  • 02/13 - 11/13 - THERM model - CD drafting - Struct. coord. - 3D Rendering

    PENN AVE. RFP

    Thoughtful Balance Inc.Request for Proposals: Build a new residential development on a site along the Penn Avenue Arts Corridor at the border between the Friendship and Garfield neighborhoods in the City of Pittsburgh. The use for this site would be a single-family, for-sale, residential development with a modern, green and energy efficient design and density appropriate for the surrounding area. Total of 6,336 sq. ft. in area. penn ave

    Typ. Unit front facade

    3th

    2nd

    1st

  • White PolycarbonatePanel (Semi-Translucent)

    Unistrut attached toceiling w/ threaded rod

    Threaded Rod

    Existing HVAC duct

    Dim. VariesTo Finish Floor

    Varies

    OPTION 3: Polycarbonate Panelling

    Manual Roller Shade Header such as Mechoshade installed behind window frame

    Existing HVAC duct

    Manual adjustment

    OPTION 1: Polycarbonate Panelling

    DetailsScale: Not to scaleA6

    MCKEESPORT YMCA THERM STUDIES

    PENN AVE. RFP

    Thermal Bridge Calculator Software ModellingThe facility renovation was designed to keep utilities andoperating costs as low as possible. A geo-thermal system will be installed to provide efficient heating and cooling. And the thermal envelope will be designed to be as efficient as the budget allows to achieve Passive House Retrofit Standard Certification. Potential Thermal bridges in the building renovation need to be studied and R-Value measured.

    Southside High School ApartmentsA0Render with Policarbonate Panels covering interior HVAC Ductwork NOT visible from exterior windows

    Building SectionA5 Scale: Not to scale

    10th Street

    Panel DetailRefer to A5

    View of visible HVAC Ductworkfrom the outside

    View of NO visible HVAC Ductworkfrom the outside

    SSHS Feasibility StudySouthside High School Apartments Ductwork Concealment Feasibility Study which consist in various solutions to mitigate the visibility of the units ductwork from the exterior as to obtain Historic Tax Credit for the recently completed renovation the building. The solutions we considered: installation time and disturbance, cost per unit, permit requirements, additional engineering, and aesthetics.

    White PolycarbonatePanel (Semi-Translucent)

    Unistrut attached toceiling w/ threaded rod

    Threaded Rod

    Existing HVAC duct

    Dim. VariesTo Finish Floor

    Varies

    OPTION 3: Polycarbonate Panelling

    Manual Roller Shade Header such as Mechoshade installed behind window frame

    Existing HVAC duct

    Manual adjustment

    OPTION 1: Polycarbonate Panelling

    DetailsScale: Not to scaleA6

    option 1: roller shade

    option 2: polycarbonate panelling

    Building SectionA5 Scale: Not to scale

    10th Street

    Panel DetailRefer to A5

    View of visible HVAC Ductworkfrom the outside

    View of NO visible HVAC Ductworkfrom the outside

    building sightline section

    56 long Wall-Slab Section Section: Isothermic view

    4 Exterior Brick12 Terracota Brick2 Rigid Foam Insulation8 Closed Cell InsulationGWBExisting Concrete SlabMetal Stud

    Example of thermal bridge at slab - wall section, where a large heat loss is detected but we take control of the heat loss with a new interior insulation wall wrap. Contractor to pay extra attention to perform air-tightness on these details.

  • WALNUT STREET

    PHPP 2007, Verification 2013.10.01 PHPP REV Climate Walnut.xls

    Building: Walnut Street RetrofitLocation and Climate: Pittsburgh, PA PITTSBURGH ALLEGHENY CO AP PA

    Street Address: Walnut StreetCity, State, Zip: Pittsburgh, PA

    Country: United States of AmericaBuilding Type: Victorian Single Family Retrofit

    Home Owner(s) / Client(s): Laura NettletonStreet Address: 456 South Graham StreetCity, State, Zip: Pittsburgh, PA 15232

    Architect: Thoughtful Balance, inc.Street: 456 South Graham Street

    City, State, Zip: Pittsburgh, PA 15232Mechanical System:

    Street Address:City, State, Zip:

    Year of Construction: 2013Number of Dwelling Units: 1 Interior Temperature: 68.0 F

    Gross Enclosed Volume Ve: 34636 ft3 Internal Heat Gains: 0.7 BTU/hr.ft2Number of Occupants: 6.0

    Energy Demands with Reference to the Treated Floor AreaTreated Floor Area: 2258 ft2

    Applied: Monthly Method PH Certificate: Fulfilled?

