Federal Acquisition Service
U.S. General Services Administration
GSA Helping Gov Go Green!Doubletree Crystal CityArlington, VA
GSA Helping Gov Go Green!Doubletree Crystal CityArlington, VA
Energy, Environmental and Sustainable Solutions through GSA MAS
Energy, Environmental and Sustainable Solutions through GSA MAS
March 31, 2010March 31, 2010
Federal Acquisition Service
2
Environmental Services
Carolyn DiCugno
Energy Management Services
Jennifer Hazelman
Environmental & Energy Savings
Products/Services
Lyn DePriest
Session Speakers
Federal Acquisition Service
3
Environmental Services Schedule 899by Carolyn DiCugno
Assists Federal agencies in complying with
environmental regulations; achieving sustainable
environmental goals; and supporting green initiatives.
www.gsa.gov/environmental
1-800-241-RAIN (7246)
environmental @gsa.gov
Federal Acquisition Service
4
Environmental Consulting Services
Environmental planning and documentation Compliance Waste management Development of environmental improvement
programs
Federal Acquisition Service
5
Environmental Training Services
Training professionals offer a wide range of environmental management training
Develop conventional courses and presentations Customize courses Develop computer/web-based interactive training
Federal Acquisition Service
6
Materials and Waste Recycling and Disposal Services
Electronics and universal waste (end-of-life) Hazardous and non-hazardous materials Solid, industrial, mining, and oilfield waste Construction debris
Federal Acquisition Service
7
Geographic Information Systems (GIS)Services
Natural resource planning Migration pattern analysis Pollution analysis Emergency preparedness planning
Federal Acquisition Service
8
Remediation and Reclamation Services
Brownfield redevelopment Wetland restoration Wasteland reclamation Emergency response cleanup
Federal Acquisition Service
9
Environmental Sustainable Solution
USACE needed Environmental specialist to drill, remove and test more than 50 monitoring wells
Government savings over $54M Timeframe reduced from 15 years to 4 years Preferred choice in overall best value
Federal Acquisition Service
10
ENERGY MANAGEMENT SERVICESby Jennifer Hazelman
Includes the major categories of energy management program support in energy audits, metering and building commissioning, etc.
www.gsa.gov/energyservices
Schedule 03FACFacilities Maintenance & Management
Federal Acquisition Service
11
Laws and Regulations
The American Recovery and Reinvestment Act of 2009 Executive Order 13514, “Federal Leadership in
Environmental, Energy and Economic Performance” (October 2009)
Executive Order 13423, “Strengthening Federal Environmental, Energy and Transportation Management” (January 2007)
The Energy Policy Act (EPAct) 2005 The Energy Independence and Security Act of 2007
(originally named the CLEAN Energy Act of 2007) Agency specific regulations
Federal Acquisition Service
12
Reduction Goals for Federal Facilities
Reduce building energy intensity 3% annually or 30% total by FY 2015 (2003 baseline)
Reduce water consumption 2% annually or 26% total by FY 2020
(2007 baseline)
Federal Acquisition Service
13
Renewable Energy Goals
EPAct 05 directs agencies to obtain the following percentage of purchased electricity from renewable sources:
2009 3% 2010-2012 5% 2013 > 7.5%
EO 13423 – encourages agencies to obtain half of the renewable energy from new sources and on-site where feasible
EISA directed not less than 30% of hot water demand in new buildings shall be from solar, if cost effective
Federal Acquisition Service
14
Green House Gas Emissions (GHG)
Develop GHG Percentage Reduction Target Scope 1 & 2 by January 3, 2010 Scope 3 by June 2, 2010
GHG Emission Reductions Energy reduction Renewable Energy Systems
GHG Emission Reporting Report GHG emission inventory for FY2010 by
January 5, 2011
Federal Acquisition Service
15
Energy Management Solutions
Energy Management Planning and Strategies A four-phase Comprehensive Energy Management
Solution consisting of all four phases of an energy
