CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern VIC 3144 PO Box 61 Malvern 3144 Tel: (03) 9524 8888 Fax: (03) 9524 8899 www.beveridgewilliams.com.au

FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

 

 

 

 

 

 

 

 

 

 

 

 

 

CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN 

  Service Feasibility Report 

  April 2013 

 

 

 

 

Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern VIC  3144 

PO Box 61 Malvern 3144 

 Tel: (03) 9524 8888 Fax: (03) 9524 8899 

www.beveridgewilliams.com.au 

 

Page 2: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

 

DOCUMENT CONTROL DATA 

Beveridge Williams 

Melbourne Office 

1 Glenferrie Road 

Malvern VIC  3144 

PO Box 61 

Malvern VIC 3144 

Tel: (03) 9524 8888 

Fax: (03) 9524 8899 

www.beveridgewilliams.com.au 

Title  Servicing  Feasibility  Report  –  Casey Fields South Precinct Structure Plan 

Author  Jake Talbot  

Checked   

Project Manager 

Mark Walker 

Synopsis  Report  into  the  serviceability of  the proposed  Precinct  Structure  Plan  at Casey Fields South. 

Reference:   1201026 

Client:    Newland Developers 

Revision Table 

Ver  Description  Date  Authorised 

A  Service Feasibility Report  12.11.2012  M. Walker 

B  Added reference to Neil Craigie report  16.04.2013  M. Walker 

       

       

       

       

       

Distribution Table 

Date  Version  Distribution 

12.11.2012  A  Steven Jennings, Newland Developers  

16.04.2013  B  Steven Jennings, Newland Developers 

     

     

     

     

     

Copyright Notice 

© Copyright – Beveridge Williams & Co P/L 

Users of this document are reminded that it is subject to copyright. This document should not be reproduced, except in full and with the permission of Beveridge Williams & Co Pty Ltd.

Page 3: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

 

Beveridge Williams                       1 

CONTENTS 

1  EXECUTIVE SUMMARY ......................................................................................... 2 

1.1  FINDINGS .................................................................................................................. 2 

2  INTRODUCTION ................................................................................................... 3 

2.1  INTRODUCTION ........................................................................................................ 3 

2.2  SITE LOCATION ......................................................................................................... 3 

2.3  ASSUMPTIONS AND LIMITATIONS ............................................................................ 4 

3  SERVICES ............................................................................................................. 6 

3.1  INVESTIGATION ........................................................................................................ 6 

3.2  ROAD ........................................................................................................................ 6 

3.3  SEWER ....................................................................................................................... 6 

3.4  ELECTRICITY .............................................................................................................. 7 

3.5  GAS ........................................................................................................................... 7 

3.6  TELECOMMUNICATIONS (FIBRE OPTIC) ................................................................... 7 

3.7  WATER ...................................................................................................................... 8 

3.8  RECYCLED WATER ..................................................................................................... 8 

3.9  STORMWATER DRAINAGE ........................................................................................ 8 

4  CONCLUSION ..................................................................................................... 10 

 

APPENDICES 

APPENDIX A.  ROAD NETWORK LAYOUT 

APPENDIX B.  INDICATIVE SEWER OUTFALL LAYOUT 

APPENDIX C.  SOUTH EAST WATER LAND SERVICING ADVICE 

APPENDIX D.  SP AUSNET ASSET MAP 

APPENDIX E.  MELBOURNE WATER CATCHMENT PLAN 

APPENDIX F.  COLLISON ROAD DSS FEASIBILITY REPORT 

APPENDIX G.  URBAN GROWTH BOUNDARY FEASIBILITY REPORT 

 

Page 4: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

 

Beveridge Williams                       2 

1 EXECUTIVE SUMMARY 

This report discusses the availability of services to the proposed Precinct Structure Plan preliminarily known as Casey Fields South PSP. 

1.1 Findings 

 

Road  Available 

It  is  anticipated  that  Ballarto  Road  will  be  upgraded  to urban  standard  and  an  interim  intersection  of  Ballarto Road  and  Morison  Road  will  be  required.  An  interim roundabout  intersection  will  be  constructed  at  the intersection of Ballarto Road and Clyde‐ Five Ways Road. 

Sewer 

(South East Water) 

Available although limited 

SEW  indicate  that  the  catchment will discharge  to  future treatment  plant  /  pumping  station  approximately  6.7km south of the subject site. There are no immediate plans for construction.  

An alternative option  is the construction of a sewer pump station  and  rising  main  discharging  at  the  proposed 300mm gravity sewer at Blue Hills Rise.  

Electricity 

(SP Ausnet) Available  SP Ausnet has determined  that  the  current  supply  in  the 

area will be sufficient to support the development.  

Gas 

(Envestra/APA Group) Available 

Envestra/APA Group has advised that gas supply is available to this area. 

Telecommunications 

(NBN) Available  The subject site is within the NBN Co footprint 

Potable Water 

(South East Water) Not Available 

SEW indicate that the site can be served via the 1150mm dia  Melbourne  Water  transfer  pipeline  in  South Gippsland Highway. This will require the construction of a pump relief station and a 600mm outlet main.  

Alternative option is the 450mm dia SEW main located in Ballarto Road.  

Re‐use Water 

(South East Water) Not Available 

The  proposed  development  is  within  the  mandated recycled  area.  An  allowance  should  be  made  for  the construction  of  a  recycled  water  reticulated  system within the development. 

Main Drainage 

(Melbourne Water) 

Available although limited 

Part  of  the  subject  site  located  within  active  Melbourne Water Collison Road Developer Services Scheme (DSS) 

Remainder  of  the  site  identified  as  forming  part  of  future DSS’s in conjunction with future PSP’s.  

Page 5: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

 

Beveridge Williams                       3 

2 INTRODUCTION 

2.1 Introduction 

Beveridge Williams has been engaged  to provide preliminary engineering advice with  respect  the provision of the necessary infrastructure required to service the proposed development. 

An aerial photograph of the site is shown in Figure 1.    

2.2 Site Location 

The site consists of six adjoining properties, these are 1345, 1365, 1385, 1405, 1425 Ballarto Road and 355 Clyde‐Five Ways Road, Cranbourne East. The properties are bounded by Ballarto Road  to the  south, Clyde‐Five Ways Road  to  the east and Casey Fields and  the existing  railway  line  to  the North. The site is approximately 50 kilometres south‐east of the Melbourne CBD. 

The site  is  located within an area being developed  from agricultural/rural uses  to medium density residential dwellings. The site  is  located within  the area  identified as Precinct Structure Plan  (PSP) 1057 – Casey Fields South. It should be noted that the PSP boundaries and names are preliminary at this stage and subject to change. The subject area borders the completed and approved Cranbourne East PSP to the north and west while the  land  to the south and east of the subject area has been included in future PSP’s awaiting completion. 

The site is approximately 107.67 ha in size, however in addition to this approximately 9.88 ha of the property at 1425 Ballarto Road has been zoned as conventional and medium density housing under the Cranbourne East PSP. The land identified under the Casey Fields South PSP is currently used for agricultural purposes and encompasses a  small number of  residential dwelling and  farm  sheds as well as a dam covering 2.5 ha.   

The topography of the site would be described as flat to gently rolling with a series of peaks located within the site creating a natural ridge line. The central portion of the site falls towards a low point along Ballarto Road  in the vicinity of the existing dam while the remainder of the site falls towards the site boundaries.  

 

Page 6: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

 

Beveridge Williams                       4 

 

Figure 1 ‐ Site location plan 

There are a number of nearby developments to the north which are mentioned within the following report. 

Villawood Properties Pasadena 

Blue Hills Pasadena 

Blue Hills Rise 

2.3 Assumptions and Limitations 

This project has been scoped and undertaken as a desktop study to provide preliminary advice on the servicing works at the proposed site.  There are limitations to the level of detail provided given the nature of this review.  Desktop studies are reliant upon information made available from service authorities;  with  assumptions  of  the  accuracy  and  completeness  of  the  information  provided.  Further assessment and confirmation of details provided will be necessary during the planning and design stages. 

Page 7: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

 

Beveridge Williams                       5 

There is currently no proposal for development of the site, but it is assumed for the purposes of this report that Casey Fields South PSP will follow the guidelines set out in the Cranbourne East PSP with regards  land  zoning  and  identification of major  infrastructure  required.  The Cranbourne  East PSP describes  the  basic  land  use  for  the majority  of  the  parcels  as  conventional  residential, with  an average of 13 dwellings per developable hectare. 

Page 8: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

 

Beveridge Williams                       6 

3 SERVICES 

3.1 Investigation 

Our  investigation  into the availability of services  included obtaining written and verbal  information relating  to existing  services  in  the area along with  requirements  to  service  the  site.   A number of service authority responses have been received however due to the status of the proposed PSP’s in the area the advice received has been of a preliminary nature. Our servicing advice is based on our knowledge of the region and likely requirements of authorities. 

