17
The Study on Integrated Water Management in the Republic of Bulgaria Final Report - Main Report Chapter 2 JICA CTI Engineering International Co., Ltd. 2-180 Figure 2.6.9 Operative and Closed Mines in Bulgaria

Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

The Study on Integrated Water Management in the Republic of Bulgaria

Final Report - Main ReportChapter 2

JICA CTI Engineering International Co., Ltd. 2-180

Figure 2.6.9 Operative and Closed Mines in Bulgaria

Page 2: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

The Study on Integrated Water Management in the Republic of Bulgaria

Final Report - Main ReportChapter 2

JICA CTI Engineering International Co., Ltd. 2-181

Figure 2.6.10 Wastewater Treatment Plants (WWTP) in the Republic of Bulgaria

Page 3: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

Final Report - Main Report Chapter 2

The Study on Integrated Water Managementin the Republic of Bulgaria

2-182 JICA CTI Engineering International Co., Ltd.

DUMMY

Page 4: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

The Study on Integrated Water Management in the Republic of Bulgaria

Final Report - Main ReportChapter 2

JICA CTI Engineering International Co., Ltd. 2-183

2.7

2.8

2.9

Figure 2.9.1 Candidate Areas of Protected Areas for EU-WFD in EABD

Figu

re 2

.9.1

Can

dida

te A

reas

of P

rote

cted

Are

as fo

r E

U-W

FD in

EA

BD

Page 5: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

Final Report - Main Report Chapter 2

The Study on Integrated Water Managementin the Republic of Bulgaria

2-184 JICA CTI Engineering International Co., Ltd.

Figure 2.9.2 Candidate Areas of Protected Areas for EU-WFD in WABD

Page 6: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

The Study on Integrated Water Management in the Republic of Bulgaria

Final Report - Main ReportChapter 2

JICA CTI Engineering International Co., Ltd. 2-185

2.10

Figure 2.10.1 Protected Areas in Bulgaria by the Protected Areas Act

Page 7: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

Final Report - Main Report Chapter 2

The Study on Integrated Water Managementin the Republic of Bulgaria

2-186 JICA CTI Engineering International Co., Ltd.

DUMMY

Page 8: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

The Study on Integrated Water Management in the Republic of Bulgaria

Final Report - Main ReportChapter 2

JICA CTI Engineering International Co., Ltd. 2-187

Figure 2.10.2 Protected Areas in EABD by the Protected Areas Act in Bulgaria

Figu

re 2

.10.

2 P

rote

cted

Are

as in

EA

BD

by

the

Prot

ecte

d A

reas

Act

in B

ulga

ria

Page 9: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

Final Report - Main Report Chapter 2

The Study on Integrated Water Managementin the Republic of Bulgaria

2-188 JICA CTI Engineering International Co., Ltd.

Figure 2.10.3 Protected Areas in WABD by the Protected Areas Act in Bulgaria

Page 10: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

The Study on Integrated Water Management in the Republic of Bulgaria

Final Report - Main ReportChapter 2

JICA CTI Engineering International Co., Ltd. 2-189

2.11

2.12

Figure 2.12.1 Sampling Points for Survey on Water Usage for Domestic Use

Figu

re 2

.12.

1 S

ampl

ing

Poin

ts fo

r Su

rvey

on

Wat

er U

sage

for

Dom

estic

Use

Page 11: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

Final Report - Main Report Chapter 2

The Study on Integrated Water Managementin the Republic of Bulgaria

2-190 JICA CTI Engineering International Co., Ltd.

