20
Trans Mountain Expansion Project Email: [email protected] | Phone: 1.866.514.6700 | Website: www.transmountain.com Suite 2700, 300 5 Avenue SW Calgary, Alberta, T2P 5J2 CANADA Page | 1 July 22, 2021 FILED ELECTRONICALLY Canada Energy Regulator Suite 210, 517 10 Ave SW Calgary, AB T2R 0A8 Attention: Mr. Jean-Denis Charlebois Secretary of the Commission of the Canada Energy Regulator ("Commission") Dear Mr. Charlebois: Re: Trans Mountain Pipeline ULC ("Trans Mountain") Trans Mountain Expansion Project ("Project" or "TMEP") File OF-Fac-Oil-T260-2013-03 63 Detailed Route Hearing MH-023-2020 ("Hearing") Confirmation of Publication and Service of Notices for the 201 ST / 100A Ave Reroute 1. On June 11, 2021, Trans Mountain filed revised PPBoR sheet M002-PM03021-010 and draft notices (C13518). On June 23, 2021, the Commission issued a decision with respect to the form of PPBoR and form of notices for revised PPBoR sheet M002- PM03021-010 (C13681) ("Decision"). This letter confirms that as of July 21, 2021 all notices have been published or served in accordance with the Decision, as described below. Service of Notice on Potentially Affected Indigenous Communities 2. With respect to the service of notices on potentially affected Indigenous peoples, the Decision states that Trans Mountain must file a list of each community served, the name of the person(s) served, and the confirmed date and method of service, within five business days after all such service is completed. 3. Attached as Appendix "A" is a chart setting out the date and manner of service for each of the potentially affected Indigenous peoples. In accordance with the manner of service approved by the Commission, Trans Mountain served notice on Indigenous groups via its typical communication protocol in place for each group, which in all cases included communication by email to designated representatives and/or inboxes. Trans Mountain also served each group by regular or registered mail. Service was completed on potentially affected Indigenous peoples by July 15, 2021. Section 201(1)(b) Publication Notices 4. The Decision approved Trans Mountain's publication plan with respect to 201(1)(b) notices, noting however that it was no longer necessary for Trans Mountain to publish a notice on Winspeaker.com as the publication is not based in British Columbia. The Commission required Trans Mountain to file confirmation that the notices were

FILED ELECTRONICALLY

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FILED ELECTRONICALLY

Trans Mountain Expansion Project

Email: [email protected] | Phone: 1.866.514.6700 | Website: www.transmountain.com

Suite 2700, 300 – 5 Avenue SW Calgary, Alberta, T2P 5J2 CANADA

P a g e | 1

July 22, 2021

FILED ELECTRONICALLY

Canada Energy Regulator Suite 210, 517 10 Ave SW Calgary, AB T2R 0A8

Attention: Mr. Jean-Denis Charlebois Secretary of the Commission of the Canada Energy Regulator ("Commission") Dear Mr. Charlebois:

Re: Trans Mountain Pipeline ULC ("Trans Mountain") Trans Mountain Expansion Project ("Project" or "TMEP") File OF-Fac-Oil-T260-2013-03 63 Detailed Route Hearing MH-023-2020 ("Hearing") Confirmation of Publication and Service of Notices for the 201 ST / 100A Ave Reroute

1. On June 11, 2021, Trans Mountain filed revised PPBoR sheet M002-PM03021-010 and draft notices (C13518). On June 23, 2021, the Commission issued a decision with respect to the form of PPBoR and form of notices for revised PPBoR sheet M002-PM03021-010 (C13681) ("Decision"). This letter confirms that as of July 21, 2021 all notices have been published or served in accordance with the Decision, as described below.

Service of Notice on Potentially Affected Indigenous Communities

2. With respect to the service of notices on potentially affected Indigenous peoples, the Decision states that Trans Mountain must file a list of each community served, the name of the person(s) served, and the confirmed date and method of service, within five business days after all such service is completed.

3. Attached as Appendix "A" is a chart setting out the date and manner of service for each of the potentially affected Indigenous peoples. In accordance with the manner of service approved by the Commission, Trans Mountain served notice on Indigenous groups via its typical communication protocol in place for each group, which in all cases included communication by email to designated representatives and/or inboxes. Trans Mountain also served each group by regular or registered mail. Service was completed on potentially affected Indigenous peoples by July 15, 2021.

Section 201(1)(b) Publication Notices

4. The Decision approved Trans Mountain's publication plan with respect to 201(1)(b) notices, noting however that it was no longer necessary for Trans Mountain to publish a notice on Winspeaker.com as the publication is not based in British Columbia. The Commission required Trans Mountain to file confirmation that the notices were

Page 2: FILED ELECTRONICALLY

P a g e | 2

published, including the dates of publication, within five business days of the final publication.

5. The charts below show the publication of all requisite notices in accordance with the Decision on July 15, 2021. Tear sheets confirming each publication are attached as Appendix "B", as requested by the Commission.

Publication Notice

Segment Notice

Language Publication Date

Langley Advance Times

General 6 English July 15, 2021

La Source1 General 6 French July 15, 2021

Langley Advance Times

Kavanagh Order

6 English and French

July 15, 2021

Vancouver Sun Kavanagh Order

6 English and French

July 15, 2021

Norwalk Hour Kavanagh Order

6 English July 15, 2021

La Jolla Light Kavanagh Order

6 English July 15, 2021

Section 201(1)(a) Service on Landowners

6. The Decision states that Trans Mountain is required to file an update with respect to service of section 201(1)(a) notices on landowners, including the names of those served or still requiring service, and confirmed dates and methods of service. Trans Mountain completed service for each party as of the dates indicated in the table below. Landowner service was completed by July 21, 2022.

Tract Landowner Method(s) of Service

Individual(s) Served Date of Service

PC 7534 Canadian National Railway Company

Email Robert Nikelski, Counsel July 15, 2021

PC 7538 Austeville Properties Ltd.

Personal Chris Samis, CFO July 14, 2021

PC 7538.01

James C. Kavanagh Registered Mail c/o Doreen Appleby in California

July 20, 2021

Process Server c/o Kay Fabbri-Benham in Connecticut

July 21, 2021

1 In order to ensure the publication is legible, Appendix B contains both the tear sheet for La Source and Trans Mountain’s submission to the publication, which are one and the same.

Page 3: FILED ELECTRONICALLY

P a g e | 3

Tract Landowner Method(s) of Service

Individual(s) Served Date of Service

PC 7538.02

James C. Kavanagh Registered Mail c/o Doreen Appleby in California

July 20, 2021

Process Server c/o Kay Fabbri-Benham in Connecticut

July 21, 2021

PC 7539 Canadian National Railway Company

Email Robert Nikelski, Counsel July 15, 2021

If you have any questions, please contact the undersigned.

Yours truly,

Scott Stoness Vice President, Regulatory and Compliance Trans Mountain Canada Inc.

Encl.

Page 4: FILED ELECTRONICALLY

Appendix "A"

Service of Notice on Potentially Affected Indigenous Communities

Community Served

Individual(s) Served Method of Service2 Date of Service

British Columbia Métis Federation

Mr. Keith Henry Email July 14, 2021

Cowichan Tribes Chief William Seymour Eamon Gaunt

Natalie Anderson

Email July 14, 2021

Halalt First Nation Chief James Thomas Caroline Gladstone

Email July 14, 2021

Hwlitsum First Nation

Chief Jim Hornbrook Jeffrey Rath

Email July 14, 2021

Katzie First Nation

Chief Grace George Kimberly Armour

Email July 14, 2021

Kwantlen First Nation

Chief Marilyn Gabriel Tumia Knott Ashley Doyle

Derrick Mitchell

Email July 14, 2021

Lyackson First Nation

Chief Richard Thomas Shannon Gammie

Karyn Scott

Email July 14, 2021

Métis Nation British Columbia

Lissa Dawn Smith Christopher Gall

Jason Chan Leona Shaw

Email July 14, 2021

Penelakut Tribe Chief Joan Brown Sharon Cross

Email July 14, 2021

Semiahmoo First Nation

Chief Harley Chappell Joanne Charles Jennine Cook

Adam Munnings

Email July 14, 2021

Skawahlook First Nation

Chief Maureen Chapman

Trena Point

Email July 14, 2021

Sto:lo Collective/S'olh

Temexw Stewardship

Alliance

Dr. Dave Schaepe Amber Kostuchenko

Matt McGinity Keri Ardell

Cara Brendzy

Email July 14, 2021

Sto:lo Nation Mr. Willy Hall Email July 14, 2021

2 Each potentially affected Indigenous group was also sent notice by registered mail or regular mail on July 14, 2021 or July 15, 2021.

