38
STS-130/20A FD 10 Execute Package MSG Page(s) Title 122B 1 - 14 FD10 Flight Plan Revision (Not Printed Onboard) 123 15 - 16 FD10 Mission Summary (Not Printed Onboard) 124 --- Daily Summary (Electronic Only. Not Printed Onboard) 125A 17 - 23 FD10 Transfer Message (Printed Onboard) 126 --- Stowage Locations for FD10 (GMT 048) (Electronic Only. Not Printed Onboard) 127 24 - 35 1.162 Cupola Audio Terminal Unit (ATU) Installation (Printed Onboard) 128 --- IMMT Results - 2/16/10 (Electronic Only. Not Printed Onboard) 130 36 FD10 Crew Choice Downlink (Not Printed Onboard) 131 37 Shuttle Tonopen Calibration Procedure (Printed Onboard) Approved by FAO: R. Smith Last Updated: Feb 16 2010 8:42 PM GMT JEDI (Joint Execute package Development and Integration), v3.0 After Saturday Night Fever After the Corps Record 3 EMU swaps for a single flight w/ 2 EV crewmen?

FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

STS-130/20A FD 10 Execute Package MSG Page(s) Title

122B 1 - 14 FD10 Flight Plan Revision (Not Printed Onboard)

123 15 - 16 FD10 Mission Summary (Not Printed Onboard)

124 --- Daily Summary (Electronic Only. Not Printed Onboard)

125A 17 - 23 FD10 Transfer Message (Printed Onboard)

126 --- Stowage Locations for FD10 (GMT 048) (Electronic Only. Not Printed Onboard)

127 24 - 35 1.162 Cupola Audio Terminal Unit (ATU) Installation (Printed Onboard)

128 --- IMMT Results - 2/16/10 (Electronic Only. Not Printed Onboard)

130 36 FD10 Crew Choice Downlink (Not Printed Onboard)

131 37 Shuttle Tonopen Calibration Procedure (Printed Onboard) Approved by FAO: R. Smith Last Updated: Feb 16 2010 8:42 PM GMT JEDI (Joint Execute package Development and Integration), v3.0

 

 

 

 

    After Saturday Night Fever 

                     

             After the Corps 

 

Record 3 EMU swaps for a single flight w/ 2 EV crewmen? 

Page 2: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

MSG 122B (22-0743B) - FD10 FLIGHT PLAN REVISION Page 1 of 14

1 MSG INDEX 2

3 MSG NO. TITLE 4

5 6 7 8 9

10 11 12 13 14 15

MSG-122 FD10 Flight Plan Revision MSG-123 FD10 Mission Summary MSG-124 Daily Summary MSG-125 FD10 Transfer Message MSG-126 Stowage Locations for FD10 (GMT 048) MSG-127 1.162 Cupola Audio Terminal Unit (ATU) Installation MSG-128 IMMT Results - 2/16/10 MSG-130 FD10 Crew Choice Downlink MSG-131 Shuttle Tonopen Calibration Procedure 1. Post-Sleep Cryo Config 16

17

18

19 20

21 22 23 24 25

26 27

For today's Post-Sleep cryo config, O2 tanks 1, 3 & 4 and H2 tanks 1 and 4 will be active. R1 O2,H2 MANF VLV TK1 (two) - OP (tb-OP) O2 TK3 HTR A - AUTO A11 CRYO TK4 HTR O2 A - AUTO A15 CRYO TK5 HTR O2 A - OFF

Pre-Sleep Cryo Config 28

29

30 31

32

33 34

35 36

37

38

39

40

41 42

43

44 45

46 47 48 49 50

√MCC for deltas prior to configuring for Pre-Sleep. For tonight's Pre-Sleep cryo config, Manifold 2 will be closed with O2 tanks 2 and 5 and H2 tanks 2 and 4 active. A15 CRYO TK5 HTR O2 A - AUTO A11 CRYO TK4 HTR O2 A - OFF R1 O2 TK1 HTR A - OFF TK2 HTR A - AUTO TK3 HTR A - OFF H2 TK1 HTRS A,B (two) - OFF TK2 HTRS A,B (two) - AUTO O2,H2 MANF VLV TK2 (two) - CL (tb-CL)

Page 1 of 14, MSG 122B (22-0743B) 1

Page 3: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

MSG 122B (22-0743B) - FD10 FLIGHT PLAN REVISION Page 2 of 14

Page 2 of 14, MSG 122B (22-0743B)

1 2. O2 Transfer via ORCA 2

Tonight the ground will be performing O2 xfer via ORCA. Recall that due to accoustic constraints, we can not have any of you sleeping in the A/L tonight. Sorry for the inconvenience.

3 4 5 6

3. Cupola ATU Install 7 Kay, we wanted to give you a heads up that a window numbering error was caught in the Cupola ATU installation procedure that affects location coding in several points. Since the procedure needed to be updated, we also removed the call down for you to ask which location to install the ATU. The RWS is definitely going to be installed at Windows 2/3 (ISS Fwd), so the ATU install procedure correspondingly now has you install the ATU at Window 6.

8 9

10 11 12 13 14 15 16 17 18

No other technical updates were made, and we uplinked a corrected version to you as MSG 127 (JEDI 22-0695) 1.162 Cupola Audio Terminal Unit (ATU) Installation. Please make sure to use this corrected version during the activity.

4. Question for Kay 19

The CBCS Powerdown and Stow activities were not marked completed yesterday. Can you please confirm that these activities are complete?

20 21 22

5. Photo/TV Config 23 Please configure the D2Xs camera (s/n 1147) light meter to "Matrix". 24

25 6. Food Ops for Extra Docked Day 26

Each of you should eat one day's worth of ISS food to cover the extra docked day. The ISS crew has been informed of this in the Daily Summary. Note that the SOLO food transferred on FD04 is for Tracy's experiment during her increment.

27 28 29 30

32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

7. REPLACE PAGES 2-34 THROUGH 2-37 and 3-104 THROUGH 3-111. 31

2

Page 4: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

02/16/10 14:31:23

FLT PLN/130/FLT

FD10

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

BEHN

KEN

10.2

DPRS

14.7

RPRS

EVA 3 (6:30)

GETAHEAD

GETAHEAD

REPLANNED

2-34

S T S - 1 3 0 S T S ISS

22

2302/17

0102

0304

0506

0708

09GMT 02/

16/10 (047)

12

1314

1516

1718

1920

2122

23009/00

MET

Day 008

CDR

POST

SLE

EP

HYG

BRK/

HATC

HCL

S

EVA-PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

P/TV07 EVA OPS

MEAL

P - R P S

C _ L K

R P R S

P O S T

E V A

W / H 2 0

PMC

A/G

I M U

PWR

FILL #1

C W C

I N I T # 6

C W C

T E R M

L O GP/TV07 EVA OPS

PS

PLT

POST

SLE

EP

P / T V 0 7

E V A S / U

I N H B T

P A DMEAL

CUPOLA PANEL INSTALL

L O G

C U P O L A

W I N D O W

C / OARED

XFER OPS

CUPOLA VEST OUTFIT

B L E E DT O N O P E N

MS1

POST

SLE

EPCUPOLA ATU

INSTALL

CUPOLA FSS FILL

M C I U *

EXERCISE

MEAL

X F E R

U P D A T E

CUPOLA

UOP

INSTALL

MTL SMPL TOOL

INSTL

CUPOLA VEST OUTFIT

MS2

POST

SLE

EPIVA SUPPORT

P - R P S

P _ D P S

EXERCISE

EVA

TOOL

CHECK

M D D K C K

CUP

FN LK CK TRM

CCAA

AV MNT

RMVL

MS3

P - R P S

C _ L K

R P R S

CLNUP

&INGRS

P _ D P S

C_LK

DPRS

EMU

PREBREATHE

E M U

P U R G E

EVA-PREP

HYGI

ENE

BREA

KPO

STSL

EEP

P O S T

E V A

W / H 2 0

CUPOLA MLI

REMOVAL

CUPOLA

LLRELEASE

EVA

EGRS/

SETUP

PMA3 H/D

CABLE INSTL

VSC VIDEO CABLE

INST

A P F R

R E L O C

P1 P-CLAMP

RELEASE

MS4

C _ L K

R P R S

P - R P S

CLNUP

&INGRS

P _ D P S

C_LK

DPRS

EMU

PREBREATHE

E M U

P U R G E

EVA-PREP

HYGI

ENE

BREA

KPO

STSL

EEP

P O S T

E V A

W / H 2 0

OPEN

LOOP

B QDS

CUPOLA MLI

REMOVAL

N 3 L T A

C A B L E

EVA

EGRS/

SETUP

NOD3 OIH/OI WIF

INST

VSC VIDEO

CABLE INST

CUP

MLI

BAG

S/U

P1P-CLAMP

RELEASE

N2 CBM

OPS

DAY/NIGHT

ORBIT

135

136

137

138

139

140

141

142

143

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

TDRS

AVAIL

*FILTER CK

NOTES

2-34

FD10

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

BEHN

KEN

10.2

DPRS

14.7

RPRS

EVA 3 (6:30)

GETAHEAD

GETAHEAD

REPLANNED

S T S - 1 3 0 S T S ISS

22

2302/17

0102

0304

0506

0708

09GMT 02/

16/10 (047)