project such a building retrofits, renewable energy
projects, etc. Consulting/Auditing/Energy Management Solutions Concept Development and Requirements Analysis Implementation and Change Management Measurement and Verification
Federal Acquisition Service
16
Energy Management Solutions
Training on Energy Management Reducing energy consumption Energy awareness Mitigating risk with energy
systems Energy efficient systems Operational assistance Obtaining LEED certification
Federal Acquisition Service
17
Energy Management Solutions
Metering Services Install meters and software to
track real time data on energy consumption of a facility, building or equipment
Gas, electric, steam and water
Federal Acquisition Service
18
Energy Management Solutions
Energy Program Support Services Billing management and oversight Allocation of costs Assistance with preparing energy
statements of work Building Commissioning Services
Includes commissioning, re-commissioning and
retro-commissioning services Ensures a building is designed and operating in
the optimal energy efficient manner
Federal Acquisition Service
19
Energy Management Solutions
Energy Audit Services Audits ranging from cursory to comprehensive Energy analysis, data collection, benchmarking
and the identification of energy conservation
measures Development, execution and reporting of audit
plans Resource Efficiency Management
Onsite analysis of current operation, equipment
and energy purchasing patterns
Federal Acquisition Service
20
Energy Management Solutions
Innovations in Energy Renewable Energy Feasibility Studies Solar Energy Wind Power Hydropower Biomass Conversion Fuel Cells Geothermal Carbon Footprint Sustainability
Federal Acquisition Service
21
Energy Management Solutions
Water Conservation Services and consulting
focused on reduction of water
usage Water audits, water balance,
and water system analysis
Federal Acquisition Service
22
Statements of Work
GSA samples We are compiling some samples and can provide
them upon request
Developing a statement of work GSA contractors can provide assistance in
developing a statement of work
Federal Acquisition Service
23
Customer Success Stories Energy Audits - VA National Energy Business Center
Used Schedule 03FAC for $11 million in energy audits for
facilities nationwide Audits done quickly – short procurement lead times Allowed for implementation of energy conservation
measures in Phase II
Energy Audits & Building Commissioning Services - North Dakota National Guard
BPAs were set up with six energy management schedule
contract holders – Schedule 03FAC BPAs have shortened lead time for National Guard Able to use for multiple bases without re-competing
Federal Acquisition Service
24
Environmental & Energy SavingsProducts/Servicesby Lyn DePriest
Schedule 56 – Building Materials
Schedule 73 – Food Service
Schedule 84 – Alarm & ESPCs
Schedule 541 – Green Events
www.gsa.gov/generalproducts
Federal Acquisition Service
25
Environmental Products Food Service, Hospitality, Cleaning Equipment/Supplies,
Chemicals and Related Services (Schedule 73)
Energy Star Fryers, griddles Hot food holding cabinets Ovens Refrigerators and freezers Steam cookers
Bio-Based / Non-Ozone Depleting / Low Non-Toxic De-Icers, concrete/asphalt release fluids Graffiti and grease removers Diesel fuel additives Trash cans and liners Carpet and upholstery cleaners Bathroom and spa cleaners Sorbents Hand cleaners and sanitizers Personal care and toiletries Food service containers Cutlery
Federal Acquisition Service
26
Environmental Products
Buildings and Building Materials/Industrial Servicesand Supplies (Schedule 56)
Energy Efficient Air conditioners (room and central) Boilers Fans (ventilating and ceiling) Programmable thermostats Water heaters (condensing, solar, high efficiency, whole-home tankless) Heat pumps Energy saving lighting (bulbs, fixtures, decorative, LED, retrofit kits)
Bio-Based Insulating foam Composite panels (acoustical, interior/structural wall and plastic lumber) Roof coatings
Federal Acquisition Service
27