Page 5: FILED ELECTRONICALLY

Community Served

Individual(s) Served Method of Service2 Date of Service

Sto:lo Tribal Council

Tyrone McNeil Email July 14, 2021

Stz'uminus First Nation

(Chemainus)

Ronda Jordan Chief Roxanne Harris

Ronda Jordan

Email July 14, 2021

Ts'uubaa-asatx First Nation

(Formerly Lake Cowichan First

Nation)

Chief Georgina Livingstone

Aaron Hamilton Carole Livingstone

Email July 14, 2021

Qayqayt First Nation (New Westminster)

Chief Rhonda Marietta Larrabee

Email July 15, 2021

Sts'ailes (Chehalis Indian

Band)

Chief Ralph Leon, Jr. Sherylynn Crispin

William Charlie

Email July 15, 2021

Page 6: FILED ELECTRONICALLY

Appendix "B"

Publication of Notice Tear Sheets

Page 7: FILED ELECTRONICALLY

Langley Advance Times www.langleyadvancetimes.comA28 Thursday, July 15, 2021

PUBLIC NOTICE

Trans Mountain Pipeline ULC, as General Partner of Trans Mountain Pipeline L.P.Trans Mountain Expansion Project Notice of Proposed Detailed Route

Pursuant to Paragraph 201(1)(b) of the Canadian Energy Regulator Act

IN THE MATTER OF the Canadian Energy Regulator Act (CER Act) and the Regulations made thereunder;

IN THE MATTER OF Certificate of Public Convenience and Necessity OC-065 (Certificate OC-065) approving the general route of the Trans Mountain Expansion Project;

AND IN THE MATTER OF an application by Trans Mountain respecting the determination and approval of the detailed route for a segment of the Trans Mountain Expansion Project in Langley, approximately between kilometre post 1154.3 and kilometre post 1154.54, as shown on the attached Route Map (201 ST / 100A Ave Reroute).

If you anticipate that lands that you own or have an interest or right in may be adversely affected by the proposed detailed route for the segment of the Trans Mountain Expansion Project in the 201 ST / 100A Ave Reroute, you may oppose the proposed detailed route by filing a written statement of opposition with the Canada Energy Regulator (CER) within thirty (30) days of the publication of this notice.

Your written statement of opposition must set out both the nature of your interest in the lands and the grounds for your opposition to the detailed route. The Commission of the CER (Commission) will only accept statements of opposition by those with an interest in lands that raise concerns regarding the detailed route of the segment of the Trans Mountain Expansion Project in the 201 ST / 100A Ave Reroute.

Where a written statement that meets the requirements of the CER Act is filed with the CER within thirty (30) days of the publication of this notice, the Commission shall forthwith order, subject to certain exceptions as noted below, that a public hearing be held with respect to any grounds of opposition set out in the statement, in relation to any section or part of the pipeline affected by the concerns disclosed in the written statement.

The Commission is not required to give any notice, hold any hearing or take any other action with respect to any written statement of opposition filed with the CER and may at any time disregard any such written statement if the person who filed the statement files a notice of withdrawal, or if it appears to the Commission that the statement is frivolous, vexatious or is not made in good faith.

If the Commission determines it is appropriate to hold a public hearing it will fix a suitable format, time and place for the hearing and will publish a notice of the hearing in at least one issue of a publication, if any, in general circulation within the area in which the lands acquired or proposed to be acquired are situated. The Commission will also send a notice of the public hearing to each person who has filed a written statement of opposition with the CER.

The public hearing will be conducted in a manner that the Commission considers convenient for persons who filed a written statement of opposition and, given the COVID-19 pandemic, may be held in writing and/or virtually.

If the Commission determines a public hearing is required, it will permit each person who filed a written statement of opposition that met the requirements of the CER Act to make representations, and may allow any other interested persons to make representations before it as the Commission deems appropriate. The Commission will take into account all written statements of opposition that have met the requirements of the CER Act and all representations made during the public hearing in determining the best possible route of the pipeline, and the most appropriate methods and timing of construction for the Trans Mountain Expansion Project. The Commission may impose in any approval such terms and conditions as it considers appropriate.

Where the Commission has held a public hearing in respect of any section or part of the Trans Mountain Expansion Project and has approved or refused to approve the plan, profile and book of reference respecting that section or part, it will forward a copy of its decision and reasons to each person who made representations to the Commission during the public hearing.

The Commission may fix such amount as it deems reasonable in respect of the interim or final costs reasonably incurred by any person who makes representations to the Commission during such a public hearing, and the amount so fixed will be paid forthwith to the person by Trans Mountain.

Copies of the plan, profile and book of reference for the detailed route of the Trans Mountain Expansion Project may be obtained by calling 1-866-514-6700 or emailing [email protected]. You may also view it online at https://www.transmountain.com/detailed-route.

A Statement of Opposition to the detailed route form is available online at www.cer-rec.gc.ca/statement-opposition.

A copy of any such written statement of opposition to this detailed route must be filed with the CER. The CER’s preferred method of filing is online through its e-filing tool (https:// apps.cer-rec.gc.ca/efile ElectronicDocument Submission.aspx?GoCTemplateCulture=en-CA), which provides step-by-step instructions. If a registrant is unable to file their form through the e-filing tool, they may file it (in PDF format) by email at [email protected].

Any written statement of opposition should also be sent to:

Trans Mountain Expansion Project Suite 2700, 300 5th Ave SW Calgary Alberta T2P 5J2 Attention: Alain Parisé, Director, Land Fax: 403-514-6401 Email: [email protected]

The CER’s Alternative Dispute Resolution (ADR) service is available to you. An ADR process could take the form of a meeting between the person filing the statement of opposition and Trans Mountain, which may be facilitated by trained CER staff or by another neutral third party. The facilitator would assist the filer and Trans Mountain to develop a process that may help to resolve outstanding issues. For more information about ADR options, please contact an ADR Specialist at the CER toll-free at 1-800-899-1265.

Should you have any questions concerning this notice, the proposed detailed route, or the CER’s detailed route procedures, please contact Trans Mountain at 1-866-454-4717 or info@ transmountain.com and a Trans Mountain representative will return your call. You may also contact a CER Process Advisor at 1-800-899-1265 or [email protected].

Property Identification

017-564-964

029-759-994

029-759-986

017-564-727

017-564-735

Page 8: FILED ELECTRONICALLY

Langley Advance Times Thursday, July 15, 2021 A29www.langleyadvancetimes.com

TRANS MOUNTAIN EXPANSION PROJECTALTERED AUSTEVILLE ROUTE

0 0.045 0.09 0.135 0.180.0225Kilometers

1:5,000Coordinate System: NAD 1983 UTM Zone 10

!. Kilometre Post (KP)

Alternate TMEP Route

Current TMEP Centreline

Local Street

Highway

Railway

Pipeline Footprint

First Nations Reserve

!

! !

!! Municipality

River

!!

!

!!

!!

!!

!!

!!

!

!

!

!!

!!

!!

!!

!

!.!. !.

!.

!.

!.!.

!.

!.

!.

!.

!.

!.!.

!.

!.!.!.

!.!.

!.