    Specific Space Heat Demand: 4.27 kBTU/(ftyr) 4.75 kBTU/(ftyr) YesPressurization Test Result: 1.00 ACH50 0.6 ACH50 No

    Specific Primary Energy Demand(DHW, Heating, Cooling, Auxiliary and Household Electricity): 36.5 kBTU/(ftyr) 38.0 kBTU/(ftyr) Yes

    Specific Primary Energy Demand(DHW, Heating and Auxiliary Electricity): 23.5 kBTU/(ftyr)

    Specific Primary Energy DemandEnergy Conservation by Solar Electricity: kBTU/(ftyr)

    Heating Load: 3.54 BTU/(ft2hr)Frequency of Overheating: % over 77.0 F

    Specific Useful Cooling Energy Demand: 0.82 kBTU/(ftyr) 4.75 kBTU/(ftyr) YesCooling Load: 2.31 BTU/(ft2hr)

    We confirm that the values given herein have been Issued on:determined following the PHPP methodology and basedon the characteristic values of the building. The calculations signed: with PHPP are attached to this application.

    Passive House Verification

    Photo or Drawing

    5724 Walnut Street Victorian House RenovationWalnut Street is the renovation of a single-family Victorian residence in the Shadyside neighborhoodin Pittsburgh. The project took the dilapidated house and put a new exterior and renovated the interior spaces. The thermal envelope was retrofitted with exterior rigid foam panels and cement board siding, and high performance windows. Zoned heating systems were installed to allow the family to condition floors separately. We are achieveing Passive House Residential Retrofit Standards.

    first floor plan

  • COMMUNITYROOM

    LAUNDRY380 SF NET

    EXERCISEROOM

    440 SF NET

    UNIT 1011 BR

    821 SF

    MAILROOM

    MEDIA ROOM

    MGMT.OFFICE

    CONFERENCE

    WALK-INCLOSET

    WALK-INCLOSET

    VENDING

    KITCHENETTE

    DUMPSTERROOM

    EXISTING COMMERCIAL

    EXISTING COMMERCIAL

    EXISTING COMMERCIAL

    EXISTINGCOMMERCIAL

    GAMES &LIBRARY563 SF NET

    W W W W

    D D D D D

    W

    VESTIBULE

    ENTRY

    LOUNGE743 SF NET

    STORAGE

    SOCIALWORKEROFFICE

    VESTIBULESTOR.

    CARTSTOR.

    JAN.

    TRASH/RECYCLING

    TRASHCHUTE

    COPY

    UNIT 1021 BR

    886 SF

    WALK-INCLOSET

    CLOSET

    UNIT 1051 BR

    774 SF

    UNIT 1042 BR

    1041 SF

    UNIT 1031 BR

    772 SF

    STAIR A

    STAIR B

    PROJECT NO: 0111

    DATE: OCTOBER 31, 2013

    bala

    ncein

    c.su

    stai

    nabl

    e ar

    chite

    ctur

    e an

    d de

    sign

    t h o

    u g

    h t

    f u l

    4

    56 so

    uth

    grah

    am st

    reet

    pitts

    burg

    h, p

    enns

    ylva

    nia

    1523

    2t.

    412.

    661.

    6010

    f.

    412

    .363

    .991

    1

    PROJ

    ECT:

    SHEET NO:

    TITLE:

    KEY PLAN:

    NORTH

    SEAL

    :

    CAST

    LETO

    NAP

    ARTM

    ENT

    COMP

    LEX

    RETR

    OFIT

    FIRSTFLOORPLAN

    SCALE:

    FIRST FLOOR PLAN1 1/16" = 1'-0"

    ELEV.LOBBY

    UNIT #011 BR

    738 SF

    ELEC/DATA

    TRASH / RECYCLEROOM

    ELEC / TELECOM.ROOM

    UPDN

    UNIT #021 BR

    776 SFUNIT #03

    1 BR803 SF

    UNIT #04EFF.

    598 SF

    UNIT #051 BR

    817 SF

    UNIT #061 BR

    783 SF

    UNIT #071 BR

    764 SF

    UNIT #091 BR

    769 SF

    UNIT #081 BR

    768 SF

    UNIT #102 BR

    1015 SF

    UNIT #111 BR

    653 SF

    STAIR B

    STAIR A

    PROJECT NO: 0111

    DATE: OCTOBER 31, 2013

    bala

    ncein

    c.su

    stai

    nabl

    e ar

    chite

    ctur

    e an

    d de

    sign

    t h o

    u g

    h t

    f u l

    4

    56 so

    uth

    grah

    am st

    reet

    pitts

    burg

    h, p

    enns

    ylva

    nia

    1523

    2t.

    412.

    661.

    6010

    f.

    412

    .363

    .991

    1

    PROJ

    ECT:

    SHEET NO:

    TITLE:

    KEY PLAN:

    NORTH

    SEAL

    :

    CAST

    LETO

    NAP

    ARTM

    ENT

    COMP

    LEX

    RETR

    OFIT

    SECOND TOSIXTHFLOOR PLANS

    SCALE:

    SECOND THROUGH SIXTH FLOOR PLANS1 1/16" = 1'-0"

    detail wall section (typ)

    CLOSET

    WALK-INCLOSET

    PROJECT NO: 0111

    DATE: OCTOBER 31, 2013

    bala

    ncein

    c.su

    stai

    nabl

    e ar

    chite

    ctur

    e an

    d de

    sign

    t h o

    u g

    h t

    f u l

    4

    56 so

    uth

    grah

    am st

    reet

    pitts

    burg

    h, p

    enns

    ylva

    nia

    1523

    2t.

