Developing, building and operating a 67.5MW heavy fuel power plant, based on a 15-years BOO contract with the local utility Senelec. The plant includes 9 diesel gensets of 7.5MW each complete with all ancillary equipment, 90kV substation, fuel storage and pipeline. This project is developed in partnership with MHI Equipment Europe, who has the overall Construction responsibility along with Operation and Maintenance. This project benefits from a long term financing package by international institutions lead by the International Finance Corporation (World Bank Group) Owner Kounoune Power SA, Senegal (Member of Matelec Group) EPC Contractor MHI Equipment Europe, France (Member of Mitsubishi Heavy Industries Group) EPC Subcontractor MATELEC, Lebanon O&M Contractor MHI Equipment Europe, France Customer Senelec, Senegal Location Kounoune - Senegal Consultant Stucky, Switzerland Type of contract BOO Contract Scope of works Financing 30% Equity - 70% senior A loans (IFC / PROPARCO / ADB / BOAD / CBAO) Engineering and Design Supply Installation Testing and Commissioning Civil works and Services Operation & Maintenance (15 years from taking over) Kounoune 67.5MW Power Plant BOO MATELEC GROUP Head Office Ghorfine - Amchit - P.O.Box: 12 Jbeil - Lebanon Tel: (961) 9 620 920 - Fax: (961) 9 620 934 / 5 E-mail: [email protected] www.matelecgroup.com

Fiche kounoune power V3 - Matelec Group, Home kounoune... · Supplied equipment 7.5MW diesel engines MITSUBISHI HEAVY INDUSTRIES, Japan 9 units KU30B (heavy fuel oil) type Generators

  • Upload
    lamkhue

  • View
    223

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Fiche kounoune power V3 - Matelec Group, Home kounoune... · Supplied equipment 7.5MW diesel engines MITSUBISHI HEAVY INDUSTRIES, Japan 9 units KU30B (heavy fuel oil) type Generators

Developing, building and operating a 67.5MWheavy fuel power plant, based on a 15-yearsBOO contract with the local utility Senelec. Theplant includes 9 diesel gensets of 7.5MW eachcomplete with all ancillary equipment, 90kVsubstation, fuel storage and pipeline. Thisproject is developed in partnership with MHIEquipment Europe, who has the overallConstruction responsibility along withOperation and Maintenance. This projectbenefits from a long term financing package byinternational institutions lead by theInternational Finance Corporation (World BankGroup)

OwnerKounoune Power SA, Senegal(Member of Matelec Group)

EPC ContractorMHI Equipment Europe, France(Member of Mitsubishi Heavy Industries Group)

EPC SubcontractorMATELEC, Lebanon

O&M ContractorMHI Equipment Europe, France

CustomerSenelec, Senegal

LocationKounoune - Senegal

ConsultantStucky, Switzerland

Type of contractBOO Contract

Scope of worksFinancing 30% Equity - 70% senior A loans(IFC / PROPARCO / ADB / BOAD / CBAO)Engineering and DesignSupplyInstallationTesting and CommissioningCivil works and ServicesOperation & Maintenance (15 years from takingover)

Kounoune

67.5MW Power PlantBOO

MATELEC GROUPHead OfficeGhorfine - Amchit - P.O.Box: 12 Jbeil - LebanonTel: (961) 9 620 920 - Fax: (961) 9 620 934 / 5E-mail: [email protected]

Page 2: Fiche kounoune power V3 - Matelec Group, Home kounoune... · Supplied equipment 7.5MW diesel engines MITSUBISHI HEAVY INDUSTRIES, Japan 9 units KU30B (heavy fuel oil) type Generators

Supplied equipment

7.5MW diesel engines

MITSUBISHI HEAVY INDUSTRIES, Japan

9 units KU30B (heavy fuel oil) type

Generators

LEROY SOMER, France

9 units

Fuel treatment System -Oil treatment System

WESTFALIA, France

Steam production system

AALBORG INDUSTRIES, Denmark

Aerorefrigerators

G.E.A., France

Combustion air and exhaust piping

FERBECK & VINCENT, France

60m stacks, 3 units

15/90kV Step-Up Transformer

VATECH STEM spa, Italy

2 units

15/90kV, 50/63/75MVA ONAN/ANAF1/ANAF2

90kV HV Equipments

ABB POWER TECHNOLOGIES AB, Switzerland

Circuit Breakers, CTs, VTs, 7 bays

COELME spa, Italy

Disconnector Switch

MV 15kV Switchgear

AREVA T&D, France

19 units

Metalclad switchgears type PIX with

withdrawable Vaccum circuit breakers, type

MVX (AREVA)

