8
1 I am applying for a British Gas Feed-in Tariff and I have: A new installation An extension on an existing installation Feed-in Tariff Application Form How to make a successful application Please make sure you send all the information requested below with your application. Your application form needs to include: A Generation and/or Export Meter Reading We need an accurate, up-to-date meter reading to set up your account. If you email us your form the meter reading will need to be taken on the same day. But if you post your form, please keep a record of your daily meter readings for seven days after you post it, because we’ll need an up-to-date meter reading. Supporting documents needed for your application MCS certificate – for up to 50kWh or Roo FiT letter – for over 50kWh EPC certificate or valid exemption letter – for Solar PV only Signed Solar PV Declarations – please make sure you have signed the two appropriate declarations (see pages 5-7) Proof of ownership – for example, a copy of your invoice for generation equipment Proof of address – if you’re not a British Gas customer, we’ll need copies of two utility bills or bank statements Proof of identification – for example, a photocopy of your passport/driving licence What you need to do Please scan and email your documents to us at feedintariff@britishgas.co.uk Please note that there is a 5MB limit for emails and you may need to send separate emails if the files are too large. Or you can post them to British Gas, Feed-in Tariff Team, Winnall Down, Alresford Road, Winchester, Hampshire SO21 1FP. Don’t forget, you may have to send us a new meter reading if you send your documents this way. How long will it take to set up my account? It may take up to 28 days to get you registered after we get your fully completed application. What happens if I don’t send everything in? If anything is missing, the date your new Feed-in Tariff can start on will be delayed, and we’ll also need a new meter reading to get your account up and running. If you have any queries about our Feed-in Tariff just give us a call on 0333 202 9483. * British Gas is a mandatory Feed-in Tariff licensee. NOTE If you have a Solar PV installation that is eligible for Feed-in Tariff payments, on or after 1st April 2012 the amount of Feed-in Tariff payments you will be entitled to receive will depend on the energy-efficiency rating of your property. Without this document you will still receive Feed-in Tariff payments but at a lower tariff. If you choose to return the application to us via email or post, the application needs to be completed and returned on the date the installation was commissioned. If your application is received after your commissioning date you may be required to provide a further reading to be used to register your account. The fastest way to register is to send your application to feedintariff@britishgas.co.uk * We may record calls to help improve our service to you. Calls to 0800 numbers are free. Call charges to 03 numbers will cost no more than 01 or 02 numbers, please check with your phone provider. If you are hard of hearing or speech impaired and use a text phone, please call 18001 0800 072 8626.

Feed-in Tariff Application Form€¦ · MCS certificate – for up to 50kWh or Roo FiT letter – for over 50kWh EPC certificate or valid exemption letter – for Solar PV only

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Feed-in Tariff Application Form€¦ · MCS certificate – for up to 50kWh or Roo FiT letter – for over 50kWh EPC certificate or valid exemption letter – for Solar PV only

1

I am applying for a British Gas Feed-in Tari� and I have:

A new installation An extension on an existing installation

Feed-in Tariff Application Form

How to make a successful applicationPlease make sure you send all the information requested below with your application.

Your application form needs to include:

A Generation and/or Export Meter Reading We need an accurate, up-to-date meter reading to set up your account.

If you email us your form the meter reading will need to be taken on the same day. But if you post your form, please keep a record of your daily meter readings for seven days after you post it, because we’ll need an up-to-date meter reading.

Supporting documents needed for your application

MCS certificate – for up to 50kWh or Roo FiT letter – for over 50kWh

EPC certificate or valid exemption letter – for Solar PV only†

Signed Solar PV Declarations – please make sure you have signed the two appropriate declarations (see pages 5-7)

Proof of ownership – for example, a copy of your invoice for generation equipment

Proof of address – if you’re not a British Gas customer, we’ll need copies of two utility bills or bank statements

Proof of identification – for example, a photocopy of your passport/driving licence

What you need to do

Please scan and email your documents to us at feedintari�@britishgas.co.uk Please note that there is a 5MB limit for emails and you may need to send separate emails if the files are too large.

Or you can post them to British Gas, Feed-in Tari� Team, Winnall Down, Alresford Road, Winchester, Hampshire SO21 1FP. Don’t forget, you may have to send us a new meter reading if you send your documents this way.

How long will it take to set up my account? It may take up to 28 days to get you registered after we get your fully completed application.

What happens if I don’t send everything in? If anything is missing, the date your new Feed-in Tari� can start on will be delayed, and we’ll also need a new meter reading to get your account up and running.