Figure 2.12.2 Average Floor Area of HHs in Both the River Basins

050

100150200250300350400450500

1 21 41 61Number of Samples (77 Samples)

Floo

r Are

a (m

2 )West Aegean River BasinMinimum Floor Area: 35 m2

Maximum Floor Area: 450 m2

Average Floor Area: 98 m2

0

100

200

300

400

500

600

1 51 101 151 201Number of Samples (215 Samples)

Floo

r Are

a (m

2 )

East Aegean River BasinMinimum Floor Area: 32 m2

Maximum Floor Area:576 m2

Average Floor Area: 98 m2

0

100

200

300

400

500

600

1 51 101 151 201 251Number of Samples (292 Samples)

Floo

r Are

a (m

2 )

Both the BasinsMinimum Floor Area: 32 m2

Maximum Floor Area: 576 m2

Average Floor Area: 98 m2

Page 12: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

The Study on Integrated Water Management in the Republic of Bulgaria

Final Report - Main ReportChapter 2

JICA CTI Engineering International Co., Ltd. 2-191

Figure 2.12.3 Number of Working Persons by Income Category

West Aegean River Basin

0

5

10

15

20

25

30

Num

ber o

f Sam

ples

(76

Sam

ples

in T

otal

)

>500 500 -750

750 -1,000

1,000 -1,250

1,250 -1,500

1,500 -2,000

2,000 -3,000

<3,000

Income Class

HHs of One Working Person

HHs of Two Working Person

HHs of Three Working Person

HHs of Pensioner(s) Only

East Aegean River Basin

0

10

20

30

40

50

60

70

80

90

Num

ber o

f Sam

ples

(215

Sam

ples

in T

otal

)

>500 500 -750

750 -1,000

1,000 -1,250

1,250 -1,500

1,500 -2,000

2,000 -3,000

<3,000

Income Class

HHs of One Working Person

HHs of Two Working Person

HHs of Three Working Person

HHs of Pensioner(s) Only

HHs of One Working Person

HHs of Two Working Person

HHs of Three Working Person

HHs of Pensioner(s) Only

Both the Basins

0

20

40

60

80

100

120

Num

ber o

f Sam

ples

(291

Sam

ples

in T

otal

)

>500 500 -750

750 -1,000

1,000 -1,250

1,250 -1,500

1,500 -2,000

2,000 -3,000

<3,000

Income Class

HHs of One Working Person

HHs of Two Working Person

HHs of Three Working Person

HHs of Pensioner(s) Only

HHs of One Working Person

HHs of Two Working Person

HHs of Three Working Person

HHs of Pensioner(s) Only

Page 13: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

Final Report - Main Report Chapter 2

The Study on Integrated Water Managementin the Republic of Bulgaria

2-192 JICA CTI Engineering International Co., Ltd.

Figure 2.12.4 Status of Monthly Expenditure per HH by Region

Figure 2.12.5 Status of Water Consumption by Public Water Users

West Aegean River Basin East Aegean River Basin Both the Basins

A. Expenditure for Food and Drink

0

200

400

600

800

1,000

0 20 40 60Number of Samples (75 Samples)

Expe

nditu

re fo

r Foo

d(L

ev/H

H)

Minimum: 60.00 Lev/HHMaximum: 1,000.00 Lev/HHAverage: 283.60 Lev/HH

0

200

400

600

800

1,000

0 50 100 150 200Number of Samples (218 Samples)

Minimum: 80.00 Lev/HHMaximum: 700.00 Lev/HHAverage: 271.22 Lev/HH

0

200

400

600

800

1,000

0 50 100 150 200 250Number of Samples (293 Samples)

Minimum: 60.00 Lev/HHMaximum: 1,000.00 Lev/HHAverage: 274.39 Lev/HH

B. Expenditure for Fuel

0

100

200

300

400

0 20 40 60Number of Samples (75 Samples)

Expe

nditu

re fo

r Fue

l (L

ev/H

H)

Minimum: 10.00 Lev/HHMaximum: 250.00 Lev/HHAverage: 62.36 Lev/HH

0

100

200

300

400

0 50 100 150 200Number of Samples (220 Samples)

