5
16 20 11 12 15 25 30 35 45 50 16 20 25 30 40 45 50 44 40 38 25 26 27 28 30 35 15 20 25 30 35 35 35 30 25 24 30 35 35 35 39 35 36 34 35 5/4/2020 1:28 PM C:\Szewczak\Flat Rock\Sheets\62260-F48.dwg O'BRIEN & GERE ENGINEERS, INC. PHILADELPHIA WATER DEPARTMENT FLAT ROCK DAM - MANYUNK SCHUYLKILL CANAL DIVERSION FACILITY & CANAL INTAKE EXISTING SITE PLAN & WATERS OF THE UNITED STATES FILE NO. 1551.62260-F48 MAY 2020 FIGURE 8 1A FIG 10A 2A FIG 10A 3A FIG 10A 4A FIG 10A 11A FIG 10C 10A FIG 10C 9A FIG 10C 8A FIG 10B 7A FIG 10B 6A FIG 10B 5A FIG 10B MANAYUNK SCHUYLKILL CANAL OHW EL 30.3 SCHUYLKILL RIVER OHW EL 15.4 SCHUYLKILL RIVER OHW EL 15.4 NORTH SCHUYLKILL RIVER TRAIL N. SCHUYLKILL RIVER TRAIL CANAL INTAKE CHANNEL OHW EL 33.4 TOP OF WALL 36.9± PROPERTY LINE (TYP.) CREST EL 33.4 PROPERTY LINE (TYP.) 0 30' 30' EXISTING SITE PLAN 1"=30' PROJECT LIMITS PROJECT LIMITS DELINEATED WETLANDS AREA OF PRELIMINARY JD CENAP-OP-R-2009-1677 LOCK NO. 68 EX WASTE WEIR SHEET PILE BULKHEAD CONCRETE CANAL INTAKE CHANNEL WALL - TOP EL 38.9± TOP EL 36.8± TOP OF WALL 40.7± TOP OF WALL 44.1± FEEDER STRUCTURE TOP EL 44.1± REMAINS OF BRICK GATE HOUSE GENERAL NOTES: 1. EXISTING FEATURES AND TOPOGRAPHY SHOWN ON THIS PLAN WERE OBTAINED FROM A PLAN TITLED 'EXISTING CONDITIONS PLAN, MANAYUNK SCHUYLKILL CANAL, RESTORATION AT FLAT ROCK DAM,' PREPARED BY HAKS ENGINEERS, ARCHITECTS AND LAND SURVEYORS, P.C., DATED DECEMBER 7, 2012. 2. ELEVATIONS ARE BASED ON CITY OF PHILADELPHIA VERTICAL DATUM. SITE BENCH MARK BEING TOP OF A CONCRETE WALL ON THE SOUTHERLY SIDE OF THE MANAYUNK CANAL LOCATED ON THE PAPERWORKS FACTORY SITE NOW OR FORMERLY ROXBOARD PHILADELPHIA, INC. PLAN BEING TITLED "SURVEY OF UTILITIES - ROADS - RAILROAD FACILITIES - ETC. AT MANAYUNK PLANT OF CONTAINER CORPORATION OF AMERICA - TWENTY FIRST WARD - PHILADELPHIA, PENNA." DATED FEBRUARY 1947. 3. FIELD SURVEY WAS PERFORMED FROM AUGUST 2011 TO NOVEMBER 2011 AND FROM JULY 2012 TO SEPTEMBER 2012. 4. ALL UNDERGROUND UTILITIES SHOWN ARE BASED ON FIELD MEASUREMENTS AND UTILITY PLANS PROVIDED BY THE UTILITY COMPANIES VIA THE PA ONE-CALL SYSTEM. DESIGN PHASE SERIAL NUMBER 20122200478. 5. ALL DISTANCES SHOWN ARE U.S. STANDARD FEET. LEGEND PROPERTY LINE PROJECT LIMITS EX. MAJOR CONTOUR EX. MINOR CONTOUR 35 34 WETLAND BOUNDARY ORDINARY HIGH WATER WATERS OF THE US DELINEATED WETLANDS AREA OF PRELIMINARY JD