If you have any queries about our Feed-in Tari� just give us a call on 0333 202 9483.*

British Gas is a mandatory Feed-in Tari� licensee.

† NOTE If you have a Solar PV installation that is eligible for Feed-in Tari� payments, on or after 1st April 2012 the amount of Feed-in Tari� payments you will be entitled to receive will depend on the energy-e�ciency rating of your property. Without this document you will still receive Feed-in Tari� payments but at a lower tari�.

If you choose to return the application to us via email or post, the application needs to be completed and returned on the date the installation was commissioned. If your application is received after your commissioning date you may be required to provide a further reading to be used to register your account. The fastest way to register is to send your application to feedintari�@britishgas.co.uk

* We may record calls to help improve our service to you. Calls to 0800 numbers are free. Call charges to 03 numbers will cost no more than 01 or 02 numbers, please check with your phone provider.

EG+ Job No: 740341-2Production:Clients:British Gas - BG:OPERATIONAL_COMMS:740341:Artworks and Linked files:Studio:740341-2_FIT_Application_Form_V3.inddTrim: 297x210mm | Visual Area: 271.6x184.6mm | Bleed: 0mm ARTWORK @ 100%

Date: 03.04.18Time: 11:36 GMT+01:00DI: Matthew Enright

PREPRESS 1

Export Option: EG+ Main Preset | Ratio: 1.414 | Page 1 of 8 Lakeside House, 30 The Causeway, Staines, TW18 3BY | www.egplusww.com

If you are hard of hearing or speech impaired and use a text phone, please call 18001 0800 072 8626.

Page 2: Feed-in Tariff Application Form€¦ · MCS certificate – for up to 50kWh or Roo FiT letter – for over 50kWh EPC certificate or valid exemption letter – for Solar PV only

2

Address

Postcode

Correspondence Address Details (if different from installation above)If there is no postcode, enter the Ordinance Survey Grid Reference.

Personal Details of the owner of the installationPlease ensure the installation address is registered with the Post Office. If the address has not been registered this may cause delays with the installation being added to the Ofgem Central FiT Register.

Full name/Company name (One person/name only)

Address

Postcode

Telephone numbers Home Mobile

Email address

Please select a password for your account (6–8 characters)

Type of installation Commercial Residential Community/School/Charity (If you are applying for Energy Efficiency Requirement relaxation

please contact Ofgem prior to sending this application form)If Commercial please provide the VAT registration number

Have you received a grant Yes No

If Yes, please provide details

Did British Gas install your generating equipment Yes No

British Gas Customer (Do you Yes No hold any British Gas products or services?)

British Gas Customer Reference/Account Number

Energy Performance Certificate (EPC) number

Date EPC issued

If EPC cannot be issued is a copy of a non-relevant building letter attached? Yes No N/A

Energy Efficiency Details

EG+ Job No: 740341-2Production:Clients:British Gas - BG:OPERATIONAL_COMMS:740341:Artworks and Linked files:Studio:740341-2_FIT_Application_Form_V3.inddTrim: 297x210mm | Visual Area: 271.6x184.6mm | Bleed: 0mm ARTWORK @ 100%

Date: 03.04.18Time: 11:36 GMT+01:00DI: Matthew Enright

PRE PRESS 1

Export Option: EG+ Main Preset | Ratio: 1.414 | Page 2 of 8 Lakeside House, 30 The Causeway, Staines, TW18 3BY | www.egplusww.com

Page 3: Feed-in Tariff Application Form€¦ · MCS certificate – for up to 50kWh or Roo FiT letter – for over 50kWh EPC certificate or valid exemption letter – for Solar PV only

3

Generation Equipment DetailsFor more information relating to your Total Installed Capacity (TIC) or Declared Net Capacity (DNC) you will need to contact your installer.

Your electricity supply number

Technology (e.g. PV, MCHP, Wind, Hydro)

For PV total number of panels installed

For PV individual wattage of panels (kW)

Total Installed Capacity (TIC), kW

NB The Total Installed Capacity of a PV installation is determined by multiplying the number of panels by the individual wattage of the panels. For example 10 panels at 200 watts would give a total installed capacity of 2.00kW.

Declared Net Capacity (kW)

Property type New build Existing property

Installation date / /

Is your Generation equipment wired to provide electricity to a relevant building? Yes No

Does the installation have co-located storage (battery storage) facilities? Yes No

If Yes, please provide the date the co-located storage facility was installed / /

We may contact you to request any additional documentation required to assess the impact of generation and export payments. Documents requested may include, but are not limited to, the Schematic Line Diagram which can be obtained from your installer.