Environmental Products
Buildings and Building Materials / Industrial
Services and Supplies (Schedule 56)
WaterSense Bathroom Sink Faucets High Efficiency Toilets Flushing urinals Pre-rinse Spray Valves Showerheads Weather or Sensor Based Irrigation Control Technologies
Federal Acquisition Service
28
Alternative/Renewable/Sustainable Energy Solutions
Buildings and Building Materials/Industrial
Services and Supplies (Schedule 56)Solar Energy SystemsSolar Powered Indoor/Outdoor Lighting
Marine, Aviation, Roadway, SignageFuel CellsWind Energy Systems
Wind TurbinesHydrogen Based Energy Systems
Federal Acquisition Service
29
Alternative/Renewable/Sustainable Energy Solutions
Buildings and Building Materials / Industrial
Services and Supplies (Schedule 56)
Sustainable Roofing Systems Vegetative Photovoltaic (PV) Reflective
Federal Acquisition Service
30
Energy Savings Performance Solutions (ESPCs)
Security, Law Enforcement & Facilities Management (Schedule 84)
Contractor and Agency enter into agreement for the contractor to perform an Investment Grade Audit (IGE)
Upon agreement of the price, scope of work and M&V Plan a delivery/task order shall be issued by the ordering agency
Upon acceptance of the work, the guarantee period shall begin
Administration Plan and Periodic M&V required
Federal Acquisition Service
31
Added Features for Turnkey Solutions
Installation/Integration Maintenance Training Consulting Ancillary Repair and Alterations
Federal Acquisition Service
32
Reducing Your Carbon Footprint Advertising & Integrated Marketing Solutions (Schedule 541)
Note: Schedule 541 does not have an official “Green” designation under the Program or Category (SIN) level, but buying activities may include in their Statement of Work (SOW) requirements for a schedule contractor to offer functions that emphasize and incorporate green attributes in their offerings. Examples are:
Email campaigns -vs- hard copy catalogs Green events and/or meetings (Statement of Work)
Negotiate catering based on recycled environmentally friendly supplies (plates, cups, utensils etc.)
Require recycle containers to collect cans, plastics and paper products
Maximize the use and collection of recyclable items (badge holders, signage etc.)
Think out of the Box!! Make Green Second Nature
Federal Acquisition Service
33
Success Stories U.S. Forest Service
Requirement - Compostable Cutlery for field personnel Challenge - Sources not on existing contract Result - GSA solicited and awarded contracts under Schedule 73
U. S. Army Fort Carson (Logistics & Dining Facility) Requirement – Replace top 40 “hospitality and food service” items with “green”
substitutes to help fulfill sustainable procurement goals (environmentally friendly, biodegradable, recycled material)
Challenge - Define top 40 and determine if existing contracts were in place Result - GSA personnel worked closely with the activity to identify items offered
under Schedule 73, and actively solicited vendors with compliant items to offer and receive awards.
Veterans Administration – Dallas, TX & Loma Linda, CA Requirement - Solar Lighting & Installation (Total Solution) Challenge – Solar lighting products under schedule, but installation services
were not Result - GSA worked with contractors to modify existing contracts to ensure a
total solution was available under contract for the customer
Federal Acquisition Service
34
Home to 10th Mountain Division
Geothermal heat pumps High efficiency HVAC upgrades New high efficiency lighting system Infrared heating system Pneumatic tool system isolated to reduce energy Direct Digital Controls (DDC) network
Installation Sq. Ft.: 11.8 million Contract Dates: 2003 - 2009 Contract Amount: $6.6 million
Product/Services Provided
Guaranteed ESPC
ESPC Project using GSA Schedule 84
Success StoriesESPC – U. S. Army Ft. Drum
Federal Acquisition Service
35
Points of Contact
Carolyn DiCugno 253.931.7042 [email protected]
Jennifer [email protected]
Lyn DePriest 817.574.2372 [email protected]
Federal Acquisition Service
36
Closing Thoughts and/or Questions?