FELLERT ACOUSTICAL PLASTERINSTALLATION GUIDE 5.1
Fellert Acoustical Ceilings ABKyrkängsgatan 6503 38 Borås, SwedenTel: 46 33 4302202
www.fellert.com
© All Rights Reserved Fellert Acoustical Ceilings AB2 09/30/14
INTRODUCTION 3
GENERAL CONDITIONS FOR INSTALLATION Limitations & Guidelines 4 Job Conditions 4 Control Joints 5 Effects Of Lighting 5
MOCK UP CONDITIONS 6
STANDARD FINISHES 7
INSTALLATION TYPES 8 MATERIALS 9
TOOLS & EQUIPMENT 13
CHECKLIST 19
PRINCIPLES OF INSTALLATION OF FELLERT EVEN BETTER PLASTER SYSTEMS (EB1 & EB2) FellertAcousticalBoard&SubstratePreparation 20 A. GWB B.Plasteronly(noFellertAcousticalboard) C.CeilingGrid400mmc/c(16”o.c.)(noGWB) Coverage and Mixing Guide 30 ApplicationofStandardFinishes 31 A.EB1“Basecoat”Plaster B.EB1“Finish”PlasterforSecern(formerlyknownasNatural) C.EB2“Finish”PlasterforSahara(formerlyknownasTroweled) D.EB2“Finish”PlasterforSilk(formerlyknownasUltra) VerticalSurfaces 39 CurvedSurfaces 41 CustomColorsandTechniques 42 KEY INSTALLATION NOTES 43
HEALTH & SAFETY GUIDELINES 44
FINAL APPEARANCE 45
DRY STAINS - ALL FELLERT FINISHES 46
SOLUBLE STAINS - ALL FELLERT FINISHES 47
HOLES, DAMAGES, & WATER DAMAGED AREAS 48
CONSTRUCTION DETAILS 51
TABLEOFCONTENTS
© All Rights Reserved Fellert Acoustical Ceilings AB3 09/30/14
INTRODUCTION
Fellertisaseamlessacousticalplastersystemwithaestheticdesigncapabilities.Themaincomponentsareacousticalboardandacousticalplaster.Boththesecomponentsindividuallycontributetowardssoundabsorption. ThepurposeofthisinstallationguideistoprovidethereaderwiththebasicfundamentalsofhowtoinstallFellert.Theguideconsistsofmainlypictures,descriptions,andnotes.
Thisdocumentservesasaguideandnotaspecificinstructionmanual.Asalmostnoconstructionprojectisidentical,eachFellertinstallationwillhavedifferentcircumstances;however,thebasicprinciplesofinstallingtheproductremainthesame.
AllFellertapplicatorsarerequiredtoattendatrainingclasspriortopurchasingmaterialsandapplyingtheFellertsystem.ApplicatorsarerequiredtoperformqualityinstallationsoftheFellertsystemoneveryproject.
TheFellertspecificationsandpolicydocumentsstatetherequirementofaprojectmockup.Applicatorsneedtoobtainapprovalofaprojectmockuppriortocommencingwiththeinstallation.Theapplicatoris100%responsibleforthequalityoftheprojectinstallation.
Notice: Fellert retains the right to edit, modify, or delete the contents of this document and other related installation information without the consent or approval from any other party. Please contact Fellert to ensure you have the latest installation and/or technical information on the Fellert system.
© All Rights Reserved Fellert Acoustical Ceilings AB4 09/30/14
GENERALCONDITIONSFORINSTALLATION
LIMITATIONS & GUIDELINES
Aswithanyhand-craftedplaster,thefinalappearanceoftheFellertacousticalsystemmayvaryslightlythroughouttheexpanseofthesurfaceareaespeciallyundercriticallightingconditions.Theinstallershouldalwaysfollowlocalbuildingcodesandregulationsandisfullyresponsibleforthequalityoftheinstallation.
JOB CONDITIONS
• Allwindowsandexteriordoorsshallbeinplaceandglazed.Thebuildingshallbewater-tightpriortothestartoftheinstallation.Thisconditionshouldbemaintainedduringandaftertheinstallation.AllGWBsubstratesmustbe“sealedairtight”toalevelonefinish.AllHVAC,electrical,firesprinklerandotherpenetrationsshallbesealedwithtraditionaldrywalltapeoraself-adhesivefire-tapetopreventairmovementbetweentheoccupiedspaceandtheplenum.FordirectattachmenttoceilinggridapplicationsensurethattheHVACsystemintheoccupiedspaceisproperlybalanced.• FixturessuchasMEP,lighting,sprinklers,ventilation,etc.,shouldbeinplacepriortothestartoftheinstallation.• TheFellertacousticalmaterialsareforinterioruseonly.Theinstallationshouldbedonewithintypicaloccupancytemperaturerangesof15–32°C(60–90°F)andatamaximumof70%relativehumidity.• Acousticalboardsshallbeprotectedfromexposuretosunlight.Keeptheboardsinthepackaginguntilreadyforuse.EnsurethatthetherearenodelaysinsprayingthefirstcoatofFellertacousticalplastertotheboards.• Itisnotrecommendedtohavecoldjointsinthefinishplaster.ThefinalapplicationoftheFellertacousticalplasterhastobecompletedinasingleworkstep—donecorner-to-cornerortoabreakstoppingpoint.
© All Rights Reserved Fellert Acoustical Ceilings AB5 09/30/14
GENERALCONDITIONSFORINSTALLATION
CONTROL JOINTS
Fundamentallyspeaking,theelasticnatureoftheFellertplastersystemmeansthatthereisnoengineeringrequirementofcontroljointsexceptwhenabuildingisunderexcessivestructuralstress.Structuralexpansionsjointsareobservedhowever.TherearepracticallimitationsofhowlargeofanexpansetheFellertcontractorcancompleteinasingleworkday.
Thefollowingareguidelines:• Upto232M2(2,500sqft)achievablewithaFellertcontractorundernormalworkingconditions.• Upto465M2(5,000sqft)achievablewithanexperiencedFellertcontractor;however,additionalspraycrewswillberequired.Additionalworkinghoursmayberequired.• Over465M2(5,000sqft)achievablewithanexperiencedFellertcontractor;however,additionalspraycrewswillberequired.Additionalworkinghourswillberequired.Properplanningisrequiredwhenattemptingverylargeexpanses.
EFFECTS OF LIGHTING
Itisadvisabletoconsiderthatthelightingselectedbecomplementarytotheceilingfinish.Themostcriticalfactoristhedirectionofthelightsource.Acriticalhorizontallightthatstrikesanyceilingsurfaceatanacuteangleaccentuatesnormalceilingirregularities,affectingthefinalappearanceofanyfinish.Exteriorlightingfromwindowscanhighlightthenaturalvariationsofhand-craftedplaster.
© All Rights Reserved Fellert Acoustical Ceilings AB6 09/30/14
MOCKUPCONDITIONS
MOCKUP CHECKLIST:Per the Fellert specifications and installation guide a mockup must be approved by the architect or client prior to the commencement of the installation. The mockup can be part of the scope of work. The contractor is fully responsible for ensuring a quality installation of the Fellert system.
□ InstallerhasattendedaFellerttrainingseminarandiscurrentlylistedasanauthorizedinstallerwithFellert.
□ InstallerhascontactedFellertatleastthreeweeksinadvanceifonsitelaborassistanceifneededforthemockup.
□ SamplesoftheFellertfinish,colorandthicknesshavebeenapproved.