If you have any other installations at the address, please provide details

S

MCS Certificate Number (e.g. MCS-00000000-L)

Date MCS issued / /

Accreditation DetailsIf your installation is smaller than 50kW, then you must provide an MCS Certification Number.

M C S – –

EG+ Job No: 740341-2Production:Clients:British Gas - BG:OPERATIONAL_COMMS:740341:Artworks and Linked files:Studio:740341-2_FIT_Application_Form_V3.inddTrim: 297x210mm | Visual Area: 271.6x184.6mm | Bleed: 0mm ARTWORK @ 100%

Date: 03.04.18Time: 11:36 GMT+01:00DI: Matthew Enright

PRE PRESS 1

Export Option: EG+ Main Preset | Ratio: 1.414 | Page 3 of 8 Lakeside House, 30 The Causeway, Staines, TW18 3BY | www.egplusww.com

Page 4: Feed-in Tariff Application Form€¦ · MCS certificate – for up to 50kWh or Roo FiT letter – for over 50kWh EPC certificate or valid exemption letter – for Solar PV only

4

Export Meter DetailsIf you do not have an Export Meter and your installation is lower than 30kW then you will receive deemed export payments from British Gas Feed-in Tariff unless you indicate ‘no’ in the details below. If your installation is larger than 30kW and you require export payments from British Gas Feed-in Tariff, you must have a compliant half hourly Export Meter installed and registered to British Gas.

Do you require export payments from British Gas? (Installations above 30kW) Yes No

Do you have an export meter Yes No

Export Meter Serial Number

Number of digits on meter (5 or 6 before the decimal point)

Export Meter Reading (On the date application sent. Please see checklist for full details)

Manufacturer of meter (e.g. Elster/Landis&Gyr/GEC)

Model Number

Meter Location

Remote Reading/Automatic Meter Reading Functionality Yes No

Signature

Date signed / /

By completing this form I confirm I would like British Gas to be my Feed-in Tariff supplier.

Generation Meter DetailsYou must have an approved Generation Meter to qualify for Feed-in Tariff. If your installation is smaller than 30kW, and you do not have an Export Meter, you must provide meter readings on the date of application.

Generation Meter Serial Number

Number of digits on meter (5 or 6 before decimal point)

Generation Meter Reading (On the date application sent. Please see checklist for full details)

Manufacturer of meter (e.g. Elster/Landis&Gyr/GEC)

Model Number

Meter Location

Remote Reading/Automatic Meter Reading Functionality Yes No

EG+ Job No: 740341-2Production:Clients:British Gas - BG:OPERATIONAL_COMMS:740341:Artworks and Linked files:Studio:740341-2_FIT_Application_Form_V3.inddTrim: 297x210mm | Visual Area: 271.6x184.6mm | Bleed: 0mm ARTWORK @ 100%

Date: 03.04.18Time: 11:36 GMT+01:00DI: Matthew Enright

PRE PRESS 1

Export Option: EG+ Main Preset | Ratio: 1.414 | Page 4 of 8 Lakeside House, 30 The Causeway, Staines, TW18 3BY | www.egplusww.com

Page 5: Feed-in Tariff Application Form€¦ · MCS certificate – for up to 50kWh or Roo FiT letter – for over 50kWh EPC certificate or valid exemption letter – for Solar PV only

5

Feed-in Tariff (FiT) Solar PV Declarations (installations and extensions)All applications for accreditation of new solar PV installations (including extensions to existing installations), with an Eligibility Date on or after 1 April 2012, need to be accompanied by a copy of this document with the relevant section signed and dated. This will then be used by FiT licensees/Ofgem as appropriate to determine whether or not (i) the energy efficiency requirement applies and, if so, has been met; and (ii) the multi-installation tariff rates should apply.

If your application is for a new solar PV installation with an Eligibility Date on or after 1 April 2012, you must sign two of the enclosed declarations; one declaration from the energy efficiency section and one declaration from the multi-installation section. Tick one of the boxes in relation to the energy efficiency declarations and one of the boxes in relation to the multi-installation declarations. Then go on to sign the two relevant declarations.

However, if your application is for an extension to an existing PV installation, you must sign one declaration from the energy efficiency section only. Tick one of the boxes in relation to the energy efficiency declarations then go on to sign the relevant declaration.

Please read the following information to understand which of the declarations are relevant to you.