Minimum: 7.00 Lev/HHMaximum: 360.00 Lev/HHAverage: 62.83 Lev/HH

0

100

200

300

400

0 50 100 150 200 250Number of Samples (295 Samples)

Minimum: 7.00 Lev/HHMaximum: 360.00 Lev/HHAverage: 62.77 Lev/HH

C. Expenditure for Water

0.0020.0040.0060.0080.00

100.00120.00140.00160.00

0 20 40 60Number of Samples (77 Samples)

Expe

nditu

re fo

r Wat

er (L

ev/H

H)

Minimum: 5.00 Lev/HHMaximum: 80.00 Lev/HHAverage: 17.07 Lev/HH

0.0020.0040.0060.0080.00

100.00120.00140.00160.00

0 50 100 150 200Number of Samples (216 Samples)

Minimum: 3.00 Lev/HHMaximum: 150.00 Lev/HHAverage: 17.56 Lev/HH

0.0020.0040.0060.0080.00

100.00120.00140.00160.00

0 50 100 150 200 250Number of Samples (293 Samples)

Minimum: 3.00 Lev/HHMaximum: 150.00 Lev/HHAverage: 17.47 Lev/HH

West Aegean River Basin East Aegean River Basin Both the Basins

A. Summer Season

0

20

40

60

80

100

0 20 40 60Number of Samples (74 Samples)

Wat

er V

olum

e C

onsu

med

(m3/

HH

per

mon

th) Minimum: 5.00 m3/HH.month

Maximum: 50.00 m3/HH.monthAverage: 17.55 m3/HH.month

0

20

40

60

80

100

0 50 100 150Number of Samples (190 Samples)

Minimum: 3.00 m3/HH.monthMaximum: 200.00 m3/HH.monthAverage: 18.77 m3/HH.month

0

20

40

60

80

100

0 50 100 150 200 250Number of Samples (264 Samples)

Minimum: 3.00 m3/HH.monthMaximum: 200.00 m3/HH.monthAverage: 18.43 m3/HH.month

B. Winter Season

0102030405060

0 20 40 60Number of Samples (74 Samples)

Wat

er V

olum

e C

onsu

med

(m3/

HH

per

mon

th) Minimum: 2.00 m3/HH.month

Maximum: 30.00 m3/HH.monthAverage: 12.45 m3/HH.month

0102030405060

0 50 100 150Number of Samples (189 Samples)

Minimum: 2.00 m3/HH.monthMaximum: 60.00 m3/HH.monthAverage: 13.25 m3/HH.month

0102030405060

0 50 100 150 200 250Number of Samples (263 Samples)

Minimum: 2.00 m3/HH.monthMaximum: 60.00 m3/HH.monthAverage: 13.02 m3/HH.month

Page 14: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

The Study on Integrated Water Management in the Republic of Bulgaria

Final Report - Main ReportChapter 2

JICA CTI Engineering International Co., Ltd. 2-193

Figure 2.12.6 Average Expenditures for Water Supplied by Public Water Supply System Together with Their Range by Basins and Seasons

West Aegean River Basin East Aegean River Basin Both the Basins

A. Summer Season

0

10

20

30

40

50

60

0 20 40 60Number of Samples (77 Samples)

Wat

er C

harg

e (L

ev/H

H p

er m

onth

)

Minimum: 5.00 Lev/HH.monthMaximum: 30.00 Lev/HH.monthAverage: 15.99 Lev/HH.month

0

10

20

30

40

50

60

0 50 100 150 200Number of Samples (215 Samples)

Minimum: 3.00 Lev/HH.monthMaximum:200.00 Lev/HH.monthAverage: 19.13 Lev/HH.month

0

10

20

30

40

50

60

0 50 100 150 200 250Number of Samples (292 Samples)

Minimum: 3.00 Lev/HH.monthMaximum:200.00 Lev/HH.monthAverage: 18.30 Lev/HH.month

B. Winter Season

0

10

20

30

40

50

60

0 20 40 60Number of Samples (77 Samples)

