FEASIBILITY ANALYSIS FOR INSTALLING FEASIBILITY ANALYSIS FOR INSTALLING A CIRCULATING FLUIDIZED BED BOILER A CIRCULATING FLUIDIZED BED BOILER FOR COFIRING MULTIPLE BIOFUELS AND FOR COFIRING MULTIPLE BIOFUELS AND OTHER WASTES WITH COAL AT PENN OTHER WASTES WITH COAL AT PENN STATE UNIVERSITY STATE UNIVERSITY Bruce G. Miller Bruce G. Miller Project Kick Project Kick- Off Meeting Off Meeting Grant No. DE Grant No. DE- FG26 FG26- 00NT40809 00NT40809 U.S. DOE National Energy Technology Laboratory U.S. DOE National Energy Technology Laboratory Pittsburgh, PA Pittsburgh, PA October 24, 2000 October 24, 2000 The Energy Institute The Energy Institute

FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

FEASIBILITY ANALYSIS FOR INSTALLING FEASIBILITY ANALYSIS FOR INSTALLING A CIRCULATING FLUIDIZED BED BOILER A CIRCULATING FLUIDIZED BED BOILER FOR COFIRING MULTIPLE BIOFUELS AND FOR COFIRING MULTIPLE BIOFUELS AND OTHER WASTES WITH COAL AT PENN OTHER WASTES WITH COAL AT PENN STATE UNIVERSITYSTATE UNIVERSITY

Bruce G. MillerBruce G. MillerProject KickProject Kick-- Off MeetingOff MeetingGrant No. DEGrant No. DE--FG26FG26--00NT4080900NT40809U.S. DOE National Energy Technology LaboratoryU.S. DOE National Energy Technology Laboratory

Pittsburgh, PAPittsburgh, PAOctober 24, 2000October 24, 2000

The Energy InstituteThe Energy Institute

Page 2: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

PROJECT OBJECTIVEPROJECT OBJECTIVE

uu Perform a feasibility analysis on installing Perform a feasibility analysis on installing a statea state--ofof-- thethe--art CFB boiler and ceramic art CFB boiler and ceramic filter emission control device for cofiring filter emission control device for cofiring multiple biofuels and other wastes with multiple biofuels and other wastes with coal or coal refuse.coal or coal refuse.

uu Develop a test program to evaluate Develop a test program to evaluate cofiring multiple biofuels and coalcofiring multiple biofuels and coal --based based feedstocks.feedstocks.

Page 3: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

PROJECT PARTICIPANTSPROJECT PARTICIPANTS

uu Penn State UniversityPenn State University

—— The Energy InstituteThe Energy Institute

—— Office of Physical PlantOffice of Physical Plant

—— College of Agricultural SciencesCollege of Agricultural Sciences

—— Farm OperationsFarm Operations

—— Agricultural & Biological Agricultural & Biological Engineering DepartmentEngineering Department

—— Horticulture DepartmentHorticulture Department

uu Foster WheelerFoster Wheeler

uu Cofiring AlternativesCofiring Alternatives

Page 4: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

CFB BOILER SYSTEM WILL BE UNIQUE:CFB BOILER SYSTEM WILL BE UNIQUE:

1) be compact vs. traditional design1) be compact vs. traditional design

2) include modules for ceramic filters2) include modules for ceramic filters

3) contain an advanced instrumentation package 3) contain an advanced instrumentation package including temperature and pressure sensors, including temperature and pressure sensors, deposition and slagging probes, heat flux deposition and slagging probes, heat flux meters, and corrosion/erosion panelsmeters, and corrosion/erosion panels

4) contain multi4) contain multi --fuel capabilitiesfuel capabilities

5) be a commercial facility in a rural, agricultural 5) be a commercial facility in a rural, agricultural setting that contains an engineering and setting that contains an engineering and agriculturalagricultural --based universitybased university

Page 5: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

THE STATETHE STATE -- OFOF--THETHE-- ART CFB BOILER ART CFB BOILER SYSTEM WILL ALLOW THE SYSTEM WILL ALLOW THE

UNIVERSITY TO:UNIVERSITY TO:uu more more economically supply heateconomically supply heat to the University to the University

Park CampusPark Campus

uu reduce the amount of airreduce the amount of air --borne pollutantsborne pollutants (NO(NO XX , , SOSO 22 , fine PM, and potentially trace elements), , fine PM, and potentially trace elements), thus helping to reduce the overall emissions from thus helping to reduce the overall emissions from the University’s central heating plantthe University’s central heating plant

uu reduce the amount of agricultural and other waste reduce the amount of agricultural and other waste productsproducts produced by the Universityproduced by the University

uu help help reduce the amount of COreduce the amount of CO 22 emissionsemissions by by combusting waste biofuelscombusting waste biofuels

uu serve as a serve as a commercial demonstrationcommercial demonstration--size test size test facilityfacility for federally and other outside sourcefor federally and other outside source--funded R&D projectsfunded R&D projects