Energy Efficiency DeclarationTick one of the following boxes in relation to the energy efficiency requirement and sign the relevant declaration overleaf:

The energy efficiency requirement does apply and an Energy Performance Certificate (EPC) rating of level D or above has been achieved (complete declaration 1)

The energy efficiency requirement does not apply because my installation is not wired to provide electricity to a “relevant building”1 (complete declaration 2)

The energy efficiency requirement does apply and an EPC rating of level D or above has not been achieved (complete declaration 3)

The energy efficiency requirement does apply and an Energy Performance Certificate (EPC) rating of level G or above has been achieved (complete declaration 4) Community energy and school installations ONLY

Multi-installation DeclarationTick one of the following boxes in relation to the multi-installation requirement and sign the relevant declaration overleaf:

The “FiT Generator”2 or “Nominated recipient”3 owns or will receive FiT payments from 25 or more other eligible solar PV installations (complete declaration 5)

Neither the FiT Generator or nominated recipient owns or will receive FiT payments from 25 or more other eligible solar PV installations (complete declaration 6)

The 3 statements below only apply to customers that have received grants:

• The FiT scheme was designed to replace publicly funded grants as a means of encouraging the growth of small scale renewable generation. It is generally not possible for an installation which has received a grant from public funds to be eligible for the FiT scheme.

• The FiT Order prohibits the accreditation of an installation where a grant has been made from public funds towards any costs of purchasing and/or installing an installation.

• If you’ve received a grant and this has been repaid in full to the grant issuing body before applying for accreditation, you must declare the details of the grant on this application form. We’ll ask you to provide documentary evidence of the grant being fully repaid as part of the application process.

EG+ Job No: 740341-2Production:Clients:British Gas - BG:OPERATIONAL_COMMS:740341:Artworks and Linked files:Studio:740341-2_FIT_Application_Form_V3.inddTrim: 297x210mm | Visual Area: 271.6x184.6mm | Bleed: 0mm ARTWORK @ 100%

Date: 03.04.18Time: 11:36 GMT+01:00DI: Matthew Enright

PRE PRESS 1

Export Option: EG+ Main Preset | Ratio: 1.414 | Page 5 of 8 Lakeside House, 30 The Causeway, Staines, TW18 3BY | www.egplusww.com

Page 6: Feed-in Tariff Application Form€¦ · MCS certificate – for up to 50kWh or Roo FiT letter – for over 50kWh EPC certificate or valid exemption letter – for Solar PV only

6

Declaration 2I certify in respect of this application for accreditation that the eligible PV installation is not wired to provide electricity to any “relevant building”1.

I have enclosed evidence supporting this declaration that the eligible PV installation is not wired to provide electricity to any “relevant building”.

Signed Dated

Declaration 3I certify that declarations 1 and 2 above do not relate to my eligible solar PV installation. An EPC level D or above is required AND has not been achieved.

I understand that this means I will receive the lower FiT generation tariff.

Signed Dated

Declaration 1I certify in respect of this application for accreditation that all of the following are applicable:

a. the eligible PV installation is wired to provide electricity to one or more relevant buildings1;

b. a valid energy performance certificate is enclosed in respect of the building (or one of the buildings) to which the PV installation is wired to provide electricity;

c. the enclosed energy performance certificate is the most recently issued energy performance certificate in respect of that building;

d. the enclosed energy performance certificate certifies that the relevant building to which it relates has been assessed as being level D or above.

Signed Dated

Energy Efficiency Declarations(Sign one declaration only from declarations 1-4)

EG+ Job No: 740341-2Production:Clients:British Gas - BG:OPERATIONAL_COMMS:740341:Artworks and Linked files:Studio:740341-2_FIT_Application_Form_V3.inddTrim: 297x210mm | Visual Area: 271.6x184.6mm | Bleed: 0mm ARTWORK @ 100%

Date: 03.04.18Time: 11:36 GMT+01:00DI: Matthew Enright

PRE PRESS 1

Export Option: EG+ Main Preset | Ratio: 1.414 | Page 6 of 8 Lakeside House, 30 The Causeway, Staines, TW18 3BY | www.egplusww.com

Page 7: Feed-in Tariff Application Form€¦ · MCS certificate – for up to 50kWh or Roo FiT letter – for over 50kWh EPC certificate or valid exemption letter – for Solar PV only

7

Declaration 5I (“the FiT Generator”) (and5

I (“the Nominated recipient”*)) certify in respect of this application for accreditation that either the FiT Generator or the Nominated recipient (if there is one) are, or have applied to be, the FiT Generator or Nominated recipient for 25 or more other eligible PV installations located on different sites.