3.2 Road 

The  upgrade  of  the  existing  road  reserve  along  Ballarto  Road  to  urban  standard  between  South Gippsland  Highway  and  the  Urban  Growth  Boundary  (UGB)  has  been  identified  as  part  of  the Cranbourne East PSP along with a  land provision to enable widening  to a 34m road reserve  in the ultimate scenario.  It  is assumed that as part of the Casey Fields South PSP Ballarto Road would be upgraded to the same standard between the UGB and Clyde‐Five Ways Road. An interim roundabout intersection will be introduced at the intersection of Ballarto Road and Clyde‐Five Ways Road.  

DCP Project no RD03 within  the Cranbourne East PSP proposes a  signalised  intersection between Berwick – Cranbourne Road and Morison Road. Morison Road, classified as a residential connector street,  is  shown  to  continue  south  and  terminate  at  the  UGB.  It  is  assumed  that  this  road will continue  and  provide  the main  north–south  connector  street within  Casey  Fields  South  PSP  and intersect with the proposed upgrade of Ballarto Road. An interim intersection will be required at this location.   

It  is  assumed  that  the  road  upgrade  of  Ballarto  Road  above  along  with  accompanied  interim roundabout  intersection works  and  the  interim  intersection  between  Ballarto  Road  and Morison Road will  be  included within  the  Developer  Contributions  Plan  for  Casey  Fields  South  PSP.  The proposed  future  widening  of  Ballarto  Road  reserve  to  34m  is  not  included  as  part  of  this development but is expected to be part of the ultimate scenario.  

Refer to Appendix A for the indicative road network layout. 

3.3 Sewer 

South  East Water  (SEW)  is  the  responsible  authority  for  sewer  services  in  the  area.  SEW  have responded  to  the  request  for  land servicing advice and  indicated  that  they  foresee  the catchment discharging into a future treatment plant or pumping station preliminarily located at the intersection of Manks Road and Yallambee Road (Option 1) to the south of the proposed development site. This proposal would be dependant on the construction of approximately 6.7km of external gravity sewer along with the construction of either a wastewater treatment works or a pumping station and this could be dependent on the completion of a number of surrounding PSP’s to warrant development of this scale.  

An alternative sewer outfall option has been  identified  in  the event that Casey Fields South PSP  is developed and completed prior to any of the surrounding PSP’s. This alternative option (Option 2) is outlined below.  

Page 9: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

 

Beveridge Williams                       7 

A 300mm diameter sewer currently runs along Berwick Cranbourne Rd. A future branch sewer being constructed as part of Blue Hills Rise and Blue Hills Pasadena is to connect to the 300mm diameter sewer  and  bring  the  sewer  to  within  525m  of  the  northern  boundary  of  the  site.  The  natural topography of the proposed site falls towards a low point along the southern boundary of the site in the vicinity of the existing dam. The internal reticulation sewer will be designed to fall towards this location and sewer pumping station will be constructed. Approximately 1450m of sewer rising main will be  constructed  to  connect  the  sewer pumping  station  to  the proposed 300mm gravity  sewer located at Blue Hills Rise.  

Refer to Appendix B  for the  indicative sewer outfall  layout and Appendix C  for South East Water’s land servicing advice.  

3.4 Electricity 

SP  Ausnet  has  determined  that  the  current  supply  in  the  area will  be  sufficient  to  support  the development. The cables along Clyde Five Ways Rd are good conductors and the Developer will have no  problem  supplying  the  estate  from  that  road.  The  cables  along  Ballarto  Rd  are  lighter  and although they can sustain some growth, may need to be upgraded at a later date. 

Under SP Ausnet’s  supply policy guidelines,  the Developer will be  required  to pay  for  the  cost of extending/upgrading  the  power  supply  if  required.  SP  Ausnet  currently  rebate  the  developer contribution for  low voltage (LV) works at a rate of $980 per  lot while the rebate available for high voltage (HV) works correlates directly to the construction costs incurred. There are existing assets on the properties that will need to be removed at the Developers expense.  

To  develop  the  site,  SP  Ausnet  would  require  the  developer  to  provide  a  number  of  electrical substations requiring reserves to accommodate the infrastructure. The cost of the sub stations and internal high voltage works will be reimbursable, within the HV rebate, but the provision of land for sub‐station reserves is not. 

Refer to Appendix D for the associated SP Ausnet asset plan. 

3.5 Gas 

Envestra/APA Group has advised  that gas supply  is available  to  this area but will be subject  to an evaluation  once  a  formal  application  has  been  received.  The  servicing  strategy  for  Envestra/APA Group will be dependent upon where the Development starts. 

Gas mains may be extended by nearby developments, and depending on the timing of development, the gas mains may have to be extended to the site.  

3.6 Telecommunications (Fibre Optic) 

Telecommunications  could  be  provided  by  NBN  Co.  The  site  is  within  the  NBN  Co  servicing footprint, and the number of lots within the development exceeds the minimum number for which NBN Co. will service.  

Alternatively, the developer may wish to supply telecommunications via another provider. That is a feasible option for the developer, which will require a commercial decision to be made at the time of development.  

Page 10: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

 

Beveridge Williams                       8 

3.7 Water 

South East Water is the responsible authority for water assets in the area and they have responded to  the  land  servicing  advice  request  to  indicate  that  water  supply  could  be  provided  from  an 1150mm diameter Melbourne Water transfer pipeline  located within South Gippsland Highway. A pressure reducing station and 600mm outlet main will need to be constructed by South East Water; details of this will not be available until the Casey Fields South PSP for the area  is completed. We would expect that any proposed shared assets, including the pressure reducing station, involved in the supply of water  to the site would be reimbursable but this would be dependent on Essential Services Commission (ESC) policy at the time.     

An alternative option is available to serve the proposed site. From the South East Water Asset Web Map a 450mm diameter water main  is  located along the  length of the southern boundary of the site along Ballarto Road and would provide  reasonably  straightforward water  supply  to  the  site. This option would require further discussion with SEW to ensure that the proposed demand could be met using this asset.  

Refer to Appendix C for South East Water’s land servicing advice.  

3.8 Recycled Water 

South  East  Water  has  not  provided  servicing  advice  for  recycled  water  but  the  proposed development is within the mandated recycled area. Consequently an allowance should be made for the construction of a recycled water reticulated system within the development. 

Prior  to  recycled water  being  available,  recycled water mains  are  to  be  'charged' with  potable water. Water restrictions in place for potable water will also apply to recycled water until such time recycled water is provided. 

Refer to Appendix C for South East Water’s land servicing advice. 

3.9 Stormwater Drainage 

Melbourne Water  is the catchment management authority for the subject site and the properties within  the  site  transverse  several  active  and  proposed Melbourne Water Development  Services Schemes, including: 

Active o Collison Road DSS (10.75 ha)  

 

Proposed (within the Urban Growth Boundary area) o Western Outfall Drain (29.08 ha)  o Moores Road Catchment (59.47 ha) o Wylies Drain Catchment (8.37 ha) 

 

Refer to Appendix E for the Melbourne Water layout indicating the different catchments within the site.   

Melbourne Water has undertaken two feasibility reports for the subject area; refer to Appendix F for the Collison Road DSS  (active) Feasibility Report and refer  to Appendix G  for the other Urban Growth Boundary areas Feasibility Report. 

Page 11: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

 

Beveridge Williams                       9 

The  active  Collison  Road  DSS  has  strategies  to  service  the  catchments  within  the  site  and infrastructure  is to be built as development requires. The proposed schemes are created  to align with the development of precinct structure plans.  

Neil Craigie has prepared a stormwater management strategy for PSP 1057 which provides detail on how the PSP is to address stormwater management. 

Page 12: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

 

Beveridge Williams                       10 

4 CONCLUSION  

The subject site  is  located within the Urban Growth Boundary as of September 2012 and has been preliminarily  identified as part of the Casey Fields South PSP 1057. Beveridge Williams confirm that the extension of all services can be achieved  through known and proven  techniques and standard agreements  with  service  opportunities  and  recommend  that  the  Casey  Fields  South  PSP  site  is suitable for development as proposed from a servicing perspective.  

    

Page 13: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

Beveridge Williams 11

APPENDIX A. Road Network Layout

Page 14: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

RISE

BLUE HILLS

PASADENA

BLUE HILLS

PASADENA

RAILW

AY LINE

CASEY FIELDS

BALLARTO ROAD

CL

YD

E-FIV

E W

AY

S R

OA

D

12.0

0

12.0

0

El.

El.

Emt.

Emt.