FIGURE 8 NORTH SCHUYLKILL RIVER TRAIL...16 20 11 12 15 25 30 35 45 50 16 20 25 30 40 45 50 44 40 38 25 26 27 30 28 35 15 20 25 30 35 35 35 30 25 24 30 35 35 35 39 35 36 34 35 5/4/2020

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FIGURE 8 NORTH SCHUYLKILL RIVER TRAIL...16 20 11 12 15 25 30 35 45 50 16 20 25 30 40 45 50 44 40 38 25 26 27 30 28 35 15 20 25 30 35 35 35 30 25 24 30 35 35 35 39 35 36 34 35 5/4/2020

1

6

20

1

1

1

2

1

5

2

5

3

0

3

5

4

5

5

0

1

6

20

25

30

4

0

45

50

4

4

4

0

3

8

25

26

27

2

8

3

0

3

5

15

2

0

2

5

3

0

35

3

5

3

5

30

2

5

24

3

0

3

5

3

5

35

39

35

3

6

34

3

5

5/4/2020 1:28 P

M

C:\S

zew

czak\F

lat R

ock\S

heets\62260-F

48.dw

g

O'BRIEN & GERE ENGINEERS, INC.

PHILADELPHIA WATER DEPARTMENT

FLAT ROCK DAM - MANYUNK

SCHUYLKILL CANAL DIVERSION

FACILITY & CANAL INTAKE

EXISTING SITE PLAN & WATERS

OF THE UNITED STATES

FILE NO. 1551.62260-F48

MAY 2020

FIGURE 8

1A

FIG 10A

2A

FIG 10A

3A

FIG 10A

4A

FIG 10A

11A

FIG 10C

10A

FIG 10C

9A

FIG 10C

8A

FIG 10B

7A

FIG 10B

6A

FIG 10B

5A

FIG 10B

MANAYUNK SCHUYLKILL CANAL

OHW EL 30.3

SCHUYLKILL RIVER

OHW EL 15.4

SCHUYLKILL RIVER

OHW EL 15.4

N

O

R

T

H

S

C

H

U

Y

L

K

IL

L

R

IV

E

R

T

R

A

IL

N

.

S

C

H

U

Y

L

K

I

L

L

R

I

V

E

R

T

R

A

I

L

CANAL INTAKE CHANNEL

OHW EL 33.4

TOP OF WALL 36.9±

PROPERTY LINE (TYP.)

C

R

E

S

T

E

L

3

3

.

4

PROPERTY LINE (TYP.)

030' 30'

EXISTING SITE PLAN

1"=30'

PROJECT LIMITS

PROJECT LIMITS

DELINEATED

WETLANDS

AREA OF PRELIMINARY JD

CENAP-OP-R-2009-1677

LOCK NO. 68

E

X

W

A

S

T

E

W

E

I

R

SHEET PILE BULKHEAD

CONCRETE CANAL

INTAKE CHANNEL

WALL - TOP EL 38.9±

TOP EL 36.8±

TOP OF WALL 40.7±

TOP OF WALL 44.1±

FEEDER STRUCTURE

TOP EL 44.1±

REMAINS OF BRICK

GATE HOUSE

GENERAL NOTES:

1. EXISTING FEATURES AND TOPOGRAPHY SHOWN ON THIS PLAN WERE OBTAINED

FROM A PLAN TITLED 'EXISTING CONDITIONS PLAN, MANAYUNK SCHUYLKILL CANAL,

RESTORATION AT FLAT ROCK DAM,' PREPARED BY HAKS ENGINEERS, ARCHITECTS

AND LAND SURVEYORS, P.C., DATED DECEMBER 7, 2012.

2. ELEVATIONS ARE BASED ON CITY OF PHILADELPHIA VERTICAL DATUM. SITE BENCH

MARK BEING TOP OF A CONCRETE WALL ON THE SOUTHERLY SIDE OF THE

MANAYUNK CANAL LOCATED ON THE PAPERWORKS FACTORY SITE NOW OR

FORMERLY ROXBOARD PHILADELPHIA, INC. PLAN BEING TITLED "SURVEY OF

UTILITIES - ROADS - RAILROAD FACILITIES - ETC. AT MANAYUNK PLANT OF

CONTAINER CORPORATION OF AMERICA - TWENTY FIRST WARD - PHILADELPHIA,

PENNA." DATED FEBRUARY 1947.

