4
800.256.2190 DRAWN BY: DATE: SHEET: SCALE: THIS DRAWING IS THE PROPERTY OF CHILLRITE MANUFACTURING AND SHOULD NOT BE USED OR RECREATED WITHOUT WRITTEN CONSENT FROM CHILLRITE. SK General Frost Rail Detail 1/4 1:12 7/16/2019 FEATURES · CREATES AN AESTHETICALLY PLEASING & UNIQUE CRISP, DRY LAYER OF FROST ON BAR TOP · IDEAL FOR PATRONS TO REST BEER MUGS & COCKTAILS UPON · BUILT IN HEATING SYSTEM ELIMINATES ANY UNWANTED CONDENSATION · CUSTOMIZED TO FIT YOUR BAR NEEDS · PLEASE CONTACT FACTORY FOR SPECIAL APPLICATIONS

FEATURES - Chill-Rite 32

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

800.

256.

2190

DR

AW

N B

Y:

DA

TE

:

SH

EE

T:

SC

ALE

:

TH

IS

D

RA

WIN

G IS

T

HE

P

RO

PE

RT

Y O

F C

HILLR

IT

E

MA

NU

FA

CT

UR

IN

G A

ND

S

HO

ULD

N

OT

B

E U

SE

D O

R R

EC

RE

AT

ED

WIT

HO

UT

W

RIT

TE

N C

ON

SE

NT

F

RO

M C

HILLR

IT

E.

SK

Gen

eral

Fro

st R

ail D

etai

l

1/4

1:12

7/16

/201

9

FEATURES· CREATES AN AESTHETICALLY PLEASING &

UNIQUE CRISP, DRY LAYER OF FROST ON BARTOP

· IDEAL FOR PATRONS TO REST BEER MUGS &COCKTAILS UPON

· BUILT IN HEATING SYSTEM ELIMINATES ANYUNWANTED CONDENSATION

· CUSTOMIZED TO FIT YOUR BAR NEEDS· PLEASE CONTACT FACTORY FOR SPECIAL

APPLICATIONS

800.

256.

2190

DR

AW

N B

Y:

DA

TE

:

SH

EE

T:

SC

ALE

:

TH

IS

D

RA

WIN

G IS

T

HE

P

RO

PE

RT

Y O

F C

HILLR

IT

E

MA

NU

FA

CT

UR

IN

G A

ND

S

HO

ULD

N

OT

B

E U

SE

D O

R R

EC

RE

AT

ED

WIT

HO

UT

W

RIT

TE

N C

ON

SE

NT

F

RO

M C

HILLR

IT

E.

SK

Gen

eral

Fro

st R

ail D

etai

l

2/4

1:15

7/16

/201

9

Heater System

Control Box

Electrical

Outlet

115V 10 AMP

Drain Lines

Heater Cable

Insulated Copper

Tubing

Insulated Copper

Jumper

Minimum 4" Chase

Drain

Top Cap

Ice Area

Bar Top

Minimum 4"

Space Needed

4" Minimum

Clearance

Bartender Side

Customer Side

800.

256.

2190

DR

AW

N B

Y:

DA

TE

:

SH

EE

T:

SC

ALE

:

TH

IS

D

RA

WIN

G IS

T

HE

P

RO

PE

RT

Y O

F C

HILLR

IT

E

MA

NU

FA

CT

UR

IN

G A

ND

S

HO

ULD

N

OT

B

E U

SE

D O

R R

EC

RE

AT

ED

WIT

HO

UT

W

RIT

TE

N C

ON

SE

NT

F

RO

M C

HILLR

IT

E.

SK

Gen

eral

Fro

st R

ail D

etai

l

3/4

1:20

7/16

/201

9

Drain

Frost Rail

Insulated

Copper

Tubing

Insulated Copper

Jumper

Drain Tubing

Heater System

Control Box

(10"x8"x3")

4" Min

Chase

Heater Cable

Bolts

(4 Per Section)

Die Wall

Drain

75' Max

Run From

Frost Rail

To Chiller

ICE-75 Unit

4" Min

Chase

5

8

" Insulated

Suction Line

1

2

" Liquid Line

Copper

Tubing

800.

256.

2190

DR

AW

N B

Y:

DA

TE

:

SH

EE

T:

SC

ALE

:

TH

IS

D

RA

WIN

G IS

T

HE

P

RO

PE

RT

Y O

F C

HILLR

IT

E

MA

NU

FA

CT

UR

IN

G A

ND

S

HO

ULD

N

OT

B

E U

SE

D O

R R

EC

RE

AT

ED

WIT

HO

UT

W

RIT

TE

N C

ON

SE

NT

F

RO

M C

HILLR

IT

E.

SK

Gen

eral

Fro

st R

ail D

etai

l

4/4

1:8

7/16

/201

9

2in

5

1

4

in

1

8

inch Layer

of Silicone

Ice Layer

REQUIREMENTS· SIGNED APPROVAL DRAWINGS ARE REQUIRED BEFORE

MANUFACTURING CAN BEGIN· FROST RAIL MUST BE PLACED ON BARTENDER SIDE OF

THE DIE WALL· MINIMUM CLEARANCE UNDER BOTTOM OF BAR TOP OF

4" REQUIRED FOR ALL SECTION SEEMS· (1) 115V RECEPTACLE UNDER BAR FOR HEATING SYSTEM

CONTROL BOX· ICE-75 SERIES CONDENSING UNIT IS USED FOR ALL

FROST RAIL APLICATIONS· MAX 75' BETWEEN FROST RAIL AND CHILLING UNIT

Die Wall

1

8

Layer On

Bottom For

Leveling

4" Chase

Required

28in

15

1

4

in

20in