12

1314

1516

1718

1920

2122

23009/00

MET

Day 008

CDR

POST

SLE

EP

HYG

BRK/

HATC

HCL

S

EVA-PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

P/TV07 EVA OPS

MEAL

P - R P S

C _ L K

R P R S

P O S T

E V A

W / H 2 0

PMC

A/G

I M U

PWR

FILL #1

C W C

I N I T # 6

C W C

T E R M

L O GP/TV07 EVA OPS

PS

PLT

POST

SLE

EP

P / T V 0 7

E V A S / U

I N H B T

P A DMEAL

CUPOLA PANEL INSTALL

L O G

C U P O L A

W I N D O W

C / OARED

XFER OPS

CUPOLA VEST OUTFIT

B L E E DT O N O P E N

MS1

POST

SLE

EPCUPOLA ATU

INSTALL

CUPOLA FSS FILL

M C I U *

EXERCISE

MEAL

X F E R

U P D A T E

CUPOLA

UOP

INSTALL

MTL SMPL TOOL

INSTL

CUPOLA VEST OUTFIT

MS2

POST

SLE

EPIVA SUPPORT

P - R P S

P _ D P S

EXERCISE

EVA

TOOL

CHECK

M D D K C K

CUP

FN LK CK TRM

CCAA

AV MNT

RMVL

MS3

P - R P S

C _ L K

R P R S

CLNUP

&INGRS

P _ D P S

C_LK

DPRS

EMU

PREBREATHE

E M U

P U R G E

EVA-PREP

HYGI

ENE

BREA

KPO

STSL

EEP

P O S T

E V A

W / H 2 0

CUPOLA MLI

REMOVAL

CUPOLA

LLRELEASE

EVA

EGRS/

SETUP

PMA3 H/D

CABLE INSTL

VSC VIDEO CABLE

INST

A P F R

R E L O C

P1 P-CLAMP

RELEASE

MS4

C _ L K

R P R S

P - R P S

CLNUP

&INGRS

P _ D P S

C_LK

DPRS

EMU

PREBREATHE

E M U

P U R G E

EVA-PREP

HYGI

ENE

BREA

KPO

STSL

EEP

P O S T

E V A

W / H 2 0

OPEN

LOOP

B QDS

CUPOLA MLI

REMOVAL

N 3 L T A

C A B L E

EVA

EGRS/

SETUP

NOD3 OIH/OI WIF

INST

VSC VIDEO

CABLE INST

CUP

MLI

BAG

S/U

P1P-CLAMP

RELEASE

N2 CBM

OPS

DAY/NIGHT

ORBIT

135

136

137

138

139

140

141

142

143

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

TDRS

AVAIL

NOTES

*FILTER CK

3

Page 5: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

02/16/10 14:31:23

FLT PLN/130/FLT

FD10

WILL

IAMS

SURA

EV

KOTO

V

CREA

MER

NOGU

CHI

FD10

REPLANNED

2-35

I S S E X P 2 2 STS

22

2302/17

0102

0304

0506

0708

09GMT 02/

16/10 (047)

12

1314

1516

1718

1920

2122

23009/00

MET

Day 008

TDRS

AVAIL

DAY/NIGHT

DAILY ORBIT

161

23

45

67

814

2142

112

112

TLM FORMAT

-XVV +ZLV TEA

ATTITUDE

ALL VHF

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

ISS

CDR

POST

SLE

EPPW

♣HO

PAN1/N3-MTL JMPR-INSTL

H 2 V N T

D C N C T

⊕CEVIS

MEAL

CUPOLA FSS FILL

TVIS

FE-1

POST

SLE

EPPW

ТЕХ-15

DL♦

TVIS

MEAL

БИО-5-INIT

МБИ-15-NEJRO-FE1

ARED

FE-4

POST

SLE

EPPW

Э Л К Т

♥TVIS

ARED

И П - 1

∆MEAL

ГЛАВБОКС-РПР-S/U

♠φ

FE-5

POST

SLE

EPPW

PW

T E S T

•C U C U

∇CEVIS

T2◊

MEAL

R F T A

A C C S S

R F T A

A C C S S

∗RFTA

CLS

RFTA

CLS

WRS RFTA

FILL

QD CNFG

♣⊕

FE-6

POST

SLEE

PHY

GIEN

E BR

EAK

EVA-PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

CEVIS

♦MEAL

G L O V E

T2

P - R P S

C _ L K

R P R S

P O S T

E V A

W / H 2 0

♣N3-

STBD RMO-ADJ

⊕THC-IMV-DUCT VLV2-CL

♦ДЗЗ-12-FE1-PREP-EXE

ДЗЗ-12

-FE1-CLSOUT

♥ТЕХ-15-DAKON-PHOTO

∆IMS-EDIT

♠ГЛАВБОКС-TEST-КНС

φБТХ-39-PREP

•JPM

/LAB

-SHUTTER-CL

∇TOCA ANLYS

◊EHS-TOCA-DATA XFE

R

∗WRS-RFTA-R&R

♣MYCO-PREP

⊕MYCO-ISS CREW-REVIEW

♦WHC-FLUSH TANK-

FILL

NOTES

2-35

FD10

WILL

IAMS

SURA

EV

KOTO

V

CREA

MER

NOGU

CHI

FD10

REPLANNED

I S S E X P 2 2 STS

22

2302/17

0102

0304

0506

0708

09GMT 02/

16/10 (047)

12

1314

1516

1718

1920

2122

23009/00

MET

Day 008

TDRS

AVAIL

DAY/NIGHT

DAILY ORBIT

161

23

45

67

8TLM FORMAT

142

142

112

112

ATTITUDE

-XVV +ZLV TEA

ALL VHF

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

ISS

CDR

POST

SLE

EPPW

♣HO

PAN1/N3-MTL JMPR-INSTL

H 2 V N T

D C N C T

⊕CEVIS

MEAL

CUPOLA FSS FILL

TVIS

FE-1

POST

SLE

EPPW

ТЕХ-15

DL♦

TVIS

MEAL

БИО-5-INIT

МБИ-15-NEJRO-FE1

ARED

FE-4

POST

SLE

EPPW

Э Л К Т

♥TVIS

ARED

И П - 1

∆MEAL

ГЛАВБОКС-РПР-S/U

♠φ

FE-5

POST

SLE

EPPW

PW

T E S T

•C U C U

∇CEVIS

T2◊

MEAL

R F T A

A C C S S

R F T A

A C C S S

∗RFTA

CLS

RFTA

CLS

WRS RFTA

FILL

QD CNFG

♣⊕

FE-6

POST

SLEE

PHY

GIEN

E BR

EAK

EVA-PREP

E M U

P U R G E

EMU

PREBREATHE

C_LK

DPRS

P _ D P S

CEVIS

♦MEAL

G L O V E

T2

P - R P S

C _ L K

R P R S

P O S T

E V A

W / H 2 0

NOTES

♣N3-

STBD RMO-ADJ

⊕THC-IMV-DUCT VLV2-CL

♦ДЗЗ-12-FE1-PREP-EXE

ДЗЗ-12

-FE1-CLSOUT

♥ТЕХ-15-DAKON-PHOTO

∆IMS-EDIT

♠ГЛАВБОКС-TEST-КНС

φБТХ-39-PREP

•JPM

/LAB

-SHUTTER-CL

∇TOCA ANLYS

◊EHS-TOCA-DATA XFE

R

∗WRS-RFTA-R&R

♣MYCO-PREP

⊕MYCO-ISS CREW-REVIEW

♦WHC-FLUSH TANK-

FILL

4

Page 6: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

02/16/10 14:31:23

FLT PLN/130/FLT

FD10

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

BEHN

KEN

FD10

REPLANNED

2-36

S T S - 1 3 0 S T S ISS

10

1112

1314

1516

1718

1920

21GMT 02/

17/10 (048)

009/00

0102

0304

0506

0708

0910

1112

MET

Day 009

CDR

SLEEP

PRE SLEEP

POST

EVA

W/H2

0

F D C O N F

PRE

SLEE

PPM

CA/

G

PLT

SLEEP

PRE SLEEP

O2 C

ONFI

GTO

XFE

R

O 2 I N I T

W C S #

MS1

SLEEP

X F E R

T A G U P

X F E R

B R I E F

PRE

SLEEP

M Y C O *

MS2

SLEEP

PRE

SLEEP

C W C

X F E R

P W R

X F E R

M D D K C K

CCAA AV MNT

RMVL

MS3

SLEEP

PRE

SLEEP

POST

EVA

W/H2

0

MS4

SLEEP

PRE

SLEEP

POST

EVA

W/H2

0

DAY/NIGHT

ORBIT

143

144

145

146

147

148

149

150

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

TDRS

AVAIL

#COM

PACT

*REV

IEW

NOTES

2-36

FD10

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

BEHN

KEN

FD10

REPLANNED

S T S - 1 3 0 S T S ISS

10

1112

1314

1516

1718

1920

21GMT 02/

17/10 (048)

009/00

0102

0304

0506

0708

0910

1112

MET

Day 009

CDR

SLEEP

PRE SLEEP

POST

EVA

W/H2

0

F D C O N F

PRE

SLEE

PPM

CA/

G

PLT

SLEEP

PRE SLEEP

O2 C

ONFI

GTO

XFE

R

O 2 I N I T

W C S #

MS1

SLEEP

X F E R

T A G U P

X F E R

B R I E F

PRE

SLEEP

M Y C O *

MS2

SLEEP

PRE

SLEEP

C W C

X F E R

P W R

X F E R

M D D K C K

CCAA AV MNT

RMVL

MS3

SLEEP

PRE

SLEEP

POST

EVA

W/H2

0

MS4

SLEEP

PRE

SLEEP

POST

EVA

W/H2

0

DAY/NIGHT

ORBIT

143

144

145

146

147

148

149

150

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

TDRS

AVAIL

NOTES

#COM

PACT

*REV

IEW

5

Page 7: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

02/16/10 14:31:23

FLT PLN/130/FLT

FD10

WILL

IAMS

SURA

EV

KOTO

V

CREA

MER

NOGU

CHI

FD10

REPLANNED

2-37

I S S E X P 2 2 STS

10

1112

1314

1516

1718

1920

21GMT 02/

17/10 (048)