    412.

    661.

    6010

    f.

    412

    .363

    .991

    1

    PROJ

    ECT:

    SHEET NO:

    TITLE:

    KEY PLAN:

    NORTH

    SEAL

    :

    CAST

    LETO

    NAP

    ARTM

    ENT

    COMP

    LEX

    RETR

    OFIT

    UNIT TYPES103 AND 104FLOOR PLANSSCALE:UNIT 103 (772 SF)1 1/8" = 1'-0" SCALE:UNIT 104 (1041 SF)2 1/8" = 1'-0"

    unit 103 - 772 sf.

    1st

    2nd to 6th

    north eastwest

    Castleton Apartments - Deep Energy Retrofit Renovation

    As part of a team, we re-designed the interior of the building to insert accesible units for rent. The renovation will include common spaces and recreational facilities. This project will apply to Housing Finance and Tax Credit. Blower door testing twice during construction, with an air tightness of 0.6 air changes per hour to be performed as part of Passive House certification.

    CASTLETON

  • Unit BUnit C

    MARKET STREET & FIRST AVENUE

    Peter Margittai ArchitectsThis1845 downtown Pittsburgh historic structure redeveloped to include three independent four story townhomes, adding a total of 4,130 sq.ft. The client required preservation of historic framing while exposing the historic essence of the structure. Principal work was on construction drawings for the elaborate staircase.

    09/12 - 01/13 - Stairs design - CD drafting - Struct. Coord.

  • MARKET STREET & FIRST AVENUE

    historic

    modern

    third floor plan

    first floor plan

  • OFFICE MARKETINGMarketing ideas and proposals were developed at the office. These wine labels were produced for the Market Street Residences project with real estate purposes.

    SSCC WELCOME CENTER

    Collaborative design and renovation of the exterior signage for the South Side Chamber of Commerce Welcome Center. The new facility will be available to community development organiza-tions asd to promote the South Side as a business-friendly neighborhood that welcomes professionals of all types

  • DESIGN & DRAFTING Peter Margittai Architects Complete sets of detailed architectural drawings in CAD format were produced for building permits, contractors estimates, and structural coordination.

  • LAXMAN RESIDENCERenovation of a 3,400 sq.ft. house and of a 2,500 sq.ft. addition. The client required a modern home with high ceilings and flat roofs. This design included minimalist materials such as cedar siding, exposed concrete and extensive glass windows.

    demolition - east elevation

    demolition - south elevation

    10/11 - 01/13

    - Arch. Design - 3D Rendering - 2D Drafting - EC Survey

  • privacy

    mass

    transparency

    Laxman - proposed renovation + addition

  • 1st floor

    section 1 - A3.01Laxman - proposed renovation + addition

  • The renovation included the removal and complete demolition of the existing second floor and roof, as well as all brick siding. New framing will be added to the exisiting first floor walls to give the desired high ceiling and flat roof.

    west

    south

    east

    north

  • Architectural design, development and construction supervision of a carriage house barn style building with a 2800 sqft. main floor. The structure is made of heavy timber framing (Hemlock & Douglas Fir), with 6-1/2 SIP panels for walls and 8-1/4 SIP panels for roofing The builiding will hold space for vehicles, workshop, a micro-brewery, and an upper level loft for guest. The interior finish is made of tongue & groove.

    KAERCHER CARRIAGE HOUSE

    lightinginterior

  • Kaercher main floor plan

    The Barn is located close to the existing home but hidden from the entrance, being only visible in its totality from the front of the house.

    05/11 - 04/12

    - Arch. Design - 3D Rendering - 2D Drafting - Const. Admin.

  • The guest house matches the architectural materials of the clients adjacent home. However, it keeps the simplicity of a barn style from the outside, leading into a complex structured interior.

    exterior rendering

  • Exposed hammer beam trusses, the porch under the deck, and the gable roof give the barn a complex character while maintaining a residential look as a secondary building.

    timber framing process

  • Located in front of an existing chemical warehouse, the architectural purpose was to create a new three story office building that will also serve as a facade for the warehouse. The corridors along the curtain wall are illuminated by the stairwell that runs vertically through the entire building, which functions as the vertical light source. The main design elements are the curtain wall and shutters, created to take full advantage of the ample natural light.

    PROQUIMSA OFFICES

    01/10 - 06/10 - Arch. Design - 3D Rendering - 2D Drafting

  • The staircase, illuminated from the front and top, becomes the spine for natural light as well as circulation for the building.

    front elevation side elevation

    staircase section

    zeni

    th lig

    ht

    boardroom, exterior & interior view