RC

A 5457

VG

G 21

August 19

85 p86

CLYDE RECREATION RESERVE

12.00Trans

missio

nSupplyE

2.0

0

E

2.00

S

E

D

2.0

0

3.00

D

S

E

MUNICIPAL RESERVE

D

E

E

E

E

E

E

E

E

S

D

S

S

S

D

D

S

S

SS

3.00

3.0

0

3.00

3.0

0

2.00

2.0

0

2.00

2.0

0

3.00 DE 2.00 S E

2.0

0S

E3.0

0D

ES

ELECRES

E

S

2.0

0

E

C/

W

CL

CL

S

E

2.0

0

E

3.00D

S

3.0

0

D

S

E

3.00

D

S

E

3.00

D

S

E

3.0

0

D

E

2.0

0

E

S

S

E

E

E

S

S

S

D

E

SD

E

E

ES

SD

D

E

S

2.0

0

ESDES2.00

3.00

3.00

2.00

2.00

2.00

2.0

0

3.0

0

3.00

4.00

3.00DSE

SD

S

3.0

0

S

ES

E

E

ED

E

ES

SD

ESD3.00

3.0

02.0

0

2.00

3.00

2.00

EE

SD

S2.0

03.0

0

E

S2.00

ELECRES

3.00

E

S

3.00

3.00

D

E

S

S

E

E

E

D

S

3.00

D

S

E

3.00

3.00

D

D

S

S

E

E

ED

2.00

D

E

2.0

0S

E

EL

EC

RE

S

MUNICIPAL RESERVE

2.0

0

2.4

0

D

S

E

DE

D

SE

D

S

E

5.00

E

D

SE

DRAINAGE

EASEMENT

ST

ST

RD

4.02

4.0

2

4.0

2

4.0

2

D

D

D

D

E

E

E

E

E

Parish of CranbourneParish of Sherwood

2.0

1

D

E

2.01

E

MUNICIPAL RESERVE

MUNICIPAL RESERVE

2.0

0

PIP

ELIN

E

E

34.0

0

C/

W

RE

SE

RV

E

MU

NICIP

AL

MU

NICIP

AL

MU

NICIP

AL

MU

NICIP

AL

RE

SE

RV

E

RE

SE

RV

ERE

SE

RV

E

MUNICIPAL RESERVE

RES

ELEC

34.0

0C/

WA

Y

E

MUNICIPAL RESERVE

3.00

S

S

E

3.0

0

S

E

E

E

E

E

E

ES

S

S

SD

E

E

E

E

E

S

S

S

D

D

D

D

D

D

2.0

0D

D

3.0

0

2.0

0

2.00

3.0

03.0

0

3.00

2.0

0

2.0

0

2.0

0

2.0

0

DE

E

E

SE

EE

E

EE

SSSS

S

S

D

D

D

D

E

E

E

E

E

E

ES

S

S

S

S

S

SD

2.0

0

D

2.0

0

3.0

0

DD

E

E

S

SD3.00

2.0

0

2.00

3.00

3.0

0

3.00

3.00

3.0

0

3.00

2.0

0

2.00

2.00

2.00

2.0

0

2.0

0

STANDARD ROAD RESERVE TO URBAN

PROPOSED UPGRADE OF 22m

INTERSECTIONPROPOSED INTERIM

INTERSECTIONROUNDABOUT PROPOSED INTERIM

N

NOT FOR CONSTRUCTIONPRELIMINARY PRINT

0 6030 300240180120

App

Project Ref

No unauthorised copying is permitted.

Beveridge Williams & Co. Pty Ltd has granted a licence to the principal to use this document for its intended purpose.

COPYRIGHT All rights reserved. '

ByDateDescriptionRev

Drawing No Rev

AppByDateDescriptionRev

Project

Drawing

Title

Drawn

Designed

Date

Approved

Date Stage No

PS Number

Beveridge Williamsdevelopment & environment consultants

Details - Revised.cel

K:\BW-MS\Sheets\TitleBlock Cell\TitleBlock

Scale

APPDT

10100 P0

APP

ph: 03 9524 8888

1201026

1 Glenferrie Road

Malvern VIC 3144

PS

www.beveridgewilliams.com.au

CITY OF CASEY

SR

BALLARTO RD, CRANBOURNE E/CLYDE

METRICON

1:3500 @ A1C.KIRKCALDY

R.HANNIGAN

07.11.12

ROAD NETWORK LAYOUT

Page 15: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

Beveridge Williams 12

APPENDIX B. Indicative Sewer Outfall Layout

Page 16: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

RISE

BLUE HILLS

PASADENA

BLUE HILLS

PASADENA

RAILW

AY LINE

CASEY FIELDS

BALLARTO ROAD

CL

YD

E-FIV

E W

AY

S R

OA

D

12.0

0

12.0

0

El.

El.

Emt.

Emt.

RC

A 5457

VG

G 21

August 19

85 p86

CLYDE RECREATION RESERVE

12.00Trans

missio

nSupplyE

2.0

0

E

2.00

S

E

D

2.0

0

3.00

D

S

E

MUNICIPAL RESERVE

D

E

E

E

E

E

E

E

E

S

D

S

S

S

D

D

S

S

SS

3.00

3.0

0

3.00

3.0

0

2.00

2.0

0

2.00

2.0

0

3.00 DE 2.00 S E

2.0

0S

E3.0

0D

ES

ELECRES

E

S

2.0

0

E

C/

W

CL

CL

S

E

2.0

0

E

3.00D

S

3.0

0

D

S

E

3.00

D

S

E

3.00

D

S

E

3.0

0

D

E

2.0

0

E

S

S

E

E

E

S

S

S

D

E

SD

E

E

ES

SD

D

E

S

2.0

0

ESDES2.00

3.00

3.00

2.00

2.00

2.00

2.0

0

3.0

0

3.00

4.00

3.00DSE

SD

S

3.0

0

S

ES

E

E

ED

E

ES

SD

ESD3.00

3.0

02.0

0

2.00

3.00

2.00

EE

SD

S2.0

03.0

0

E

S2.00

ELECRES

3.00

E

S

3.00

3.00

D

E

S

S

E

E

E

D

S

3.00

D

S

E

3.00

3.00

D

D

S

S

E

E

ED

2.00

D

E

2.0

0S

E

EL

EC

RE

S

MUNICIPAL RESERVE

2.0

0

2.4

0

D

S

E

DE

D

SE

D

S

E

5.00

E

D

SE

DRAINAGE

EASEMENT

ST

ST

RD

4.02

4.0

2

4.0

2

4.0

2

D

D

D

D

E

E

E

E

E

Parish of CranbourneParish of Sherwood

2.0

1

D

E

2.01

E

MUNICIPAL RESERVE

MUNICIPAL RESERVE

2.0

0

PIP

ELIN

E

E

34.0

0

C/

W

RE

SE

RV

E

MU

NICIP

AL

MU

NICIP

AL

MU

NICIP

AL

MU

NICIP

AL

RE

SE

RV

E

RE

SE

RV

ERE

SE

RV

E

MUNICIPAL RESERVE

RES

ELEC

34.0

0C/

WA

Y

E

MUNICIPAL RESERVE

3.00

S

S

E

3.0

0

S

E

E

E

E

E

E

ES

S

S

SD

E

E

E

E

E

S

S

S

D

D

D

D

D

D

2.0

0D

D

3.0

0

2.0

0

2.00

3.0

03.0

0

3.00

2.0

0

2.0

0

2.0

0

2.0

0

DE

E

E

SE

EE

E

EE

SSSS

S

S

D

D

D

D

E

E

E

E

E

E

ES

S

S

S

S

S

SD

2.0

0

D

2.0

0

3.0

0

DD

E

E

S

SD3.00

2.0

0

2.00

3.00

3.0

0

3.00

3.00

3.0

0

3.00

2.0

0

2.00

2.00

2.00

2.0

0

2.0

0

RISE DEVELOPMENTSEWER AT BLUE HILLS PROPOSED 300ł GRAVITY CONNECTION TO

PUMPING STATIONPROPOSED SEWER

SEWER OPTION 1

(OPTION 2)PROPOSED RISING MAIN

NOT FOR CONSTRUCTIONPRELIMINARY PRINT

N0 6030 300240180120

App

Project Ref

No unauthorised copying is permitted.

Beveridge Williams & Co. Pty Ltd has granted a licence to the principal to use this document for its intended purpose.