3. FIELD SURVEY WAS PERFORMED FROM AUGUST 2011 TO NOVEMBER 2011 AND FROM

JULY 2012 TO SEPTEMBER 2012.

4. ALL UNDERGROUND UTILITIES SHOWN ARE BASED ON FIELD MEASUREMENTS AND

UTILITY PLANS PROVIDED BY THE UTILITY COMPANIES VIA THE PA ONE-CALL SYSTEM.

DESIGN PHASE SERIAL NUMBER 20122200478.

5. ALL DISTANCES SHOWN ARE U.S. STANDARD FEET.

LEGEND

PROPERTY LINE

PROJECT LIMITS

EX. MAJOR CONTOUR

EX. MINOR CONTOUR

35

34

WETLAND BOUNDARY

ORDINARY HIGH WATER

WATERS OF THE US

DELINEATED WETLANDS

AREA OF PRELIMINARY

JD

Page 2: FIGURE 8 NORTH SCHUYLKILL RIVER TRAIL...16 20 11 12 15 25 30 35 45 50 16 20 25 30 40 45 50 44 40 38 25 26 27 30 28 35 15 20 25 30 35 35 35 30 25 24 30 35 35 35 39 35 36 34 35 5/4/2020

D

D

D

D

o

o

o

o

o

o

o

P

P

P

P

39

37

36

38

3

9

3

9

3

8

40

2

5

2

6

3

0

3

5

4

0

4

1

42

4

2

4

1

4

0

4

1

38

39

1

6

20

1

1

1

2

1

5

2

5

3

0

3

5

4

5

5

0

1

6

20

25

30

35

40

3

9

3

8

3

7

39

38

3

7

3

5

3

6

3

4

38

3

9

4

0

4

0

45

50

4

4

4

0

3

8

25

26

3

6

3

7

3

8

27

2

8

3

0

3

5

15

2

0

2

5

3

0

35

4

0

5/4/2020 1:45 P

M

C:\S

zew

czak\F

lat R

ock\S

heets\62260-F

47.dw

g

O'BRIEN & GERE ENGINEERS, INC.

PHILADELPHIA WATER DEPARTMENT

FLAT ROCK DAM - MANYUNK

SCHUYLKILL CANAL DIVERSION

FACILITY & CANAL INTAKE

PROPOSED FILLS IN WATERS

OF THE UNITED STATES

FILE NO. 1551.62260-F47

MAY 2020

FIGURE 9

1B

FIG 10A

2B

FIG 10A

3B

FIG 10A

4B

FIG 10A

11B

FIG 10C

10B

FIG 10C

9B

FIG 10C

8B

FIG 10B

7B

FIG 10B

6B

FIG 10B

5B

FIG 10B

MANAYUNK SCHUYLKILL CANAL

OHW EL 30.3

SCHUYLKILL RIVER

OHW EL 15.4

SCHUYLKILL RIVER

OHW EL 15.4

N

O

R

T

H

S

C

H

U

Y

L

K

IL

L

R

IV

E

R

T

R

A

IL

N

.

S

C

H

U

Y

L

K

I

L

L

R

I

V

E

R

T

R

A

I

L

TEMP. DEWATERING

FACILITY

CANAL INTAKE CHANNEL

OHW EL 33.4

TEMP.

DEWATERING

FACILITY

TEMP. DEWATERING

FACILITY

TEMP. DEWATERING

FACILITY

TEMP. TURBIDITY

BARRIER

TOP OF WALL 36.9±

PROPERTY LINE (TYP.)

8

0

'

W

A

S

T

E

W

E

I

R

C

R

E

S

T

E

L

3

3

.

5

SLUICEWAY

PROPERTY LINE (TYP.)

