Welcome
FEDERAL Blvd from 5th Ave to Howard
PUBLIC OPEN HOUSE
Welcome
BIENVENIDOS
C O N S U LT I N G E N G I N E E R S
TSIOUVARAS SIMMONS HOLDERNESS
5:45 SHORT PRESENTATION
6:00 CONTINUED REVIEW OF INFORMATION
7:00 OPEN HOUSE COMPLETE
5:00 OPEN HOUSE REVIEW OF INFORMATION
Agenda for Tonight’s Meeting
WelcomeBIENVENIDOS
C O N S U LT I N G E N G I N E E R S
TSIOUVARAS SIMMONS HOLDERNESS
HISTORIA DEL PROYECTOPROJECT HISTORY
Planning and Environmental Linkage (PEL) Completed in 2009
Preliminary Design Started (February 2011)
Funding for Construction (December 2013)
Corridor Vision Established - Federal Boulevard Corridor Plan (CCD, 1995)
Environmental Assessment (In Progress)
C O N S U LT I N G E N G I N E E R S
TSIOUVARAS SIMMONS HOLDERNESS
NEXT STEPS & SCHEDULEPRÓXIMOS PASOS Y HORARIO
Complete Final Design
Begin Right-of-Way ProcessBegin Construction
Complete Environmental Assessment and(Decision Document)
Early 2015
Public Review Period (30 days) October 2014Draft Environmental Assessment Document Ready September 2014
Early 2015Summer 2016
December 2014
Environmental Assessment
Final Design
Right-of-Way
Construction
Task 2014 2015 2016 2017 2018
C O N S U LT I N G E N G I N E E R S
TSIOUVARAS SIMMONS HOLDERNESS
C O N S U LT I N G E N G I N E E R S
TSIOUVARAS SIMMONS HOLDERNESS
Environmental Assessment ProcessPROCESO DE EVALUACIÓN AMBIENTAL
• Public and agency outreach• Data gatheringIdentify Potential Areas
of Concern
• Traffic and safety assessmentsDevelop Purpose
and Need
• Develop and refine design
Alternative Analyses
• Identify potential impacts to resources• Identify mitigation measuresImpact Assessment/
Mitigation Planning
•Respond to comments from EA review•Provide commitment to mitigation measures•Document decision/action to be taken•Signed by FHWA and CDOT (lead agencies)
Prepare Decision Document
• We are hereIdentify Preferred Alternative
• Document EA process• Publish and provide for 30-day review
and comment periodPrepare Environmental
Assessment (EA)
PROYECTOS CONJUNTOSADJACENT PROJECTS
C O N S U LT I N G E N G I N E E R S
TSIOUVARAS SIMMONS HOLDERNESS
Federal Boulevard, 5th to Howard (7th to Holden Design)
• Widening to 6 lanes, improved sidewalks• Construction Timing • Lead Agency: City of Denver
Federal Boulevard over 6th Avenue Bridge Replacement
• Bridge replacement, 6 lanes plus turn lanes, improved sidewalks• • Lead Agency: CDOT
Federal Boulevard, Alameda to 5th
• Currently under construction, completion in 2013• 6 lanes plus turn lanes, improved sidewalks• Lead Agencies: CDOT/City of Denver Project
West Corridor Light Rail + Decatur Station
• • Replaced Federal bridge over Lakewood Gulch• Lead Agency: RTD
Federal Boulevard over Colfax Bridge Replacement
• Bridge replacement, minor roadway changes• Construction in 2012, 2013• Lead Agency: CDOT
Myers Gulch, Platte River
• Bike Trail improvements• Lead Agency: City of Denver
US6US6
I-25
8th Avenue8th Avenue
10th Avenue 10th Avenue
Holden Place
14th Avenue
Colfax Avenue
Howard Place
Fede
ral B
oule
vard
Fede
ral B
oule
vard
Fede
ral B
oule
vard
2nd Avenue
1st Avenue
12th Avenue
Colfax Avenue
Fede
ral B
oule
vard
Completion Anticipated Summer 2016
: In progress
Opened
C O N S U LT I N G E N G I N E E R S
TSIOUVARAS SIMMONS HOLDERNESS
PROJECT LIMITS ZONA DEL PROYECTO
Holden Place
Howard Place
Colfax Avenue
7th Avenue
10th Avenue
US 6 US 6
I-25I-25
12th Avenue
8th Avenue
Fede
ral B
oule
vard
N
No-ActionTypical Section
Recommended Typical Section
SECTION VIEW OF FEDERALSECCIÓN TĺPICA DE FEDERAL
C O N S U LT I N G E N G I N E E R S
TSIOUVARAS SIMMONS HOLDERNESS
11’
8’
Lane
2.5’Curb &Gutter
2.5’Curb &GutterPedestrian
Zone
10.5’ to 16.5’ 14.5’ - typical11’Lane
11’Lane
16’
Raised Median w/Left Turn Lane atIntersections
11’Lane
11’Lane
11’Lane
Varies 109’ to 113’
Righ
t-of
-Way
Righ
t-of
-Way
8’
PedestrianZone
9.5’
68’
Lane
5.5’
Cur
b, G
utte
r, an
d Si
dew
alk
Righ
t-of
-Way
Righ
t-of
-Way
5.5’
Cur
b, G
utte
r, an
d Si
dew
alk
9.5’Lane
9.5’Lane
9.5’ExistingTwo-wayLeft-turn Lane
9.5’Lane
9.5’Lane
During the public review and comment period for this EA, submit comments:
In Writing: Karen Good 201 West Colfax Department 509, Denver, CO 80202
By Email: [email protected] Via Fax: 720-865-2676 Online: www.denvergov.org/infrastructure/PolicyandPlanning/Curent/ Projects/FederalBoulevard/tabid/442758/Default.aspx
EA Review Locations: CDOT, Region 1 Offices - 2000 S. Holly Street Denver, CO 80222 Federal Highway Administration Offices - 2300 W. Dakota Avenue Lakewood, CO 80228 City and County of Denver Webb Building - 201 W. Colfax Avenue, Denver, CO 80202 Barnum Recreational Center - 360 Hooker Street, Denver, CO 80219 Rude Park Recreational Center - 2855 W Holden Place, Denver, CO 80204 Denver Workforce Center at Westside - 1200 Federal Boulevard Denver, CO 80204
C O N S U LT I N G E N G I N E E R S
TSIOUVARAS SIMMONS HOLDERNESS
How to Comment on the Federal Boulevard EAFORMAS PARA COMUNICAR SU OPINIÓN