 Dr Van Der Merwe Rd & Rooibos Rd

TYPE OF SURVEY

COUNT DATE THURSDAY 07 FEBRUARY 2019 Project No. 20017

TRAFFIC MOVEMENT : TAXIS

START END 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL

06:00 06:15 1 1 0 0 3 0 2 1 0 0 0 0 8

06:15 06:30 1 0 2 0 3 2 0 1 0 0 1 0 10

06:30 06:45 0 0 0 0 1 1 1 0 0 0 4 0 7

06:45 07:00 4 0 1 0 1 1 0 2 0 0 1 0 10

07:00 07:15 2 0 0 1 2 1 0 1 0 0 1 0 8

07:15 07:30 1 1 0 0 1 0 0 2 0 0 1 0 6

07:30 07:45 0 0 0 0 0 0 0 0 0 0 1 0 1

07:45 08:00 0 0 0 0 0 3 0 0 0 0 1 0 4

08:00 08:15 0 0 0 0 0 0 1 1 0 0 1 0 3

08:15 08:30 0 2 0 0 0 0 0 1 0 0 0 0 3

08:30 08:45 0 0 1 0 1 0 1 0 0 0 0 0 3

08:45 09:00 0 0 0 0 0 0 0 0 0 0 0 0 0

09:00 09:15 0 0 0 0 1 0 0 0 0 0 1 0 2

09:15 09:30 0 0 0 0 1 0 1 0 0 0 0 0 2

09:30 09:45 0 0 0 0 0 0 0 0 0 0 1 0 1

09:45 10:00 0 1 0 0 0 0 0 0 0 0 0 0 1

10:00 10:15 0 0 0 0 0 1 0 0 0 0 0 0 1

10:15 10:30 0 1 0 0 0 0 0 0 0 0 0 1 2

10:30 10:45 0 0 0 0 0 0 0 1 0 0 0 0 1

10:45 11:00 0 0 0 0 0 0 0 0 0 0 0 0 0

11:00 11:15 0 1 1 0 0 0 0 1 0 0 0 0 3

11:15 11:30 0 0 0 0 0 0 0 0 0 0 0 0 0

11:30 11:45 0 0 0 0 0 0 0 0 0 0 0 0 0

11:45 12:00 0 0 0 0 0 0 0 2 0 0 0 0 2

12:00 12:15 0 1 0 0 0 0 0 0 0 0 0 0 1

12:15 12:30 0 0 0 0 1 0 0 1 0 0 1 0 3

12:30 12:45 0 1 1 0 0 0 0 0 0 0 0 0 2

12:45 13:00 0 0 0 0 0 0 0 1 0 0 0 0 1

13:00 13:15 0 1 0 1 1 0 0 0 1 0 0 0 4

13:15 13:30 0 0 0 1 0 0 1 1 0 0 0 0 3

13:30 13:45 0 1 0 1 1 1 0 0 0 1 1 0 6

13:45 14:00 1 1 0 0 1 0 0 0 0 0 0 0 3

14:00 14:15 1 0 0 0 0 0 1 1 0 0 1 0 4

14:15 14:30 2 1 0 0 2 1 0 1 0 0 1 0 8

14:30 14:45 1 2 1 0 0 1 1 1 0 0 0 0 7

14:45 15:00 0 0 0 0 2 0 1 3 0 0 0 0 6

15:00 15:15 0 0 0 1 0 2 1 0 0 0 0 0 4

15:15 15:30 0 1 0 0 1 0 1 1 0 0 0 0 4

15:30 15:45 0 1 0 0 0 1 2 0 0 0 1 0 5

15:45 16:00 0 0 1 0 1 1 1 0 0 0 0 0 4

16:00 16:15 0 2 0 0 0 0 0 2 0 0 3 0 7

16:15 16:30 0 3 1 1 1 0 0 0 0 0 0 0 6

16:30 16:45 0 2 0 0 1 0 0 0 0 0 0 0 3

16:45 17:00 1 3 0 0 2 0 0 0 0 0 0 0 6

17:00 17:15 0 0 1 0 0 0 1 0 0 0 1 0 3

17:15 17:30 0 1 0 0 0 0 0 0 0 0 0 0 1

17:30 17:45 0 0 0 0 1 0 0 1 0 0 0 0 2

17:45 18:00 1 0 0 0 1 0 1 2 0 0 0 0 5

18:00 18:15 0 0 0 0 1 0 0 1 0 0 0 0 2

18:15 18:30 0 0 0 0 1 0 0 0 0 0 0 0 1

18:30 18:45 0 0 0 0 1 0 0 0 0 0 0 0 1

18:45 19:00 0 0 0 0 1 0 0 0 0 0 0 0 1

16 28 10 6 30 16 17 28 1 1 22 1 176

19 34 12 7 36 19 20 34 1 1 26 1 211EST. 24 HR

TOTAL

EASTBOUND

13 HOURS CLASSIFIED

T I M E NORTHBOUND WESTBOUND SOUTHBOUND

IC1 Taxis Page 9 of 12

Page 44: FILLING STATION FEASIBILITY STUDY

TRAFFIC COUNT Dr Van Der Merwe Rd & Rooibos Rd Traffic CountINTERSECTION 1 Dr Van Der Merwe Rd & Rooibos Rd