□ LocationofFellertmockuphasbeenconfirmedwithgeneralcontractorwhichshouldbeatleast9m2(100sqft)insize.Themockupshallremainintactthroughouttheproject.
Ensurethefollowingsiteconditionshavebeenmetpriortomockupinstallation:□ Allwindowsandexteriordoorsshallbeinplaceandglazed.Thebuildingshallbewatertightpriortothestartoftheinstallation.AllGWBsubstratesmustbe“sealedairtight”toalevelonefinish.AllHVAC,electrical,firesprinklerandotherpenetrationsshallbesealedwithtraditionaldrywalltapeoraself-adhesivefire-tapetopreventairmovementbetweentheoccupiedspaceandtheplenum.FordirectattachmenttoceilinggridapplicationsensurethattheHVACsystemintheoccupiedspaceisproperlybalanced.□ Theinstallationshouldbedonewithintypicaloccupancytemperaturerangesof15–32°C(60–90°F)andatamaximumof70%relativehumidity.□ Allpermanentfixturessuchaslights,diffusers,speakers,etc.aretobeincludedinthemockup.□ Theintendedlightingconditionsforthebuildingaretobeusedorsimulatedinthemockup.□ EnsurethatthebuildingisventilatedtoassistwiththedryingprocessiftheHVACisnotoperational.
□ Delivermaterialstoprojectsiteinoriginal,unopenedpackagesandstoretheminafullyenclosedspacewheretheywillbeprotectedagainstdamagefrommoistureandotherharmfulconditions.Protectmaterialsfromfreezing.
□ Installerhasrecommendedtoolsandequipmentonsite
□ Installerhasaccesstopotablewater.
□ InstallthemockuppertherecommendationslistedintheFellertinstallationguide.
□ Mockupapprovedbyarchitect/client.
AnyadditionalcostsincurredtoFellertasaresultofchangestothemockupscheduleand/orscopeofworkwillbebornebytheinstallingcontractor.TheFellertsystemmustbeinstalledperthespecificationsandmanufacturer’sinstallationguideinordertoqualifyfortheproductwarranty.
© All Rights Reserved Fellert Acoustical Ceilings AB7 09/30/14
STANDARDFINISHES
SILK (Smooth)
Thisfinishresemblesasmoothmonolithichand-craftedfinish.
Two-coatapplication:1xEB1(basecoat)1xEB2(finishcoat)
SAHARA (Fine Textured)
Thisfinishresemblesalightlytexturedmonolithichand-craftedfinish.
Two-coatapplication:1xEB1(basecoat)1xEB2(finishcoat)
SECERN (Textured)
Thisfinishresemblesatexturedmonolithichand-craftedfinish.
Two-coatapplication:1xEB1(basecoat)1xEB1(finishcoat)
© All Rights Reserved Fellert Acoustical Ceilings AB8 09/30/14
INSTALLATIONTYPES
A. New GWB (FullyAdheredSystem)
Thisisthepredominantapplicationmethod.TheFellertAcousticalBoardisadheredtoGWBsubstratethatmustbe“sealedairtight”toalevelonefinish.AllHVAC,electrical,firesprinklerandotherpenetrationsshallbesealedwithtraditionaldrywalltapeoraself-adhesivefiretapetopreventairmovementbetweentheoccupiedspaceandtheplenum.MeshtapeandFellertPrimerareappliedtotheplasticCchannel,GWBrippers,cornerbeads,etc.TheFellertAcousticalBoardisthensprayedwiththeFellertacousticalplaster.
AlternativesubstratestheFellertmaybeappliedtoare:concrete,existingplaster,GFRGsurfaces,andpreviouslypaintedGWB.Thesesubstrateswillneedtobetestedforbondstrength,cleanedandsandedsmooth.TheFellertAcousticalBoardisattachedtothesubstrateswiththeFellertAdhesiveandsecuredwithaminimalamountofFellertSpringWashersifrequired.
B. Ceiling Grid (DirecttoFraming–NoGWB)
TheFellertacousticalplastersystemcanbeinstalledto406mmc/c(16”o.c.)drywallgrid.ThesubstrateisconstructedwithoutalayerofGWB.TheFellertacousticalboardsaremechanicallyattachedtodrywallgridtherebyeliminatingtheneedandcostforalayerofGWB.Thereisanincreaseinsoundabsorptionperformanceinthelowfrequencyrangewiththedirect-togridinstallationmethodwhichiscommonlyreferredtoastheE-400mountand/orairgapbehind.TherearelimitationstowhattypesofsubstratedesignsthatcanbedonewiththeFellertdirect-to-gridmethod.Thefollowingareguidelines:
• FlatshapesareachievablewiththenormalFellertdirect-togridinstallationmethod.Thisincludesangledceilingsandwalls1.82M(6ft)aboveFFL.ThisisthestandardFellertdirect-to-gridapplicationmethodandisexpectedfromalltrainedinstallers.• Barrelvaultedceilingsarepossibleprovidingthedrywallgridis406mmc/c(16”o.c.).However,notethatthisinstallationmethodwillbemoretimeconsumingasmoreFellertSpringWasherswillbeneeded.ConsultwithyourlocalFellertagentpriortospecifyingtheFellertdirect-to-gridsystemonabarrelshapedceiling.• Domesandvaultedceilingsarenotpossiblewiththedirect-to-gridsystem.• NotethattheHVACsystemintheoccupiedspaceistobeproperlybalanced.
C. Plaster only (NoFellertAcousticalBoard)
FellertPrimerisappliedtoadrywallsubstratepreparedtoalevel4standard.TheprimedsurfaceisthensprayedwiththeFellertacousticalplaster.Alternativesubstratessuchasconcrete,existingplasterandpreviouslypaintedGWBwillneedtobepreppedaccordinglyandensuretheyaresoundandfreefromcracking.
© All Rights Reserved Fellert Acoustical Ceilings AB9 09/30/14
MATERIALS
USE ONLY PROPRIETARY MATERIALS AND ACCESSORIES DISTRIBUTED OR RECOMMENDED BY FELLERT.
Plastic C Channel
ThisproductisusedtofinishtheFellertAcousticalBoardandFellertPlastertoanadjacentsurface.Theproductcanbecuttoflexandfitaroundgradualshapesandangles.
TheCchannelisnotdesignedtobeaself-finishedexposededgedetail,e.g.cloudsorexposedreturnangles:soldin3M(10ft)lengths.
Fellert Acoustical Board
The25mm(1”)or39mm(1.5”)122x122cm(4’x4’)FellertAcousticalBoardisthemaincomponentoftheFellertsystemthatabsorbssound.Donotremovefromthepackagingorexposetosunlightuntilreadytoapply.AlwaysapplythefirstlayerofFellertplasterwithin24hoursofinstallingtheacousticalboardprovidinganyapplicationofFellertprimerhasfullydried.Alwaysstoreflat,donotstackonedge.The25mm(1”)sizehas8boardsperboxand39mm(1.5”)sizehas6boardsperbox.
Coverage:1.5M2(16sqft)perpanel
Fellert Spring Washers
OnlytheFellertSpringWashersandthe50mm(2”)FellertZincotecZNscrewsaretobeusedtoanchortheacousticalboardsinthedirect-to-gridapplicationon406mmc/c(16”o.c.)drywallgrid.TheFellertSpringWashers(andotherflatdisc-shapedwashers)arealsousedtotemporarilyholdthefiberglassboardinpositiononcurvedsurfaces.