Page 6: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

THE FEASIBILITY ANALYSIS WILL ASSESS:THE FEASIBILITY ANALYSIS WILL ASSESS:

uu the the economics of producing steameconomics of producing steam

uu the the economics of offeconomics of off --setssets such as utilizing such as utilizing multiple biomass and other wastesmultiple biomass and other wastes

uu the the valuevalue of a unique CFB test facility to perform of a unique CFB test facility to perform researchresearch for industry and government agenciesfor industry and government agencies

uu the the environmental aspectsenvironmental aspects of the CFB boilerof the CFB boiler

uu the the availability of fundingavailability of funding from multiple sources from multiple sources including University, state, and federal sourcesincluding University, state, and federal sources

The feasibility study The feasibility study will also include developing a will also include developing a multimulti --year programyear program to test biofuels in a boiler to test biofuels in a boiler system that is heavily instrumented and able to system that is heavily instrumented and able to handle multiple fuels. handle multiple fuels.

Page 7: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

PENN STATE’S WEST CAMPUS AND EAST CAMPUS STEAM PLANTSPENN STATE’S WEST CAMPUS AND EAST CAMPUS STEAM PLANTS

WCSP

ECSP

• 4 vibra-grate stokers (32 to 39 years old) 450,000 lb steam / h

• 1 gas / oil-fired boiler (53 years old) 60,000 lb steam / h

• 2 steam turbine driven generators 6,500 kW

• 2 gas / oil-fired boilers (29 years old) 200,000 lb steam / h

ECSP

WCSP

Page 8: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

MILESTONE SCHEDULEMILESTONE SCHEDULE

2000 2001

June July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. April May June

1² 2²

Task 1. Information and Sample Collection

1,2²

Task 2. Biofuels and Biofuel Coal

Characterization

Task 3. Develop Conceptual Design

Task 4. Develop Preliminary Test Program/

Budget

1² 2² 3²

Task 5. Determine System/Program

Economics

Task 6. Complete Feasibility Study

1 2² 3² 4²

Task 7. Project Management/Reporting

2000 2001June July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. April May June

Task 1. Information and Sample Collection

Task 2. Biofuels and Biofuel Coal Characterization

Task 3. Develop Conceptual Design

Task 4. Develop Preliminary Test Program/ Budget

Task 5. Determine System/ Program Economics

Task 6. Complete Feasibility Study

Task 7. Project Management/ Reporting

1∆∆ 2∆∆

1,2∆∆

3∆∆

4∆∆

1∆∆

1∆∆

1∆∆ 2∆∆

1∆∆

1∆∆ 2∆∆ 3∆∆

Page 9: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

SUMMARY OF ACTIVITIESSUMMARY OF ACTIVITIESTask 1. Information and Sample CollectionTask 1. Information and Sample Collection

ll Assemble system requirements and infrastructure Assemble system requirements and infrastructure requirementsrequirements

ll Collect representative samples of biofuel, coal, and Collect representative samples of biofuel, coal, and coal refusecoal refuse

Task 2. Characterize Biofuels and Biofuel/Coal Task 2. Characterize Biofuels and Biofuel/Coal CombinationsCombinations

ll Analyze samplesAnalyze samples

ll Assess issues such as materials handling, Assess issues such as materials handling, deposition, and emissionsdeposition, and emissions

Task 3. Develop Conceptual DesignTask 3. Develop Conceptual Design

ll Design a stateDesign a state--ofof--thethe--art CFB boiler system to art CFB boiler system to address objectivesaddress objectives

Page 10: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

SUMMARY OF ACTIVITIES (continued)SUMMARY OF ACTIVITIES (continued)

Task 4. Develop Preliminary Test Program/BudgetTask 4. Develop Preliminary Test Program/Budget

ll Develop and cost a 3Develop and cost a 3 --5 year test program to 5 year test program to use the CFB boiler systemuse the CFB boiler system

Task 5. Determine System/Program EconomicsTask 5. Determine System/Program Economics

ll Determine capital and operating costsDetermine capital and operating costs

ll Assess availability of funding for the system Assess availability of funding for the system and test programand test program

Task 6. Complete Feasibility StudyTask 6. Complete Feasibility Study

ll Integrate results from Tasks 1 through 5 Integrate results from Tasks 1 through 5

Page 11: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

PROJECT STATUSPROJECT STATUS

ll Contract signed 06/15/00Contract signed 06/15/00

ll Subcontract executed with Cofiring Subcontract executed with Cofiring Alternatives 09/25/00Alternatives 09/25/00

ll Subcontract still being negotiated with Foster Subcontract still being negotiated with Foster WheelerWheeler

ll Assessment of the types and quantities of Assessment of the types and quantities of potential feedstocks has startedpotential feedstocks has started

ll Preliminary list of potential feedstocks Preliminary list of potential feedstocks developeddeveloped

