14
Feasibility Report and Detailed Project Report for Planning and Construction of a Grade Separator Connecting Anna Salai and Mahalingapuram through Usman Road suitably integrating existing Flyovers in the route for Chennai Corporation

Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

Embed Size (px)

Citation preview

Page 1: Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

Feasibility Report and Detailed Project Report for Planning and Construction of a Grade Separator Connecting Anna Salai and Mahalingapuram through Usman Road suitably integrating existing Flyovers in the route for Chennai Corporation

Page 2: Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

Falls in Zone IX,X,XIII of CoC

Length - 3.5km in busy shopping area

9 Major junctions

Grade separators at 2 junctions at 800m apart

Project Corridor (Usman Road)

2

Below T.Nagar Flyover Near Habibullah Road Jn

South Usman Road Siva Vishnu temple

Page 3: Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

Alternatives – Elevated Corridor from Anna Salai to Mahalingapuram

3

Alt. Description Status

1-6 Elevated Continuous/Discontinuous corridor from Anna Salai to Mahalingapuram

Not feasible

7 Extension of Usman Road Flyover on Southern side covering Burkit Road Junction

Under consideration

8 Elevated 2 Lane Corridor between Boag Road junction and beyond Bazullah Road junction ending before Mahalingapuram Flyover (Disturbing both northern and southern approach of Usman Road Flyover)

Under consideration

9 Elevated 2 Lane Corridor between Boag Road junction and beyond Bazullah Road junction ending before Mahalingapuram Flyover (Disturbing only southern approach of Usman Road Flyover)

Under consideration

Page 4: Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

Pedestrian Zone - Madley road Jn. to Duraisamy road Jn.

4

• Heavy pedestrian movements along the corridor - 4000 to 6000

• Heavy pedestrian crossings at Bus stand, Ranganathan street jn. , Duraisamy road jn.

• Proposed for “Pedestrian Zone”

• Pedestrian subway across Madley road and Duraisamy road

Page 5: Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

Alternative 7 Extension of Usman Road Flyover Covering Burkit Road Junction

5

Item Details

Length & Width 1.5 km & 10m

Total Project Cost INR 260 Crores

EIRR (base case) 19%

• Extension of Usman Road Flyover covering Burkit road junction

• Eliminates major pedestrian - Vehicle conflict at Ranganathan street junction and near T.Nagar bus terminus

• Facilitates free flow of about 4000 pedestrians during peak hour from Pedestrian zone to the railway station and bus stand & vice versa

• 50% of traffic flowing at- grade will use the flyover

• North bound MTC buses have to take a detour using Boag road and Muthurangan road to enter and exit from Bus stand

• Involves reconstruction of southern side of approach ramp of Usman

road flyover

Page 6: Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

Alternative-7

6 L-Section

Page 7: Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

7

• Extension of Usman Road Flyover on both approaches with 5.5m clearance to create hassle free shopping environment

• Eliminates major pedestrian - Vehicle conflict at Ranganathan street junction and near T.Nagar bus terminus

• Free flow of about 4000 pedestrians during peak hour from Pedestrian zone to the railway station and T Nagar bus stand & vice versa

• 35% of N-S straight traffic flowing at- grade will use the flyover

• Part of through & North bound buses will be benefited with flyover & few bus routes needs to be diverted

• Involves reconstruction of both approach ramps of Usman road

flyover for integration with the proposed flyover

Alternative 8

Elevated continuous 2 Lane Corridor of 10m carriageway between Boag Road junction and beyond Bazullah Road junction ending before Mahalingapuram Flyover (Disturbing both approach ramps of Usman Road Flyover)

Item Details

Length & Width 2.2 km & 10m

Total Project Cost INR 384 Crores

EIRR (base case) 12%

Page 8: Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

Alternative-8

8 L-Section

Page 9: Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

9

Alternative 9

Elevated continuous 2 Lane Corridor of 10m carriageway between Boag Road junction and beyond Bazullah Road junction ending before Mahalingapuram Flyover (Disturbing only southern approach ramp of Usman Road Flyover)

Extension of only Southern Side of Usman Road Flyover

with 5.5m clearance + Isolated flyover across Bazulla road

Involves reconstruction of only southern approach ramp

of Usman road flyover for integration with the proposed

flyover

The other features & benefits are same as Alternative 8

Item Details

Length & Width 2.2 km & 10m

Total Project Cost INR 342 Crores

EIRR (base case) 14%

Page 10: Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

Alternative-9

10 L-Section

Page 11: Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

11

Typical Cross Section of Approaches

Typical Cross Section of Approaches - Ramp Portion of the Flyover

Proposed Cross Section

Page 12: Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

12

Proposed Elevated structure

Cross Section - Usman road flyover

Proposed Cross Section

Page 13: Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

13

Typical Cross Section at grade between Bazullah jn. flyover and Mahalingapuram flyover

Proposed Cross Section

Transition from 10000 to 7000

Page 14: Feasibility Report and Detailed Project Report for ...chennaicorporation.gov.in/images/Stakeholder Meeting English.pdf · Feasibility Report and Detailed Project Report for Planning

Please send your Opinion / suggestions on or before 06.01.2014 to:

[email protected]

[email protected]

14