L A N G L E YS U R R E Y

KP1154.7 KP 1154.6

KP1154.4

KP 1155.4

KP1154.1

KP 1154.5

KP1154.2

KP 1155.3

KP1154.3 KP

1153.9

KP 1155.0KP1155.1

KP1153.8

KP 1155.7KP 1155.5

KP 1155.6

KP1154.0

KP 1155.2

97 Avenue

201

Stre

et

199A

Stre

et

Golden Ears Way

199A

Conn

Street 98A Avenue

196A

Stre

et

Telegraph Trail

203

Stre

et

203A

Stre

et

96 Avenue

201

Onr

amp

Stre

et

198BStreet

199A

Offr

amp

Stre

et

198

Stre

et

205

Stre

et

97BAvenue

204

Stre

et202

Stre

et

199B

Str

eet

97AAvenue

196

Stre

et

98 Avenue

197B

Str

eet

197

Stre

et

100A Avenue

99A Avenue

102 Avenue

101 Avenue

.

!!

!!

!

!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!

!

!

!

!

! !!

!!

!!

!!

!!

!!

!!

!!

!!

!

!.!.!.

201

Stre

et

98A Avenue

KP 1154.4KP 1154.5KP 1154.3

PUBLIC NOTICE

TRANS MOUNTAIN EXPANSION PROJECT

ALTERED AUSTEVILLE ROUTE

Dreaming of a Vacation? Meet the Armchair Traveller!Indulge your wanderlust with the Armchair Traveller! To get the week’s top ALBERTA, BC & YUKON TRAVEL STORIES delivered right to your inbox, sign up at westcoasttraveller.com/newsletter

Page 9: FILED ELECTRONICALLY

La Source (tear sheet)

Page 10: FILED ELECTRONICALLY

AVIS PUBLIC

Trans Mountain Pipeline ULC, à titre de commanditaire de Trans Mountain Pipeline L.P. Projet d’agrandissement du réseau de Trans Mountain

Avis relatif au tracé détaillé proposé en vertu de l’alinéa 201(1)(b) de la Loi sur la Régie canadienne de l’énergie

EN CE QUI CONCERNE la Loi sur la Régie canadienne de l’énergie (Loi RCE) et les règlements afférents.

ET EN CE QUI CONCERNE le Certificat d’utilité publique OC-065 (Certificat OC-065) autorisant le tracé général du Projet d’agrandissement du réseau de Trans Mountain.

ET EN CE QUI CONCERNE une demande faite par Trans Mountain à l’égard de la détermination et de l’approbation du tracé détaillé pour un segment du Projet d’agrandissement du réseau de Trans Mountain à Langley, entre approximativement la borne kilométrique 1154.3 et la borne kilométrique 1154.54, comme le montre la carte du tracé ci-jointe (changement de tracé 201e RUE /100A Avenue).

Si vous estimez que le tracé détaillé pour le segment du Projet d’agrandissement du réseau de Trans Mountain conçernant le changement de route du tracé 201e RUE / 100A Avenue pourrait avoir des répercussions néfastes sur le terrain dont vous êtes propriétaire ou dans lequel vous avez un intérêt ou un droit, vous pouvez vous y opposer en déposant une déclaration d’opposition écrite auprès de la Régie de l’énergie du Canada (REC) dans les trente (30) jours suivant la publication du présent avis.

Votre déclaration d’opposition écrite doit préciser la nature de votre intérêt dans les terrains et les motifs de votre opposition au tracé détaillé. La Commission de la REC (la « Commission ») n’acceptera que les déclarations d’opposition présentées par les personnes qui ont un intérêt dans les terrains et qui font part de leurs préoccupations à l’égard du tracé détaillé du segment du Projet d’agrandissement du réseau de Trans Mountain dans le tracé 201e RUE / 100A Avenue.

Lorsqu’une déclaration écrite qui satisfait aux exigences de la Loi sur la RCE est déposée auprès de la REC dans les trente (30) jours suivant la publication du présent avis, la Commission ordonnera immédiatement, sous réserve de certaines exceptions mentionnées ci-dessous,

la tenue d’une audience publique portant sur les motifs d’opposition énoncés dans la déclaration d’opposition, relativement à toute section ou partie de l’oléoduc touchée par les préoccupations divulguées dans la déclaration écrite.

La Commission n’est pas tenue de donner d’avis, ni de tenir d’audience, ni d’entreprendre de démarches à l’égard de toute déclaration d’opposition écrite déposée auprès de la REC et se réserve le droit, à tout moment, de rejeter ladite déclaration écrite si la personne ayant déposé la déclaration dépose un avis de retrait ou si la Commission juge la déclaration frivole, vexatoire ou faite de mauvaise foi.

Si la Commission estime qu’il convient de tenir une audience publique, elle fixera une date et un lieu convenables pour l’audience et publiera par la suite un avis d’audience dans au moins un numéro d’une publication, le cas échéant, à grand tirage dans la région où se trouvent les terrains acquis ou proposé d’être acquis. La Commission fera également parvenir un avis d’audience publique à chacune des personnes qui aura déposé une déclaration d’opposition écrite auprès de la REC.

L’audience publique se déroulera de la manière que la Commission jugera la plus commode pour les personnes ayant déposé une déclaration écrite d’opposition et, compte tenu de la pandémie de COVID-19, pourra se tenir par écrit et/ou virtuellement.

Si la Commission juge qu’une audience publique est requise, elle permettra à chacune des personnes qui auront déposé une déclaration d’opposition écrite conforme aux exigences de la Loi sur la RCE de présenter des observations; la Commission se réserve par ailleurs le droit de permettre à toute autre personne intéressée de présenter des observations devant elle, comme la Commission le juge approprié. La Commission tiendra compte de l’ensemble des déclarations d’opposition écrites qui satisfont aux exigences de la Loi sur la RCE et des observations présentées au cours de l’audience publique afin de déterminer, d’une

part, le meilleur tracé possible pour l’oléoduc et, d’autre part, les méthodes et les dates les plus propices à la construction du Projet d’agrandissement du réseau de Trans Mountain. La Commission peut assortir toute approbation de conditions qu’elle juge appropriées. La Commission transmettra, motifs à l’appui, à chacune des personnes qui lui aura présenté des observations, une copie de toute décision d’approbation ou de refus d’approbation des plan, profil et livre de renvoi relatifs à une section ou partie du Projet d’agrandissement du réseau de Trans Mountain rendue après toute audience publique.

La Commission peut fixer une somme qu’elle juge raisonnable pour les frais intérimaires ou finaux entraînés de façon raisonnable par une personne qui présente des observations à la Commission au cours d’une pareille audience publique; ce montant fixé sera versé sans délai à la personne par Trans Mountain.

Des copies des plan, profil et livre de renvoi relatifs au tracé détaillé du Projet d’agrandissement de Trans Mountain peuvent être procuré en composant le 1-866-514-6700 ou en envoyant un courriel à l’adresse [email protected]. Il est également possible de les consulter en ligne sur https://www.transmountain.com/fr/detailed-route.

Une déclaration d’opposition au tracé détaillé peut être consultée en ligne sur www.rec-cer.gc.ca/declaration-opposition.

Une copie de toute déclaration d’opposition écrite à ce tracé détaillé doit être déposée auprès de la REC. La méthode de dépôt préférée de la REC est par l’intermédiaire de l’outil de dépôt électronique (https://apps.cer-rec.gc.ca/efile/ElectronicDocum entSubmission.aspx?GoCTemplateCulture=fr-CA) qui fournit des instructions étape par étape. Si une personne déposant la déclaration n’est pas en mesure de déposer son formulaire à l’aide de l’outil de dépôt en ligne, elle peut le déposer (en format PDF) par courriel à [email protected].