Coverage:approx.8washersper1M2(10sqft)
© All Rights Reserved Fellert Acoustical Ceilings AB10 09/30/14
Fellert Caparol Adhesive
UsedforbondingtheFellertAcousticalBoardtodrywall,existingplaster,concreteorpreviouslypaintedsurfaces.AdhesiveisappliedonbackoftheFellertAcousticalBoardwith6.35mmx6.35mm(1/4”x1/4”)notchedtrowel.
Coverage:10M2(110sqft)Soldin25kg(55lb)bags
50 mm (2”) self-adhesive mesh tape
TheGrabberGMT200self-adhesivemeshtapeorequivalent,isusedtobridgethejoiningoftheCchannelandanydrywall“rippers”totheFellertAcousticalBoard:soldinsinglerolls.
Useonlywhiteorclearcoloredmeshtape.
Coverage:90linearmeters(300linearfeet)
MATERIALS
Fellert Styrobond Adhesive - North America only
UsedforbondingtheFellertAcousticalBoardtodrywall,existingplaster,concreteorpreviouslypaintedsurfaces.AdhesiveisappliedonbackoftheFellertAcousticalBoardwith6.35mmx6.35mm(1/4”x1/4”)notchedtrowel.
Coverage:7M2(75sqft)Soldin23kg(50lb)bags
© All Rights Reserved Fellert Acoustical Ceilings AB11 09/30/14
Fellert Alcro Primer
Theproductismixedwithone(1)containerofthesandadditive.UsedforprimingthemeshtapejoiningofthewallchanneltrimandFellertAcousticalBoardanddrywallinitsentiretywhendoingnonacousticalboardinstallations.Theprimerisalsousedtocoatplasticbeadsandanydrywallrippers.
Primercoverage:56LM(185lft)fortrimtransitionsor24M2(260sqft)forgeneralapplication
MATERIALS
Fellert Sand Finish Additive
TheFellertPrimerandsandadditivearealwayspurchasedtogether.
Primerwithsandcoverage:101LM(366lft)fortrimtransitionsor16M2(180sqft)forgeneralapplication
Fellert Sand Finish Additive - North America only
Thisproductismixedonsitewithone4Lcontainerofprimer.TheFellertPrimerandsandadditivearealwayspurchasedtogether.
Primerwithsandcoverage:101LM(366lft)fortrimtransitionsor16M2(180sqft)forgeneralapplication
© All Rights Reserved Fellert Acoustical Ceilings AB12 09/30/14
MATERIALS
Fellert Even Better 2 (EB2)
TheFellertEB2plasterismadefromrecycledcottonfibersandperlite.ThisisthefinishcoatfortheSilkandSaharafinishsystems.Itissprayedonapprox.1.5mm(1/16”)wetthickness:Soldin5kg(11pounds)bags.
SilkFinishCoverage:20M2(200sqft)perbagSaharaFinishCoverage:40M2(430sqft)perbag-notethatahigherconsumptionratemayoccurwhendoingmidtodarkcolors.
Calculatedwaste:5%
Fellert Even Better 1 (EB1)
Madefromrecycledcottonfibersandperlite.Useasbasecoatforallthefinishes.UseasthefinishcoatfortheSecernfinish.Theplasterissprayedonapprox.3mm(1/8”)wetthickness:soldin5kg(11pounds)bags.
BasecoatCoverage:10M2(100sqft)perbagSecernFinishCoverage:15-30M2(150-300sqft)perbagCalculatedwaste:5%
PROPRIETARYMATERIALSLISTEDABOVEAREONLYAVAILABLETOORDERVIAFELLERT. USEONLYMATERIALSLISTEDINMANUALINORDERTOCOMPLYWITHWARRANTY.
Sanding Pads
Fullsized(hook&loop)sandingpadsanddiscsthatareusedwiththe#7800orbitalstylevacuumsander.Usedinthesandingoftheacousticalboardandthebasecoat.Soldinfive(5)sandingdiscsperpack.Thepowerpadstheysticktoaresoldindividually.
80grade:sandingtheacousticalboard220grade:sandingthebasecoats
© All Rights Reserved Fellert Acoustical Ceilings AB13 09/30/14
TOOLS&EQUIPMENT
Listed below are typically the tools and equipment you will need to install the Fellert system. USE ONLY TOOLS AND EQUIPMENT AS DISTRIBUTED OR RECOMMENDED BY FELLERT.
Tools for attaching C channel:A. Screw gun B.Straightcuttingsnippers(belowpictureforexamplepurposesonly)
Tools for mixing and applying Fellert Adhesive:C. Bucket D.PaddleE. Drill F.6mm(¼”)notchedtrowelG.Scoop
Tools for cutting Fellert Acoustical Board:H.Knife-IdealforcuttingandtrimmingFellertAcousticalBoard,soldbyFellert.
A B
C D E F
G
© All Rights Reserved Fellert Acoustical Ceilings AB14 09/30/14
TOOLS&EQUIPMENT
Tools for detailed cutting & installation of Fellert Acoustical Board:I.TapemeasureJ.T-squareK.Scissors(notpictured)L.SmallutilityknifeM.Sprayadhesive(mayusedouble-sidedtapewhenapplicable)N.SandingspongeO.PuttyknifeP.JointknifeQ.TapeR.Chalklinereel
I J L M
N O P Q
R
Tools for applying Fellert Primer:S.PaintBrush
S
© All Rights Reserved Fellert Acoustical Ceilings AB15 09/30/14
TOOLS&EQUIPMENT
Fellert Whisk
OnlytheFellertMixingPaddlecanbeusedtomixtheFellertPlaster.Theproductmustbemixed to an even consistency.
DonotleavethepaddleintheFellertPlasterafterinitialmixing,removeandrinseoff.
FellertWhiskissoldbyFellert.
Flat Base Mixing Container
Usewhiteornaturalcoloredplasticmixingcontainerswithaflatbase.
200L(55gal)containerssoldbyFellert.
Graco RTX 1500
TheonlyrecommendedspraymachineforinstallingtheFellertsystemistheGracoRTX1500.Theunitisportableandrelativelysimpletouse.Thisselfcompressingportableelectricunithasa55L(15gal)capacityhopper.TheGracoRTX1500comeswith7.5M(25ft)ofhoselengthandastandardspraygun.
GracoRTX1500issoldbyFellert.
© All Rights Reserved Fellert Acoustical Ceilings AB16 09/30/14
TOOLS&EQUIPMENT
Fellert Trowel
UsedforapplyingtheFellertPlaster.TheFellertTrowelisalsousedininstallingtheFellertAcousticalBoard.Usuallyapplicatorshavetwosetsoftrowels:onefortheboardinstallationandonefortheplasters.
TheFellertTrowelissoldbyFellert.
Flexible Finishing Trowel
This1mmthickplastictrowelisalotmoreflexibleallowingthefinishingtrowelpassestocloseintheplastersurfacewithlesseffortonthefinishingpasses.Thesewillbeextremelyhelpfuloncurvedandradiussurfaces.TheFellertTrowelisstillusedtocloseintheplastersurfaceoncesprayedandtoremovetheexcessplasteronthesurface.
280mmlongx120mmwidex1mmthick
*different colors but same trowel
Flexogrip Trowel
Availablein800mmand1200mm.
UsedforapplyingtheFellertplaster.ItisimperativethatyouonlyusetheFellertFlexogripTroweland/orthestandardFellertTrowelshownbelow.