009/00

0102

0304

0506

0708

0910

1112

MET

Day 009

TDRS

AVAIL

DAY/NIGHT

DAILY ORBIT

89

1011

1213

1415

1112

TLM FORMAT

-XVV +ZLV TEA

ATTITUDE

ALL VHF

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

ISS

CDR

TVIS

PWPR

E SL

EEP-ISS

SLEEP

FE-1

ARED

PWPR

E SL

EEP-

ISS

♣⊕

SLEEP

FE-4

PWPR

E SL

EEP-

ISS

♥∆

♠SLEEP

FE-5

O2 C

ONFI

GTO

XFE

R

O 2 I N I T

CAMR

RCNF

GPR

E SL

EEP-ISS

SLEEP

FE-6

POST

EVA

W/H2

PWPR

E SL

EEP-ISS

SLEEP

♣PRE SLEEP-ISS

⊕СОГС-ЭЛЕКТР-БД-MONTR

♦СОГ

С-ЭЛ

ЕК-А

Ф-БЖ

-MON

СО

ГС-В

ОЗДУ

Х-БВ

К-RP

LC♥P

RE SLEEP-ISS

∆БИТС-ТМИ-РАЗЪЁМ-CNCT

♠СОГС-ВОЗДУХ-ON

φMYC

O-IS

S CR

EW-R

EVIEW

NOTES

2-37

FD10

WILL

IAMS

SURA

EV

KOTO

V

CREA

MER

NOGU

CHI

FD10

REPLANNED

I S S E X P 2 2 STS

10

1112

1314

1516

1718

1920

21GMT 02/

17/10 (048)

009/00

0102

0304

0506

0708

0910

1112

MET

Day 009

TDRS

AVAIL

DAY/NIGHT

DAILY ORBIT

89

1011

1213

1415

1TLM FORMAT

112

ATTITUDE

-XVV +ZLV TEA

ALL VHF

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

ISS

CDR

TVIS

PWPR

E SL

EEP-ISS

SLEEP

FE-1

ARED

PWPR

E SL

EEP-

ISS

♣⊕

SLEEP

FE-4

PWPR

E SL

EEP-

ISS

♥∆

♠SLEEP

FE-5

O2 C

ONFI

GTO

XFE

R

O 2 I N I T

CAMR

RCNF

GPR

E SL

EEP-ISS

SLEEP

FE-6

POST

EVA

W/H2

PWPR

E SL

EEP-ISS

SLEEP

NOTES

♣PRE SLEEP-ISS

⊕СОГС-ЭЛЕКТР-БД-MONTR

♦СОГ

С-ЭЛ

ЕК-А

Ф-БЖ

-MON

СО

ГС-В

ОЗДУ

Х-БВ

К-RP

LC♥P

RE SLEEP-ISS

∆БИТС-ТМИ-РАЗЪЁМ-CNCT

♠СОГС-ВОЗДУХ-ON

φMYC

O-IS

S CR

EW-R

EVIEW

6

Page 8: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

02/16/10 14:31:57

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

10

FD10 EZ ACTIVITIES:

√O

CAC

FILT

ER &

MDDK

DUCT

SCR

EEN

TE

PC (

STAT

US C

HECK

)

(OR

B OP

S, C

REW

SYS)

HA

RD R

EBOO

T AL

L PG

SCs

EXCE

PT:

S

TS-6

(WLE

S),S

TS-5

(RPO

P2),

&

OCA

ROU

TER.

Return all Shuttle IFM tools

used on ISS, per

MSG

052,

to

E

ndea

vour

pri

or to sleep.

REPLANNED

3-104

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/16

(047)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

8W

EZ

T D R S

~

~

~

D / N

O R B 1 3 5 1 3 6 1 3 7

~ ~B I A S - X L V - Z V VS T S A T T

CDR

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

EVA

SYST

EMS:

1.2

11 H

YGIE

NE BREAK

EVA

SYST

EMS:

1.2

16 E

VA P

REP

EVA

SYST

EMS:

1.2

20 E

MU P

URGE

EVA

SYST

EMS:

1.2

25 E

MU P

REBREATHE

~

PRIV

ATE

MEDI

CAL

CONF

ERENCE

L9

PAYL

OAD

STAT

ION

A/G

(two) - OFF

Per

form

via

A/G

2

SLEE

P LO

GBOO

K (O

RB O

PS,

SDBI)

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

PLT

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

P/TV07 EVA (PHOTO/TV, SCENES)

Perform SETUP

EVA 3 INHIBIT PAD

(EVA, TIMELINES)

SLEEP LOGBOOK (ORB OPS, SDBI)

1.156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O)

Steps 23-24

Ref. MSG 093

~

MO69M LEH O2 8 vlv - OP

TONOPEN - Ref. MSG 131

MS1

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

L17 Check MCIU filter screen

TRANSFER UPDATE

Ref. Transfer List & MSG 125

1.156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O)

Steps 23-24

Ref. MSG 093

~

Notes

3-104

ZAMK

AVI

RTS

HIRE

10

FD10 EZ ACTIVITIES:

√O

CAC

FILT

ER &

MDDK

DUCT

SCR

EEN

TE

PC (

STAT

US C

HECK

)

(OR

B OP

S, C

REW

SYS)

HA

RD R

EBOO

T AL

L PG

SCs

EXCE

PT:

S

TS-6

(WLE

S),S

TS-5

(RPO

P2),

&

OCA

ROU

TER.

Return all Shuttle IFM tools

used on ISS, per

MSG

052,

to

E

ndea

vour

pri

or to sleep.

REPLANNED

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/16

(047)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

8W

EZ

T D R SD / N

O R B 1 3 5 1 3 6 1 3 7

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

EVA

SYST

EMS:

1.2

11 H

YGIE

NE BREAK

EVA

SYST

EMS:

1.2

16 E

VA P

REP

EVA

SYST

EMS:

1.2

20 E

MU P

URGE

~

EVA

SYST

EMS:

1.2

25 E

MU P

REBREATHE

PRIV

ATE

MEDI

CAL

CONF

ERENCE

L9

PAYL

OAD

STAT

ION

A/G

(two) - OFF

Per

form

via

A/G

2

SLEE

P LO

GBOO

K (O

RB O

PS,

SDBI)

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

PLT

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

P/TV07 EVA (PHOTO/TV, SCENES)

Perform SETUP

EVA 3 INHIBIT PAD

(EVA, TIMELINES)

SLEEP LOGBOOK (ORB OPS, SDBI)

~

1.156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O)

Steps 23-24

Ref. MSG 093

MO69M LEH O2 8 vlv - OP

TONOPEN - Ref. MSG 131

MS1

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

L17 Check MCIU filter screen

TRANSFER UPDATE

Ref. Transfer List & MSG 125

~

1.156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O)

Steps 23-24

Ref. MSG 093

Notes

7

Page 9: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

02/16/10 14:31:57

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

10 REPLANNED

GLAC

IER

STAT

US C

HECK (

ASSY OPS,CC)

3-105

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/16

(047)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

8W

EZ

T D R S

~

~

~

D / N

O R B 1 3 5 1 3 6 1 3 7

~ ~B I A S - X L V - Z V VS T S A T T

MS2

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS) EXER

CISE

~

EVA

TOOL

CHE

CK R

ef.

EVA

3 TO

OL C

ONFI

G (E

VA, TIMELINES)

1.18

8 CU

POLA

FIN

E LE

AK C

HECK ON NODE3 DECK

(AS

SY O

PS,

ACT&

C/O) S

teps

2.3,2.5,7.5-end

Ste

p 8-

VAJ/

ISA

setu

p wi

ll be temp stowed

for

PMA

2 de

pres

s us

e. 3

5Ft VAJ to be used

for

FSS

Fil

l op

s to

day.

MS3

EVA SYSTEMS: 1.225 EMU PREBREATHE

~

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 1.216 EVA PREP

EVA SYSTEMS: 1.211 HYGIENE BREAK

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

EVA SYSTEMS: 1.225 EMU PREBREATHE

~

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 1.216 EVA PREP

EVA SYSTEMS: 1.211 HYGIENE BREAK

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Notes

3-105

ROBI

NSON

PATR

ICK

BEHN

KEN

10 REPLANNED

GLAC

IER

STAT

US C

HECK (

ASSY OPS,CC)

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/16

(047)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

8W

EZ

T D R SD / N

O R B 1 3 5 1 3 6 1 3 7

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

~

EXER

CISE

EVA

TOOL

CHE

CK R

ef.

EVA

3 TO

OL C

ONFI

G (E

VA, TIMELINES)

1.18

8 CU

POLA

FIN

E LE

AK C

HECK ON NODE3 DECK

(AS

SY O

PS,

ACT&

C/O) S

teps

2.3,2.5,7.5-end

Ste

p 8-

VAJ/

ISA

setu

p wi

ll be temp stowed

for

PMA

2 de

pres

s us

e. 3

5Ft VAJ to be used

for

FSS

Fil

l op

s to

day.