FILLS IN WATERS OF THE UNITED STATES

NO. WORK ITEM BODY OF WATER

PERMANENT OR

TEMPORARY

SUBITEM QUANTITY

1 WASTE WEIR AND SLUICEWAY

CANAL INTAKE CHANNEL

AND SCHUYLKILL RIVER

PERMANENT

EXCAVATION FOR FOUNDATION

PREPARATION

1,455 CY

NEW CONCRETE STRUCTURES1,850 CY

IMPORTED EARTH/AGGREGATE BACKFILL 550 CY

2 DIVERSION FACILITY BULKHEAD CANAL INTAKE CHANNEL PERMANENT

EXCAVATION FOR FOUNDATION

PREPARATION

1,000 CY

NEW CONCRETE STRUCTURES 190 CY

IMPORTED EARTH/AGGREGATE BACKFILL2,115 CY

CONCRETE PAVEMENT1,560 CY

3 SUBMERGED CONCRETE APRONS CANAL INTAKE CHANNEL PERMANENT CONCRETE STRUCTURES 320 CY

4 INTAKE STRUCTURE CANAL INTAKE CHANNEL PERMANENT

EXCAVATION FOR FOUNDATION

PREPARATION

360 CY

CONCRETE STRUCTURES AND

PAVEMENT

310 CY

5 RIPRAP SHORELINE PROTECTION CANAL INTAKE CHANNEL PERMANENT IMPORTED R-5 RIPRAP 150 CY

6 CONCRETE CHANNEL

AREA OF PRELIMINARY JD

AND DELINEATED

WETLANDS

PERMANENT

EXCAVATION FOR FOUNDATION

PREPARATION

2,210 CY

NEW CONCRETE STRUCTURES 700 CY

IMPORTED EARTH/AGGREGATE BACKFILL 405 CY

7

PAVED ACCESS DRIVE AND

STORMWATER FACILITIES

DELINEATED WETLANDS PERMANENT

EXCAVATION TO REMOVE SEDIMENT1,800 CY

IMPORTED EARTH/AGGREGATE BACKFILL2,445 CY

BITUMINOUS PAVEMENT 28 CY

8 LOCK NO. 68

MANAYUNK SCHUYLKILL

CANAL

PERMANENT

REMOVE DEBRIS AND SEDIMENT TO

EXPOSE BOTTOM OF LOCK

270 CY

9

CANAL INTAKE CHANNEL

COFFERDAM

CANAL INTAKE CHANNEL TEMPORARY

STEEL SHEET PILING AND BRACING 200 LF

IMPORTED EARTH/AGGREGATE FILL 760 CY

DEWATERING FACILITY (PUMP TO

UPSTREAM CHANNEL)

1 EA

10 SCHUYLKILL RIVER COFFERDAM SCHUYLKILL RIVER TEMPORARY

CONCRETE BLOCKS OR SANDBAGS 250 CY

DEWATERING FACILITY (PUMP TO

DOWNSTREAM SCHUYLKILL RIVER)

1 EA

11

MANAYUNK SCHUYLKILL CANAL

COFFERDAM

MANAYUNK SCHUYLKILL

CANAL

TEMPORARY

CONCRETE BLOCKS OR SANDBAGS 120 CY

DEWATERING FACILITY (PUMP TO

DOWNSTREAM CANAL)

2 EA

TURBIDITY BARRIER 125 LF

1

2

2

3

5

6

7

8

9

10

11

WASTE WEIR/SLUICEWAY

BUTTRESS SECTION

4

BIT

UM

INO

US

PA

VE

D A

CC

ES

S D

RIV

E

030' 30'

PROPOSED SITE PLAN

1"=30'

PROJECT LIMITS

PROJECT LIMITS

WALL LOWERED

TO EL 37.0

TOP OF WALL

EL 42.5

LEGEND

PROPERTY LINE

PROJECT LIMITS

EX. MAJOR CONTOUR

EX. MINOR CONTOUR

35

34

WETLAND BOUNDARY

ORDINARY HIGH WATER

WATERS OF THE US

TEMP. COFFERDAM

PR. MAJOR CONTOUR

PR. MINOR CONTOUR34

35

1

WORK ITEM - REFER

TO TABLE

BITUMINOUS PAVEMENT

CONCRETE PAVEMENT

Page 3: FIGURE 8 NORTH SCHUYLKILL RIVER TRAIL...16 20 11 12 15 25 30 35 45 50 16 20 25 30 40 45 50 44 40 38 25 26 27 30 28 35 15 20 25 30 35 35 35 30 25 24 30 35 35 35 39 35 36 34 35 5/4/2020

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

5/4

/2

02

0 3

:5

0 P

M

D:\R

AM

BO

LL

P

RO

JE

CT

S\P

WD

F

LA

TR

OC

K\D

WG

\S

he

ets\6

22

60

-F

46

.d

wg

O'BRIEN & GERE ENGINEERS, INC.