Toute déclaration d’opposition écrite doit également être envoyée a l’adresse suivante :

Projet d’agrandissement du réseau de Trans Mountain 300, 5e Avenue S.-O., bureau 2700 Calgary (Alberta) T2P 5J2 À l’attention de : Alain Parisé, directeur, Terrains Télécopieur : 403-514-6401 Adresse de courriel : [email protected]

Le Mode alternatif de règlement des différends (MRD) de la REC vous êtes offert. Le MRD peut prendre la forme d’une réunion entre la personne qui dépose la déclaration d’opposition et Trans Mountain, animée par des membres qualifiés du personnel de la REC formés en la matière ou par une tierce partie impartiale. L’animateur aiderait la personne qui dépose la déclaration d’opposition et Trans Mountain à élaborer un processus qui pourrait permettre de régler les différends en suspens. Pour de plus amples renseignements sur les options de MRD, veuillez communiquer avec un spécialiste du MRD à la REC au numéro sans frais 1-800-899-1265.

Si vous avez des questions à propos du présent avis, du tracé détaillé ou des démarches mises en place par la REC quant au tracé détaillé, prière de communiquer avec Trans Mountain en composant sans frais le 1-866-454-4717 ou en envoyant un courriel à l’adresse [email protected]; un représentant de Trans Mountain vous rappellera par la suite. Vous pouvez également communiquer avec un conseiller ou une conseillère sur les processus de la REC en composant le 1-800-899-1265 ou en envoyant un courriel àl’adresse [email protected].

Identification de la propriété

017-564-964

029-759-994

029-759-986

017-564-727

017-564-735

PROJET D'AGRANDISSEMENT DU RÉSEAU DE TRANSMOUNTAIN TRAJET AUSTEVILLE MODIFIÉ

0 0.045 0.09 0.135 0.180.0225kilométres

1:5,000Système de coordonnées : NAD 1983 UTM Zone 10

!. Bornes de kilométres (KP)

Trajet TMEP alternatif

Conduite centrale TMEP actuelle

Rue locale

Autoroute

Chemin de fer

Empreinte de l’olèoduc

d'une Première nation

!

! !

!! Municipalité

Fleuve

!!

!

!!

!!

!!

!!

!!

!

!

!

!!

!!

!!

!!

!

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!. !.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.!.

!.!.

!.!.

!.!.

!.

!.

!.!.!.!.!.!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

97 Avenue

201

Rue

199A

Rue

Golden Ears Way

199A

Conn

Rue 98A Avenue

196A

Rue

Telegraph Trail

203

Rue 203A

Rue

96 Avenue

Bre

telle

d'a

ccés

201

Rue

198BRue

Bre

telle

de

sort

ie 1

99A

Rue

198

Stre

et

205

Rue

97BAvenue

204

Rue

202

Rue

199B

Rue

97AAvenue

196

Ru e 98 Avenue

197B

Str

eet

197

Rue

100A Avenue

99A Avenue

102 Avenue

101 Avenue

L A N G L E YS U R R E Y

KP 1154.9

KP1154.7 KP 1154.6

KP1154.4

KP 1155.4

KP1154.1

KP 1154.5

KP1154.2

KP 1155.3

KP1154.3 KP

1153.9 KP1153.8

KP 1155.7KP 1155.5

KP 1155.6

KP1154.0

KP 1154.8

KP 1155.2

.

!!

!!

!

!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!

!

!

!

!

! !!

!!

!!

!!

!!

!!

!!

!!

!!

!

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.!.

!.!.

!.

!.

!.!.

!.

!.

!.!.!.!.!.!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

201

Rue

98A Avenue

KP 1154.4KP1154.5

KP 1154.3

Trajet Austeville

Modifié

Projet d’agrandissement du réseau de

Trans Mountain

La Source (Trans Mountain submission)

Page 11: FILED ELECTRONICALLY

La Source (tear sheet)

Page 12: FILED ELECTRONICALLY

Langley Advance Times www.langleyadvancetimes.comA30 Thursday, July 15, 2021

PUBLIC NOTICE

IN THE MATTER OF the Canadian Energy Regulator Act (CER Act) and the Regulations made thereunder;

IN THE MATTER OF Certificate of Public Convenience and Necessity OC-065 (Certificate OC-065) approving the general route of the Trans Mountain Expansion Project;

AND IN THE MATTER OF an application by Trans Mountain respecting the determination and approval of the detailed route for a segment of the Trans Mountain Expansion Project in Langley, approximately between kilometre post 1154.3 and kilometre post 1154.54, as shown on the attached Route Map (201 ST / 100A Ave Reroute).

HEREBY GIVES NOTICE:

TO: JAMES C. KAVANAGH (Landowner)

Being the registered owner(s), in so far as they can be ascertained, of the lands required for the detailed route of the Trans Mountain Expansion Project, located at

LOT 2 DISTRICT LOT 124 GROUP 1 NEW WESTMINSTER DISTRICT PLAN 1115 EXCEPT REFERENCE PLAN 267 AND PLAN 2026

Title Number: BB3037774

LOT 3 DISTRICT LOT 124 GROUP 1 NEW WESTMINSTER DISTRICT PLAN 1115 EXCEPT REFERENCE PLAN 267 AND PLAN 2026

Title Number: BB3037775 (Lands)

Trans Mountain is seeking to locate the Landowner, or heirs of the Landowner, described above in order to provide them with information and this notice concerning the detailed route of the Trans Mountain Expansion Project.

The attached Individual Ownership Sketch details the route of the Trans Mountain Expansion Project, specific to the portion of the above Lands included within the permanent easement agreement with Trans Mountain.

If you have a legal right to the Lands described above and wish to oppose the proposed detailed route of the Trans Mountain Expansion Project, including the method and timing of construction of the pipeline, you may file a written statement of opposition with the Canada Energy Regulator (CER) within thirty (30) days of the publication of this notice. Your written statement of opposition must set out both the nature of your interest in the lands and the grounds for your opposition to the detailed route.

Where a written statement that meets the requirements of the CER Act is filed with the CER within thirty (30) days of the publication of this notice, the Commission shall forthwith order, subject to certain exceptions as noted below, that a public hearing be held with respect to any grounds of opposition set out in the statement, in relation to any section or part of the pipeline affected by the concerns disclosed in the written statement.

The Commission is not required to give any notice, hold any hearing or take any other action with respect to any written statement of opposition filed with the CER and may at any time disregard any such written statement if the person who filed the statement files a notice of withdrawal, or if it appears to the Commission that the statement is frivolous, vexatious or is not made in good faith.

If the Commission determines it is appropriate to hold a public hearing, it will fix a suitable format, time and place for the hearing and will publish a notice of the hearing in at least one issue of a publication, if any, in general circulation within the area in which the lands acquired or proposed to be acquired are situated. The Commission will also send a notice of the public hearing to each person who has filed a written statement of opposition with the CER.

The public hearing will be conducted in a manner that the Commission considers convenient for persons who filed a written statement of opposition and,

given the COVID-19 pandemic, may be held in writing and/or virtually.

If the Commission determines a public hearing is required, it will permit each person who filed a written statement of opposition that met the requirements of the CER Act to make representations, and may allow any other interested persons to make representations before it as the Commission deems appropriate. The Commission will take into account all written statements of opposition that have met the requirements of the CER Act and all representations made during the public hearing in determining the best possible route of the pipeline, and the most appropriate methods and timing of construction for the Trans Mountain Expansion Project. The Commission may impose in any approval such terms and conditions as it considers appropriate. Where the Commission has held a public hearing in respect of any section or part of the Trans Mountain Expansion Project and has approved or refused to approve the plan, profile and book of reference respecting that section or part, it will forward a copy of its decision and reasons to each person who made representations to the Commission during the public hearing.

The Commission may fix such amount as it deems reasonable in respect of the interim or final costs reasonably incurred by any person who makes representations to the Commission during such a public hearing, and the amount so fixed will be paid forthwith to the person by Trans Mountain.

Copies of the plan, profile and book of reference for the detailed route of the Trans Mountain Expansion Project may be obtained by calling 1-866-514-6700 or emailing info@transmountain. com. You may also view it online at https://www. transmountain.com/detailed-route.