MS3

~

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 1.216 EVA PREP

EVA SYSTEMS: 1.211 HYGIENE BREAK

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

EVA SYSTEMS: 1.225 EMU PREBREATHE

EVA SYSTEMS: 1.220 EMU PURGE

EVA SYSTEMS: 1.216 EVA PREP

EVA SYSTEMS: 1.211 HYGIENE BREAK

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Notes

8

Page 10: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

02/16/10 14:31:57

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

10 REPLANNED

3-106

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/17

(048)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

8W

EZ

T D R S

~

~

~

D / N

O R B 1 3 8 1 3 9 1 4 0

~ ~B I A S - X L V - Z V VS T S A T T

CDR

EVA

SYST

EMS:

1.2

25 E

MU P

REBREATHE

~

EVA

SYST

EMS:

CRE

WLOC

K DE

PRESS/REPRESS (CC)

EVA

SYST

EMS:

CRE

WLOC

K PO

ST DEPRESS (CC)

P/TV

07 E

VA (

PHOT

O/TV

, SC

ENES)

Per

form

OPS

~

IMU

STAR

OF

OPPT

Y AL

IGN (O

RB OPS, GNC)

PLT

MEAL ~

TRANSFER OPS

Ref. Transfer List & MSG 125

1.156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O)

Steps 23-24

Ref. MSG 093

~

MS1

1.162 CUPOLA AUDIO TERMINAL UNIT

(ATU) INSTALLATION

Ref. MSG 122, Item 3

Ref. MSG 127

MEAL

1.158 CUPOLA UTILITY OUTLET PANEL INSTALL

(ASSY OPS, ACT&C/O)

1.128 NODE 3 ITCS SAMPLING ADAPTER INSTALL

-MTL (NOD3O6)

(ASSY OPS, ACT&C/O)

~

1.156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O)

Steps 23-24

Ref. MSG 093

~

Notes

3-106

ZAMK

AVI

RTS

HIRE

10 REPLANNED

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/17

(048)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

8W

EZ

T D R SD / N

O R B 1 3 8 1 3 9 1 4 0

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

~EV

A SY

STEM

S: 1

.225

EMU

PREBREATHE

EVA

SYST

EMS:

CRE

WLOC

K DE

PRESS/REPRESS (CC)

EVA

SYST

EMS:

CRE

WLOC

K PO

ST DEPRESS (CC)

~

P/TV

07 E

VA (

PHOT

O/TV

, SC

ENES)

Per

form

OPS

IMU

STAR

OF

OPPT

Y AL

IGN (O

RB OPS, GNC)

PLT

~

MEAL

TRANSFER OPS

Ref. Transfer List & MSG 125

~1.156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O)

Steps 23-24

Ref. MSG 093

MS1

1.162 CUPOLA AUDIO TERMINAL UNIT

(ATU) INSTALLATION

Ref. MSG 122, Item 3

Ref. MSG 127

MEAL

1.158 CUPOLA UTILITY OUTLET PANEL INSTALL

(ASSY OPS, ACT&C/O)

~

1.128 NODE 3 ITCS SAMPLING ADAPTER INSTALL

-MTL (NOD3O6)

(ASSY OPS, ACT&C/O)

~1.

156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O)

Steps 23-24

Ref. MSG 093

Notes

9

Page 11: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

02/16/10 14:31:57

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

10 REPLANNED

3-107

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/17

(048)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

8W

EZ

T D R S

~

~

~

D / N

O R B 1 3 8 1 3 9 1 4 0

~ ~B I A S - X L V - Z V VS T S A T T

MS2

IVA

SUPP

ORT

FOR EVA

~

EVA

SYST

EMS:

CRE

WLOC

K PO

ST DEPRESS (CC)

EXER

CISE

~

MS3

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

~

CUPOLA MLI REMOVAL

CUPOLA LL RELEASE

~

EVA 3 SETUP

PMA 3 HEATER/DATA CABLE INSTALL

MS4

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: 1.225 EMU PREBREATHE

~

OPEN LOOP B QDS

CUPOLA MLI REMOVAL

NODE3 LTA CABLE

EVA 3 SETUP

NODE 3 OIH/OI WIF INSTALL

~

CUPOLA MLI BAG SETUP

Notes

3-107

ROBI

NSON

PATR

ICK

BEHN

KEN

10 REPLANNED

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/17

(048)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

8W

EZ

T D R SD / N

O R B 1 3 8 1 3 9 1 4 0

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

~

IVA

SUPP

ORT

FOR EVA

EVA

SYST

EMS:

CRE

WLOC

K PO

ST DEPRESS (CC)

~

EXER

CISE

MS3

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

~EVA SYSTEMS: 1.225 EMU PREBREATHE

CUPOLA MLI REMOVAL

~

CUPOLA LL RELEASE

EVA 3 SETUP

PMA 3 HEATER/DATA CABLE INSTALL

MS4

EVA SYSTEMS: CREWLOCK POST DEPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

~EV

A SYSTEMS: 1.225 EMU PREBREATHE

OPEN LOOP B QDS

CUPOLA MLI REMOVAL

NODE3 LTA CABLE

EVA 3 SETUP

~

NODE 3 OIH/OI WIF INSTALL

CUPOLA MLI BAG SETUP

Notes

10

Page 12: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

02/16/10 14:31:57

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

10 REPLANNED

P/TV

07 E

VA (

PHOT

O/TV

, SC

ENES) Perform OPS

3-108

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/17

(048)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

8W

EZ

T D R S

~ ~~

~

D / N

O R B 1 4 0 1 4 1 1 4 2 1 4 3

~ ~B I A S - X L V - Z V VS T S A T T

CDR

~

MEAL

EVA

SYST

EMS:

PRE

REP

RESS (

CC)

EVA

SYST

EMS:

CRE

WLOC

K DE

PRESS/REPRESS (CC)

EVA

SYST

EMS:

1.2

40 P

OST

EVA

Per

form

Wat

er R

echa

rge,

No Metox Regen

Ref

. ST

S-13

0 Co

nsum

able

s Tracking CC(EVA)

~

PWR

FILL (

ORB

OPS,

ECL

S) I

nit

Fill

#1

Fil

l du

r ~3

0 mi

n R

ef.

MSG

027

CWC

FILL (

ORB

OPS,

CWC

OPS)

Ini

t Fi

ll #

6 R

ef.

MSG

027

CWC

FILL (

ORB

OPS,

CWC

OPS)

Per

form

FIL

L TE

RMIN

ATIO

N

P/TV

07 E

VA (

PHOT

O/TV

, SC

ENES)

Per

form

OPS

PLT

MEAL~

1.168 CUPOLA CORNER PANEL INSTALL

(ASSY OPS, ACT&C/O)

Steps 2-end

1.176 CUPOLA WINDOW SHUTTER TEST

(ASSY OPS, ACT&C/O)

MED OPS: 2.1.175 ARED - EXERCISE

Login as ARED Guest and refer to MSG 030

how to deviate using the ARED Display.

Verify X-Rotation Dashpot Inspection

Complete.

MS1

1.140 CUPOLA & NODE 3/NODE 1 ITCS FILL

USING FSS

(ASSY OPS, ACT&C/O)

Steps 1-19

Do not perform steps 4.8 and 19.6

EXERCISE

1.128 NODE 3 ITCS SAMPLING ADAPTER INSTALL

-MTL (NOD3O6)

(ASSY OPS, ACT&C/O)

~

Notes

3-108

ZAMK

AVI

RTS

HIRE

10 REPLANNED

P/TV

07 E

VA (

PHOT

O/TV

, SC

ENES) Perform OPS

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/17

(048)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

8W

EZ

T D R SD / N

O R B 1 4 0 1 4 1 1 4 2 1 4 3

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

~

MEAL

EVA

SYST

EMS:

PRE

REP

RESS (

CC)

EVA

SYST

EMS:

CRE

WLOC

K DE

PRESS/REPRESS (CC)

~

EVA

SYST

EMS:

1.2

40 P

OST

EVA

Per

form

Wat

er R

echa

rge,

No Metox Regen

Ref

. ST

S-13

0 Co

nsum

able

s Tracking CC(EVA)

PWR

FILL (

ORB

OPS,

ECL

S) I

nit

Fill

#1

Fil

l du

r ~3

0 mi

n R

ef.

MSG

027

CWC

FILL (

ORB

OPS,

CWC

OPS)

Ini

t Fi

ll #

6 R

ef.

MSG

027

CWC

FILL (

ORB

OPS,

CWC

OPS)

Per

form

FIL

L TE

RMIN

ATIO

N

P/TV

07 E

VA (

PHOT

O/TV

, SC

ENES)

Per

form

OPS

PLT

~

MEAL

1.168 CUPOLA CORNER PANEL INSTALL

(ASSY OPS, ACT&C/O)

Steps 2-end

1.176 CUPOLA WINDOW SHUTTER TEST

(ASSY OPS, ACT&C/O)

MED OPS: 2.1.175 ARED - EXERCISE

Login as ARED Guest and refer to MSG 030

how to deviate using the ARED Display.

Verify X-Rotation Dashpot Inspection

Complete.

MS1

1.140 CUPOLA & NODE 3/NODE 1 ITCS FILL

USING FSS

(ASSY OPS, ACT&C/O)

Steps 1-19

Do not perform steps 4.8 and 19.6

EXERCISE

~1.

128 NODE 3 ITCS SAMPLING ADAPTER INSTALL

-MTL (NOD3O6)

(ASSY OPS, ACT&C/O)

Notes

11

Page 13: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

02/16/10 14:31:57

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

10 REPLANNED

3-109

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/17

(048)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

8W

EZ

T D R S

~ ~~

~

D / N

O R B 1 4 0 1 4 1 1 4 2 1 4 3

~ ~B I A S - X L V - Z V VS T S A T T

MS2

IVA

SUPP

ORT

FOR EVA

~

EVA

SYST

EMS:

PRE

REP

RESS (

CC)

1.13

2 NO

DE 3

CCA

A AN

TI-V

IBRATION MODULE

(AVM

)LAU

NCH

BRAC

KET

REMO

VAL

(AS

SY O

PS,

ACT&

C/O)

~

MS3

EVA SYSTEMS: PRE REPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA CLEANUP & INGRESS

EVA SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

~

CUPOLA LL RELEASE

~

VSC VIDEO CABLE INSTALL

APFR RELOCATE

GETAHEAD - P1 P-CLAMP RELEASE

MS4

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: PRE REPRESS (CC)

EVA CLEANUP & INGRESS

EVA SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

~

NODE 3 OIH/OI WIF INSTALL

~

VSC VIDEO CABLE INSTALL

GETAHEAD - P1 P-CLAMP RELEASE

N2 CBM OPS

Notes

3-109

ROBI

NSON

PATR

ICK

BEHN

KEN

10 REPLANNED

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/17

(048)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

8W

EZ

T D R SD / N

O R B 1 4 0 1 4 1 1 4 2 1 4 3

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

~

IVA

SUPP

ORT

FOR EVA

EVA

SYST

EMS:

PRE

REP

RESS (

CC)

~

1.13

2 NO

DE 3

CCA

A AN

TI-V

IBRATION MODULE

(AVM

)LAU

NCH

BRAC

KET

REMO

VAL

(AS

SY O

PS,

ACT&

C/O)

MS3

EVA SYSTEMS: PRE REPRESS (CC)

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA CLEANUP & INGRESS

~

EVA SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

~

CUPOLA LL RELEASE

VSC VIDEO CABLE INSTALL

APFR RELOCATE

GETAHEAD - P1 P-CLAMP RELEASE

MS4

EVA SYSTEMS: CREWLOCK DEPRESS/REPRESS (CC)

EVA SYSTEMS: PRE REPRESS (CC)

EVA CLEANUP & INGRESS

~

EVA SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

~

NODE 3 OIH/OI WIF INSTALL

VSC VIDEO CABLE INSTALL

GETAHEAD - P1 P-CLAMP RELEASE

N2 CBM OPS

Notes

12

Page 14: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

02/16/10 14:31:57

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

10

CREW WAKE AT 09/12:00

REPLANNED

On MCC-H GO:

JOINT OPS: 3.128 O2 XFER TO HI P & LO P O2

TANKS

Step 2

3-110

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/17

(048)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

9W

EZ

T D R S

~ ~

~

~

D / N

O R B 1 4 3 1 4 4 1 4 5

~ ~B I A S - X L V - Z V VS T S A T T

CDR

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

EVA

SYST

EMS:

1.2

40 P

OST

EVA

Per

form

Wat

er R

echa

rge,

No Metox Regen

Ref

. ST

S-13

0 Co

nsum

able

s Tracking CC(EVA)

~

FLIG

HT D

IREC

TOR

CONFERENCE

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

PRIV

ATE

MEDI

CAL

CONF

ERENCE

L9

PAYL

OAD

STAT

ION

A/G

(two) - OFF

Per

form

via

A/G

2

PLT

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√ILLUMINATORS OFF - ALL

JOINT OPS: 3.123 O2 TRANSFER SETUP (POST

PREBREATHE USING SHUTTLE O2)

Steps 2-5.8,Ground will perform steps

2.5, 5.6 and 6

WCS COMPACTOR OPS (DUAL-VANE)

(ORB OPS, CUE CARD)

MS1

TRANSFER TAGUP

Coordinate with transfer counterpart

TRANSFER BRIEF

Call down status to MCC

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MYCO BODY SAMPLE COLLECTION

(ASSY OPS, P/L) REVIEW ONLY

Notes

3-110

ZAMK

AVI

RTS

HIRE

10

CREW WAKE AT 09/12:00

REPLANNED

On MCC-H GO:

JOINT OPS: 3.128 O2 XFER TO HI P & LO P O2

TANKS

Step 2

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/17

(048)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

9W

EZ

T D R SD / N

O R B 1 4 3 1 4 4 1 4 5

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

~EV

A SY

STEM

S: 1

.240

POS

T EVA

Per

form

Wat

er R

echa

rge,

No Metox Regen

Ref

. ST

S-13

0 Co

nsum

able

s Tracking CC(EVA)

FLIG

HT D

IREC

TOR

CONFERENCE

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

PRIV

ATE

MEDI

CAL

CONF

ERENCE

L9

PAYL

OAD

STAT

ION

A/G

(two) - OFF

Per

form

via

A/G

2

PLT

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√ILLUMINATORS OFF - ALL

JOINT OPS: 3.123 O2 TRANSFER SETUP (POST

PREBREATHE USING SHUTTLE O2)

Steps 2-5.8,Ground will perform steps

2.5, 5.6 and 6

WCS COMPACTOR OPS (DUAL-VANE)

(ORB OPS, CUE CARD)

MS1

TRANSFER TAGUP

Coordinate with transfer counterpart

TRANSFER BRIEF

Call down status to MCC

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MYCO BODY SAMPLE COLLECTION

(ASSY OPS, P/L) REVIEW ONLY

Notes

13

Page 15: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

02/16/10 14:31:57

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

10

CREW WAKE AT 09/12:00

REPLANNED

3-111

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/17

(048)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

9W

EZ

T D R S

~ ~

~

~

D / N

O R B 1 4 3 1 4 4 1 4 5

~ ~B I A S - X L V - Z V VS T S A T T

MS2

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

CWC

TRAN

SFER

Tra

nsfe

r CW

C to

ISS

PWR

TRAN

SFER

Tra

nsfe

r PW

R to

ISS

GLAC

IER

STAT

US C

HECK (

ASSY OPS,CC)

1.13

2 NO

DE 3

CCA

A AN

TI-V

IBRATION MODULE

(AVM

)LAU

NCH

BRAC

KET

REMO

VAL

(AS

SY O

PS,

ACT&

C/O)

~

MS3

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

~

MS4

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

~

Notes

3-111

ROBI

NSON

PATR

ICK

BEHN

KEN

10

CREW WAKE AT 09/12:00

REPLANNED

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/17

(048)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

9W

EZ

T D R SD / N

O R B 1 4 3 1 4 4 1 4 5

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

CWC

TRAN

SFER

Tra

nsfe

r CW

C to

ISS

PWR

TRAN

SFER

Tra

nsfe

r PW

R to

ISS

GLAC

IER

STAT

US C

HECK (

ASSY OPS,CC)

~1.

132

NODE

3 C

CAA

ANTI

-VIBRATION MODULE

(AVM

)LAU

NCH

BRAC

KET

REMO

VAL

(AS

SY O

PS,

ACT&

C/O)

MS3

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~EVA SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

MS4

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~EV

A SYSTEMS: 1.240 POST EVA

Perform Water Recharge, No Metox Regen

Ref. STS-130 Consumables Tracking CC(EVA)

Notes

14

Page 16: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

MSG 123 - FD10 MISSION SUMMARY

1 2 3 4 5 6 7 8 9

10 11 12 13 14

Good Morning Endeavour!!!! Congratulations on getting all the outside elements of station moved around and in their proper places!! That took a lot of fancy arm work! We are all really looking forward to watching you unwrap the new Cupola during your EVA today!!! Like you, we can’t wait to see the views!!! Have a great EVA and observation day!!!! YOUR CURRENT ORBIT IS: 188 X 180 NM NOTAMS: ONE CHANGE (ADDED FOK) 15

16 17 18 19 20 21 22 23 24 25 26 27 28

EDW - TEMP RWY IN USE. PERM RWY CLOSED FOR CONSTRUCTION. EDW - LAKEBED RWYS RED. NOR - LAKEBED RWYS USABLE. DRYING OUT. FOK - CLOSED. WAL- CLOSED. ZZA - ARRESTING NET INSTALLED 40M FROM END OF RWY 30L. ESN - RWY 03R/21L CLOSED. 03L/21R USABLE. GUA - RWY 06L/24R RWY END LIGHTS OUT OF SERVICE. PTN - CLOSED FOR RUNWAY CONSTRUCTION. IKF - NOT USABLE. NO AGREEMENT. BEN - NOT RECOMMENDED/NOT SUPPORTED.

NEXT 2 PLS OPPORTUNITIES: 29

30 31 32 33 34

EDT04L ORB 141 – 8/21:25 BKN250 7 050/4P6 EDT22R ORB 157 – 9/21:48 SKC 7 240/3P5 OMS TANK FAIL CAPABILITY: 35

36 37 38 39

L OMS FAILS: NO R OMS FAILS: NO LEAKING OMS PRPLT BURN: 40

41 42 43 44

L OMS LEAK: ALWAYS BURN RETROGRADE R OMS LEAK: ALWAYS BURN RETROGRADE OMS QUANTITIES(%) 45

46 47 48 49 50 51

L OMS OX = 30.2 R OMS OX = 31.4 FU = 29.9 FU = 31.2 Subtract interconnect counter for current OMS quantities.

END OF PAGE 1 OF 2, MSG 123 15

Page 17: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

MSG 123 - FD10 MISSION SUMMARY

END OF PAGE 2 OF 2, MSG 123

1 DELTA V AVAILABLE: 2

3 4

OMS 321 FPS ARCS (TOTAL ABOVE QTY1) 44 FPS 5

6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

TOTAL IN THE AFT 365 FPS ARCS (TOTAL ABOVE QTY2) 77 FPS FRCS (ABOVE QTY 1) 32 FPS AFT QTY 1 82 % AFT QTY 2 44 % THERE ARE NO FAILURE/IMPACT/WORK AROUNDS FOR TODAY.