PHILADELPHIA WATER DEPARTMENT

FLAT ROCK DAM - MANAYUNK

SCHUYLKILL CANAL DIVERSION

FACILITY & CANAL INTAKE

CROSS-SECTIONS

FILE NO. 1551.62260-F46

MAY 2020

FIGURE 10A

OHWM 33.4

OHWM 15.4 OHWM 15.4

OHWM 15.4OHWM 15.4

OHWM 15.4 OHWM 15.4

OHWM 15.4OHWM 15.4

OHWM 33.4

OHWM 33.4

OHWM 33.4

OHWM 33.4

EX. CANAL INTAKE

CHANNEL WALL

TO REMAIN

TEMPORARY COFFERDAM

TOP EL 39.0

APPROX. TOP OF HIGHLY

WEATHERED ROCK

APPROX. TOP OF HIGHLY

WEATHERED ROCK

TEMPORARY EARTH OR

AGGREGATE FILL

OHWM 33.4

OHWM 33.4

OHWM 33.4CREST 33.5

TEMP. COFFERDAM

RIPRAP SHORELINE

PROTECTION

RIPRAP SHORELINE

PROTECTION

APPROX. TOP OF HIGHLY

WEATHERED ROCK

APPROX. TOP OF HIGHLY

WEATHERED ROCK

APPROX. TOP OF HIGHLY

WEATHERED ROCK

EX. GRADE

PORTION OF EX.

CANAL INTAKE

CHANNEL WALL

TO REMAIN

ROCK EXCAVATION IN

CANAL INTAKE CHANNEL

EXCAVATE SEDIMENT IN

CANAL INTAKE CHANNEL

NEW CONCRETE BUTTRESS

STRUCTURE

NEW CONCRETE APRON

IMPORTED SELECT FILL

FOR BACKFILL

NEW CONCRETE WASTE

WEIR STRUCTURE

IMPORTED SELECT FILL

FOR BACKFILL

NEW CONCRETE APRON

TEMP. COFFERDAM

CREST 33.5

TOP OF WALL 36.8

DEMOLISH EX. CANAL

INTAKE CHANNEL

WALL

ROCK EXCAVATION IN

CANAL INTAKE CHANNEL

EXCAVATE SEDIMENT IN

CANAL INTAKE CHANNEL

ROCK EXCAVATION IN

CANAL INTAKE CHANNEL

EXCAVATE SEDIMENT IN

CANAL INTAKE CHANNEL

NEW CONCRETE WASTE

WEIR STRUCTURE

IMPORTED SELECT FILL

FOR BACKFILL

NEW CONCRETE APRON

DEMOLISH EX. CONCRETE

SPILLWAY / WASTE WEIR

EX. CANAL INTAKE

CHANNEL WALL

TO REMAIN

APPROX. TOP OF HIGHLY

WEATHERED ROCK

APPROX. TOP OF HIGHLY

WEATHERED ROCK

APPROX. TOP OF HIGHLY

WEATHERED ROCK

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

DEMOLISH PORTION

OF EX. CANAL INTAKE

CHANNEL WALL

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

020' 20'

EXISTING SECTION

1"=20'

1A

FIG 8

020' 20'

EXISTING SECTION

1"=20'

2A

FIG 8

020' 20'

EXISTING SECTION

1"=20'

3A

FIG 8

020' 20'

EXISTING SECTION

1"=20'

4A

FIG 8

020' 20'

PROPOSED SECTION

1"=20'

1B

FIG 9

020' 20'

PROPOSED SECTION

1"=20'

2B

FIG 9

020' 20'

PROPOSED SECTION

1"=20'

3B

FIG 9

020' 20'

PROPOSED SECTION

1"=20'

4B

FIG 9

Page 4: FIGURE 8 NORTH SCHUYLKILL RIVER TRAIL...16 20 11 12 15 25 30 35 45 50 16 20 25 30 40 45 50 44 40 38 25 26 27 30 28 35 15 20 25 30 35 35 35 30 25 24 30 35 35 35 39 35 36 34 35 5/4/2020

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

ELE

VA

TIO

N

ELE

VA

TIO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

ELE

VA

TIO

N

ELE

VA

TIO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

5/4

/2

02

0 3

:5

0 P

M

D:\R

AM

BO

LL

P

RO

JE

CT

S\P

WD

F

LA

TR

OC

K\D

WG

\S

he

ets\6

22

60

-F

46

.d

wg

O'BRIEN & GERE ENGINEERS, INC.