A Statement of Opposition to the detailed route form is available online at www.cer-rec.gc.ca/statement-opposition.

A copy of any such written statement of opposition to this detailed route must be filed with the CER. The CER’s preferred method of filing is online through its e-filing tool (https://apps.cer-rec.gc.ca/efile/ElectronicDocumentSubmission.aspx?GoCTemp lateCulture=en-CA), which provides step-by-step instructions. If a registrant is unable to file their form through the e-filing tool, they may file it (in PDF format) by email at secretary@ cer-rec.gc.ca.

Any written statement of opposition should also be sent to:

Trans Mountain Expansion Project Suite 2700, 300 – 5th Avenue S.W. Calgary Alberta T2P 5J2 Attn: Alain Parisé, Director, Land Fax: 403-514-6401 Email: [email protected]

The CER’s Alternative Dispute Resolution (ADR) service is available to you. An ADR process could take the form of a meeting between the person filing the statement of opposition and Trans Mountain, which may be facilitated by trained CER staff or by another neutral third party. The facilitator would assist the filer and Trans Mountain to develop a process that may help to resolve outstanding issues. For more information about ADR options, please contact an ADR Specialist at the CER toll-free at 1-800-899-1265.

Should you have any questions concerning this notice, the proposed detailed route, or the CER’s detailed route procedures, please contact Trans Mountain at 1-866-454-4717 or info@ transmountain.com and a Trans Mountain representative will return your call. You may also contact a CER Process Advisor at 1-800-899-1265 or [email protected].

Trans Mountain Pipeline ULC, as General Partner of Trans Mountain Pipeline L.P. (“Trans Mountain”)Trans Mountain Expansion Project Notice of Proposed Detailed Route

Pursuant to Paragraph 201(1)(b) of the Canadian Energy Regulator Act

TRANS MOUNTAIN EXPANSION PROJECTALTERED AUSTEVILLE ROUTE

0 0.045 0.09 0.135 0.180.0225Kilometers

1:5,000Coordinate System: NAD 1983 UTM Zone 10

!. Kilometre Post (KP)

Alternate TMEP Route

Current TMEP Centreline

Local Street

Highway

Railway

Pipeline Footprint

First Nations Reserve

!

! !

!! Municipality

River

!!

!

!!

!!

!!

!!

!!

!

!

!

!!

!!

!!

!!

!

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!. !.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.!.

!.!.

!.!.

!.!.

!.

!.

!.!.!.!.!.!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

L A N G L E YS U R R E Y

KP1154.7 KP 1154.6

KP1154.4

KP 1155.4

KP1154.1

KP 1154.5

KP1154.2

KP 1155.3

KP1154.3 KP

1153.9

KP 1155.0KP1155.1

KP1153.8

KP 1155.7KP 1155.5

KP 1155.6

KP1154.0

KP 1155.2

97 Avenue

201

Stre

et

199A

Str

eet

Golden Ears Way

199A

Conn

Street 98A Avenue

196A

Stre

et

Telegraph Trail

203

Stre

et

203A

Stre

et

96 Avenue

201

Onr

amp

Stre

et

198BStreet

199A

Offr

amp

Stre

et

198

Stre

et

205

Stre

et

97BAvenue

204

Stre

et202

Stre

et

199B

Str

eet

97AAvenue

196

Stre

et

98 Avenue

197B

Str

eet

197

Stre

et

100A Avenue

99A Avenue

102 Avenue

101 Avenue

.

!!

!!

!

!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!

!

!

!

!

! !!

!!

!!

!!

!!

!!

!!

!!

!!

!

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.!.

!.!.

!.

!.

!.!.

!.

!.

!.!.!.!.!.!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

201

Stre

et

98A Avenue

KP 1154.4KP 1154.5KP 1154.3

Altered Austeville

Route

Page 13: FILED ELECTRONICALLY

Langley Advance Times Thursday, July 15, 2021 A31www.langleyadvancetimes.com

PUBLIC NOTICE

INDIVIDUAL OWNERSHIP SKETCH

INDIVIDUAL OWNERSHIP SKETCH

Page 14: FILED ELECTRONICALLY

Langley Advance Times www.langleyadvancetimes.comA32 Thursday, July 15, 2021

AVIS PUBLIC

EN CE QUI CONCERNE la Loi sur la Régie canadienne de l’énergie (Loi RCE) et les règlements afférents.

ET EN CE QUI CONCERNE le Certificat d’utilité publique OC-065 (Certificat OC-065) autorisant le tracé général du Projet d’agrandissement de Trans Mountain.

ET EN CE QUI CONCERNE une demande faite par Trans Mountain à l’égard de la détermination et de l’approbation du tracé détaillé pour un segment du Projet d’agrandissement de Trans Mountain à Langley, entre approximativement la borne kilométrique 1154.3 et la borne kilométrique 1154.54, comme le montre la carte du tracé ci-jointe (changement de tracé 201e RUE / 100A Avenue).

DONNE PAR LA PRÉSENTE UN AVIS :

À : JAMES C. KAVANAGH (propriétaire foncier)

Étant le(s) propriétaire(s) enregistré(s), dans la mesure où ils peuvent être établis, des terres requises pour le tracé détaillé du Projet d’agrandissement de Trans Mountain, situé au

LOT 2 LOT DE DISTRICT 124 GROUPE 1 PLAN DU DISTRICT DE NEW WESTMINSTER 1115 SAUF LE PLAN DE RÉFÉRENCE 267 ET LE PLAN 2026

Numéro du titre : BB3037774

LOT 3 LOT DE DISTRICT 124 GROUPE 1 PLAN DU DISTRICT DE NEW WESTMINSTER 1115 SAUF LE PLAN DE RÉFÉRENCE 267 ET LE PLAN 2026

Numéro du titre : BB3037775 (terres)

Trans Mountain cherche à localiser le propriétaire foncier, ou ses héritiers, décrit ci-dessus afin de lui fournir des renseignements et le présent avis concernant le tracé détaillé du Projet d’agrandissement du réseau de Trans Mountain.

Le croquis de propriété individuelle ci-joint détaille le tracé du Projet d’agrandissement du réseau de Trans Mountain, propre à la partie des terres susmentionnées incluse dans l’entente de servitude permanente avec Trans Mountain.

Si vous avez un droit légal sur les terres décrites ci-dessus et que vous souhaitez vous opposer au tracé détaillé proposé du Projet d’agrandissement du réseau de Trans Mountain, y compris la méthode et le calendrier de construction de l’oléoduc, vous pouvez déposer une déclaration d’opposition écrite auprès de la Régie de l’énergie du Canada (REC) dans les trente (30) jours suivant la publication du présent avis. Votre déclaration d’opposition écrite doit préciser la nature de votre intérêt dans les terrains et les motifs de votre opposition au tracé détaillé.

Lorsqu’une déclaration écrite qui satisfait aux exigences de la Loi sur la RCE est déposée auprès de la REC dans les trente (30) jours suivant la publication du présent avis, la Commission ordonnera immédiatement, sous réserve de certaines exceptions mentionnées ci-dessous, la tenue d’une audience publique portant sur les motifs d’opposition énoncés dans la déclaration d’opposition, relativement à toute section ou partie de l’oléoduc touchée par les préoccupations divulguées dans la déclaration écrite.

La Commission n’est pas tenue de donner d’avis, ni de tenir d’audience, ni d’entreprendre de démarches à l’égard de toute déclaration d’opposition écrite déposée auprès de la REC et se réserve le droit, à tout moment, de rejeter ladite déclaration écrite si la personne ayant déposé la déclaration dépose un avis de retrait ou si la Commission juge la déclaration frivole, vexatoire ou faite de mauvaise foi.

Si la Commission estime qu’il convient de tenir une audience publique, elle fixera une date et un lieu convenables pour l’audience et publiera par la suite un avis d’audience dans au moins un numéro d’une publication, le cas échéant, à grand tirage dans la région où se trouvent les terrains acquis ou proposés d’être acquis. La Commission fera également parvenir un avis d’audience publique à chacune des personnes qui aura déposé une déclaration d’opposition écrite auprès de la REC.