TheFlexogripTrowelissoldbyFellert
© All Rights Reserved Fellert Acoustical Ceilings AB17 09/30/14
TOOLS&EQUIPMENT
Usedmixingdrillsthatcanoperateataminimumof300rpm.
Suitabledrills:
Makita DA4031DeWalt DWD460KMilwaukee 1676 (Holehawg)Flex R 500 FR Festool MX 1000
Porter Cable 7800 “Orbital” Vacuum Sander - North America Only
UsedforsandingtheFellertAcousticalBoardsubstrateandtheFellertAcousticalPlasterbasecoat.Youmustusethefullsizehookandloopsandingdiscsandpadscompatibleforthe7800modeltoensureconsistentsanding.
SanderandvacuumaresoldbyFellert.
Festool Long-reach sander PLANEX LHS
UsedforsandingtheFellertAcousticalBoardsubstrateandtheFellertAcousticalPlasterbasecoat.Youmustusethefullsizehookandloopsandingdiscsandcompatiblepadstoensure consistent sanding.
SanderandvacuumaresoldbyFellert.
© All Rights Reserved Fellert Acoustical Ceilings AB18 09/30/14
TOOLS&EQUIPMENT
Graco Fine Finish Kit
Consistofanextendernozzle,4outerspraytips(A,B,C,D),andacovercap.TheattachmentsarenecessarytocreateacontrolledfanspraypatternforthefinishcoatsofFellertplaster.Partialcontentofthekitispicturedright.Theextendernozzlekit“FineFinishKit”screwsontothestandardGracospraygun,picturerightbelow.GenerallyyouwillusethefinefinishkitonlywhensprayingtheFellertfinishcoat.
Graco Spray Gun
AttachsprayguntospraymachineforinstallingFellertsystem.Sixstandardsizeorifices(Sizes 3, 4, 6, 8, 10, & 12) areincludedwiththeGracospraygun.
© All Rights Reserved Fellert Acoustical Ceilings AB19 09/30/14
CHECKLIST
Sold Only by Fellert• PlasticCChannel• FellertAcousticalBoard• FellertSpringWashers• FellertBoardAdhesive• FellertAlcroPrimer• FellertEvenBetter1-basecoatforall
andfinishcoatforSecern• FellertEvenBetter2-finishcoatforSahara&Silk• FellertMixingPaddle• FlexogripTrowel• Fellert Trowel• FlexibleFinishingTrowel• Knife
Available to order by Fellert• SandingPads–80&220grit• 6mm(¼”)notchedtrowel• FellertMixingPaddle• PorterCable7800“giraffe”vacuum
sander • MakatiDA4031Drillwith300rpm• 200L(55gal)whiteornaturalplastic
mixing containers • GracoRTX1500Spraymachine• Finefinishspraykit• 50mm(2”)Self-Adhesivemeshtape• 122cm(48”)mesh(forvertical
applicationsbelow3M(10ft))• Powerpad
PRIORTOSTARTINGANYINSTALLATIONVERIFYTHATYOUHAVETHECORRECTMATERIALS,TOOLSANDEQUIPMENTFORYOURPROJECT.
Sundry items• maskingtape• plasticmaskingfilm• floorprotectionifapplicable• rags(usewhitecoloredragsonly)• 400gritsandpaper/sandingsponges• brushesforprimer• dustmasksandrespirators• trashbags• drywallscrewstoattachplasticC
channeltostudwork
Typical tools and equipment• Screw gun• Straightcuttingsnippers• Smallplasticbreakawayutilityknifes• tapemeasure• ChalkLine• straightedge• Measuringbuckets• Fivegallonbuckets
© All Rights Reserved Fellert Acoustical Ceilings AB20 09/30/14
PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation
1. GWB -TheGWBsubstratemustbe“sealedairtight”toalevelonefinish.AllHVAC,electrical,firesprinklerandotherpenetrationsshallbesealedwithtraditionaldrywalltapeoraself-adhesivefiretapetopreventairmovementbetweentheoccupiedspaceandtheplenum.
ScrewtheplasticCchanneltrimintotheperimeterwall400mmc/c(16”o.c.)studdingandnottheceiling.
It’snotrecommendedtousetheCChanneltrimonexposededgedetails.(i.e.soffits)
Usethestraight-edgedsnipperstobendtheplasticCchannelaroundanycurvesandangles.
Fortightercurvesaplasticflexiblearchwaybeadmaybeused.
FortheFellertCaparolAdhesive,mixcontentsofbagwithapproximately5-6litersofwater.Allowtosetfor5minutesandremixpriortouse.
FortheFellertStyrobondAdhesivemixcontentsofbagwithapproximately1.5gallonsofwater.Allowtosetfor5minutesandremixpriortouse.
Youmustremixtheadhesiveafterthesettimeaswithmostcementbasedproducts.
© All Rights Reserved Fellert Acoustical Ceilings AB21 09/30/14
PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation
WhereverpossibleinstalltheFellertacousticalboardssothelongestrunsofjointlinesflowintoandawayfromthestrongestsourceoflight.Thisprocessisdeemeda“bestpractice”onlyandnotanabsoluterule.Itisasimpleandalogicalapproachtohelpminimizeanyshadowingeffectswhichcanbeexacerbatebycriticallighting.
Markastraightlineforyourstartingpointtoensurethatthefirstrunofacousticalboardswillbestraightaspossible.
OnanyboardsthatwillslotintotheplasticCchannelyouneedtobeveltheedgebytrimmingthebackedgeofthefiberglassboardasthiswillenableiteaseintothechannel;keepthesesliversforjointpreparationwork.
EnsurethepresslinesonthebackoftheFellertacousticalboardallflowinthesamedirectionduringtheinstallation.Theselineswillflowperpendiculartothelongrunsofjointlinesasdepicted.
ApplytheFellertAdhesivetothebackoftheboardevenly.Donotleaveanyspotsuncoveredandensureyouapplytheadhesiveallthewaytotheedges.
strongest source of light
© All Rights Reserved Fellert Acoustical Ceilings AB22 09/30/14
PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation
Finishofftheadhesiveapplicationbystraighteningthe6mm(¼”)notchedlines.Thiswillensureanevenlayerofadhesiveonthedrywallceiling.
Ensurenoadhesivegetsontothesidesorthefaceoftheacousticalboard.
SlottheFellertacousticalboardintotheCchannelwithoutexertinganysignificantpressureandusetheFellertTroweltosteadytheboardasyoupositionitcorrectly.
UsetheFellertTroweltoapplyfirmpressuretosecuretheacousticalboardintoplacefor1-2minutesastheadhesivebeginstoset.
WhenapplyingadhesivetotheboardensurenottogetanyFellertAdhesiveonthefaceoftheboard.
Useroundtemporarywashers,asshown,toholdtheboardinplaceuntiladhesivecures.WashersareoftenusedonsitebyapplicatorstotemporaryleveloffanyunevennessinthejoiningoftheFellertAcousticalBoard,especiallyoncurvedsurfaces.
© All Rights Reserved Fellert Acoustical Ceilings AB23 09/30/14
PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation
Asyouprogresswiththeinstallationoftheacousticalboardsyoumayhavetoperiodically“straightentheline”asdepicted.TheFellertAcousticalBoardsaremanufacturedtoatoleranceof3mm(1/8”);therefore,thisstraighteningprocessis normal.
Useastraightedgetoensureacutisstraightaspossible.Thisinsuresagoodboardinstallation.