16

Page 18: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

MSG 125A (22-0741A) - FD10 TRANSFER MESSAGE Page 1 of 7

1 2 3 4 5 6 7 8 9

10 11 12 13 14

Good morning Kay, Terry, & Steve, You are doing well on transfer overall, and are now 66 percent complete! Today, Terry has XFER OPS time in the morning. We have provided direction for him in the choreography below. The Transfer List Excel file, FD10_Transfer_List_STS130.xls, is located on the KFX machine in C:\OCA-up\transfer (and available via the PGSC homepage). For ISS, the Transfer List Excel file, FD10_Transfer_List_STS130.xls, is located in K:\OCA-up\transfer. Change Pages 15

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

Please incorporate changes as follows: In the Transfer List RETURN tab

Replace the following pages: Return – 1 and 2

Pen and Ink the following page: Return – 3 For item 702: in the notes field, change “FD12” to “FD11”

Replace the following page: Return – 4

Pen and Ink the following page: Return – 7 For item 732: in the Initial Stowage column, change “LAB1P4

(WRS2 Rack) installed” to “NOD2D2” Replace the following page:

Return – 9

Page 1 of 7, MSG 125A (22-0741A) 17

Page 19: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

MSG 125A (22-0741A) - FD10 TRANSFER MESSAGE Page 2 of 7

1 FD10 Choreography 2

4 5 6 7 8

9

10 11

12 13

14 15 16

17 18 19 20 21 22 23 24 25 26 27 28 29

• XFER OPS – Terry: 3 o Stow available MF57O items: Retrieve an empty 1.0 CTB from ISS

(NOD1D2) and record the s/n (please note s/n for Kay to give us at the Transfer Brief). Stow this CTB in MF57O. We expect there are already two items loose in the locker, and a few more can be added today as follows:

Already in the locker: • GSC (Item 719): wrap this item in a towel and stow in CTB • C&W panel (Item 705, in ziplock): stow in CTB

Can be added to the locker today: • Food warmer (Item 718), move into this CTB (food warmer is

currently in Bag D on the middeck) • Transfer CSA-O2s anytime after EVA3 A/L egress (Items 707

and 708) – verify serial numbers, wrap in towel or bubble wrap, and stow in CTB

• Transfer EMU 3-micron filters into this CTB, wrapped in towels (Item 738)

Note that on FD12, additional items will be added to the CTB. o These items may be done based on previous activities/calls, please verify:

EVA cable (Item 48.2) ITCS sample (Item 740) (performed by TJ on FD08) Old CDRA bed (Item 608) PWR CTB with foam (Item 725) (may have been done on FD04)

o Transfer returning RFTA after Soichi’s WRS-RFTA-R&R activity (Item 732) Have a great day! - The 20A Transfer Team 30

31 32 33

20A Transfer Choreography

FD11 34

35

36 37

38 39 40 41 42 43 44 45 46 47 48 49 50

• Bob: Transfer SAFER to shuttle per SAFER XFER activity (Item 714) • Nick & Bob: Transfer EVA items to shuttle per EVA RECONFIG & XFER activity

(Items 702, 712, 713, and 715) • XFER OPS:

o Per FD08 Transfer Brief, please check on whether item 611 is complete o Final stow of items already on MDDK (Items 711, 723) o Relocate entry garments (Item 38) o Transfer returning P/TV items if ready (Items 403, 403.2, 403.3, 403.4, 727) o Continue other available return items (Item 404, 406, 609, 610)

Page 2 of 7, MSG 125A (22-0741A) 18

Page 20: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

MSG 125A (22-0741A) - FD10 TRANSFER MESSAGE Page 3 of 7

Page 3 of 7, MSG 125A (22-0741A)

1 FD12 2

10 11 12 13

• Jeff: Transfer returning blood sample per BLD STW activity (Item 704) 3

• TJ: Transfer returning saliva sample per SLV STW activity (Item 728) 4

• Steve: Transfer AFD PCS per AFT PCS XFER activity (Item 39) 5

• Steve: Transfer SSC back to ISS during SSC RETURN activity (Item 804) 6

• Soichi: Transfer returning RAMs to shuttle per RAM INSTALL activity (Item 726) 7

• Soichi: Transfer DCBs to shuttle per DCB-TRANSFER activity (Item 709 and 710) 8

• XFER OPS: 9 o Complete water hardware transfers (Items 24, 25, 801, 729, and 735) o Transfer remaining 5 MLE bags (Items 408 and 701)

5 MLE Bag Plan (9 total) 14

15

16

17

18

19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

• Bags B & H: to Columbus for temp stow (as needed) • Bag F: to Columbus permanently (return prepacked 5 MLE in its place) • Bags C, D & E: remain on shuttle for unpacking/repacking • Bag A: contains UPA DA, temp stow in JEM for FD04 • Bags G & I: handled via EVA procedures (G will be temp stowed in Node 1)

19

Page 21: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

MS

G 1

25 (2

2-07

41) -

- FD

10 T

rans

fer M

essa

geST

S-13

0 / 2

0A R

etur

n Tr

ansf

er L

ist

CH

NG

FDIn

itial

sIte

m #Ite

m N

ame

Qty

Initi

al S

tow

age

Tem

p St

owag

eSt

owag

e at

U

ndoc

kW

t (lb

s)AC

TIVI

TY /

Con

stra

ints

/ **

Com

men

ts

Mid

deck

Ret

urn

Prep

acke

d B

ags/

Item

s

840

020

A R

etur

n B

ag 4

001.

0 C

TBN

OD

2D2

MF4

3O24

.80

840

120

A R

etur

n B

ag 4

010.

5 C

TBN

OD

2D2

MF1

4G19

.00

840

220

A R

etur

n B

ag 4

020.

5 C

TBN

OD

2D2

MF1

4G12

.30

X

403

20A

Ret

urn

Bag

403

1.0

CTB

NO

D2D

2M

F14K

22.4

0**

Bag

alre

ady

cont

ains

pre

pack

ed

item

s. I

tem

s be

low

will

be a

dded

to th

is

bag.

403.

2

D

2Xs

Cam

era

[S/N

110

8]1

A/L

1_D

eplo

yed

MF1

4K

(in C

TB)

-R

emov

e an

d te

mp

stow

bat

tery

, m

emor

y ca

rd, f

lash

and

lens

from

D

2X c

amer

a be

fore

tran

sfer

.

403.

3

D

2Xs

Cam

era

[S/N

110

6]1

LAB

1_D

eplo

yed

MF1

4K

(in C

TB)

-R

emov

e an

d te

mp

stow

bat

tery

, m

emor

y ca

rd, f

lash

and

lens

from

D

2X c

amer

a be

fore

tran

sfer

.

403.

4

G

1 C

amco

rder

[S/N

101

0]1

LAB

1_D

eplo

yed

MF1

4K

(in C

TB)

-R

emov

e an

d te

mp

stow

bat

tery

, wid

e an

gle

lens

and

vid

eota

pe fr

om G

1 C

dIf

lh

di

Cam

cord

er. I

f a le

ns h

ood

is

atta

ched

, lea

ve it

on.

404

20A

Ret

urn

Bag

404

1.0

CTB

NO

D2D

2M

F43H

27.8

0Lo

catio

n al

read

y co

ntai

ns s

ampl

es.

Add

sam

ples

to th

is C

TB a

nd

clam

shel

l the

tray

s ar

ound

the

CTB

. If

CTB

doe

s no

t fit,

all

sam

ples

can

be

sto

wed

dire

ctly

into

the

tray

s.

406

20A

Ret

urn

Bag

406

3.0

CTB

NO

D2D

2M

idde

ck S

eat

7 B

ag73

.80

408

20A

Ret

urn

Bag

408

5 M

LE B

agJL

P1S

1ra

ck fr

ont

MD

CEI

L P

OR

T 2

110.

33

2/16

/201

0[ ]

- no

tes

incl

uded

by

trans

fer t

eam

, - n

ot o

n ac

tual

labe

l

Ret

urn

Pag

e - 1

20

Page 22: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

MS

G 1

25 (2

2-07

41) -

- FD

10 T

rans

fer M

essa

geST

S-13

0 / 2

0A R

etur

n Tr

ansf

er L

ist

CH

NG

FDIn

itial

sIte

m #Ite

m N

ame

Qty

Initi

al S

tow

age

Tem

p St

owag

eSt

owag

e at

U

ndoc

kW

t (lb

s)AC

TIVI

TY /

Con

stra

ints

/ **

Com

men

ts

860

020

A R

etur

n Ite

m 6

00[W

RS

Rec

ycle

Filt

er T

ank

Ass

embl

ys/

n 00

5]

1N

OD

2D2

CO

L1D

3(in

Bag

B)

148.

00**

Foam

cap

tran

sfer

s w

ith it

em.

Item

Del

eted

860

220

A R

etur

n B

ag 6

02[T

hirs

k fo

r ret

urn]

0.5

CTB

NO

D2D

2M

D C

EIL

P

OR

T 1

(in B

ag E

)

11.0

0

860

320

A R

etur

n B

ag 6

03[S

tott

for r

etur

n]0.

5 C

TBN

OD

2D2

MD

CE

IL

PO

RT

1 (in

Bag

E)

11.0

0

860

420

A R

etur

n B

ag 6

04[D

eWin

ne fo

r ret

urn]

0.5

CTB

NO

D2D

2N

OD

1(in

Bag

G)

11.0

0

860

520

A R

etur

n B

ag 6

051.

0 C

TBN

OD

2D2

MF1

4E4.

00

608

20A

Ret

urn

Item

608

[CD

RA

Des

sica

nt/S

orbe

nt B

ed (o

ld)]

1N

OD

2D2

CO

L1D

2(in

Bag

H)

102.

00C

onta

in o

ld C

DR

A b

ed in

new

CD

RA

be

d fo

am a

nd th

en w

rap

in 2

jetti

son

stow

age

bags

. JS

Bs

are

preg

athe

red

near

the

CD

RA

bed

.

609

20A

Ret

urn

Bag

609

1.0

CTB

NO

D2D

2M

F57C

4.00

610

20A

Ret

urn

Item

610

[Pum

p/S

epar

ator

OR

U]

1 fo

am b

oxN

OD

2D2

MD

FLO

OR

P

OR

T 2

(in B

ag A

)

60.8

0Ta

pe th

e fo

am c

ushi

on c

lam

shel

l se

am, t

hen

plac

e th

e as

sem

bly

in a

H

efty

bag

. Lab

el H

efty

bag

"FW

D

FOR

LA

UN

CH

" to

mat

ch la

bel o

n fo

am.

Secu

re, t

ie o

pen

end

of b

ag

and

grey

tape

.

X61

120

A R

etur

n Ite

m 6

11[R

ecyc

le to

FC

PA]

1N

OD

2D2

Shu

ttle

A/L

(in

Bag

D)

3.00

**Ite

m is

bag

ged

and

tape

d.