L’audience publique se déroulera de la manière que la Commission jugera la plus commode pour les personnes ayant déposé une déclaration écrite d’opposition et,

compte tenu de la pandémie de COVID-19, pourra se tenir par écrit et/ou virtuellement.

Si la Commission juge qu’une audience publique est requise, elle permettra à chacune des personnes qui auront déposé une déclaration d’opposition écrite conforme aux exigences de la Loi sur la RCE de présenter des observations; la Commission se réserve par ailleurs le droit de permettre à toute autre personne intéressée de présenter des observations devant elle, comme la Commission le juge approprié. La Commission tiendra compte de l’ensemble des déclarations d’opposition écrites qui satisfont aux exigences de la Loi sur la RCE et des observations présentées au cours de l’audience publique afin de déterminer, d’une part, le meilleur tracé possible pour l’oléoduc et, d’autre part, les méthodes et le dates les plus propices à la construction du Projet d’agrandissement du réseau de Trans Mountain. La Commission peut assortir toute approbation de conditions qu’elle juge appropriées. La Commission transmettra, motifs à l’appui, à chacune des personnes qui lui aura présenté des observations, une copie de toute décision d’approbation ou de refus d’approbation des plan, profil et livre de renvoi relatifs à une section ou partie du Projet d’agrandissement du réseaun de Trans Mountain rendue après toute audience publique.

La Commission peut fixer une somme qu’elle juge raisonnable pour les frais intérimaires ou finaux entraînés de façon raisonnable par une personne qui présente des observations à la Commission au cours d’une pareille audience publique; ce montant fixé sera versé sans délai à la personne par Trans Mountain.

Des copies des plan, profil et livre de renvoi relatifs au tracé détaillé du Projet d’agrandissement du réseau de Trans Mountain peuvent être procuré en composant le 1-866-514-6700 ou en envoyant un courriel à l’adresse [email protected]. Il est également possible de les consulter en ligne sur https://www.transmountain.com/fr/detailed-route.

Une déclaration d’opposition au tracé détaillé peut être consultée en ligne sur www.rec-cer.gc. ca/declaration-opposition.

Une copie de toute déclaration d’opposition écrite à ce tracé détaillé doit être déposée auprès de la REC. La méthode de dépôt préférée de la REC est par l’intermédiaire de l’outil de dépôt électronique (https://apps.cer-rec.gc.ca/efile/ElectronicDocum entSubmission.aspx?GoCTemplateCulture=fr-CA) qui fournit des instructions étape par étape. Si une personne déposant la déclaration n’est pas en mesure de déposer son formulaire à l’aide de l’outil de dépôt en ligne, elle peut le déposer (en format PDF) par courriel à [email protected].

Toute déclaration d’opposition écrite doit également être envoyée à l’adresse suivante :

300, 5e Avenue S.-O., bureau 2700 Calgary (Alberta) T2P 5J2 À l’attention de : Alain Parisé, directeur, Terrains Télécopieur : 403-514-6401 Adresse de courriel : [email protected]

Le Mode alternatif de règlement des différends (MRD) de la REC vous êtes offert. Le MRD peut prendre la forme d’une réunion entre la personne qui dépose la déclaration d’opposition et Trans Mountain, animée par des membres qualifiés du personnel de la REC formés en la matière ou par une tierce partie impartiale. L’animateur aiderait la personne qui dépose la déclaration et Trans Mountain à élaborer un processus qui pourrait permettre de régler les différends en suspens. Pour de plus amples renseignements sur les options de MRD, veuillez communiquer avec un spécialiste du MRD à la REC au numéro sans frais 1-800-899-1265.

Si vous avez des questions à propos du présent avis, du tracé détaillé ou des démarches mises en place par la REC quant au tracé détaillé, prière de communiquer avec Trans Mountain en composant sans frais le 1-866-454-4717 ou en envoyant un courriel à l’adresse [email protected]; un représentant de Trans Mountain vous rappellera par la suite. Vous pouvez également communiquer avec un conseiller ou une conseillère sur les processus de la REC en composant le 1-800-899-1265 ou en envoyant un courriel à l’adresse [email protected].

Trans Mountain Pipeline ULC, à titre de commanditaire de Trans Mountain Pipeline L.P.Projet d’agrandissement du réseau de Trans Mountain

Avis relatif au tracé détaillé proposé en vertude l’alinéa 201(1)(b) de la Loi sur la Régie canadienne de l’énergie

PROJET D'AGRANDISSEMENT DU RÉSEAU DE TRANSMOUNTAIN TRAJET AUSTEVILLE MODIFIÉ

0 0.045 0.09 0.135 0.180.0225kilométres

1:5,000Système de coordonnées : NAD 1983 UTM Zone 10

!. Bornes de kilométres (KP)

Trajet TMEP alternatif

Conduite centrale TMEP actuelle

Rue locale

Autoroute

Chemin de fer

Empreinte de l’olèoduc

d'une Première nation

!

! !

!! Municipalité

Fleuve

!!

!

!!

!!

!!

!!

!!

!

!

!

!!

!!

!!

!!

!

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!. !.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.!.

!.!.

!.!.

!.!.

!.

!.

!.!.!.!.!.!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

97 Avenue

201

Rue

199A

Rue

Golden Ears Way

199A

Conn

Rue 98A Avenue

196A

Rue

Telegraph Trail

203

Rue 203A

Rue

96 Avenue

Bre

telle

d'a

ccés

201

Rue

198BRue

Bre

telle

de

sort

ie 1

99A

Rue

198

Stre

et

205

Rue

97BAvenue

204

Rue

202

Rue

199B

Rue

97AAvenue

196

Ru e 98 Avenue

197B

Str

eet

197

Rue

100A Avenue

99A Avenue

102 Avenue

101 Avenue

L A N G L E YS U R R E Y

KP 1154.9

KP1154.7 KP 1154.6

KP1154.4

KP 1155.4

KP1154.1

KP 1154.5

KP1154.2

KP 1155.3

KP1154.3 KP

1153.9 KP1153.8

KP 1155.7KP 1155.5

KP 1155.6

KP1154.0

KP 1154.8

KP 1155.2

.

!!

!!

!

!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!

!

!

!

!

! !!

!!

!!

!!

!!

!!

!!

!!

!!

!

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.!.

!.!.

!.

!.

!.!.

!.

!.

!.!.!.!.!.!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

201

Rue

98A Avenue

KP 1154.4KP1154.5

KP 1154.3

Trajet Austeville

Modifié

Page 15: FILED ELECTRONICALLY

Langley Advance Times Thursday, July 15, 2021 A33www.langleyadvancetimes.com

AVIS PUBLIC

CROQUIS DE PROPRIÉTÉ

CROQUIS DE PROPRIÉTÉ

Page 16: FILED ELECTRONICALLY

A6 T H U R S D AY, J U LY 1 5 , 2 0 2 1 VA N C O U V E R S U N

Page 17: FILED ELECTRONICALLY

T H U R S D AY, J U LY 1 5 , 2 0 2 1 VA N C O U V E R S U N A7

Page 18: FILED ELECTRONICALLY

Thursday, July 15, 2021 | The Norwalk Hour | A9

PUBLIC NOTICE

IN THE MATTER OF the Canadian Energy

Regulator Act (CER Act) and the Regulations

made thereunder;

IN THE MATTER OF Certificate of Public Convenience

and Necessity OC-065 (Certificate OC-065)

approving the general route of the Trans Mountain

Expansion Project;

AND IN THE MATTER OF an application by Trans

Mountain respecting the determination and approval

of the detailed route for a segment of the Trans

Mountain Expansion Project in Langley, approximately

between kilometre post 1154.3 and kilometre post

1154.54, as shown on the attached Route Map

(201 ST / 100A Ave Reroute).