COPYRIGHT All rights reserved. '

ByDateDescriptionRev

Drawing No Rev

AppByDateDescriptionRev

Project

Drawing

Title

Drawn

Designed

Date

Approved

Date Stage No

PS Number

Beveridge Williamsdevelopment & environment consultants

Details - Revised.cel

K:\BW-MS\Sheets\TitleBlock Cell\TitleBlock

Scale

APPDT

10200 P0

APP

ph: 03 9524 8888

1201026

1 Glenferrie Road

Malvern VIC 3144

PS

www.beveridgewilliams.com.au

CITY OF CASEY

SR

BALLARTO RD, CRANBOURNE E/CLYDE

METRICON

1:3500 @ A1C.KIRKCALDY

R.HANNIGAN

07.11.12

SEWER PLAN

VALLEY WATER SERVICING ADVICEFOR FULL SEWER ALIGNMENT SEE YARRA

Page 17: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

Beveridge Williams 13

APPENDIX C. South East Water Land Servicing Advice

Page 18: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

South East Water Corporation ABN 89 066 902 547Locked Bag 1, Moorabbin, Vic 3189Fax (03) 9552 3001Internet www.southeastwater.com.au/ice

DV_FEASIBILITY

01 NOVEMBER 2012

Mr M WalkerEngineering General ManagerBEVERIDGE WILLIAMS & COPO BOX 61MALVERN VIC 3144Email: [email protected]

Dear Mr Walker,

LAND SERVICING ADVICERe: 355 Clyde Fiveways Road, ClydeOur Reference: Case Number 19500138 File 08PD9798

I refer to your email dated 04 October 2012 requesting for Land Servicing Advice for the provision ofSouth East Water’s potable water, recycled water and sewerage facilities to the above property. We areable to provide you with the following general servicing advice for the proposed development based onthe information provided.

The GAA (Growth Area Authority) has recently indicated that there is no growth anticipated for thisprecinct in the short term and that the PSP (Precinct Structure Plan) for this area is not likely to bedeveloped further surrounding PSPs are completed.

South East Water has not completed or obtained formal approval for the strategy for servicing the area,however, please find below South East Water’s preliminary strategy to be adopted for discussionpurposes only.

Preliminary investigations indicate that the supply for potable water for the proposed developmentcould be sourced from Melbourne Water’s 1150mm diameter transfer pipeline located within SouthGippsland Highway subject to an agreement reached with Melbourne Water. A Pressure ReducingStation and 600mm outlet main will be required to be installed at the off take.

The proposed development is likely to be within the mandated recycled water area, therefore anallowance should be made for the construction of a reticulated recycled water system (third pipe).

In regards to sewerage, the proposed development is divided into two catchments as shown on theattached ‘Sewer Plan’.

Catchment ‘A’Catchment ‘A’ is to discharge into the proposed Bimberry Circuit Pumping Station within PasdenaClyde Estate.

Catchment ‘B’Catchment ‘B’ is to discharge into the future Treatment Plant or Pumping Station as shown on theattached ‘Sewer Plan’.

Page 19: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

South East Water Corporation ABN 89 066 902 547Locked Bag 1, Moorabbin, Vic 3189Fax (03) 9552 3001Internet www.southeastwater.com.au/ice

DV_FEASIBILITY

This land servicing advice has been prepared based on the information available at the time, howeverwe reserve the right to vary this advice in the future as circumstances change without furthernotification.

If you require further information, please contact Patrick Soong on 9552 3738.

Yours sincerely

Giuliano GavaMANAGER LAND DEVELOPMENT

Page 20: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern
Page 21: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

Beveridge Williams 14

APPENDIX D. SP Ausnet Asset Map

Page 22: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

K

K

K

K

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

ED

ED

ED

ED

BA

AR

RC

ED

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

ED

OPEN

2 40s

a

240A

l24

0Al

240Al

4-6/1/.118

3-6/.186

4-6 /

1 /.1

1 8

3 -6 /

1 /. 1

4 4

3-7/4.75

3-6/1/.144

3-6/1/.118

2-6/1/.118

2-6/1/.118

2 -7 /

4 .7 5

2 -7 /

4 .7 5

3-6/1/.118

4TW

3-7/4.75+SW

4-19/3

.25

3-7/4.75+SW

4-6/.186+SW

3-7/.080

4 -6 /

.18 6

4-19/3.

25

4-6/.186+SW

3-6/.186

3-6/1/.118

4-19/3.25

4-6/.186+SW

4-6/.186+SW

4-19/3.25

3-6/1/.118

3-6/1/.118

240sa

240s

a

240sa

185sa

1 85 s

a

240sa

1 85 s

a

185sa

2 40 s

a

240sa

240 sa

1 85 s

a

240sa

240sa

2 40 s

a

240sa

240sa

240sa

2 40 s

a

240sa

240s

a

240sa

2 40s

a

2 40 s

a

2 40s

a

240sa

240sa

2 40 s

a

2 40s

a

2 40 s

a

240Al

16C

u

35C

u

1-6/1/.144

1 -6 /

1 /. 1

1 8

1-7/3.75

1-6/1/.118

1 -7 /

3 .7 5

1-7/

3.75

1-7/3.75

1-7/3.75

1-6/1/.144

1-6/1/.093

185Al

3-3/2.75

185Al

3-7/.064

3-19

/3. 2

5

3-19/3.25

35Al

35Al

35Al

2-3/

2 .75

3-6/

4.75

3-6/4.75

3-3/

2 .7 5

3-6/4.75

3- 3/2.75

3-6/4.75

3-3/2.