2/16

/201

0[ ]

- no

tes

incl

uded

by

trans

fer t

eam

, - n

ot o

n ac

tual

labe

l

Ret

urn

Pag

e - 2

21

Page 23: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

MS

G 1

25 (2

2-07

41) -

- FD

10 T

rans

fer M

essa

geST

S-13

0 / 2

0A R

etur

n Tr

ansf

er L

ist

CH

NG

FDIn

itial

sIte

m #Ite

m N

ame

Qty

Initi

al S

tow

age

Tem

p St

owag

eSt

owag

e at

U

ndoc

kW

t (lb

s)AC

TIVI

TY /

Con

stra

ints

/ **

Com

men

ts

707

CS

A-O

2[s

/n 1

046]

1IS

S A

/LM

F57O

(in

CTB

)1.

40Tr

ansf

er a

fter E

VA3

A/L

egr

ess.

Wra

p C

SA-O

2 in

tow

el o

r bub

ble

wra

p.

Verif

y se

rial n

umbe

r is

1046

.

708

CS

A-O

2[s

/n 1

063]

1IS

S A

/LM

F57O

(in

CTB

)1.

40Tr

ansf

er a

fter E

VA3

A/L

egr

ess.

Wra

p C

SA-O

2 in

tow

el o

r bub

ble

wra

p.

Verif

y se

rial n

umbe

r is

1063

.

709

Dou

ble

Col

dbag

[s/n

100

4]1

ISS

de

ploy

edM

F43C

52.2

0Tr

ansf

er o

n FD

12 p

er D

CB

XFE

R

activ

ity.

710

Dou

ble

Col

dbag

[s/n

100

6]1

ISS

de

ploy

edM

F71C

49.4

0Tr

ansf

er o

n FD

12 p

er D

CB

XFE

R

activ

ity.

711

ED

V[li

d #

897,

bod

y #

418]

1M

DD

KS

huttl

e A

/L (i

n B

ag D

)58

.40

Don

PPE

- To

x 2

fluid

con

tain

ed in

ED

V. U

se b

ubbl

e w

rap

to c

over

m

etal

pro

trus

ions

on

lid.

Plac

e in

to

Hef

ty b

ag, t

ie, a

nd g

rey

tape

.

712

EM

U[S

/N30

04B

e]1

ISS

A/L

Shu

ttle

292.

30Tr

ansf

er o

n FD

11 F

D12

per

EVA

R

ECO

NFI

G&

XFER

tiit

X[S

/N 3

004,

Be]

REC

ON

FIG

& X

FER

act

ivity

.

**R

efer

ence

resu

pply

item

#34

.

X71

3E

MU

[S/N

301

8, P

k]1

ISS

A/L

Shu

ttle

299.

60Tr

ansf

er o

n FD

11 F

D12

per

EVA

R

ECO

NFI

G &

XFE

R a

ctiv

ity.

X

714

EV

A H

AR

DW

AR

E[c

onta

ins

old

SA

FER

]3.

0 C

TBN

OD

3 Af

t Hat

ch

Bun

gee

Jail

Shu

ttle

A/L

(in

Bag

D)

74.3

0Tr

ansf

er o

n FD

11 F

D12

per

SA

FER

XF

ER a

ctiv

ity.

**R

efer

ence

resu

pply

item

41.

X

715

EV

A S

ys X

fer B

ag1

ISS

A/L

Shu

ttle

8.60

Tran

sfer

on

FD11

FD

12 p

er E

VA

REC

ON

FIG

& X

FER

act

ivity

.

**R

efer

ence

resu

pply

item

#33

.

2/16

/201

0[ ]

- no

tes

incl

uded

by

trans

fer t

eam

, - n

ot o

n ac

tual

labe

l

Ret

urn

Pag

e - 4

22

Page 24: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

MS

G 1

25 (2

2-07

41) -

- FD

10 T

rans

fer M

essa

geST

S-13

0 / 2

0A R

etur

n Tr

ansf

er L

ist

CH

NG

FDIn

itial

sIte

m #Ite

m N

ame

Qty

Initi

al S

tow

age

Tem

p St

owag

eSt

owag

e at

U

ndoc

kW

t (lb

s)AC

TIVI

TY /

Con

stra

ints

/ **

Com

men

ts

Ret

urn

Rea

ltim

e A

dditi

ons

X

901

EM

U P

ower

Har

ness

Ass

y.[s

/n 1

042]

Item

del

eted

- st

ill re

turn

ing

- will

be h

andl

ed

in E

VA p

roce

dure

s

1IS

S A

/L(in

EV

A T

ask

Xfer

Bag

)

MD

FLO

OR

S

TBD

2(in

Bag

G)

0.50

Rem

ove

from

mes

h ba

g an

d w

rap

with

tow

els,

foam

or b

ubbl

e w

rap.

B

end

radi

us s

houl

d no

t be

smal

ler

than

6 in

ches

.

X

902

MC

A Se

ries

Sam

ple

Pum

p As

sem

bly

[s/n

F00

02]

1N

OD

1D2

(in 1

.0 C

TB

1152

)

MF5

7G(in

top

tray

in

foam

cut

-out

)

6.90

2/16

/201

0[ ]

- no

tes

incl

uded

by

trans

fer t

eam

, - n

ot o

n ac

tual

labe

l

Ret

urn

Pag

e - 9

23

Page 25: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

22-0695 (MSG 127) 1.162 CUPOLA AUDIO TERMINAL UNIT (ATU) INSTALLATION

(ASSY OPS/20A/FIN 1) Page 1 of 12 pages

13 FEB 10

OBJECTIVE: Install Audio Terminal Unit (ATU) in Cupola. LOCATION: Cupola DURATION: 1 Hour CREW: One PARTS: Audio Terminal Unit P/N 3000001-301 Cupola ATU Coldplate P/N 2000CU301-801 Cupola ATU Bracket P/N 1240CU801-401 Cupola ATU Cnctr P/N 1F15244-501 MATERIALS: Ziplock (small) Velcro Straps TOOLS: Digital Camera ISS IVA Toolbox: Drawer 2:

Ratchet, 1/4” Drive 5/32” Hex Head, 1/4” Drive (40-200) in-lbs Trq Wrench, 1/4” Drive

REFERENCED PROCEDURE(S): None RESTOW: Ziplock Bag “Cupola ATU Launch Fasteners” with

ATU fasteners, washers (six each)

24

Page 26: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

22-0695 (MSG 127) 1.162 CUPOLA AUDIO TERMINAL UNIT (ATU) INSTALLATION

(ASSY OPS/20A/FIN 1) Page 2 of 12 pages

13 FEB 10

1. INSTALLING ATU IN ATU BRACKET

Figure 2.- Cupola ATU Coldplate Installation into Cupola ATU Bracket.

Figure 1. - Bottom View of ATU Installed in Bracket (Ground Photo).

ATU Bracket

Fasteners (seven)

ATU front panel

Cupola ATU

Coldplate

TCS Lines (two),

premated to coldplate

(gray insulation for ground use)

Cupola ATU

Bracket

Cupola ATU

Bracket

Cupola ATU

Coldplate

This Hose (Coolant Water HTL Return

From ATU) must be inserted through

Cupola ATU Bracket to install coldplate.

Refer to Figure 3. Cupola ATU Bracket Fasteners (seven)

25

Page 27: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

22-0695 (MSG 127) 1.162 CUPOLA AUDIO TERMINAL UNIT (ATU) INSTALLATION

(ASSY OPS/20A/FIN 1) Page 3 of 12 pages

13 FEB 10

Figure 3. - Crew Preference Label on HTL Line to be Routed Through Cupola ATU

Bracket.

Figure 4. - Crew Preference Labeling to Assist with Orientation of

Cupola ATU Coldplate.

NOTE Coolant Water HTL Return Line label includes a crew preference label to remind crew that it is the line that needs to be fed through the Cupola ATU Bracket. There are also alignment arrows on the underside of the Cupola ATU Bracket and Coldplate to help make orientation easier. Refer to Figures 2 to 4.

Alignment arrows on underside of

Cupola ATU Bracket, Coldplate

26

Page 28: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

22-0695 (MSG 127) 1.162 CUPOLA AUDIO TERMINAL UNIT (ATU) INSTALLATION

(ASSY OPS/20A/FIN 1) Page 4 of 12 pages

13 FEB 10

1.1 Locate HTL line labeled “Coolant Water HTL Return From ATU” on Cupola ATU Coldplate.

Route through Cupola ATU Bracket according to Figure 2. Carefully rotate Cupola ATU Coldplate as required to install

Coldplate into Bracket using alignment arrows to assist with orientation.

Refer to Figures 1 to 4.

Non-Captive

fasteners (six),

installed for launch

Figure 5. - Bottom View of ATU with Six Launch Fasteners Installed.

27

Page 29: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

22-0695 (MSG 127) 1.162 CUPOLA AUDIO TERMINAL UNIT (ATU) INSTALLATION

(ASSY OPS/20A/FIN 1) Page 5 of 12 pages

13 FEB 10

1.2 Remove non-captive fasteners, washers (six each) from baseplate of

ATU (Ratchet, 1/4” Drive; 5/32” Hex Head, 1/4” Drive). Stow in Ziplock Bag. Label Ziplock Bag “Cupola ATU Launch

Fasteners.” Temporarily stow ziplock bag. Refer to Figure 5. 1.3 Slide ATU into Cupola ATU Bracket. Refer to Figure 1. 1.4 Remove Kapton Tape from Cupola ATU Bracket Fasteners. Check alignment of Cupola ATU Bracket fasteners (seven) by hand

threading each one individually to ensure there is no binding or misalignment of threads.

Refer to Figures 1 and 2. 1.5 Snug ATU outer flange fasteners (eight) (Ratchet, 1/4” Drive; 5/32”

Hex Head. 1/4” Drive). Refer to Figure 6.

Figure 6. - ATU Outer Flange Fasteners.

ATU Outer Flange

Fasteners (four of eight)

ATU Outer Flange

Fasteners (four of eight)

28

Page 30: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

22-0695 (MSG 127) 1.162 CUPOLA AUDIO TERMINAL UNIT (ATU) INSTALLATION

(ASSY OPS/20A/FIN 1) Page 6 of 12 pages

13 FEB 10

1.6 Tighten, torque Cupola ATU Bracket Fasteners (seven) to 61 in-lbs [Ratchet, 1/4” Drive; 5/32” Hex Head, 1/4” Drive; (40-200) in-lbs Trq Wrench, 1/4” Drive].