TYPE OF SURVEY

COUNT DATE THURSDAY 07 FEBRUARY 2019 Project No. 20017

TRAFFIC MOVEMENT : HEAVY VEHICLES

START END 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL

06:00 06:15 0 0 0 0 0 0 2 0 0 0 0 0 2

06:15 06:30 0 0 1 0 0 0 1 0 0 0 0 0 2

06:30 06:45 0 0 0 0 0 0 0 0 0 0 0 0 0

06:45 07:00 0 0 0 0 1 0 0 0 0 0 0 0 1

07:00 07:15 0 0 0 0 0 0 0 0 0 0 0 0 0

07:15 07:30 0 0 0 0 0 0 0 0 0 0 0 0 0

07:30 07:45 0 1 0 0 0 0 1 3 1 0 1 0 7

07:45 08:00 0 1 0 0 0 0 0 0 0 0 0 0 1

08:00 08:15 1 1 0 0 2 1 0 0 0 0 0 0 5

08:15 08:30 0 1 0 0 1 0 0 0 0 0 3 0 5

08:30 08:45 0 0 0 0 0 0 0 2 0 0 1 0 3

08:45 09:00 1 0 0 0 0 1 0 0 0 0 1 0 3

09:00 09:15 1 2 0 1 2 1 0 0 0 0 2 0 9

09:15 09:30 0 0 0 0 0 0 0 1 0 0 1 0 2

09:30 09:45 0 0 0 0 0 0 0 2 0 0 1 0 3

09:45 10:00 0 1 0 0 0 0 0 1 0 0 0 1 3

10:00 10:15 0 0 0 1 0 0 0 0 0 0 1 1 3

10:15 10:30 1 1 0 0 0 0 0 0 1 0 1 0 4

10:30 10:45 0 1 0 1 0 0 1 1 0 0 0 0 4

10:45 11:00 0 4 0 0 0 0 0 0 0 0 0 3 7

11:00 11:15 0 2 2 0 0 0 0 0 0 0 0 0 4

11:15 11:30 1 1 0 0 1 0 0 2 0 0 0 1 6

11:30 11:45 0 1 0 0 1 0 0 0 0 0 0 0 2

11:45 12:00 0 0 1 0 0 2 0 0 0 0 1 0 4

12:00 12:15 1 0 0 0 0 1 0 0 0 0 0 0 2

12:15 12:30 0 0 0 0 0 0 0 1 0 0 1 1 3

12:30 12:45 1 1 2 2 2 0 0 1 0 0 0 0 9

12:45 13:00 0 0 0 0 3 0 0 0 0 0 1 1 5

13:00 13:15 0 3 0 2 0 0 0 0 0 0 1 0 6

13:15 13:30 0 1 1 0 2 0 0 0 0 0 0 0 4

13:30 13:45 0 0 0 0 0 0 1 0 0 0 2 1 4

13:45 14:00 0 1 1 0 0 0 1 1 0 0 0 0 4

14:00 14:15 0 1 0 0 1 0 1 0 0 0 0 0 3

14:15 14:30 0 0 0 0 2 0 0 1 0 1 2 0 6

14:30 14:45 1 0 0 0 2 0 0 1 0 0 3 2 9

14:45 15:00 0 1 1 0 0 3 0 0 0 0 0 0 5

15:00 15:15 1 0 0 1 1 1 0 1 0 0 1 0 6

15:15 15:30 0 2 0 1 2 0 0 0 0 0 0 1 6

15:30 15:45 0 0 1 0 0 0 1 2 1 0 0 1 6

15:45 16:00 0 0 0 0 1 0 0 0 0 0 0 1 2

16:00 16:15 0 0 1 0 0 1 1 0 0 0 0 1 4

16:15 16:30 1 0 2 0 1 0 0 0 0 0 0 0 4

16:30 16:45 0 1 2 1 1 0 1 2 0 0 0 1 9

16:45 17:00 0 0 0 0 4 0 0 0 0 0 1 0 5

17:00 17:15 0 2 0 1 0 0 1 0 0 0 1 0 5

17:15 17:30 0 1 0 0 0 1 0 1 0 0 0 0 3

17:30 17:45 0 0 1 0 1 1 0 0 0 0 0 0 3

17:45 18:00 0 0 0 0 0 1 0 1 0 0 0 0 2

18:00 18:15 0 0 0 0 0 0 0 0 0 0 0 0 0

18:15 18:30 0 0 0 0 0 0 0 0 0 0 0 0 0

18:30 18:45 0 0 0 0 0 0 0 0 0 0 0 0 0

18:45 19:00 0 0 0 0 0 1 0 0 0 0 0 0 1

10 31 16 11 31 14 12 24 3 1 26 16 195

12 37 19 13 37 17 14 29 4 1 31 19 234EST. 24 HR