In this certification, references to the “FiT Generator” and “Nominated recipient” include all persons who are “connected persons”56 in relation to them.

Signed FiT Generator

Signed Nominated recipient*

Dated

Please tick the relevant box or boxes to confirm whether the FiT Generator and/or the Nominated recipient owns or will receive FiT payments from 25 or more other eligible solar PV installations

FiT Generator

Nominated recipient*

*where applicable

Multi-installation DeclarationsSign one declaration only from declarations 5-6, unless your application is for the accreditation of an extension to an existing PV installation in which case you do not need to sign either of these declarations.

Declaration 4

I certify in respect of this application for accreditation of a community energy/school installation4 on behalf of (name of community organisation

or education provider) that all of

the following are applicable:

A7.1. the eligible PV community energy/school installation is wired to provide electricity to one or more relevant buildings1 at the address below;

Address of the building to which the installation is wired

A7.2. a valid energy performance certificate is enclosed in respect of the building (or one of the buildings, which is not a dwelling) to which the PV installation is wired to provide electricity;

A7.3. the enclosed energy performance certificate is the most recently issued energy performance certificate in respect of that building;

A7.4. the enclosed energy performance certificate certifies that the relevant building to which it relates has been assessed as being level G or above.

Signed Dated

EG+ Job No: 740341-2Production:Clients:British Gas - BG:OPERATIONAL_COMMS:740341:Artworks and Linked files:Studio:740341-2_FIT_Application_Form_V3.inddTrim: 297x210mm | Visual Area: 271.6x184.6mm | Bleed: 0mm ARTWORK @ 100%

Date: 03.04.18Time: 11:36 GMT+01:00DI: Matthew Enright

PRE PRESS 1

Export Option: EG+ Main Preset | Ratio: 1.414 | Page 7 of 8 Lakeside House, 30 The Causeway, Staines, TW18 3BY | www.egplusww.com

Page 8: Feed-in Tariff Application Form€¦ · MCS certificate – for up to 50kWh or Roo FiT letter – for over 50kWh EPC certificate or valid exemption letter – for Solar PV only

8

7403

41-2

British Gas is a trading name of British Gas Trading Limited. Registered in England and Wales (No. 03078711). Registered office: Millstream, Maidenhead Road, Windsor, Berkshire SL4 5GD. British Gas is a mandatory FiT Licensee. britishgas.co.uk

Notes relating to the above Declarations

1 “relevant building” means a roofed construction having walls, for which energy is used to condition the indoor climate, other than such a building for which an energy performance certificate cannot be issued; and a reference to a relevant building includes a reference to part of such a building which has been designed or altered to be used separately;

2 “FiT Generator” means in relation to an Accredited FiT Installation, the person identified as the Owner in the Central FiT Register; and in relation to any other Eligible Installation, the Owner, Whether or not that person is also operating or intending to operate the Eligible Installation;

3 ”Nominated recipient” means a person appointed by a FiT Generator to receive FiT Payments in respect of an Accredited FiT Installation owned by that FiT Generator and recorded as such on the Central FiT Register;

4 As defined in the FiT Order;

5 Only to be completed where there is a nominated recipient;

6 A “connected person” in relation to a FiT Generator or a nominated recipient, means any person connected to that person within the meaning of section 1122 of the Corporation Tax Act 2010;

7 Only to be completed where there is a nominated recipient.

EG+ Job No: 740341-2Production:Clients:British Gas - BG:OPERATIONAL_COMMS:740341:Artworks and Linked files:Studio:740341-2_FIT_Application_Form_V3.inddTrim: 297x210mm | Visual Area: 271.6x184.6mm | Bleed: 0mm ARTWORK @ 100%

Date: 03.04.18Time: 11:36 GMT+01:00DI: Matthew Enright

PRE PRESS 1

Export Option: EG+ Main Preset | Ratio: 1.414 | Page 8 of 8 Lakeside House, 30 The Causeway, Staines, TW18 3BY | www.egplusww.com

Declaration 6I (“the FiT Generator”) (and7

I (“the Nominated recipient”*)) certify in respect of this application for accreditation that neither the FiT Generator nor the Nominated recipient (if there is one) are, or have applied to be, the FiT Generator or Nominated recipient for 25 or more other eligible PV installations located on different sites.

In this certification, references to the “FiT Generator” and “Nominated recipient” include all persons who are “connected persons” in relation to them.

Signed FiT Generator

Signed Nominated recipient*

Dated

*where applicable