75

3-3/2.75

3-3/

2.75

3-7/4.75

3-3/2.75

3-6/4.75

3-7/4.75

3-6/4.75

3-19

/3. 2

5

3-19

/3. 2

5

3-7/

2.75

3 -1 9

/3. 2

5

3-6/4.75

3-7/

.064

3-3/12

185A

l

185Al

185A

l18

5Al

185Al

35 Al

35Al

35Al

185Al

V E8 /

8 12 7

V E5 /

742 8

3 76 6

/1

VE5/74318422/1

VE5/74283767/1

VE5/74360920/1

VE5/

7 428

376 8

/ 1

VE5/74295666/1

V E8/

103 4

6 /1

VE5/74318422/1

VE5/74283766/1

VE5 /

7 42 8

3 768

/1

VE5/74283768/1

V E5 /

7 43 1

8422

/1

VE5 /

7 42 9

5 666

/1

VE5/74295666/1

VE5/74302862/1

VE5/

7430

2862

/1

V E5/

7430

2 86 2

/ 1

VE5/74057626/2

VE5 /740 5762 6/1

VE5/74057626/2

VE5/74228844/3

VE5 /

7 42 2

8 844

/3

V E5 /

7 422

884 4

/ 3

V E5/

7 431

750 7

/ 1

VE5/74317507/1

VE5/74228844/3

VE5 /

7 431

7 50 7

/1

VE5/74317507/1

VE5 /

18/2 3

10

V E5 /

1 8/ 32

1 6

VE8/

12/3

425/

S4

VE8/

3 75 6

VE8/12/3425/S5

VE5/18/2061

VE5/18/903 VE8/12/3425/S1

VE5/18/1267

VE5/18/3376

VE8/

12/3

4 25/S

3

V E5/

18/1

935

V E5 /

7 421

413 6

VE8/1166 0

VE8/11660

VE8/12/1307/S1

VE8/12/1307/S2

VE5/18/499

VE5/18 /315

VE8/3425

VE5/18/904

VE8/12/1307/S3

VE5/74302862/1

VE5/74343460/1

VE8/12/4189/S1

VE5/74343460/1

V E5 /

1 8/7

27

V E7/ B

F D/3

100 5

VE8/

BFD/

3100

5

VE5 /

1 8/2

100

V E5 /

18/1

268

VE8/3641

VE8/12/3641/S1

VE5/74107610

VE8/74000718

VE5/18/1879

VE8 /3

6 41

VE8/3641

VE8/74000718

VE5/18/1878

VE7/8131

VE5/18/549

VE5/18/3854

VE8/3425

VE8/3262

VE7/8131

VE8/8132

V E5 /

7 428

072 3

/ 1

VE5/18/3853

VE5/18/968

VE8/8131

VE5/18/333

VE8 /

7 40 3

8 91 6

V E8/

7 403

891 6

VE5/74128698

VE8/3425

V E8/

1034

6 /1

V E8 /

8 132

VE5/18/3375

VE8/10876

VE5/18/3692

VE5/18/2393

VE5/18/1431

V E5/

1 8/81

5

VE5/

18/7

0

VE8/8132

V/74

0 18 3

4 4

V E5 /

1 8/3

5 22

8592

8681

8591

8535

8634

8633

5757

862

5 757

872

5757874

5757873

5757877

5765

481

5765

483

5765

48457

6548

6

8309

523761

5764

790

5757

860 57

5786

3

5757

859

5757858

5757857

8310

8311

20828

575 7

856

576 4

737

20827

20826

20825

5765

487

5765

485

5765491

5765482

5757876

5765490

576 5

489

5765

4 88

5757

875

5757852

5757854

5764736

5757

855

5764

738

5764

739

57654925757853

5 765

494

5765493

5764

7 40

5764741

5765

495

5764742 5764

743

5764

750

5764748

5764749

576 4

744

5764

7 55

5 764

756

5764757

5764758

5764751

5764752

5764753

5763906

5763909

5763

907

5763

9 11

5763910

5763912

5764203

5 763

9 13

5763

898

5764204

5763908

5 763

8 99

5763900

5764211

5764

210

5764

2 09

576 4

214

5764212

5764213

5764205

5764206

5764

208

5764

215

5764207

19126

19128

19127

19129

19135

19134

19133

19132

19112

19111

19131

19138

1914019139

19141

19113

19124

1914

5

19144

19146

19142

19143

19136

19103 19104

19105

19107

19108

19106

19110

19109

519130

5764

754

5775

388

5775

389

5775

390

5775

391

5775392

2083

1

2082

9

2083

0

577539520824

5775

393

5775

394

20823

20822

2082120961

20820

20819

21006

20960

unset

20818

21009

21008

595959

21005

21045

21046

2104721007

unset

2100221148

21058

21016

21017

21015

21014

21013

21012

21011

21004

21003

21018

21019

21020

210275782

747

2102

8

229 5

0

2 102

9

21079

2107021

147

2107221071

unset

unset

2107

3

21074

21076

21077

2107

5

21149

21078

21272

20817

20816

191 5

1

1915

2

20815

20933

1914

8

1915

0

1914

9

19181

19182

1914

7

21043

21044

21042

21041

21040

21039

21038

2102

2

21049

21048

2102

1

21037

21010

21069

21024

21036

210682106721066

2105

7

2102

3

21065

2106

42106

3

21026

21025

1918320932

20931

20930

STOCKS

PATTERSONS 3

BULLER

GRAMPIAN

CASEY4

BERWICK CRANB

CASEY2

BERWICK CRANB

CASEY3

BERWICK CRANB

BOLCH

BALLARTO

BRIGGS

BALLARTO 2

BA

L LA

RTO

RIC

HA

RD

S

BA

LLA

RT

O

P19

CL

YDE

BALLARTO

LAMATTINA

BA

LLA

RT

O

NE

LSO

N

MAGIAS BALLARTO

LAM

ATT

INA

2 C

LYD

E

LA

MA

TTI

NA

1 C

LYD

E

CLYDE 5 WAYS TWYFORD

CRADLE

WINHAM

TWYF

ORD P

5

SCHREU

RS

CLYDE

P4 OROYA

SCHREURS

2 TWYFORD

SCHREURS

1 TWYFORD

OROYA

RAILWAY

TWYFORD

YALLAM

BEE

BA

LL

AR

TO

RI D

GE

WA

Y

YALLAMBEE

BALLARTO 1

BA

LL A

RT

O

CL Y

DE

VALETTA RAILW

AY

OIRSCHOT

BALLARTO

CLYDE

BEECHERS 2

848819

BW235

57579

82

5765

688

BW

136

5 75 7

8 68

BW095

5765496

5765497

5764745

5764747

5 76 4

7 46

5764763

5764762

5764216

576 4

217

BW410

BW

483

BW35

4

BW315

BW

3 17

BW098

BW1045

BW

7 34

BW098B

CLYDE RECREATION RESERVE

ELECRES

RESEL

MUNICIPAL RESERVE

MU

NIC

I PA

LR

ES

ER

VE

MU

NIC

IPA

LR

ES

ER

VE

RE

SE

RV

E

MU

NIC

I PA

L

MUNICIPAL RESERVE

MUNICIPAL RESERVE

MUNICIPAL RESERVE

MUNICIPAL RESERVE

ELE

CR

ES

MUNICIPAL RESERVE

CL

CL

CL

SCENIC CA

NY

ON

PA

SA

DE

NA

CC

T

GREEN GULLY

AV

RD

AV

RD

BU

LLE

R

WAY

AVBULLER

ST

CR

AV

TEVIOT

PE

LIO

N

RD

GREEN GULLYRD

KO

SC

IUS

KO

RD

ST

BV

D

GRAMPIAN

PA

SA

DE

NA

PY

RE

NE

ES

TRICKETT

RD

DR

PYRENEES

OSSA

HI L

L FA

RM

MO

RIS

ON

DR

ELMSLIE

DR

HOLT

MC

EW

AN

LA

CA

SE

Y F

I EL D

S

ST

ST

NE

LSO

N

RD

BALLARTO

CLY

DE

-

FI V

EW

AY

S

TWYFORD

RD

RAILWAY

RD

GV

RD

RD

RD

RD

YALLAMBEE

ST

VA

LETT

A

OROYA

RID

GW

AY

CLY

DE

-

FIV

EW

AY

SE

2.00

S

2.0 0

2.0 0

2.0 0

2 .40

E

2.0

0

S

E

ES

DE

3 .00

S

S

E

2 .0 0

E

ES2.00

E

C/W

4.00SE

3.0 0

DE

S2

.00

ES

D3.00

2.00S

E

2.00

ES

E

E

E

D

SD

E D3 .

00

SE

S2.00

2. 0

0

2.0

0

3.00

D

3.00

SE 2.00E

S

E

D

SD

3.00

3.0

0E

S

DS

E

E 3.00

ES

D3.

0 0E

EE S2.00

S2

.00

SD3.00ESD3.00

S2

.00

3.00 D

2.00

E

D

2.0

0

ES

D

3.003 .00

ES

2.0

0

3.0 0

S

S

E

E

2.00 S

D

S

34.0

0

34.00

E

E

C/W

AY

EP

IPE

L IN

E

D

E

E

D

4 .02

4. 02

D

E

E

4.02

2 .01

E

D

D

4 .0

2

2.0

0

E

2.0

1

E

E

2.0 1

2.01

E

E

2.01

D

D

2.01

Em

t.

El .

12.0 0

El.

Em

t.