Applythe50mm(2”)self-adhesivemeshtapetobridgetheplasticCchannel,plastictrims,drywallrippersandboardtransitionstoothersubstrates.
MixtheFellertAlcoPrimerwiththesandadditive.Ensuretocoverallofthechannel,plastictrim,drywallripperorboardtransitionincludingthemeshtapewiththeprimer.ItisrecommendedtobrushapplytheFellertprimerinacontinuousdirection.Removeanysandgrainsfromtheplasterstopflangeofanytrimpieces.
ImportantFellertAlcoPrimerapplicationinstructions:EnsurethattheAlcroprimerdries12hourspriortotheplasterapplication.
ForGWBorlevel4preppedsubstrate:Usea½”naprollertoapplytheAlcroPrimertothelevel4preppedsubstrate.Ensurethe Primercovers100%ofthesurface.
Fortrim/substratetransitions: Usea2”½naprollerora2”longbristlebrush.Whenusingabrushensuretoonlybrushinone directiontopreventthemeshtapefrommovingandbubbling.Covertheentiretrimandmesh tapesurfacetoensuretheplasterwillbondadequatelyandprovideasecuretransition.Always wipethesandadditiveofftheplasterflangetoprovideacleanappearancewhencompleted.
© All Rights Reserved Fellert Acoustical Ceilings AB24 09/30/14
PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation
Removemaskingtapewhencomplete.LeavetheFellertPrimertodryovernight.NeverapplyFellertPlasterandPrimerthesame day.
Fillinwhereyouhaveanygapsbetweentheacousticalboardswithwasteoffcuts.AnygapsbetweentheFellertAcousticalBoardsthatexceed0.8mm(1/32”)shouldbesplicedwithacousticalboard.
Ensurethesplicedmaterialiswedgedverytightlyintoanygapandcutflushinpreparationforsanding.YoucanusethebeveledcutshavingsfromtheboardsthatwereinsertedintotheCchannel.Itiscriticalthattheboardsareinstalledandpreppedcorrectly.
Removethebristleguardfromthevacuumsandersothatthebristlesdonotrestrictanysandingtothesurfacesandpreventsdamagetotheboardandbasecoatlayers.
© All Rights Reserved Fellert Acoustical Ceilings AB25 09/30/14
PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation
Sandtheentiresurfaceoftheacousticalboardinagradualcircularmotiontoensuretheboardjointsaresandedflushand all variances are sanded out, i.e.eliminatingvalleys,“lowpointsorlines”intheboardsubstrate.Use80gritfullsizesandingdiscpads.Thecompletedboardinstallationshouldappeartobeconsistentwithnovariancesinthickness.Ensurethecriticallightingisinplacepriortosandingtoensure any variances are sanded.
AlwaysapplythefirstlayerofFellertplasterwithin24hoursofinstallingtheacousticalboardprovidinganyapplicationofFellertprimerhasfullydried.
© All Rights Reserved Fellert Acoustical Ceilings AB26 09/30/14
PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation
B. Ceiling Grid 400mmc/c(16”o.c.)(noGWB)Thistypeofsystemiscommonlyreferredtoasthedirect-to-gridapplication.YoueliminatetherequirementofaGWBsubstratebyattachingtheacousticalboarddirectlytothe400mmc/c(16”o.c.)drywallgrid.
02/06/14
*General Notes: Not to Scale. This detail should be included in the project mock-up.
Fellert ABKyrkängsgatan 6, 50338 Borås, SwedenPhone: +46 33 430 23 10Fax: +46 33 430 22 19Email: [email protected]: www.fellert.com
5.2 Direct Attachment to Ceiling Grid with Air Gap (No GWB)
5.2
DIR
EC
T AT
TAC
HM
EN
T TO
CE
ILIN
G G
RID
with
Air
Gap
(NO
GW
B)
Drywall ceiling grid (for typical GWB application) @ 400 mm c/c (16” o.c.) (by others)
Fellert Acoustical Board 25 mm (1”) or 39 mm (1.5”)
Fellert Stainless Steel “Spring” Washer 50 mm (2”) Fellert Zincotech ZN screw
Fellert Acoustical Plaster approx. 3 mm (1/8”) thick
Fellert C Channel
GWB (by others)
6 mm (1/4”) Air Gap for proper air flow (insert backer during installation to allow constistent gap)
50 mm (2”) self-adhesive mesh tape
Fellert Primer
Fellert C Channel
Fellert Acoustical Plaster approx. 3 mm (1/8”) thick
A
A
Hanger Wire (by others)
Splay Wire (by others)
© All Rights Reserved Fellert Acoustical Ceilings AB27 09/30/14
PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation
WheninstallingtheFellertsystemdirect-to-grid,itisrecommendedtoleavea6mm(¼”)airgapalongthewallperimeter.Thisisaccomplishedbyinsertinga6mm(¼”)solidspaceralongthewallperimeter.Typically,apieceof6mm(¼”)GWB(orwoodtrim)actingasaspacer,willcreateanconsistentgap.ThenattachtheFellertC-Channeltotheceilingframingagainstthespacer.InstalltheFellertsystemandremovetheGWBspacerwhencomplete.
AnalternativeoptiontotheCChannel,wouldbetouseaselffinishedLtrimaftertheboardisinstalled.ReferenceTrim-Tex3510for25mm(1”)boardor3650for39mm(1.5”)board.
Basic Installation Steps
1.Screwwashertogridsoheadisjustbelowsurface.Alternateboardedgeswhenscrewingintoframingattheboardjointstokeeptensionconsistent(notinthejoint).
2.CutaroundFellertSpringWasher.Donotcuttoodeeporwasherswilllosetension.
3.Pullandtuckboardflushtothesurface.
4.Applyapre-fillofbasecoatwithahandtooltotheFellertSpringWashercutslitsandleavetodry.Spraythebasecoatasnormal.
© All Rights Reserved Fellert Acoustical Ceilings AB28 09/30/14
PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation
16’ x 16 (256sqft)4.9m x 4.9m (24m2)
ceiling grid at 16” o.c.400mm
example of Fellert Spring Washer layout
(washer size enlarged for viewing purposes)
ceiling grid
spring washer
C channel
206 washers used in 256sqft.23.75m2
1 washer every 1.24 sqft avg.0.12m2
Fellert Spring Washer Layout(washersizeenlargedforviewingpurposes)
ceilinggridat400mmc/c(16”o.c.)
256sqft(16’x16’)24M2(4.9Mx4.9M)
206washersusedin24M2(256sqft)
1washerevery0.12M2avg(1.24sqft)
© All Rights Reserved Fellert Acoustical Ceilings AB29 09/30/14
PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation
ApplytheFellertPrimertothedrywallsubstratewithashortnaproller.
C. Plaster onlyNoFellertAcousticalBoard
WhenyouareapplyingtheFellertEvenBetter1directlytoadrywallsubstratetherearefollowingrecommendationstonote:
• Ensurethedrywallsubstrateispreparedtoatleastalevel4standard.• ApplytheFellertPrimer(withsandadditive)withabrushandroller.• Leaveovernighttodrypriortoapplyingthebasecoat.• Spraythenextplasterlayerasnormal.
