Activities:
1) RFQ cold model end flange inserts
2) RFQ cold model couplers
3) FETS support stand rail system
4) Laserwire beam profile measurement tank
1) RFQ cold model end flange inserts
Due for delivery on September 3rd but anticipate a delay of approx. one week.
Activities:
1) RFQ cold model end flange inserts
2) RFQ cold model couplers
3) FETS support stand rail system
4) Laserwire beam profile measurement tank
Activities:
1) RFQ cold model end flange inserts
2) RFQ cold model couplers
3) FETS support stand rail system
4) Laserwire beam profile measurement tank
The FETS support stands in R8
The FETS support stand with rails
Beam
•Floor to centre of beam = 1650mm
•Rail diameter = 50mm
•Rail spacing = 800mm
•Floor to centre of rail = 800mm
The FETS support stands main parameters
The FETS support stands vee blocks
Corner vee block – 4 per stand
Mid vee block – where needed
Due for delivery on September 10th.
Activities:
1) RFQ cold model end flange inserts
2) RFQ cold model couplers
3) FETS support stand rail system
4) Laserwire beam profile measurement tank
Design concept of the laserwire beam profile measurement tank
Layout of four ALIO linear/rotary stages
Beam pipe
Beam
Design concept of the laserwire beam profile measurement tank
Solenoid
Faraday cup
Post acceleration conceptual design