Control & Protection Panels

MATELEC, Lebanon

Based on ABB relays

Numerical Control Command

ABB SUISSE, Switzerland

Total project valueTotal budget, including development costs 67.5 M€

EPC value 55M€

Contract signature28/02/2005

Taking overQ2 - 2007

Involved manpower(in man/hours)Engineering : 26,000

Project management : 6,000

Civil works/Services : 250,000

Erection/Installation : 50,000

Testing and Commissioning : 10,000

Contact nameSaid Jalkh

Kounoune Power SA

Tel : (221) 8209212

162.87

57.9

3

41.3

4

157.24

134.8

140.77

28.7

3. 2

10.1

8 8.0

5

139.45

154.87

22.2

4

148.01

35.3

6

137.26

36.7

9

137.41

32.7

9

154.14

175.6

51

75.5

138.12137.45

247.5

HFO

200 m3

146.05

71.3

8

66.33

30.9

4125.46

42.5

3

48.2

14.37

75.9

9

6.52

50.9

9

15.45

71.97

28.1

4

123.08

21.0

5

54.04

0

75.6

9

50.6

9

7.46

32.5

7

131.42 131.27

36.5

6

31.4

9

27.4

9

114.97

102.97

27.9

4

31.9

3

102.82

114.82

112.51

160.0

11

59.8

90.01

54.9

7

108.34

105.71

7.8

9

100.71

7.7

122.08

21.0

1

115.95

20.7

8

3.9

5

116.57

123.714.2

2

4.7

7

124.05

5.0

4

116.91

125.1

81.8

6

124.26

104.3

4

123.42

126.8

3

~900m

PIPE LINE FUELCONDUITE RACCORDEMENT EAU CENTRALE

CONDUITE D'EAU EXISTANTE

PIPE LINE GAZ

174.2

2

17.5

PISTE LATERITE

0

XB40

Batiment

Administratif

Poste de Garde

CLOTURE EN PLAQUE

BETON PREFABRIQUEE

B3

2 Cuves DO

50m3 Enterrées

(Double enveloppe)

15

Batiment

Centrale Diesel

Y

PIP

E L

INE

FU

EL

Dépotage Huile

B6Atelier Externe

B5

55

CLOTURE GRILLAGEE

ENTRE CENTRALE

ET POSTE

Local

gardiennage

18.755

21

Batiment

Combustible

Zone de dépotage

Local Effluents

Incinérateur

8

Axe

Mas

sif/Mo

teur

Axe

Mas

sif/Mo

teur

Axe

Mas

sif/Mo

teur

Axe

Mas

sif/Mo

teur

Axe

Mas

sif/Mo

teur

Axe

Mas

sif/Mo

teur

Axe

Mas

sif/Mo

teur

Axe

Mas

sif/Mo

teur

Axe

Mas

sif/Mo

teur

Zone

GE10

LOCAL

ATELIER

+3500

1V

1U

2U2V

2W

Bureau

Bureau

Bureau

+4770

1W

1N

LOCAL

CONTROLECOMMANDE

Baie vitrée

5

PO

NT

1T

Dépotage

1N

5FOSSE

SEPTIQUE

4.5 x 2 .5 x 2 .5m

+2800

Tôle larmée

G.E

700 KVA

(Groupe

de

démarrage)

+5070

Echelle

1U

1V

1W

2U2V

2W

FOSSE

SEPTIQUE

4.5 x 2 .5 x 2 .5m

PI S

TE

LE

GE

RE

PI S

TE

LE

GE

RE

TR

OT

TO

IR

BA

TIM

EN

T D

E C

ON

TR

OLE

3.2

3.2

2 Cuves HFO

40 m3

EAU

500m3

HFO

3000 m3

HFO

3000 m3

B1

5

5

Aéroréfrigérants

Grillage de séparation

stockageMur rétention

stockage HFO Local

Incendie

Echappements

Poste 90KV

B2

11

10

9

8

7

6

5

4

3

2

1

A B C D E F G H

CENTRALE ELECTRIQUE 67.5MW

SOCIETE D'ELECTRICITE DU SENEGAL

FORMAT

A1

Size

13

N° FICHIER File N°

-

REV.Rev.

Titre:

Projet:

1/1

FOLIOSSheets

N° MEEF-IG-005

Scale

ECHELLE

1/500

Drawing N°N° PLAN

TITRE DU PLAN N° DE PLAN

I J K L M N O P

Ref. PS KP/04/07All rights reserved, Matelec Group, 2007.

Kounoune

67.5MW Power PlantBOO