12.0

0

E

Supp

ly

Tran

smis

sion

12.0

0

70

4

10

1

68

12

14

9

11

13

15

17

70S

75

85S

77

450

13

22

7

119

2018

1214

16

2

10

4644

50 48

54 52

5856

2

4

6

8

10

10E

1315

1012

11

1816

20

15

6

3

410

410

73

16

1214

119

13

69

71

2

4

6

8

1

3

5

7

10

9

11

1

810

46

35

7

16

19

21

23

1825

27

29

31

33

35

64

2

37

32

8

2422

1917

30

2

2826

2321

4

25

14

16

18

13

15

34

17

19

21

1

6

3

5

7

222420

9

8

10

12

11

13

15

415S

14

1214

10

16

8

5

1311

97

2P

5I

2

1

8

1I

2

4

5S

1P

345I

365I

162

11

7

6

5

4

3

1

164

1385

1385

1370

1365

1370

1360

1360

1405

1405

1410

1430

1450

1450

1425

1425

13051305

1320

X

X

1325

1330

1340

1340

1330

1345

400

400

385

385

30

90

350

355

36

34

X

30

28

150

26

24

22

X

20

18

162A

1

3

810

21

17

12

14

10

8

X

6

X

4

2

1

8

6

42

57

3

10

1513

119

12

1595

1585

2

2

1564

4

1570

4

6

8

X

2

X

X

1490

1470

1470

X

40

14

12

10

8

5

11

6

4

9

14

16

75

12

1921

17

14

23

16

20

18

13

1531

X

18

280

1

3

5

9

30

285

275

1

205

114

20 4

207206

115

11 6

105

10 6

1 07

1 08

1 09

D

1142

E

1143

215

214

218217

R1216

213212

209210

211

219

208

324325

327 326

329 328

331 330

323

322

32 1

32 0

315

319

318332

316317

409410

408

411

427

428

2

1141

1144

11461145

1131 1130

1132

R1

B

1140

1139

1 13 8

113

7

110 1

11 0

21 1

0 3

R1

1 13 6

113 5

1133

1 10 4

110 5

1 106

1126

11471149

11481134

11271128

1129

1 17

3 01

3 02

3 03

R1

304

3 05

30 6

307

3 08

30 9

313312

311

3 10

314

407406

413412

402

403

R1

416

404405

415414

1 125

1 12

41

123

11 0

71

1 08

401

1 10

91 1

1 01 1

11

R1

111

2

417

111

3

418

419

111

41

115

11201122 1121

111

6

420

421

434

111

711

18

111

9

D

435

424423

425

422

432433

426

429

431430

PtC.P

R1

180

181

177

178

1 79

D

RE

S2

2

17

26

1 6

2 7

15

14

4

6

2

5

4

1

2

1

2

28

11

10

29

9

4

1

1

1

1

C.A.2008

Pt C

.P

1

Pt C.A.38

1

1

2

1

5

2

2

C.A.53A

7

8

1

2

C.A.P38

1

12

2

40

41

3837

36

35

13

14

15

16

C.A.P38

17

18

1

20

2

1

39

2223

21

5

2726

2425

6

1

21

3

2

20

19

181

7

1

C.A.2022

C.A

.2023

1

1

3

1

49

4 84

746

1

4 5

1

2

2

32

33

4342

34

3029

28

7

31

8

10

9

Pt C

A 3

8

Pt C.A.38

11

1

2

1213

16

23

2

3

TP939261

PS637234

PS

6 26

415

PS

701

114 PS

626

415

PS62641

5

PS700450

PS701118

PS701118

PS701118

PS700450

PS

7004

50

PS701116

PS

7011

16

PS

701

1 16

PS701116

PS637234

PS637234

PS637234

PS637234

PS637235

PS637235

PS

637

235

PS

637

235

PS637235

PS641259

PS641259

LP

209

371

PS

701

116

PS

7011

16

PS700450

PS700450

PS

701

116

PS

701

116

PS701116

PS

7011

16

PS

701

116

PS701116

PS

6412

75

PS700450

PS

7004

50

PS

700

450

PS

700

450

PS700450

PS700450

PS

637

235

PS

637

235

PS637235

PS

637

235

PS641259

PS641259

PS

7004

50

PS

700

450

PS641259

PS

648

086

PS

641

259

PS701116PS700450

PS

6480

86

PS641259

PS

6445

60P

S64

1259

PS641259

PS641259

PS641259

PS641259

PS644560

PS644560

PS

644

560

PS644560

PS

644

560

PS

644560

PS644560

PS

644

560

PS

6445

60

PS

644

560

PS635283

PS635283

PS

635

283

PS635283

PS

6446

93

PS

6446

93

PS

644

693

PS

635283

PS

648

264

PS644693

PS644693

PS644693

PS644693

PS644693

PS644693

PS

644

693

PS

6446

94

PS644694

PS

644

693

PS

6446

93

PS

644

693

PS

644

693

PS644693

PS

6446

94

PS644694

PS644694

PS

648264

PS

6446

94

PS

6446

94

PS644694

PS644694

PS

644

694

PS

6446

94

PS644694

PS

6446

9 4P

S64

9 47 4

PS644694

PS644694

PS644694

PS

644694

PS

6446

94

PS

644

694

PS644694

PS644694

PS644684

LP

531

66

LP

5186

6

PS618611

PS618611

LP63967

4

LP205490

LP205490

LP134739

LP54058

PS618610

LP66390

PS644560

PS701113

PS701113

PS701113

PS701113

PS701113

TP548555

PS701113

PS701113

PS701113

PS701113

PS701113

PT37

TP

4190

81

LP145584

PS318331

PT53

PS339215

PS318331

PS540430

LP14

2718

PS339215

2

LP81164

TP649

LP20

2374

TP649

LP3632

TP649

TP203603

S-1291

LP5176PS504632

LP3632

LP3632

LP3632

LP96868

TP623500

TP623500

LP36228

PT38

1

LP3632

49

LP3 6

32

L P3 0

2 10

L P3

0 21 0

L P12

52 7

0

LP3632

LP3632

PT38

LP5176

L P82

4 27

LP

121

4 79

CP

1 08

206

LP1 1

8 60 2

10713

13A

10 8

107

A

15

10 8

A

15A

17

64

CC

TR1

18

66

KO

SC

I US

ZK

O

19

68

WAY

20

70

2322

76 74 72

21

2S

G

CC

T

NEBO

8684

82

29

28

88

2625

80

24

7827

KO

SC

IUS

ZK

O

RD

13171

1316

A

X

3

AV

13 1

6 B

F87S

E

GREEN GULLY

1331

83

1332

85 1330

81

SE

D

E

3.00

SE

E 415S

132

9

4

132

8

6

S

5

1318

1 31

9 7

1320 9

R1

1321 11

TEVIOT

1 31

1 13

ST

E

S

131

2 15

D

8 132

7

1326

10

13 2

5

12

132

4

14

132 3

16

18

E

132

2R

ES

1

20E

13 3

4 B

S

X

3 .0 0

E

S2.00

2.0

0S

E

2.00

1333

42

1334APYRENEES

1313 17

ILLA

WA

RR

A

40

381314

D

S

3. 0

0

ED3.00

1301

AV

13 0

7

4

130

8

6

E

130

9 B

S2 .

0 0

X

1 30

2 5

130

3 7

PE

LIO

N321309A

1315

36

S2.00

E

1310

34

1305

1304

30

RD

3

2628

1306

DR

E

16601

602 18

6 03

SE

2 .10

2. 0

0S

22

604

20

HILL FARM

HIL

L FA

RM

32608

30607

28606

2624

605

R1

612

611

2725

613

23610

29

E

AV

6144

3.00

SD

E

3

609

DR

S

D

3.0

0

6 15

6

CR

AD

LE

616

8

617

10

D

E

2.00

E

3. 00

D

3 .00

S

11

13

DRAINAGE

EASEMENT

2

6354

E

634

CC

T

63 6

63 3

632

6

63 78

S

6 38

10

12 6 39

64014

5

6 31 7

630

BI M

BE

RR

Y

9

629BIM

BERRY

641

16

642

182.0

0

E

2.0

0

EE

W/S

S

2.00

4.00

2106

8 211

DR

2 12

10

2 1312

209 5

ED

2 .0

0S

E2.

0 0

208 7

MACPHERSON

217 9

E2 .

00D 218

4

ES

2.0

0

11

214

14

R1

216

16 21 5

23418

LA

BV

D

202

13

201

15

CCT

HO

LTC

CT

22 212

5

206207

3

119

205

7

204203

E

220221

10

219

68

S

3.00D

SD

3.0

0

14

16

SE

E

2.0

0

227

22

22518

226

20

CCT

2826

229

230

228

24

245244

2 23

2 24

MA

CP

HE

RS

ON

337360

338362

364 33 9

CA

SE

Y F

I ELD

S

366 34 0

2523

246

21

S

D3.00

247

19 ES

D3

. 00

E

ES

13

336

2. 0

0

97

11

335

333334

235

20

23 622

23 724

23 8

26

233 13

232 15

2 31

ES

D3 .

0 0

MACPHERSON

243

27

E

17

1924 2

MC

EW

AN

239

21

24 1

240 23

3.00

301

E

30S

D

S E

ES

D2 .

00

3.0

0

2.00

ESD

5

332

3

331

DR

1

330

HEALES

28

30

30232

303

34

36 304

BV

D

38 3 05

40 30 6

42 3 07

308 R144

46 309

27

2.00

329

8

343

6

342

E

341

4

S

ES

3.00D

S2.00

E

29328

31

327

D3 .

00

D3.00

ES

31

326

SCULLIN

325

3B

4

35635

324

57

354355 9

353

358

X

357

68

D

S

2.00

3 23 37 E

S2.

00

2.00

E

39322

S2.00ESD

48 3 10

50 311

312

52

313

54

3.00

56 314

58 315

12

345

10

344

RD

ES

D

368 346

370

347

3 .00

ES

E

S

R1

34 8

34 9

25S

F

ST

CA

SE

Y FIE

LDS

11

352 1513

351350

2.0 0

372

374

ST

14 3 61

16 362

18

10

359

12

360

ES

2.0

0E

SD

3.0

0

E

E

D3.00

1315

365

366

11

367

363

E

SC

ULL

IN

S

17

36419I

RES1

20

37 1

RD

60 3 16

62 3 17

1

321

CORTULA

MC

EW

AN 43319

64 318

35

370

320

9

368

7

369

G

4S

ED

2 .0 0

20

D

3.00

628

CCT

643

644

22 645

24

646

26

647

28

3.00

E

S

S

3.00

ED

E

627

15

D

17

624A

X

625

19

624B

X

D

626

BIMBERRY

648

30

650

649

32

34

36

23

623

622

S

651

652

38R1

653

40

654

42

D

D

27

25

S

E

X

619A

X

33

621

29

620

619B

655

44

656

46

657

48

658

50

618

CCT E

35

665

E

D

ST

S

FRE

NC

HDE

3.000.10

S E

0.10

S

F

415S

CC

T

E

3.00

D

E

659

A

49

S

661

43662

41

660

45

S

47

659B

E

RES2

62E

D

DE

5.00

E

S

EE

37

664663

39

RES1

BIMBERRY

52I

S S

D

E

Parish of Sherwood

Parish of Cranbourne

RC

A 5457

VGG 21 August 1985 p86

RCA 5457

Parish of CranbourneParish of Sherwood

540 m0

5777624 N

3510

10 E

3540

76 E

5779328 N

Melway 134 G10Vic Roads 95 G3ESMAP 766 C11

Carrum 2,500/23.15

H

5

4

3

2

1

BA DC E GF

Directory Reference

04/10/2012

Page 23: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

Beveridge Williams 15

APPENDIX E. Melbourne Water Catchment Plan

Page 24: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

RISE

BLUE HILLS

PASADENA

BLUE HILLS

PASADENA

RAILW

AY LINE

CASEY FIELDS

BALLARTO ROAD

CL

YD

E-FIV

E W

AY

S R

OA

D

12.0

0

12.0

0

El.