HEREBY GIVES NOTICE:

TO: JAMES C. KAVANAGH (Landowner)

Being the registered owner(s), in so far

as they can be ascertained, of the lands

required for the detailed route of the

Trans Mountain Expansion Project,

located at

LOT 2 DISTRICT LOT 124 GROUP 1 NEW

WESTMINSTER DISTRICT PLAN 1115 EXCEPT

REFERENCE PLAN 267 AND PLAN 2026

Title Number: BB3037774

LOT 3 DISTRICT LOT 124 GROUP 1 NEW

WESTMINSTER DISTRICT PLAN 1115 EXCEPT

REFERENCE PLAN 267 AND PLAN 2026

Title Number: BB3037775 (Lands)

Trans Mountain is seeking to locate the Landowner,

or heirs of the Landowner, described above in order

to provide them with information and this notice

concerning the detailed route of the Trans Mountain

Expansion Project.

The attached Individual Ownership Sketch details the

route of the Trans Mountain Expansion Project, specific

to the portion of the above Lands included within the

permanent easement agreement with Trans Mountain.

If you have a legal right to the Lands described above

and wish to oppose the proposed detailed route of

the Trans Mountain Expansion Project, including the

method and timing of construction of the pipeline,

you may file a written statement of opposition with the

Canada Energy Regulator (CER) within thirty (30) days

of the publication of this notice. Your written statement

of opposition must set out both the nature of your

interest in the lands and the grounds for your opposition

to the detailed route.

Where a written statement that meets the requirements

of the CER Act is filed with the CER within thirty (30)

days of the publication of this notice, the Commission

shall forthwith order, subject to certain exceptions as

noted below, that a public hearing be held with respect

to any grounds of opposition set out in the statement,

in relation to any section or part of the pipeline affected

by the concerns disclosed in the written statement.

The Commission is not required to give any notice,

hold any hearing or take any other action with respect

to any written statement of opposition filed with the

CER and may at any time disregard any such written

statement if the person who filed the statement

files a notice of withdrawal, or if it appears to the

Commission that the statement is frivolous, vexatious

or is not made in good faith.

If the Commission determines it is appropriate to hold

a public hearing, it will fix a suitable format, time and

place for the hearing and will publish a notice of the

hearing in at least one issue of a publication, if any, in

general circulation within the area in which the lands

acquired or proposed to be acquired are situated.

The Commission will also send a notice of the public

hearing to each person who has filed a written

statement of opposition with the CER.

The public hearing will be conducted in a manner

that the Commission considers convenient for persons

who filed a written statement of opposition and,

given the COVID-19 pandemic, may be held in writing

and/or virtually.

If the Commission determines a public hearing is

required, it will permit each person who filed a written

statement of opposition that met the requirements of

the CER Act to make representations, and may allow

any other interested persons to make representations

before it as the Commission deems appropriate. The

Commission will take into account all written statements

of opposition that have met the requirements of the

CER Act and all representations made during the public

hearing in determining the best possible route of the

pipeline, and the most appropriate methods and timing

of construction for the Trans Mountain Expansion Project.

The Commission may impose in any approval such

terms and conditions as it considers appropriate. Where

the Commission has held a public hearing in respect

of any section or part of the Trans Mountain Expansion

Project and has approved or refused to approve the plan,

profile and book of reference respecting that section or

part, it will forward a copy of its decision and reasons

to each person who made representations to the

Commission during the public hearing.

The Commission may fix such amount as it deems

reasonable in respect of the interim or final costs

reasonably incurred by any person who makes

representations to the Commission during such a

public hearing, and the amount so fixed will be paid

forthwith to the person by Trans Mountain.

Copies of the plan, profile and book of reference for the

detailed route of the Trans Mountain Expansion Project

may be obtained by calling 1-866-514-6700 or emailing

info@transmountain. com. You may also view it online

at https://www. transmountain.com/detailed-route.

A Statement of Opposition to the detailed route

form is available online at www.cer-rec.gc.ca/

statement-opposition.

A copy of any such written statement of opposition

to this detailed route must be filed with the CER.

The CER’s preferred method of filing is online through

its e-filing tool (https://apps.cer-rec.gc.ca/efile/

ElectronicDocumentSubmission.aspx?GoCTemp

lateCulture=en-CA), which provides step-by-step

instructions. If a registrant is unable to file their form

through the e-filing tool, they may file it (in PDF format)

by email at secretary@ cer-rec.gc.ca.

Any written statement of opposition should also be

sent to:

Trans Mountain Expansion Project

Suite 2700, 300 – 5th Avenue S.W.

Calgary Alberta T2P 5J2

Attn: Alain Parisé, Director, Land

Fax: 403-514-6401

Email: [email protected]

The CER’s Alternative Dispute Resolution (ADR) service

is available to you. An ADR process could take the form

of a meeting between the person filing the statement of

opposition and Trans Mountain, which may be facilitated

by trained CER staff or by another neutral third party.

The facilitator would assist the filer and Trans Mountain

to develop a process that may help to resolve

outstanding issues. For more information about ADR

options, please contact an ADR Specialist at the CER

toll-free at 1-800-899-1265.

Should you have any questions concerning this notice,

the proposed detailed route, or the CER’s detailed

route procedures, please contact Trans Mountain at

1-866-454-4717 or info@ transmountain.com and a

Trans Mountain representative will return your call.

You may also contact a CER Process Advisor at

1-800-899-1265 or [email protected].

Trans Mountain Pipeline ULC, as General Partner of Trans Mountain Pipeline L.P. (“Trans Mountain”)Trans Mountain Expansion ProjectNotice of Proposed Detailed Route

Pursuant to Paragraph 201(1)(b) of the Canadian Energy Regulator Act

!!

!

!!

!!

!!

!!

!!

!

!

!

!!

!!

!!

!!

!

!.!. !.

!.

!.

!.!.

!.

!.

!.

!.

!.

!.!.

!.

!.!.!.

!.!.

!.

L A N G L E YS U R R E Y

KP1154.7 KP 1154.6

KP1154.4

KP 1155.4

KP1154.1

KP 1154.5

KP1154.2

KP 1155.3

KP1154.3 KP

1153.9

KP 1155.0KP1155.1

KP1153.8

KP 1155.7KP 1155.5

KP 1155.6

KP1154.0

KP 1155.2

97 Avenue

201Street

199A

Street

GoldenEarsW

ay

199A

Conn

Street 98A Avenue

1 96A

Street

Telegraph Trail

203Street

203A

Street

96 Avenue

201OnrampStreet

198BStreet

199A

OfframpStreet

198

Street

205

Street

97BAvenue

204Street202Street

199B

Street

97AAvenue

196

S treet

98 Avenue

197B

Street

197Street

100A Avenue

99A Avenue

102 Avenue

101 Avenue

.

!!

!!

!

!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!

!

!

!

!

! !!

!!

!!

!!

!!

!!

!!

!!

!!

!

!.!.!.

201Street

98A Avenue

KP 1154.4KP 1154.5KP 1154.3

.TRANS MOUNTAIN EXPANSION PROJECTALTERED AUSTEVILLE ROUTE

0 0.045 0.09 0.135 0.180.0225Kilometers

1:5,000Coordinate System: NAD 1983 UTM Zone 10

!. Kilometre Post (KP)

Alternate TMEP Route

Current TMEP Centreline

Local Street

Highway

Railway

Pipeline Footprint

First Nations Reserve

!

! !

!! Municipality

River

INDIVIDUAL OWNERSHIP SKETCHES

ALTERED AUSTEVILLE ROUTE

Page 19: FILED ELECTRONICALLY

PAGE A10 - JULY 15, 2021 - LA JOLLA LIGHT www.lajollalight.com

PUBLIC NOTICE

IN THE MATTER OF the Canadian Energy Regulator Act(CER Act) and the Regulations made thereunder;

IN THE MATTER OF Certificate of Public Convenienceand Necessity OC-065 (Certificate OC-065) approving thegeneral route of the Trans Mountain Expansion Project;

AND IN THE MATTER OF an application by Trans Mountainrespecting the determination and approval of the detailedroute for a segment of the Trans Mountain ExpansionProject in Langley, approximately between kilometre post1154.3 and kilometre post 1154.54, as shown on theattached Route Map (201 ST / 100A Ave Reroute).