Wat

er C

harg

e (L

ev/H

H p

er m

onth

)

Minimum: 2.50 Lev/HH.monthMaximum: 25.00 Lev/HH.monthAverage: 11.19 Lev/HH.month

0

10

20

30

40

50

60

0 50 100 150 200Number of Samples (215 Samples)

Minimum: 2.00 Lev/HH.monthMaximum: 60.00 Lev/HH.monthAverage: 13.92 Lev/HH.month

0

10

20

30

40

50

60

0 50 100 150 200 250Number of Samples (292 Samples)

Minimum: 2.00 Lev/HH.monthMaximum: 60.00 Lev/HH.monthAverage: 13.20 Lev/HH.month

Page 15: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

Final Report - Main Report Chapter 2

The Study on Integrated Water Managementin the Republic of Bulgaria

2-194 JICA CTI Engineering International Co., Ltd.

Figure 2.12.7 Relationship between Expenditure for Bottled Mineral Water and Income Class

y = 0.25956 Ln(x) + 0.10248

0%10%20%30%40%50%60%70%

1 2 3 4 5 6 7 8 9

Income Classification (Lev/HH per month)

Shar

e R

ate

(%)

Pensioner(s) Only

>500 500 - 750

750 - 1,000

1,000 - 1,250

1,250 - 1,500

1,500 - 2,000

2,000 - 3,000

<3,000Class

West Aegean River Basin

y = 0.12906 Ln(x) + 0.21175

0%

10%

20%

30%

40%

50%

60%

70%

1 2 3 4 5 6 7 8 9

Income Classification (Lev/HH per month)

Shar

e R

ate

(%)

Pensioner(s) Only

>500 500 - 750

750 - 1,000

1,000 - 1,250

1,250 - 1,500

1,500 - 2,000

2,000 - 3,000

<3,000Class

East Aegean River Basin

y = 0.17630 Ln(x) + 0.16387

0%

10%

20%

30%

40%

50%

60%

70%

1 2 3 4 5 6 7 8 9

Income Classification (Lev/HH per month)

Shar

e R

ate

(%)

Both the Basins

ClassPensioner(s)

Only>500 500 -

750750 - 1,000

1,000 - 1,250

1,250 - 1,500

1,500 - 2,000

2,000 - 3,000

<3,000

Page 16: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

The Study on Integrated Water Management in the Republic of Bulgaria

Final Report - Main ReportChapter 2

JICA CTI Engineering International Co., Ltd. 2-195

Figure 2.12.8 Additional Willingness of People to Pay for Water

West Aegean River Basin East Aegean River Basin Both the Basins

0

5

10

15

20

25

30

0 10 20 30 40 50Number of Answers (53 Samples)

Add

ition

al A

mou

nt o

f Will

ingn

ess t

o Pa

y (L

ev/H

H p

er m

onth

)

Minimum: 0.00 Lev/HH.monthMaximum: 30.00 Lev/HH.monthAverage: 2.72 Lev/HH.month

0

5

10

15

20

25

30

0 50 100 150Number of Answers (179 Samples)

Minimum: 0.00 Lev/HH.monthMaximum: 20.00 Lev/HH.monthAverage: 2.02 Lev/HH.month

0

5

10

15

20

25

30

0 50 100 150 200Number of Answers (232 Samples)

Minimum: 0.00 Lev/HH.monthMaximum: 30.00 Lev/HH.monthAverage: 2.18 Lev/HH.month

Page 17: Figure 2.6.9 Operative and Closed Mines in Bulgariaopen_jicareport.jica.go.jp/pdf/11878667_09.pdf · The Study on Integrated Water Management in the Republic of Bulgaria Final Report

Final Report - Main Report Chapter 2

The Study on Integrated Water Managementin the Republic of Bulgaria

2-196 JICA CTI Engineering International Co., Ltd.