Developing, building and operating a 67.5MWheavy fuel power plant, based on a 15-yearsBOO contract with the local utility Senelec. Theplant includes 9 diesel gensets of 7.5MW eachcomplete with all ancillary equipment, 90kVsubstation, fuel storage and pipeline. Thisproject is developed in partnership with MHIEquipment Europe, who has the overallConstruction responsibility along withOperation and Maintenance. This projectbenefits from a long term financing package byinternational institutions lead by theInternational Finance Corporation (World BankGroup)
OwnerKounoune Power SA, Senegal(Member of Matelec Group)
EPC ContractorMHI Equipment Europe, France(Member of Mitsubishi Heavy Industries Group)
EPC SubcontractorMATELEC, Lebanon
O&M ContractorMHI Equipment Europe, France
CustomerSenelec, Senegal
LocationKounoune - Senegal
ConsultantStucky, Switzerland
Type of contractBOO Contract
Scope of worksFinancing 30% Equity - 70% senior A loans(IFC / PROPARCO / ADB / BOAD / CBAO)Engineering and DesignSupplyInstallationTesting and CommissioningCivil works and ServicesOperation & Maintenance (15 years from takingover)
Kounoune
67.5MW Power PlantBOO
MATELEC GROUPHead OfficeGhorfine - Amchit - P.O.Box: 12 Jbeil - LebanonTel: (961) 9 620 920 - Fax: (961) 9 620 934 / 5E-mail: [email protected]
Supplied equipment
7.5MW diesel engines
MITSUBISHI HEAVY INDUSTRIES, Japan
9 units KU30B (heavy fuel oil) type
Generators
LEROY SOMER, France
9 units
Fuel treatment System -Oil treatment System
WESTFALIA, France
Steam production system
AALBORG INDUSTRIES, Denmark
Aerorefrigerators
G.E.A., France
Combustion air and exhaust piping
FERBECK & VINCENT, France
60m stacks, 3 units
15/90kV Step-Up Transformer
VATECH STEM spa, Italy
2 units
15/90kV, 50/63/75MVA ONAN/ANAF1/ANAF2
90kV HV Equipments
ABB POWER TECHNOLOGIES AB, Switzerland
Circuit Breakers, CTs, VTs, 7 bays
COELME spa, Italy
Disconnector Switch
MV 15kV Switchgear
AREVA T&D, France
19 units
Metalclad switchgears type PIX with
withdrawable Vaccum circuit breakers, type
MVX (AREVA)
Control & Protection Panels
MATELEC, Lebanon
Based on ABB relays
Numerical Control Command
ABB SUISSE, Switzerland
Total project valueTotal budget, including development costs 67.5 M€
EPC value 55M€
Contract signature28/02/2005
Taking overQ2 - 2007
Involved manpower(in man/hours)Engineering : 26,000
Project management : 6,000
Civil works/Services : 250,000
Erection/Installation : 50,000
Testing and Commissioning : 10,000
Contact nameSaid Jalkh
Kounoune Power SA
Tel : (221) 8209212
162.87
57.9
3
41.3
4
157.24
134.8
140.77
28.7
3. 2
10.1
8 8.0
5
139.45
154.87
22.2
4
148.01
35.3
6
137.26
36.7
9
137.41
32.7
9
154.14
175.6
51
75.5
138.12137.45
247.5
HFO
200 m3
146.05
71.3
8
66.33
30.9
4125.46
42.5
3
48.2
14.37
75.9
9
6.52
50.9
9
15.45
71.97
28.1
4
123.08
21.0
5
54.04
0
75.6
9
50.6
9
7.46
32.5
7
131.42 131.27
36.5
6
31.4
9
27.4
9
114.97
102.97
27.9
4
31.9
3
102.82
114.82
112.51
160.0
11
59.8
90.01
54.9
7
108.34
105.71
7.8
9
100.71
7.7
122.08
21.0
1
115.95
20.7
8
3.9
5
116.57
123.714.2
2
4.7
7
124.05
5.0
4
116.91
125.1
81.8
6
124.26
104.3
4
123.42
126.8
3
~900m
PIPE LINE FUELCONDUITE RACCORDEMENT EAU CENTRALE
CONDUITE D'EAU EXISTANTE
PIPE LINE GAZ
174.2
2
17.5
PISTE LATERITE
0
XB40
Batiment
Administratif
Poste de Garde
CLOTURE EN PLAQUE
BETON PREFABRIQUEE
B3
2 Cuves DO
50m3 Enterrées
(Double enveloppe)
15
Batiment
Centrale Diesel
Y
PIP
E L
INE
FU
EL
Dépotage Huile
B6Atelier Externe
B5
55
CLOTURE GRILLAGEE
ENTRE CENTRALE
ET POSTE
Local
gardiennage
18.755
21
Batiment
Combustible
Zone de dépotage
Local Effluents
Incinérateur
8
Axe
Mas
sif/Mo
teur
Axe
Mas
sif/Mo
teur
Axe
Mas
sif/Mo
teur
Axe
Mas
sif/Mo
teur
Axe
Mas
sif/Mo
teur
Axe
Mas
sif/Mo
teur
Axe
Mas
sif/Mo
teur
Axe
Mas
sif/Mo
teur
Axe
Mas
sif/Mo
teur
Zone
GE10
LOCAL
ATELIER
+3500
1V
1U
2U2V
2W
Bureau
Bureau
Bureau
+4770
1W
1N
LOCAL
CONTROLECOMMANDE
Baie vitrée
5
PO
NT
1T
Dépotage
1N
5FOSSE
SEPTIQUE
4.5 x 2 .5 x 2 .5m
+2800
Tôle larmée
G.E
700 KVA
(Groupe
de
démarrage)
+5070
Echelle
1U
1V
1W
2U2V
2W
FOSSE
SEPTIQUE
4.5 x 2 .5 x 2 .5m
PI S
TE
LE
GE
RE
PI S
TE
LE
GE
RE
TR
OT
TO
IR
BA
TIM
EN
T D
E C
ON
TR
OLE
3.2
3.2
2 Cuves HFO
40 m3
EAU
500m3
HFO
3000 m3
HFO
3000 m3
B1
5
5
Aéroréfrigérants
Grillage de séparation
stockageMur rétention
stockage HFO Local
Incendie
Echappements
Poste 90KV
B2
11
10
9
8
7
6
5
4
3
2
1
A B C D E F G H
CENTRALE ELECTRIQUE 67.5MW
SOCIETE D'ELECTRICITE DU SENEGAL
FORMAT
A1
Size
13
N° FICHIER File N°
-
REV.Rev.
Titre:
Projet:
1/1
FOLIOSSheets
N° MEEF-IG-005
Scale
ECHELLE
1/500
Drawing N°N° PLAN
TITRE DU PLAN N° DE PLAN
I J K L M N O P
Ref. PS KP/04/07All rights reserved, Matelec Group, 2007.
Kounoune
67.5MW Power PlantBOO