El.

Emt.

Emt.

RC

A 5457

VG

G 21

August 19

85 p86

CLYDE RECREATION RESERVE

12.00Trans

missio

nSupplyE

2.0

0

E

2.00

S

E

D

2.0

0

3.00

D

S

E

MUNICIPAL RESERVE

D

E

E

E

E

E

E

E

E

S

D

S

S

S

D

D

S

S

SS

3.00

3.0

0

3.00

3.0

0

2.00

2.0

0

2.00

2.0

0

3.00 DE 2.00 S E

2.0

0S

E3.0

0D

ES

ELECRES

E

S

2.0

0

E

C/

W

CL

CL

S

E

2.0

0

E

3.00D

S

3.0

0

D

S

E

3.00

D

S

E

3.00

D

S

E

3.0

0

D

E

2.0

0

E

S

S

E

E

E

S

S

S

D

E

SD

E

E

ES

SD

D

E

S

2.0

0

ESDES2.00

3.00

3.00

2.00

2.00

2.00

2.0

0

3.0

0

3.00

4.00

3.00DSE

SD

S

3.0

0

S

ES

E

E

ED

E

ES

SD

ESD3.00

3.0

02.0

0

2.00

3.00

2.00

EE

SD

S2.0

03.0

0

E

S2.00

ELECRES

3.00

E

S

3.00

3.00

D

E

S

S

E

E

E

D

S

3.00

D

S

E

3.00

3.00

D

D

S

S

E

E

ED

2.00

D

E

2.0

0S

E

EL

EC

RE

S

MUNICIPAL RESERVE

2.0

0

2.4

0

D

S

E

DE

D

SE

D

S

E

5.00

E

D

SE

DRAINAGE

EASEMENT

ST

ST

RD

4.02

4.0

2

4.0

2

4.0

2

D

D

D

D

E

E

E

E

E

Parish of CranbourneParish of Sherwood

2.0

1

D

E

2.01

E

MUNICIPAL RESERVE

MUNICIPAL RESERVE

2.0

0

PIP

ELIN

E

E

34.0

0

C/

W

RE

SE

RV

E

MU

NICIP

AL

MU

NICIP

AL

MU

NICIP

AL

MU

NICIP

AL

RE

SE

RV

E

RE

SE

RV

ERE

SE

RV

E

MUNICIPAL RESERVE

RES

ELEC

34.0

0C/

WA

Y

E

MUNICIPAL RESERVE

3.00

S

S

E

3.0

0

S

E

E

E

E

E

E

ES

S

S

SD

E

E

E

E

E

S

S

S

D

D

D

D

D

D

2.0

0D

D

3.0

0

2.0

0

2.00

3.0

03.0

0

3.00

2.0

0

2.0

0

2.0

0

2.0

0

DE

E

E

SE

EE

E

EE

SSSS

S

S

D

D

D

D

E

E

E

E

E

E

ES

S

S

S

S

S

SD

2.0

0

D

2.0

0

3.0

0

DD

E

E

S

SD3.00

2.0

0

2.00

3.00

3.0

0

3.00

3.00

3.0

0

3.00

2.0

0

2.00

2.00

2.00

2.0

0

2.0

0

NOT FOR CONSTRUCTIONPRELIMINARY PRINT

N0 6030 300240180120

App

Project Ref

No unauthorised copying is permitted.

Beveridge Williams & Co. Pty Ltd has granted a licence to the principal to use this document for its intended purpose.

COPYRIGHT All rights reserved. '

ByDateDescriptionRev

Drawing No Rev

AppByDateDescriptionRev

Project

Drawing

Title

Drawn

Designed

Date

Approved

Date Stage No

PS Number

Beveridge Williamsdevelopment & environment consultants

Details - Revised.cel

K:\BW-MS\Sheets\TitleBlock Cell\TitleBlock

Scale

APPDT

10300 P0

APP

ph: 03 9524 8888

1201026

1 Glenferrie Road

Malvern VIC 3144

PS

www.beveridgewilliams.com.au

CITY OF CASEY1:3500 @ A1

C.KIRKCALDY

R.HANNIGAN

07.11.12

SR

BALLARTO RD, CRANBOURNE E/CLYDE

METRICON

MELBOURNE WATER CATCHMENT

& DSS PLAN

WESTERN OUTFALL DRAIN DSS

MOORES ROAD CATCHMENT DSS

COLLISON ROAD DSS

WYLIES DRAIN CATCHMENT DSS

Page 25: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

Beveridge Williams 16

APPENDIX F. Collison Road DSS Feasibility Report

Page 26: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

Version 2.7 1 of 4

19 October 2012 Mr Mark Walker Beveridge Williams 1 Glenferrie Road Malvern, VIC, 3144 Dear Mr Mark Walker Property: Proposed Development Sites

355 Clyde-Five Ways Road Clyde, 3978, VIC

Thank you for your email of 4/10/12 requesting Developer Services Scheme information for the above mentioned property. Melbourne Water has the following comments to make regarding the provision of surface water management infrastructure and contributions for this property in the areas shown on the layout as Collison Road DSS. Drainage Agreement: Prior to the issue of a Statement of Compliance, the Owner will need to enter into and comply with an agreement with Melbourne Water Corporation, under the Water Act 1989, for the provision of drainage works and the acceptance of surface and storm water from the subject land directly or indirectly into Melbourne Water’s drainage system. The agreement may include the following components. Drainage Contributions: A drainage agreement usually includes the payment of drainage contributions, where a property is being developed. These contributions are used to recover the cost of constructing drainage works such as main drains, retarding basins, waterway improvements and flood mitigation works that service properties such as your clients. The contributions are based on the increased load on the drainage system created by the development.

Melbourne Water Ref: 214479

Page 27: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

Version 2.7 2 of 4

The property in question is contained within Melbourne Water’s Collison Road Drainage Scheme. Melbourne Water advises that the residential contribution rate is $68,199/Ha, comprising of a hydraulic charge of $64,234/Ha and a stormwater quality charge of $3,965/Ha. The stormwater quality charge can be reduced or removed by on-site treatment works, in-line with Melbourne Water’s ‘Stormwater Quality Offset Policy’, which is discussed under the heading ‘Stormwater Quality’ below. Please note that contribution rates are subject to periodical review and hence the future contribution rate may be higher than the current. For registered users, two months notice of any change in rates, will be provided on Melbourne Water’s Land Development Manual website, http://ldm.melbournewater.com.au/. Contributions payable for this property will be calculated upon receipt of an application for ‘Conditions of Agreement for the Provision of Drainage Facilities’ and a subdivisional plan. Stormwater Quality: The Urban Stormwater Best Practice Environmental Management Guidelines require that runoff from all new developments (including redevelopments) be treated to comply with the following, ‘Best Practice’ standards criteria: Removal of 80% of the suspended solid annual load, 45% of total phosphorus and 45% of total nitrogen annual loads. As of the 1st of September 2005, Melbourne Water will be introducing a ‘Stormwater Quality Offset Strategy’ to consistently and equitably apply stormwater quality standards to all developments greater than 0.4Ha. This strategy allows the following two options for any new development. 1. Compliance with Best Practice objectives through on-site treatment works

will reduce the stormwater quality charge component of the drainage contributions. The works must satisfy Melbourne Water’s standards and must be designed with the software package ‘MUSIC’ (Model for Urban Stormwater Improvement Conceptualisation), or alternatively through the use of the ‘WSUD Engineering Procedures Manual’ available on the Melbourne Water’s website http://wsud.melbournewater.com.au which provides the procedures for the design of various treatment measures.

2. Non- compliance with Best Practice objectives will require the payment of

the stormwater quality component of the drainage contributions. This money will help fund water quality works, elsewhere in the catchment.

For further information on the strategy, please refer to Melbourne Water’s Land Development Manual website. Drainage Scheme Works A drainage agreement usually requires the construction of permanent works in conjunction with the development as outlined by the appropriate drainage scheme. A review of the Collison Road Drainage Scheme has identified that there are permanent Melbourne Water works to be constructed on this property.