TOTAL

EASTBOUND

13 HOURS CLASSIFIED

T I M E NORTHBOUND WESTBOUND SOUTHBOUND

IC1 Heavy Vehicles Page 10 of 12

Page 45: FILLING STATION FEASIBILITY STUDY

TRAFFIC COUNT Dr Van Der Merwe Rd & Rooibos Rd Traffic Count TYPE OF SURVEY 13 HOURS CLASSIFIED PROJECT NUMBER

INTERSECTION 1 Dr Van Der Merwe Rd & Rooibos Rd COUNT DATE THURSDAY 07 FEBRUARY 2019 20017

SUMMARY OF ALL VEHICLES1

89

25

2

30

7

41

9

44

8

44

4

33

7

34

1

26

5

23

6

21

8

21

0

18

5

18

3

22

6

22

5

22

4 24

0

21

1

20

1 20

8

23

0

21

0 22

2

21

3

24

3

23

8

22

6

25

8

23

9

26

1 27

7

33

5

27

5

29

2 30

6

32

3

29

0 30

6

28

2

36

9

39

2

42

8

41

6

45

2

40

3

33

4

31

4 32

1

36

0

39

7

38

4

0

100

200

300

400

500

06

:00

07

:00

08

:00

09

:00

10

:00

11

:00

12

:00

13

:00

14

:00

15

:00

16

:00

17

:00

18

:00

TR

AF

FIC

MO

VE

ME

NT

TRAFFIC PER 15 MINUTE PERIOD

IC1 Summary Charts Page 11 of 12

Page 46: FILLING STATION FEASIBILITY STUDY

TRAFFIC COUNT Dr Van Der Merwe Rd & Rooibos Rd Traffic Count TYPE OF SURVEY 13 HOURS CLASSIFIED PROJECT No.

INTERSECTION 1 Dr Van Der Merwe Rd & Rooibos Rd COUNT DATE THURSDAY 07 FEBRUARY 2019 20017

SUMMARISED BREAKDOWN OF ALL VEHICLES

TAXIS

HEAVY VEHICLES

LIGHT VEHICLES

17

92

40

30

04

08 4

40

43

83

29

33

62

57

22

82

12

20

71

74

17

92

22

22

12

20 23

42

06

19

42

01 22

42

08

21

62

10 2

37

22

72

20 2

48

23

2 25

1 27

03

28

26

1 27

6 29

5 31

32

80 29

52

76

35

8 38

2 41

64

05

44

43

99

32

93

07

31

83

59 3

96

38

2

0

100

200

300

400

500

06:0

0

07:0

0

08:0

0

09:0

0

10:0

0

11:0

0

12:0

0

13:0

0

14:0

0

15:0

0

16:0

0

17:0

0

18:0

0

81

07

10

86

14

3 3 30

2 21 1 1

21

03

0 02

13

21

43

63

48

76

4 45

47

63

63

12

52

1 11

0

2

4

6

8

10

12

06:0

0

07:0

0

08:0

0

09:0

0

10:0

0

11:0

0

12:0

0

13:0

0

14:0

0

15:0

0

16:0

0

17:0

0

18:0

0

2 20

10 0

71

5 53 3

92

3 3 34 4

74

62

42

39

56

4 4 43

69

56 6 6

24 4

95 5

3 32

0 0 01

0

1

2

3

4

5

6

7

8

9

10

06:0

0

07:0

0

08:0

0

09:0

0

10:0

0

11:0

0

12:0

0

13:0

0

14:0

0

15:0

0

16:0

0

17:0

0

18:0

0

IC1 Summary Charts Page 12 of 12