© All Rights Reserved Fellert Acoustical Ceilings AB30 09/30/14
PRINCIPLESOFINSTALLATIONCoverage Rates & Mixing Guide
Product Size Coverage WaterFellertCaparolAdhesive 25 kg
(55lb)10M2
(110sqft)5-6L
(1.3-1.6gal)FellertNorthAmericaAdhesive(StyrobondII)
23 kg(50lb)
7M2(75sqft)
5.7L(1.5gal)
FellertPrimer(Cchanneledging) 4 L 56 LM(185lft)
N/A
FellertPrimer(directdrywall) 4 L 24 M2 (260sqft)
N/A
FellertEvenBetter1(basecoat)calculated waste: 5%
5 kg 10M2(100sqft)
9gal(34L)
FellertEvenBetter1Finish(Secern)calculated waste: 5%
5 kg 15-30M2(150-300sqft)
9gal(34L)
FellertEvenBetter2Finish(Sahara)calculated waste: 5%
5 kg 40 M2(430sqft)
7gal(26.5L)
FellertEvenBetter2Finish(Silk)calculated waste: 5%
5 kg 20 M2 (200sqft)
8 gal(30.2L)
COVERAGERATESAREAVERAGESANDMAYVARYACCORDINGTOPROJECTCONDITIONS. 1.Put34L(9gal)ofwaterintoalargecleanmixingcontainerforFellertEvenBetter1.Use30.2L(8gal)fortheFellertEvenBetter2.Recommendusingaclearorwhitecoloredplasticcon-tainerformixingtheplaster.Youcanadd1.9L(½gal)ofwaterifdeemednecessaryfordesiredconsistency.
2.Ifacustomcoloredfinishisrequiredaddcolorantvialtothewaterinthemixingcontainer,rinsethecolorantvialcleanandmixwellwiththewater.Fellertrecommendsthatbothcoatsofplasterbetinted.However,insomecasesitispossibletoonlytintthefinishcoatonverylightcolors.YourFellertagentwilladviseyouifthebasecoatshouldbetintedornot.
3.AddFellertPlastertowaterandmixuntildesired(oatmeal)consistency.Donotovermixasthismaycauseexcessiveclumpingofthematerial.Shouldonlytake3-4minutestomixtheplaster.
4.Leaveplastersetfor30minutes;thisistoletthecottonfibersexpandsoyoucanspraythematerialwithoutexcessiveclogging.
5.Remixtheplasterafterthesettimepriortospraying.
6.UsetheFellertWhiskwithmixingdrillspeednotexceeding300rpm.
7.NotethatahigherconsumptionrateofEB2plastermayoccurwhendoingtheSaharafinishinmid to dark colors.
© All Rights Reserved Fellert Acoustical Ceilings AB31 09/30/14
PRINCIPLESOFINSTALLATIONApplication of Standard Finishes
Forthebasecoatapplication,use#10Gracoorifice. Youwillnotusetheextendernozzleandouterspraytipwhensprayingthebasecoat.
SetthematerialflowcontrolontheGracoRTX1500spraymachinetothefollowingsettings:
• The4thdotforthebasecoat.• The3rddotforthefinishes.
Adjusttheairflowvalveasneeded.
A. EB1 “Basecoat” PlasterColoredfinishes:addandmixtintvialtothewaterinthemixingcontainerpriortoaddingandmixingthebaseplaster.Usetintguidelinesoutlinedonpage27.
© All Rights Reserved Fellert Acoustical Ceilings AB32 09/30/14
PRINCIPLESOFINSTALLATIONApplication of Standard Finishes
UsesandpapertoslightlyroundthecornersandsmooththeedgesoftheFellertTrowel.
TheobjectiveistosprayandtrowelthebasecoatontotheFellertAcousticalBoardat3mm(1/8”)wetthicknessasthedrythicknesswillbeapprox.1.5mm(1/16”).
Sprayinasmallcircularmotionapproximately3M2(30sqft)andhaveapplicatorsstarttotroweltheplaster.
Startsmoothingofftheplasterinneartheedges.
PositiontheFellertTrowelatalowangleandfirmbutnotexcessivepressureonthebasecoat.
© All Rights Reserved Fellert Acoustical Ceilings AB33 09/30/14
PRINCIPLESOFINSTALLATIONApplication of Standard Finishes
Itiscriticalyouonlytrowelthebasecoatplasternomorethan3–4timesasdepictedonthepicture.
Themoreyoutrowelthemoreuneventheplastersurfacebecomes.Donotexcessivelytrowelthebasecoatplaster.
Thisisthebasecoatbeinghandtroweled.
Leavetheminortrowellinesorimperfectionsonthesurfaceastheywillbesandedsmoothwhendry.
Allowthebasecoattofullydry.Thiswilltakeanaverageof2-3daysinmildconditions.UsefansinthedryingprocessandensuretheHVACisoperationalortheairintheareaisbeingrecirculated.
© All Rights Reserved Fellert Acoustical Ceilings AB34 09/30/14
PRINCIPLESOFINSTALLATIONApplication of Standard Finishes
Resin Spots: MustbetreatedbycuttingintotheaffectedbasecoatandFellertAcousticalBoardtoremovetheresindeposit.Filltheextractedareawithnewboard,basecoatandsandwhendry.
“Quick Patch” method: SprayasingleFellertAcousticalBoardatthesametimeyouapplythebasecoat.Oncedry,plug-intheextractedareawiththepre-sprayedboard.Lightlysand,fillwithbaseplasterandproceedwiththefinishcoat.
ThisisNOTaresinspot.
AnypotentialresinspottingmatterwillnotbevisibleontheFellertAcousticalBoardsurface.
Pre-fillingofanyjointsorvariancesinthebasecoatisveryimportant.SpotapplyEB1toanyrippers,beads,boardjoints,etc.asneededandletdry.Whendry,sandoutanyridgelinesorsurfaceunevennessfromthebasecoatapplication.Sandtheentiresurfaceofthebasecoatwith220gradesanding discs.
© All Rights Reserved Fellert Acoustical Ceilings AB35 09/30/14
PRINCIPLESOFINSTALLATIONApplication of Standard Finishes
Thematerialflowwouldnormallybesetthe3rdascendingdotontheGracoRTX1500.MixuptheEB1finishcoatinthesamemannerasthebasecoat.
Theobjectiveistospraythefinishdesiredtextureapprox.1.5mm(1/16”).Completetheentiresurfacecorner-to-cornerwiththeEB1finishinoneapplication.Leavetodry1-2days.
FortheEB1finishcoatuse#8orificewiththesecondlargestouterfanspraytip(C)nearright.Youmayneedtoadjustthecomponentstomatchthedesiredtexture.SomeapplicatorsprefernottousethefinefinishkitwhencreatingaNaturalfinish—the golden rule is to match the mock-up.
CompletedSecernfinish-the golden rule is to match the mock-up.
Drythicknessoftheplasterfinishwillbeapprox.3mm(1/8”).
B. EB1 “Finish” Plaster for SecernColoredfinishes:addandmixtintvialtothewaterinthemixingcontainerpriortoaddingandmixingthefinishplaster.Usetintguidlinesoutlinedonpage28.Useplasterthesamedayofmixing.
© All Rights Reserved Fellert Acoustical Ceilings AB36 09/30/14
PRINCIPLESOFINSTALLATIONApplication of Standard Finishes
TheobjectiveistospraytheEB2finishontothebasecoatleavingafinesprayedtexture,at1.5mm(1/16”)wetthickness.
Sprayconsistentandeliminatespatteringonplastersurfaceleavetodry1-2days.Drythicknessoftheplasterfinishwillbeapproximately3mm(1/8”).