Page 12: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

PROJECT STATUS (continued)PROJECT STATUS (continued)

Sample collection and analyses have startedSample collection and analyses have started

—— Waste Water Treatment Plant Sludge Waste Water Treatment Plant Sludge –– Dairy TieDairy Tie--Stall ManureStall Manure

—— WWTP Digester EffluentWWTP Digester Effluent –– Dairy FreeDairy Free--Stall ManureStall Manure

—— Pine ChipsPine Chips –– Mulch HayMulch Hay

—— Pine ShavingsPine Shavings –– Mulch LeavesMulch Leaves

—— Red Oak ShavingsRed Oak Shavings –– Bale TarpBale Tarp

—— Stoker boiler fly ashStoker boiler fly ash –– Silo Bunker CoverSilo Bunker Cover

—— Stoker boiler bottom ashStoker boiler bottom ash –– Sheep ManureSheep Manure

—— Hard Plastic (Horticulture Dept.)Hard Plastic (Horticulture Dept.) –– Beef Barn ManureBeef Barn Manure

—— Plastic BagsPlastic Bags –– Swine WasteSwine Waste

—— Miscellaneous Manure from Covered Manure BarnMiscellaneous Manure from Covered Manure Barn

Page 13: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

PROJECT ORGANIZATIONAL CHARTPROJECT ORGANIZATIONAL CHARTC O L L E G E O F E A R T H

A N D

M IN E R A L S C I E N C E S

T H E E N E R G Y I N S T I T U T E

Budget Clerk

Bruce G. Mil ler

Project Manager

P E N N S T A T E O F F I C E F O S T E R COFIRING

O F P H Y S I C A L P L A N T W H E E L E R A L T E R N A T I V E S

Robert Cooper Neil R. Raskin, Director Joseph J. Battista, Jr.

Manager, Engineering Services Demonstration Projects Proprietor

Matthew Lapinsky Douglas Donovan David Ti l lman

Environmental Engineer Energy Program Engineer Product Manager

Richard Harris Will iam Serencsits Tom Steitz

Utility Systems Engineer Utility Systems Engineer Project Engineer

Ralph Johnson David Burns

Director of Operations Manager Uti l i ty Service

Page 14: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

STATESTATE--OFOF--THETHE--ART ACFB BOILERART ACFB BOILER

Page 15: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

CONCEPTUAL DESIGNCONCEPTUAL DESIGN

FB1 80

Page 16: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

POTENTIAL CFB FEEDSTOCKSPOTENTIAL CFB FEEDSTOCKS

Material Quantity (tons/yr)

Biomass/Biomass Waste at University ParkAnimal Wastes:

Dairy manure (tie stall and free stallmixed with leaves) 13,200Manure from covered manure barn(poultry litter, horse barn, misc.) 1,180Beef manure 1,033Sheep manure 265Swine waste 2,505

(@ 2.2% solids)Woodwaste/brush 150Pallets 92Reed Canary Grass 600

Other Wastes at University ParkSewage sludge 2,708

(@ 12% solids)Bottom ash 6,990Fly ash 1,445Plastics - total 2.1 Horticulture hard plastics 0.2 Horticulture plastic bags 1.0 Bale tarps 0.5 Silo bunker covers 0.4Used oil 14Tires 5

Biomass from Surrounding RegionWood products (chips/shavings) 20,000

Page 17: FEASIBILITY ANALYSIS FOR INSTALLING A ...sites.science.oregonstate.edu/~hetheriw/energy/topics/...2000/09/25  · u Foster Wheeler u Cofiring Alternatives CFB BOILER SYSTEM WILL BE

WASTE AND BYWASTE AND BY--PRODUCT STREAMS THAT WERE PRODUCED AT THE UNIVERSITY PARK PRODUCT STREAMS THAT WERE PRODUCED AT THE UNIVERSITY PARK

CAMPUS DURING 1998CAMPUS DURING 1998

Material Quantity (tons)Biomass Waste/ By-Products

Bedding/ manure 10,000Wood waste/ brush 150Leaves – Penn State 150Pallets 92

Spoiled hay small amountSpoiled feed small amountGrass clippings small amount

Excess lumber unknown small amountWoodchips/ sawdust unknown small amountChicken litter unknown small amount

Other Wastes

Garbage 6,719Bottom ash 6,394Fly ash 1,400Paper 736Cardboard 472Sewage sludge 360Newspaper 200Dead animals 95Food waste 93Used oil 14Tires 5Agricultural plastics – animal feed bags 5Agricultural plastics – horticulture use 2