Page 28: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

Version 2.7 3 of 4

Such works may require that several surveys be undertaken to determine the most efficient and environmentally friendly design outcomes. These may include, but are not limited to, a ‘Flora & Fauna’ assessment and an ‘Archaeological’ investigation, which would all guide the most appropriate design. Design approval from Melbourne Water and any other relevant authorities may be required prior to commencement of the drainage works. To achieve appropriate outfall for this development, temporary works may be required as part of the drainage agreement. If the development proceeds out of sequence then the developer will need to fund the costs of these temporary works. The developer will need to negotiate these temporary works with the downstream landowners to obtain a free draining solution through their properties. Approval will need to be granted and forwarded to Melbourne Water before construction of the drainage works begins. Please be advised that this information may be refined and/or modified upon any application for a drainage offer/agreement. Overland Flow Paths Melbourne Water expects that upon any application for certification of any subdivision plan associated with the property, due consideration will be given to the alignment of roads and reserves with any adjoining estates, to ensure continuity and provide uninterrupted conveyance of overland flows. These overland flow paths will need to be designed in accordance with the safety criteria outlined in Appendix G of Melbourne Water’s Land Development Manual found on the website http://ldm.melbournewater.com.au/ Before starting works separate application, direct to Melbourne Water, must be made for any new or modified storm water connection to Melbourne Water’s drains or watercourses. Before accepting an application, evidence must be provided demonstrating that Council has considered that it is not feasible to connect to the local drainage system. Water Sensitive Urban Design WSUD is a design process that enables localised collection and treatment of stormwater runoff. Melbourne Water acknowledges the potential for Water Sensitive Urban Design to be incorporated into the development to enable sustainable management of stormwater across the property and to compliment the social and environmental values of the area. Melbourne Water recommends that initiatives such as sediment ponds, bio-filtration systems, grassed swales, grey water re-use, rainwater tanks and porous soils be considered in the design of the complex. Stormwater runoff from paved areas can also be a valuable resource for irrigating trees, grassed areas and landscaped garden beds.

Page 29: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

Version 2.7 4 of 4

Please contact Melbourne Water to discuss how WSUD principles will enhance the proposed development or visit our website at www.melbournewater.com.au Offer Application Prior to any application for an offer of drainage contributions, Melbourne Water requests that you forward a drainage strategy demonstrating that the proposed drainage for the property coincides with the intent of Melbourne Water’s Collison Road Drainage Scheme. The following information should be included within the strategy:

General site information Options for the proposed drainage of the property Consideration for Water Sensitive Urban Design

Melbourne Water look forward to further discussion on the above and advise that this information is only preliminary and forms no contractual agreement between your company and Melbourne Water. Melbourne Water reserves the right to alter any or all of this information at any time. If you have any enquiries, please contact me on telephone number 9679 6762 or via email at [email protected] Yours sincerely

SHANE KELLY DEVELOPER WORKS

Page 30: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

Beveridge Williams 17

APPENDIX G. Urban Growth Boundary Feasibility Report

Page 31: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

1 of 5

19 October 2012 Mr Mark Walker Beveridge Williams 1 Glenferrie Road Malvern, VIC, 3144 Dear Mr Mark Walker Property: Proposed Development Sites

355 Clyde-Five Ways Road Clyde, 3978, VIC

Thank you for your email of 4/10/12 requesting Developer Services Scheme information for the above mentioned property. Melbourne Water has the following comments to make regarding the provision of surface water management infrastructure and contributions for this property in the areas shown on the layout as Moores Road Catchment DSS, Wylies Drain Catchment DSS and Western outfall DSS. Servicing new growth areas Since the announcement of the VC68 Amendment on 29th July 2010, and the extension of Melbourne’s Urban Growth Boundary, Melbourne Water has been working with the Growth Areas Authority to understand their priorities, timeframes and information requirements for preparing Growth Area Framework Plans and subsequent Precinct Structure Plans. Melbourne Water does not yet have servicing advice prepared for the areas comprising the extended UGB. We will be preparing Schemes in conjunction with the GAA Growth Area Framework Planning and Precinct Structure Planning process for these areas, with priorities and timeframes for Scheme preparation being dictated by GAA priorities. In the meantime, we will require the consultants working for clients interested in developing parcels of land in this area ahead of GAA timeframes to prepare Surface Water Management Strategies (SWMS) in consultation with Melbourne Water and the relevant authorities. The SWMS will need to cover all aspects of drainage, flood, waterway and water quality management for the parcel of land in question. Servicing existing growth areas

Melbourne Water Ref: 214479 Applicant Ref: N/A

Page 32: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

2 of 5

All existing growth areas have Melbourne Water Schemes prepared that are being incorporated into Precinct Structure Plans. Servicing advice can readily be provided for these areas. Development Services Agreement Prior to the issue of a Statement of Compliance, the Owner will need to enter into and comply with an agreement with Melbourne Water Corporation, under the Water Act 1989, for the provision of drainage works and the acceptance of surface and storm water from the subject land directly or indirectly into Melbourne Water’s drainage system. The agreement may include the following components. A drainage agreement usually includes the payment of drainage contributions, where a property is being developed. These contributions are used to recover the cost of constructing drainage works such as main drains, retarding basins, waterway improvements and flood mitigation works that service properties such as your clients. The contributions are based on the increased impact on the drainage system created development. Please note that any contribution rates are subject to periodical review and hence the future contribution rates may be higher than the current published rates. Two months notice of any change in rates, will be provided on Melbourne Water’s Land Development Manual website, http://ldm.melbournewater.com.au/. Contributions payable for this property will be calculated upon receipt of an application for ‘Conditions of Agreement for the Provision of Drainage Facilities’ and a subdivisional plan. Development Services Scheme/ Strategy All proposed development must be in line with the future Growth Areas Authority Precent Structure Plan for the area. A development services strategy is likely for the area. The scheme/strategy will be finalised in line with the timing of the PSP and rezoning. Melbourne Water will communicate the scheme/strategy to all the landowners once the scheme has been initiated. Development Services Works The developer may need to negotiate temporary works with the downstream landowners to obtain a free draining solution through their properties. Approval will need to be granted and forwarded to Melbourne Water before construction of the drainage works begins.

Page 33: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

3 of 5

Drainage Options should be presented for the proposed drainage of the development for the 5 (Residential) 10 (Industrial) year & 100 year systems. This includes utilisation of proposed road and drainage, pipelines and existing or constructed waterways. Water Sensitive Urban Design WSUD is a design process that enables localised collection and treatment of stormwater runoff. Melbourne Water acknowledges the potential for Water Sensitive Urban Design to be incorporated into the development to enable sustainable management of stormwater across the property and to compliment the social and environmental values of the area. Melbourne Water recommends that initiatives such as sediment ponds, bio-filtration systems, grassed swales, grey water re-use, rainwater tanks and porous soils be considered in the design of the development. Stormwater runoff from paved areas can also be a valuable resource for irrigating trees, grassed areas and landscaped garden beds. Please contact Melbourne Water to discuss how WSUD principles will enhance the proposed development or visit our website at www.melbournewater.com.au Stormwater Quality The Urban Stormwater Best Practice Environmental Management Guidelines require that runoff from all new developments (including redevelopments) be treated to comply with the following, ‘Best Practice’ standards criteria: Removal of 80% of the suspended solid annual load, 45% of total phosphorus and 45% of total nitrogen annual loads. Stormwater Quantity Should we put in anything about the little used 1.5year ARI requirement from the USQBMP guidelines or anything about considerations to minimising the impact of stormwater quantity on receiving waterways through any of the new research on geomorphic flow objectives and flow frequency objectives? Overland Flow Paths Melbourne Water expects that upon any application for certification of any subdivision plan associated with the property, due consideration will be given to the alignment of roads and reserves with any adjoining estates, to ensure continuity

Page 34: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

4 of 5

and provide uninterrupted conveyance of overland flows. These overland flow paths will need to be designed in accordance with the safety criteria outlined in the Melbourne Water’s Land Development Manual found on the website http://ldm.melbournewater.com.au/ Connecting to Melbourne Water Assets Before starting works separate application, direct to Melbourne Water, must be made for any new or modified storm water connection to Melbourne Water’s drains or watercourses. Before accepting an application, evidence must be provided demonstrating that Council has considered that it is not feasible to connect to the local drainage system. Special Conditions Should permanent Melbourne Water works be required on site, prior to submitting a planning permit a flora & fauna or archaeological survey may be required. Melbourne Water may request for more information at the planning permit stage to ensure the development meets all environmental, heritage and drainage requirements. Design approval from Melbourne Water and any other relevant authorities may be required prior to commencement of the drainage works. As part of the planning permit submission Melbourne Water requests that a drainage strategy be submitted demonstrating the proposed drainage for the development. All new lots must achieve appropriate freeboard in relation to local overland flow paths to Council’s satisfaction. All new lots must achieve appropriate freeboard in relation to any local Melbourne Water Assets. No fill is to be placed within an existing floodplain without the prior consent of Melbourne Water. Further information Melbourne Water looks forward to further discussion on the above and advise that this information is only preliminary and forms no contractual agreement between your company and Melbourne Water. Melbourne Water reserves the right to alter any or all of this information at any time.

Page 35: FIELDS PRECINCT STRUCTURE PLAN - VPA · CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN Service Feasibility Report April 2013 Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern

5 of 5

Please be advised that this information may be refined and/or modified upon any application for a Development Services Agreement and/or upon the preparation and completion of a Development Services Scheme/Strategy. If you have any enquiries, please contact me on telephone number 9679 6862 or via email at [email protected] Yours sincerely