HEREBY GIVES NOTICE:

TO: JAMES C. KAVANAGH (Landowner)

Being the registered owner(s), in so far as theycan be ascertained, of the lands required forthe detailed route of the Trans MountainExpansion Project, located at

LOT 2 DISTRICT LOT 124 GROUP 1 NEWWESTMINSTER DISTRICT PLAN 1115 EXCEPTREFERENCE PLAN 267 AND PLAN 2026

Title Number: BB3037774

LOT 3 DISTRICT LOT 124 GROUP 1 NEWWESTMINSTER DISTRICT PLAN 1115 EXCEPTREFERENCE PLAN 267 AND PLAN 2026

Title Number: BB3037775 (Lands)

Trans Mountain is seeking to locate the Landowner, or heirsof the Landowner, described above in order to providethem with information and this notice concerning thedetailed route of the Trans Mountain Expansion Project.

The attached Individual Ownership Sketch details theroute of the Trans Mountain Expansion Project, specificto the portion of the above Lands included within thepermanent easement agreement with Trans Mountain.

If you have a legal right to the Lands described aboveand wish to oppose the proposed detailed route of theTrans Mountain Expansion Project, including the methodand timing of construction of the pipeline, you may file awritten statement of opposition with the Canada EnergyRegulator (CER) within thirty (30) days of the publicationof this notice. Your written statement of opposition mustset out both the nature of your interest in the lands andthe grounds for your opposition to the detailed route.

Where a written statement that meets the requirementsof the CER Act is filed with the CER within thirty (30) daysof the publication of this notice, the Commission shallforthwith order, subject to certain exceptions as notedbelow, that a public hearing be held with respect to anygrounds of opposition set out in the statement, in relationto any section or part of the pipeline affected by theconcerns disclosed in the written statement.

The Commission is not required to give any notice,hold any hearing or take any other action with respectto any written statement of opposition filed with theCER and may at any time disregard any such writtenstatement if the person who filed the statement files anotice of withdrawal, or if it appears to the Commissionthat the statement is frivolous, vexatious or is not madein good faith.

If the Commission determines it is appropriate to hold apublic hearing, it will fix a suitable format, time and placefor the hearing and will publish a notice of the hearingin at least one issue of a publication, if any, in generalcirculation within the area in which the lands acquired orproposed to be acquired are situated. The Commissionwill also send a notice of the public hearing to eachperson who has filed a written statement of oppositionwith the CER.

The public hearing will be conducted in a mannerthat the Commission considers convenient for personswho filed a written statement of opposition and,

given the COVID-19 pandemic, may be held in writingand/or virtually.

If the Commission determines a public hearing isrequired, it will permit each person who filed a writtenstatement of opposition that met the requirements ofthe CER Act to make representations, and may allowany other interested persons to make representationsbefore it as the Commission deems appropriate. TheCommission will take into account all written statementsof opposition that have met the requirements of theCER Act and all representations made during the publichearing in determining the best possible route of thepipeline, and the most appropriate methods and timingof construction for the Trans Mountain Expansion Project.The Commission may impose in any approval such termsand conditions as it considers appropriate. Where theCommission has held a public hearing in respect of anysection or part of the Trans Mountain Expansion Projectand has approved or refused to approve the plan, profileand book of reference respecting that section or part, itwill forward a copy of its decision and reasons to eachperson who made representations to the Commissionduring the public hearing.

The Commission may fix such amount as it deemsreasonable in respect of the interim or final costsreasonably incurred by any person who makesrepresentations to the Commission during such apublic hearing, and the amount so fixed will be paidforthwith to the person by Trans Mountain.

Copies of the plan, profile and book of reference for thedetailed route of the Trans Mountain Expansion Projectmay be obtained by calling 1-866-514-6700 or emailinginfo@transmountain. com. You may also view it onlineat https://www. transmountain.com/detailed-route.

A Statement of Opposition to the detailed routeform is available online at www.cer-rec.gc.ca/statement-opposition.

A copy of any such written statement of oppositionto this detailed route must be filed with the CER.The CER’s preferred method of filing is online throughits e-filing tool (https://apps.cer-rec.gc.ca/efile/ElectronicDocumentSubmission.aspx?GoCTemplateCulture=en-CA), which provides step-by-stepinstructions. If a registrant is unable to file their formthrough the e-filing tool, they may file it (in PDF format)by email at secretary@ cer-rec.gc.ca.

Any written statement of opposition should also besent to:

Trans Mountain Expansion ProjectSuite 2700, 300 – 5th Avenue S.W.Calgary Alberta T2P 5J2Attn: Alain Parisé, Director, LandFax: 403-514-6401Email: [email protected]

The CER’s Alternative Dispute Resolution (ADR) serviceis available to you. An ADR process could take the formof a meeting between the person filing the statementof opposition and Trans Mountain, which may befacilitated by trained CER staff or by another neutralthird party. The facilitator would assist the filer andTrans Mountain to develop a process that may help toresolve outstanding issues. For more information aboutADR options, please contact an ADR Specialist at theCER toll-free at 1-800-899-1265.

Should you have any questions concerning this notice,the proposed detailed route, or the CER’s detailedroute procedures, please contact Trans Mountain at1-866-454-4717 or info@ transmountain.com and aTrans Mountain representative will return your call.You may also contact a CER Process Advisor at1-800-899-1265 or [email protected].

Trans Mountain Pipeline ULC, as General Partner of Trans Mountain Pipeline L.P. (“Trans Mountain”)Trans Mountain Expansion ProjectNotice of Proposed Detailed Route

Pursuant to Paragraph 201(1)(b) of the Canadian Energy Regulator Act

TRANS MOUNTAIN EXPANSION PROJECTALTERED AUSTEVILLE ROUTE

0 0.045 0.09 0.135 0.180.0225Kilometers

1:5,000Coordinate System: NAD 1983 UTM Zone 10

!. Kilometre Post (KP)

Alternate TMEP Route

Current TMEP Centreline

Local Street

Highway

Railway

Pipeline Footprint

First Nations Reserve

!

! !

!! Municipality

River

!!

!

!!

!!

!!

!!

!!

!

!

!

!!

!!

!!

!!

!

!.!. !.

!.

!.

!.!.

!.

!.

!.

!.

!.

!.!.

!.

!.!.!.

!.!.

!.

L A N G L E YS U R R E Y

KP1154.7 KP 1154.6

KP1154.4

KP 1155.4

KP1154.1

KP 1154.5

KP1154.2

KP 1155.3

KP1154.3 KP

1153.9

KP 1155.0KP1155.1

KP1153.8

KP 1155.7KP 1155.5

KP 1155.6

KP1154.0

KP 1155.2

97 Avenue

201Street

199A

Street

GoldenEars W

ay

199A

Conn

Street 98A Avenue

196A

Street

Telegraph Trail

203Street

203A

Street

96 Avenue

201Onram

pStreet

198BStreet

199A

Offram

pStreet

198

Street

205

Street

97BAvenue

204Street202Street

199B

Street

97AAvenue

196

Street

98 Avenue

197B

Street

197Street

100A Avenue

99A Avenue

102 Avenue

101 Avenue

.

!!

!!

!

!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!

!

!

!

!

! !!

!!

!!

!!

!!

!!

!!

!!

!!

!

!.!.!.

201Street

98A Avenue

KP 1154.4KP 1154.5KP 1154.3

AlteredAusteville

Route

Page 20: FILED ELECTRONICALLY

www.lajollalight.com LA JOLLA LIGHT - JULY 15, 2021 - PAGE A11

PUBLIC NOTICE

INDIVIDUAL OWNERSHIP SKETCH

INDIVIDUAL OWNERSHIP SKETCH