PHILADELPHIA WATER DEPARTMENT

FLAT ROCK DAM - MANAYUNK

SCHUYLKILL CANAL DIVERSION

FACILITY & CANAL INTAKE

CROSS-SECTIONS

FILE NO. 1551.62260-F46

MAY 2020

FIGURE 10B

OHWM 15.4

OHWM 33.4

APPROX. TOP OF HIGHLY

WEATHERED ROCK

ROCK EXCAVATION IN

CANAL INTAKE CHANNEL

EXCAVATE SEDIMENT IN

CANAL INTAKE CHANNEL

DEMOLISH EX. CONCRETE

SPILLWAY / WASTE WEIR

OHWM 15.4

OHWM 33.4

APPROX. TOP OF HIGHLY

WEATHERED ROCK

ROCK EXCAVATION IN

CANAL INTAKE CHANNEL

EXCAVATE SEDIMENT IN

CANAL INTAKE CHANNEL

DEMOLISH EX. CONCRETE

SPILLWAY / WASTE WEIR

OHWM 15.4

OHWM 33.4

APPROX. TOP OF HIGHLY

WEATHERED ROCK

ROCK EXCAVATION IN

CANAL INTAKE CHANNEL

EXCAVATE SEDIMENT IN

CANAL INTAKE CHANNEL

DEMOLISH EX. CONCRETE

SPILLWAY / WASTE WEIR

TRAINING WALL

OHWM 15.4

OHWM 33.4

APPROX. TOP OF HIGHLY

WEATHERED ROCK

ROCK EXCAVATION IN

CANAL INTAKE CHANNEL

EXCAVATE SEDIMENT IN

CANAL INTAKE CHANNEL

DEMOLISH PORTION OF EX.

CANAL INTAKE CHANNEL

WALL

OHWM 15.4

OHWM 33.4CREST 33.5

TEMP. COFFERDAM

RIPRAP SHORELINE

PROTECTION

NEW CONCRETE WASTE

WEIR STRUCTURE

IMPORTED SELECT FILL

FOR BACKFILL

NEW CONCRETE APRON

OHWM 15.4

OHWM 33.4

TOP EL 42.5

TEMP. COFFERDAM

RIPRAP SHORELINE

PROTECTION

NEW CONCRETE SLUICE

STRUCTURE

IMPORTED SELECT FILL

FOR BACKFILL

NEW CONCRETE APRON

DIVERSION FACILITY

BULKHEAD WALL BEYOND

TOP EL 42.5

NEW CONCRETE INTAKE

STRUCTURE

DIVERSION FACILITY

BULKHEAD WALL

INTAKE

STRUCTURE

GRADE

CONTROL

STRUCTURE

OHWM 15.4

TEMP. COFFERDAM

OHWM 33.4

TOP EL 42.5

NEW CONCRETE DIVERSION

FACILITY STRUCTURE

NEW CONCRETE SLUICE

STRUCTURE TRAINING

WALL

OHWM 15.4

TEMP. COFFERDAM

OHWM 33.4

FOUNDATIONS FOR

DIVERSION FACILITY

BULKHEAD

NEW CONCRETE INTAKE

STRUCTURE

NEW CONCRETE CAP

ON CANAL INTAKE

CHANNEL WALL

TOP EL 37.0

CONCRETE PAVEMENT

IMPORTED SELECT FILL

BACKFILL

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

SLUICE

TRAINING

WALL

DIVERSION FACILITY

BULKHEAD WALL

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

020' 20'

EXISTING SECTION

1"=20'

5A

FIG 8

020' 20'

EXISTING SECTION

1"=20'