FortheEB2finishcoatusesize3orificewiththesmallestouterfantip(A).Thematerialflowwouldnormallybesettothe4thascendingdotforfinetextureand5thascendingdotformediumtexture.Theairventisfullyopenandthematerialflowcontrolonthespraygun(seepicture)issettobealmostclosed.(Whenitisinaccuratepositionyouwillonlygetaspraymist,withoutanysplattering.)
C. EB2 “Finish” Plaster for SaharaColoredfinishes:addandmixtintvialtothewaterinthemixingcontainerpriortoaddingandmixingthebaseandfinishplaster.Usetintguidlinesoutlinedonpage28.Useplasterthesamedayofmixing.
© All Rights Reserved Fellert Acoustical Ceilings AB37 09/30/14
PRINCIPLESOFINSTALLATIONApplication of Standard Finishes
FortheSilkfinishusesize6orificewiththesecondlargestouterfanspraytip(C)nearright.ThematerialflowontheGracoRTX1500wouldtypicallybesettothe3rdascending dot.
MixtheSilkwith34L(8gal)ofwater.
SpraytheEB2Silkplasterontothesurfaceapprox.3mm(1/8”)wetthicknessandtrowelsmoothaspossible.Donotovertroweltheplaster.HavetwoapplicatorstrowelingtheSilkplastersmoothimmediatelyuponspraying.Closinginthesurfaceandremovingtheexcessplaster.Astheplastertakesup(surfacemoisturedecreases)youmayneed2-3separatepasseswiththetroweloverthesurfaceinordertoachieveaconsistentfinish,approx.4-5minuteinbetweenpasses.
TheSilkfinishconsistsofabaselayerofEB1andafinishcoatofEB2plaster.Sandthebaselayerapplicationwitha220gritsandingdiscandsandingsponges.Oncesandingiscompleteallimperfectionsshouldbeeliminatedincludinganyboardjoints,holes,ortrimdetails.
D. EB2 “Finish” Plaster for Silk Coloredfinishes:addandmixtintvialtothewaterinthemixingcontainerpriortoaddingandmixingthefinishplaster.Usetintguidlinesoutlinedonpage28.Useplasterthesamedayofmixing.
© All Rights Reserved Fellert Acoustical Ceilings AB38 09/30/14
PRINCIPLESOFINSTALLATIONApplication of Standard Finishes
CompletedSilkfinish—the golden rule is to match the mock-up.
DrythicknessofFellertSilkfinishwillbeapproximately3mm(1/8”)thick.TheSilkfinishisintendednottobesanded.
HavethirdapplicatormakeafinalpassovertheEB2Silkplasterwithin15–20minutesoftheinitialapplication.
Thiswillensureaconsistentlysmoothhand-craftedfinish
EnsuretokeepyourtrowelscleanatalltimesduringthetrowelingoftheSilkplasterbyconstantlywipingwithdamprags.
© All Rights Reserved Fellert Acoustical Ceilings AB39 09/30/14
PRINCIPLESOFINSTALLATIONVertical Surfaces
Asanoptionfiberglassmeshcanbeusedforverticalsurfacesorareaswhereimpactisaconcern.
PropertiesofthemeshthatFellertsuppliesare:• 1.22M(48”)widefiberglassmesh• 128grams(4.5oz)persquareyard• clear in color • .08mm(1/32”)thickness
Belowisanexampleofhowtoemploythe1.22M(48”)meshwithFellertonaverticalapplication.
© All Rights Reserved Fellert Acoustical Ceilings AB40 09/30/14
PRINCIPLESOFINSTALLATIONVertical Surface
Troweltheplaster1–2times.Youwillvisuallynoticethemeshwithinthebasecoat.
Sprayapproximately30%ofthebasecoatoverthemeshimbeddedbasecoatandlightlytrowel.
Youstillmaynoticethemeshstillatthispointespeciallyasthebasecoatproductisstillwet.
Leavethebasecoattofullydry,lightlysandandproceedwiththefinishcoatasnormal.
Applyapproximately70%ofthebasecoatasnormaltothesurface.Placeeachverticallengthofmeshasyouproceedalongthelengthofawallsprayingbasecoat.Donotoverlapthemesh.Tryandbuttthelengthsastightaspossible.Asmallgapof1.3cm(1/2”)isacceptable.
Sprayadditionalbasecoatplasteroverthesurfaceofthemeshtocompletetheappropriatethickness.
© All Rights Reserved Fellert Acoustical Ceilings AB41 09/30/14
PRINCIPLESOFINSTALLATIONCurved Surfaces
Whenestimatingprojectsthathavecurvedshapes,itisadvisabletoallowfortheapplicationofanadditionalbasecoatofFellertplaster,EB1basecoatforallfinishes.Thisadditionalcoatwillassistinachievingarelativelyevenbaselayer.
AnexampleofacurvedceilingdonewiththeFellertisdepictedbelow.Anapplicationoftwo(2)coatsofFellertAcousticalPlasterEB1BasecoatwasundertakenpriortotheapplicationoftheFellertSaharafinish.
Youwillachieveslightlymoreflexintheboardbycutting1.3cm(½”)every5cm–7.5cm(2”–3”)intotheboardfromtherear.UsetheFellertSpringWashersorotherdiscshapedwasherstoassistyouwithtemporarysecuringtheacousticalboardtothedrywallsubstrate.
InstallationofcurvedsurfacesistobedonewiththeadheredtoGWBmethod.
© All Rights Reserved Fellert Acoustical Ceilings AB42 09/30/14
PRINCIPLESOFINSTALLATIONCustom Color and Techniques
Multi-Color
Severalcolorscanbeincorporatedintotheacousticalfinishtocreatecustomdesigns.
TheSecern,Sahara,andSilkfinishesareavailableincustomcolors.AllcustomfinishesmustbemadeandapprovedbyFellert.
Duringthemixingprocessthecolorantismixedintothewaterpriortotheadditionoftheplasterproduct.Forapplicationswithcolorsofmoreintenseordeepcolorsitwilltendtohavemoremottlingoracolorvariancethroughouttheceilingsinceitisahandappliedplaster.Ifalighterormoremediumtoneofblueischosenthemottlingwillbeconsiderablylessbutwillalwayshaveaslightcolorvariance.Allcustomfinishtechniquesneedtobeapprovedbyallpartieswithamock-uppriortoinstallation.
AllcustomsamplesmustbemadebyFellert.
© All Rights Reserved Fellert Acoustical Ceilings AB43 09/30/14
PRINCIPLESOFINSTALLATIONKey Installation Notes
• Obtaintheapprovalofamock-uppriortocommencingwiththeinstallation—thegoldenrule of Fellert.Mock-upapprovalisFellertpolicyandisintheproductspecifications.
• Alwaysstagesufficientlightingtoilluminateworkareaasifduplicatingthetruecriticallightingenvironment.
• KeeptheFellertAcousticalBoardintheboxesuntiltheyreadyforinstallationtoensureedgesareprotectedfromdamageandexposuretosunlight.Alwaysstoreflat,donotstackon edge.
• Applytheadhesiveevenlytothebackoftheboard.
• Ensurethemanufacturingpresslinesonthebackoftheboardremainincontinuityonthesubstrate.
• IfpossiblealignthecontinuousjoinlinesofFellertAcousticalBoardstowardsthestrongestsourceoflight.
• Fillinboardjointgapsmorethan0.8mm(1/32”)widewithFellertAcousticalBoardsplices.
• SandtheentiresurfaceoftheFellertAcousticalBoard,notjustthejoints.
• Removetheprotectivemaskingtapeafterprimingthetransitionsandre-maskaccordingly.
