24
Fiber Glass Systems, L.P. Little Rock Wastewater Industrial Wastewater Discharge Permit Application April 8, 2013

Fiber Glass Systems, L.P. Little Rock Wastewater ...€¦ · 8/4/2013  · Prosonic FMU 860. Jerry Givens, Plant Manager. Appendix A Section D.2- Facility Process List . Appendix

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

  • Fiber Glass Systems, L.P. Little Rock Wastewater Industrial

    Wastewater Discharge Permit Application

    April 8, 2013

  • Little Rock Wastewater Industrial Wastewater Discharge Permit Application Prepared for: Fiber Glass Systems, L.P. 2700 West 65th Street Little Rock, AR 72209

    Prepared by: GBMc & Associates 219 Brown Lane Bryant, AR 72022

    April 8, 2013

  • April 10, 2013 i

    CONTENTS

    Little Rock Wastewater Industrial Permit Application Form

    APPENDICES Appendix A – Section D.2 Facility Process List Appendix B – Section D.3 Raw Material List Appendix C – Section D.4 Wastewater Generation Sources Appendix D – Section E.1 MSDS on CD Appendix E – Section E.2 Spill Control Plan Appendix F – Section F.1 Wastewater Treatment System Plans and Diagrams

  • rmechlingTypewritten Text

    rmechlingTypewritten Text

    rmechlingTypewritten TextX

    rmechlingTypewritten TextFiber Glass Systems

    rmechlingTypewritten TextX

    rmechlingTypewritten Text2700 West 65th Street, Little Rock, AR 72209

    rmechlingTypewritten Text501-568-4010

    rmechlingTypewritten Text501-568-3029

    rmechlingTypewritten Text501-258-7273

    rmechlingTypewritten TextJerry Givens

    rmechlingTypewritten TextPlant Manager

    rmechlingTypewritten TextBob Gasper

    rmechlingTypewritten TextHealth, Safety & Environmental Specialist

    rmechlingTypewritten TextJerry Givens

    rmechlingTypewritten TextPlant Manager

    rmechlingTypewritten TextX

  • rmechlingTypewritten TextNOV Fiber Glass Systems, PO Box 968, Sand Springs, OK 74065-0968

    rmechlingTypewritten TextPhone: 918-246-2284

    rmechlingTypewritten Text

    rmechlingTypewritten Text

    rmechlingTypewritten TextFax: 918-245-7566

    rmechlingTypewritten TextContact: Mike Thayer

    rmechlingTypewritten TextHossein Arien, President

    rmechlingTypewritten Text17115 San Pedro Ave

    rmechlingTypewritten TextSan Antonio, TX 78237

    rmechlingTypewritten TextPhone: 210-477-7500

    rmechlingTypewritten TextFax: 210-477-7560

    rmechlingTypewritten Text3089

    rmechlingTypewritten TextX

    rmechlingTypewritten TextX

    rmechlingTypewritten Text

    rmechlingTypewritten TextARR00A694

    rmechlingTypewritten Text0587-AR-10

    rmechlingTypewritten TextX

    rmechlingTypewritten TextN/A

  • rmechlingTypewritten Text307-0905.300

    rmechlingTypewritten Text307-0910.300

    rmechlingTypewritten Text589

    rmechlingTypewritten TextX

    rmechlingTypewritten TextX

    rmechlingTypewritten TextCooling tower evaporation, evaporation from mandrel cooling

    rmechlingTypewritten TextX

    rmechlingTypewritten TextM-F; 7:30 am - 4:30 pm

    rmechlingTypewritten Text6:30 am

    rmechlingTypewritten Text3:30 pm

    rmechlingTypewritten Text35

    rmechlingTypewritten TextProduction/maintenance/cleanup/administrative

    rmechlingTypewritten Text

  • rmechlingTypewritten TextX

    rmechlingTypewritten TextX

    rmechlingTypewritten TextFiberglass reinforced epoxy and vinyl ester resin piping systems (pipe, fittings, and adhesives)

    rmechlingTypewritten TextSee Appendix A

    rmechlingTypewritten TextSee Appendix B

  • rmechlingTypewritten TextSee Appendix C

    rmechlingTypewritten TextX

    rmechlingTypewritten TextX

    rmechlingTypewritten TextX

    rmechlingTypewritten TextSee Appendix D

    rmechlingTypewritten TextX

    rmechlingTypewritten TextSee Appendix E

  • rmechlingTypewritten TextX

    rmechlingTypewritten TextN/A

    rmechlingTypewritten TextOil skimming, solids settling, neutralization, and aeration.

    rmechlingTypewritten TextSee Appendix F for treatment system plans and diagrams.

    rmechlingTypewritten TextX

    rmechlingTypewritten TextN/A

    rmechlingTypewritten TextX

    rmechlingTypewritten TextTwo Pines Landfill - Solids from treatment system - Every 2 years

    rmechlingTypewritten TextFCC Environmental - Oil recycling - as needed

    rmechlingTypewritten TextFiber Glass Systems maintains a SWPPP, SPCC Plan, and other pollution prevention policies/controls

    rmechlingTypewritten Text(i.e, good housekeeping, oil handling procedures, spill clean-up procedures, etc) that controls any

    rmechlingTypewritten Textpotential discharge of pollutants.

  • rmechlingTypewritten TextTo be determined

    rmechlingTypewritten Text27

    rmechlingTypewritten Text*

    rmechlingTypewritten Text*estimate based on existing

    rmechlingTypewritten Textflow data from NPDES Permit

    rmechlingTypewritten TextProsonic FMU 860

  • rmechlingTypewritten TextJerry Givens, Plant Manager

  • Appendix A Section D.2- Facility Process List

  • Appendix B Section D.3 - Raw Materials List

  • Appendix C Section D.4 - Wastewater Generation Sources

  • Appendix D Section E.1 - Material Safety Data Sheets CD

  • Appendix E Section E.2 - Spill Control Plan

  • Appendix F Section F.1 -Wastewater Treatment System Plans

    and Diagrams

    General Cover-No PicturesTITLE PAGE(1)Little Rock WastewaterIndustrial Wastewater DischargePermit ApplicationApril 8, 2013

    ContentsCONTENTS

    Little Rock Wastewater Industrial Permit ApplicationAppendix PagesAppendix AAppendix BAppendix CAppendix DAppendix ESection E.2 - Spill Control Plan Appendix F