6A

FIG 8

020' 20'

EXISTING SECTION

1"=20'

7A

FIG 8

020' 20'

EXISTING SECTION

1"=20'

8A

FIG 8

020' 20'

PROPOSED SECTION

1"=20'

5B

FIG 9

020' 20'

PROPOSED SECTION

1"=20'

6B

FIG 9

020' 20'

PROPOSED SECTION

1"=20'

7B

FIG 9

020' 20'

PROPOSED SECTION

1"=20'

8B

FIG 9

Page 5: FIGURE 8 NORTH SCHUYLKILL RIVER TRAIL...16 20 11 12 15 25 30 35 45 50 16 20 25 30 40 45 50 44 40 38 25 26 27 30 28 35 15 20 25 30 35 35 35 30 25 24 30 35 35 35 39 35 36 34 35 5/4/2020

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

EL

EV

AT

IO

N

EL

EV

AT

IO

N

0

10

20

30

40

50

60

0

10

20

30

40

50

60

5/4

/2

02

0 3

:5

0 P

M

D:\R

AM

BO

LL

P

RO

JE

CT

S\P

WD

F

LA

TR

OC

K\D

WG

\S

he

ets\6

22

60

-F

46

.d

wg

O'BRIEN & GERE ENGINEERS, INC.

PHILADELPHIA WATER DEPARTMENT

FLAT ROCK DAM - MANAYUNK

SCHUYLKILL CANAL DIVERSION

FACILITY & CANAL INTAKE

CROSS-SECTIONS

FILE NO. 1551.62260-F46

MAY 2020

FIGURE 10C

APPROX. TOP OF HIGHLY

WEATHERED ROCK

APPROX. TOP OF HIGHLY

WEATHERED ROCK

OHWM 33.4

OHWM 15.4 OHWM 15.4

OHWM 30.3OHWM 30.3 OHWM 30.3OHWM 30.3

OHWM 30.3 OHWM 30.3

EXCAVATE SEDIMENT IN

CANAL INTAKE CHANNEL

APPROX. TOP OF NATIVE

SOILS

DEMOLISH PORTION OF EX.

CANAL INTAKE CHANNEL

WALL

EX. MASONRY CANAL

WALL TO REMAIN

MASONRY PLATFORM TO

REMAIN

EXCAVATE DEBRIS AND

SEDIMENT IN LOCK NO. 68

TO FLOOR OR NATURAL

BOTTOM

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

WATERS OF THE US

(LOCK NO. 68 / MANAYUNK

SCHUYLKILL CANAL)

WATERS OF THE US

(MANAYUNK SCHUYLKILL CANAL)

WATERS OF THE US

(MANAYUNK SCHUYLKILL CANAL)

TEMPORARY COFFERDAM

TOP EL 33.0±

BITUMINOUS PAVED

ACCESS DRIVE

BITUMINOUS PAVED DRIVES

CONCRETE

CHANNEL

IMPORTED SELECT FILL

BACKFILL

NEW CONCRETE CAP

ON CANAL INTAKE

CHANNEL WALL

TOP EL 37.0

020' 20'

EXISTING SECTION

1"=20'

9A

FIG 8

020' 20'

EXISTING SECTION

1"=20'

10A

FIG 8

020' 20'

EXISTING SECTION

1"=20'

11A

FIG 8

020' 20'

PROPOSED SECTION

1"=20'

9B

FIG 9

020' 20'

PROPOSED SECTION

1"=20'

10B

FIG 9

020' 20'

PROPOSED SECTION

1"=20'

11B

FIG 9

WATERS OF THE US

(LOCK NO. 68 / MANAYUNK

SCHUYLKILL CANAL)

WATERS OF THE US

(MANAYUNK SCHUYLKILL CANAL)

WATERS OF THE US

(MANAYUNK SCHUYLKILL CANAL)

WATERS OF THE US

(CANAL INTAKE CHANNEL)

WATERS OF THE US

(SCHUYLKILL RIVER)

WATERS OF THE US

PRELIMINARY JD

WATERS OF THE US

(DELINEATED WETLANDS)

WATERS OF THE US

PRELIMINARY JD

WATERS OF THE US

(DELINEATED WETLANDS)