• AlwaysleavetheFellertPrimertodryovernight.
• Donotovermixtheplaster.Addthecorrectamountofwatertoachievedesired consistency.
• AlwaysusetheFlexogriporFellertTrowel.
• Donotexcessivelytrowelthebasecoat,lessisbetter.
• SpotapplyEB1toanyrippers,beads,boardjoints,etc.asneededandletdry.
• Leavebasecoatuntilfullydrywhichisapprox.2-3daysbutmaybequickerwithforcedair.
• Alwaysspraythefinishplastercorner-to-cornerandsprayinanirregularpatterntoeliminateplastercoldjoints.
© All Rights Reserved Fellert Acoustical Ceilings AB44 09/30/14
HEALTH&SAFETYRECOMMENDATIONS
• Whenmixinganyofthedrypowderproductsweararespirator.
• WhenhandlingandinstallinganyFellertacousticalpanelsorothersystemcomponentsfollowregionalgovernmentenforcedhealthandsafetycodesincludingOSHA.
• WhenusinganyoftheFellertproductswearprotectiveclothingandavoidcontactwithyourskinwheneverpossible.
• Weareyeprotectionatalltimes.Ifeyecontactoccursirrigateeyewithcleanwaterandseekimmediatemedicalattention.
• Ifanyofthematerialsareswallowed,seekimmediatemedicalattention.
AllcurrentMSDSdocumentsareavailableonline.
© All Rights Reserved Fellert Acoustical Ceilings AB45 09/30/14
FINALAPPEARANCESTATEMENT
TheFellertAcousticalPlastersystemisdesignedtobeanacousticalsoundabsorptionsystemwitharchitecturalaestheticdesigncapabilities.Thevisualappearanceisintendedtobeamonolithicandnaturallookinghand-craftedplaster.
Astheplasterissprayedandhandtroweledproduct,itallowssoundtobeabsorbedwhileretaininganattractive,wall-to-wallseamlessappearance.
ThefinalappearanceofanyTextured,FineTextured,orSmoothfinisheswillvaryslightlythroughouttheexpanseofthesurfaceaswithanyhand-craftedplaster,especiallyundercriticallightingconditions.Theproductshouldbemonolithicandnaturalplasterlookinginfinalappearance.
AsperFellertpoliciesandspecifications,anapprovedprojectmockupisrequired.
© All Rights Reserved Fellert Acoustical Ceilings AB46 09/30/14
DRYSTAINS-ALLFELLERTFINISHES(NON-SOLUBLE)
Commence with step 1. Proceed to the other steps if needed.
Step #1Trybrushingthestainwithasoftuncoloredbrush.
Step #3Spraywatermist.
Step #4SaharaandSecern-formthesurfacetothedesiredappearancebyusingafirmbrush.
Silk-formthesurfacetothedesiredappearancebyusingasoftspongeoraplastictrowel.
Step #2Vacuumwithsoftbrushnozzle.Ifthereareremainingstains,lightlyscrapecarefullywithasharpedge.
© All Rights Reserved Fellert Acoustical Ceilings AB47 09/30/14
SOLUBLESTAINS-ALLFELLERTFINISHES
Step #1Dampasoftspongewithfreshwater.Pressthespongeonthestainandletthewatersoakintothesurface.Releasethepressure,lettingthewatersoakbackintothesponge.Rinsespongeandrepeatifnecessary.
Step #2SaharaandSecern-formthesurfacetothedesiredappearancebyusingafirmbrush.
Silk-formthesurfacetothedesiredappearancebyusingasoftspongeoraplastictrowel.
© All Rights Reserved Fellert Acoustical Ceilings AB48 09/30/14
HOLES,DAMAGES,&WATERDAMAGEDAREAS1. SILK
Step #1Cutoutthedamagedarea.Replacedamagedacousticalboard.Ifpossible,useanacousticalboardpreparedinadvancewithEvenBetter1plaster.Ifnot,buildupanEvenBetter1layerandleavetodry,byfillingthescratchwithasmallamountofEvenBetter1plaster.Moistenedgeofexistingplasterpriortoapplication.Useplasterwithsamebatchnumberastheoneusedfortheceiling.
Step #2SprayEvenBetter2plasterontherepairedareatothedesiredappearance.Moistenedgeofexistingplasterpriortoapplication.Handtroweltheplasterifnecessary.Leavetodry.Lightlysandwith400gritsandpaperandsoftsponge(moistenplasterwithwater),ifnecessarytoblend.
© All Rights Reserved Fellert Acoustical Ceilings AB49 09/30/14
HOLES,DAMAGES,&WATERDAMAGEDAREAS2. SAHARA
Step #1Cutoutthedamagedarea.Replacedamagedacousticalboard.Ifpossible,useanacousticalboardpreparedinadvancewithEvenBetter2plaster.Ifnot,buildupanEvenBetter2layerandleavetodry,byfillingthescratchwithasmallamountofEvenBetter2plaster.Moistenedgeofexistingplasterpriortoapplication.Useplasterwithsamebatchnumberastheoneusedfortheceiling.
Step #2Inacircularmotion,sprayEvenBetter2plasterontherepairedareatothedesiredappearance.Moistenedgeofexistingplasterpriortoapplication.Leavetodry.Lightlysandwith400gritsandpaperandbrush(moistenplasterwithwater),ifnecessarytoblend.
© All Rights Reserved Fellert Acoustical Ceilings AB50 09/30/14
HOLES,DAMAGES,&WATERDAMAGEDAREAS3. SECERN
Step #1Cutoutthedamagedarea.Replacedamagedacousticalboard.Ifpossible,useanacousticalboardpreparedinadvancewithEvenBetter1plaster.Ifnot,buildupanEvenBetter1layerandleavetodry,byfillingthescratchwithasmallamountofEvenBetter1plaster.Moistenedgeofexistingplasterpriortoapplication.Useplasterwithsamebatchnumberastheoneusedfortheceiling.
Step #2SprayEvenBetter1plasterontherepairedareatothedesiredappearance.Sprayincircularmovements,thinnerandthinnertoconnectthenewandtheoldsurfaces.Leaveto dry.
© All Rights Reserved Fellert Acoustical Ceilings AB51 09/30/14
TYPICALCONSTRUCTIONDETAIL
Customdetailsareavailableuponrequest.Installerisresponsibleforinstallationandtoensurerelevantdetailsareincludedintheprojectmock-up.Visitwww.fellert.comtoaccessallFellertconstructiondetails.
02/06/14
*General Notes: Not to Scale. This detail should be included in the project mock-up.
Fellert ABKyrkängsgatan 6, 50338 Borås, SwedenPhone: +46 33 430 23 10Fax: +46 33 430 22 19Email: [email protected]: www.fellert.com
Ceiling to Wall Interface with GWBFully Adhered System
5.1
5.1
CE
ILIN
G T
O W
ALL
INTE
RFA
CE
WIT
H G
WB
FU
LLY
AD
HE
RE
D S
YS
TEM
50 mm (2”) self-adhesive mesh tape
Fellert PrimerFellert C Channel Fellert Acoustical Plaster
approx. 3 mm (1/8”) thick
Drywall ceiling grid (for typical GWB application) @ 400 mm c/c (16” o.c.) (by others)
Fellert Acoustical Board 25 mm (1”) or 39 mm (1.5”)
GWB (by others)
GWB (by others)
Fellert Adhesive
© All Rights Reserved Fellert Acoustical Ceilings AB52 09/30/14
NOTES