Refer to Figure 2. 1.7 Tighten, torque outer flange fasteners (eight) to 52 in-lbs [Ratchet,

1/4” Drive; 5/32” Hex Head, 1/4” Drive; (40-200) in-lbs Trq Wrench, 1/4” Drive].

2. INSTALLING ATU BRACKET ON HANDRAIL

NOTE The Cupola ATU can be installed in front of Window 3 or in front of Window 6. The installation location will depend on the installation location of the Robotic Workstation. When the RWS is installed in front of Windows 2&3 or Window 4, the ATU must be installed in front of Window 6. When the RWS is installed in front of Windows 5&6 or Window 1, the ATU must be installed in front of Window 3.

2.1 √MCC-H to verify RPCM N32A2B_C2 RPC 14 is open, close

command inhibited and either DDCU N32A or DDCU N32B converter is off.

56

1

23

4

Window Number

Possible ATU

Location

Figure 7. - ATU Installation Locations (Two).

Launch Location of

ATU Connectors

Possible ATU

Location

PORT

FWD

AFT

STBD

CBCS Target

shown in Launch Config

29

Page 31: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

22-0695 (MSG 127) 1.162 CUPOLA AUDIO TERMINAL UNIT (ATU) INSTALLATION

(ASSY OPS/20A/FIN 1) Page 7 of 12 pages

13 FEB 10

Figure 8. - Location of ATU Interfaces (ATU Shown Installed at Window 3 Location).

Figure 9. - ATU Installed on Handrail with Handrail Equipment Anchors in Locked Position.

Handrail Equipment

Anchors (two)

Handrail Equipment

Anchor Locking Feature

Bracket for ATU TCS Umbilicals. Labeled “ATU 1”

or “ATU 2”. “ATU 2” is bracket by window 3

location, “ATU 1” is bracket by window 6 location.

RWS Connector Bracket

“ATU Ground” Attachment Point

(photo shows ATU Ground for ATU at

window 3). Analogous ATU Ground next to Cupola Temperature Control for ATU when installed at window 6

Handrail Equipment

Anchor Tab

30

Page 32: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

22-0695 (MSG 127) 1.162 CUPOLA AUDIO TERMINAL UNIT (ATU) INSTALLATION

(ASSY OPS/20A/FIN 1) Page 8 of 12 pages

13 FEB 10

2.2 Install Cupola ATU Bracket on Handrail in front of Window 6 using

Handrail Equipment Anchors (two). √Handrail Equipment Anchors (two) are in locked position Refer to Figures 8 and 9.

3. CONNECTING ATU GROUND STRAP

NOTE 1. ATU Grounding Fastener is located at the loose end of a white wire

extending from the right, lower rear corner of the Cupola ATU Bracket.

2. There are two ATU Ground attachment points (one for each ATU installation location). When the ATU is installed at Window 3, the ATU Ground attachment point next to the RWS Connector Bracket (CUP1F1) is used. When the ATU is installed at Window 6, the ATU Ground next to the Cupola Temperature Control (CUP1A1) is used. Refer to Figure 8.

3.1 Install ATU Grounding Fastener (one) into ATU Ground hole

(Ratchet, 1/4” Drive; 5/32” Hex Head, 1/4” Drive). Refer to Figure 8. 3.2 Torque ATU Grounding Fastener (one) to 50 in-lbs [5/32” Hex Head,

1/4” Drive; (40-200) in-lbs Trq Wrench, 1/4” Drive].

4. MATING ATU TCS INTERFACES 4.1 Tethered Cap ←|→ MTL Sply on ATU 1 Bracket Tethered Cap ←|→ MTL Rtn on ATU 1 Bracket Refer to Figure 8. 4.2 Plug ←|→ COOLANT WATER MTL SUPPLY QD Plug ←|→ COOLANT WATER MTL RETURN QD Mate Plugs to Tethered Caps on MTL Sply and Rtn. 4.3 COOLANT WATER HTL SUPPLY →|← MTL Sply on ATU 1 Bracket COOLANT WATER HTL RETURN →|← MTL Rtn on ATU 1 Bracket

NOTE Handrail Equipment Anchors are opened by performing the following: a. Pressing Locking Feature in opposite direction from LOCK arrow. b. Pressing Tab to allow anchor to rotate open. Refer to Figure 9.

31

Page 33: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

22-0695 (MSG 127) 1.162 CUPOLA AUDIO TERMINAL UNIT (ATU) INSTALLATION

(ASSY OPS/20A/FIN 1) Page 9 of 12 pages

13 FEB 10

5. CONFIGURING ATU POWER AND AUDIO LINES

Figure 10. - ATU Power and Fiber Umbilicals in Launch Configuration (CUP1S1 - Vent Panel 3 Removed).

Velcro securing CP2103F

and CP2102F

CP2103F and

CP2102F in launch

configuration

32

Page 34: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

22-0695 (MSG 127) 1.162 CUPOLA AUDIO TERMINAL UNIT (ATU) INSTALLATION

(ASSY OPS/20A/FIN 1) Page 10 of 12 pages

13 FEB 10

Figure 11.- Launch Config. of ATU Umbilicals With Vent Panel 3 Installed (CUP1S1).

Figure 12.- ATU Wire Harness Routing - Launch Config.

Vent Panel 3 (partially

covers ATU Umbilicals)

CP2103F and CP2102F in

launch configuration

STBD

PORT

FWD

AFTEnd of Black Sheathing

on ATU Fiber/Power Lines (two)

Launch config for ATU

Power/Fiber Lines

33

Page 35: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

22-0695 (MSG 127) 1.162 CUPOLA AUDIO TERMINAL UNIT (ATU) INSTALLATION

(ASSY OPS/20A/FIN 1) Page 11 of 12 pages

13 FEB 10

Figure 13.- ATU Wire Harness Routing.

NOTE 1. ATU power and data umbilicals are mated to dummy connectors on a

bracket for launch. The bracket is located near Window 4 (CUP1S1). The umbilicals are secured to Cupola structure by Velcro from the bracket location half way around the Cupola circumference to the Window 2 area. In the Window 2 area, the black sheathing on the umbilicals will end where the umbilicals are secured with a P-Clamp.

2. The portion of the umbilicals with the black sheathing is available for in-cabin routing to the ATU installation location. Corner Panel 1, which will be installed later in the Window 2 area, has a cutout for the ATU umbilicals. Refer to Figures 7 and 10 to 13.

3. Vent Panels 1 and 3 have eight captive fasteners. Vent Panels 2 and 4

have nine captive fasteners. It may be necessary to remove Vent Panels to deroute ATU umbilicals from their launch position.

CAUTION CP1203F data umbilical contains Fiber Optic lines. Do not expose this umbilical to tension or tight bend radius (less than 2 inches).

Corner Pnl 1 Cutout for ATU Wire

Harness

Alternative ATU Mounting Positions

Window 3

Window 6

Harness Routing for ATU Position at window 3

Harness Routing for ATU Position at

window 6

Port

Stbd

Aft Fwd

34

Page 36: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

22-0695 (MSG 127) 1.162 CUPOLA AUDIO TERMINAL UNIT (ATU) INSTALLATION

(ASSY OPS/20A/FIN 1) Page 12 of 12 pages

13 FEB 10

5.1 CP2103F ←|→ J3 on launch bracket (fiber) Kapton Tape over CP2103F fiber connection to protect it during

cable routing. CP2102F ←|→ J1 on launch bracket (power) Refer to Figures 7 and 10 to 12. 5.2 As required to relocate ATU Umbilicals, remove Vent Panels,

fasteners (eight or nine) (Ratchet, 1/4” Drive; 5/32” Hex Head, 1/4” Drive).

Refer to Figure 12. 5.3 Remove CP2103F and CP2102F from Velcro Restraints until black

tubing ends and P-Clamp is reached near ISS Port/Fwd quadrant. Refer to Figure 12. 5.4 Route CP2103F and CP2102F to ATU at Window 6 according to

Figure 13 (Corner Panel 1 will not be present at this time). 5.5 If removed, replace Vent Panels, fasteners (eight or nine) (Ratchet,

1/4” Drive; 5/32” Hex Head, 1/4” Drive). 5.6 Cupola ATU Cnctr →|← J4 on ATU (Address Connector) CP2103F →|← J3 on ATU (fiber) CP2102F →|← J1 on ATU (power) 5.7 Temporarily restrain ATU Umbilicals away from translation path in

Cupola (Velcro Straps).

6. POST-MAINTENANCE 6.1 ISS ⇓ MCC-H “Cupola ATU installed” 6.2 Photo-document final configuration of Cupla ATU and final umbilical

routing (Digital Camera). 6.3 Stow tools, materials, Ziplock Bag labeled “Cupola ATU Launch

Fasteners.”

35

Page 37: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

MSG 130 - FD10 CREW CHOICE DOWNLINK

1

TDRS AOS LOS Delta (min) Notes W-171 9/00:58 9/01:30 32 E-275 9/02:25 9/02:34 9 Analog only E-TDS 9/03:30 9/03:44 14

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

Note: Please notify MCC-H 10 minutes prior to the event to allow for ground network configuration.

END OF PAGE 1 OF 1, MSG 130 36

Page 38: FD10 FLIGHT PLAN REVISION · 2/16/2010  · a c c s s r f t a a c c s s ∗ rfta cls rfta cls wrsrfta fill qd cnfg ♣ ⊕ fe6 post sleep hygienebreak evaprep e m u p u r g e emu

MSG 131 - SHUTTLE TONOPEN CALIBRATION PROCEDURE

1 2 3

TONOPEN

CALIBRATION PROCEDURE IN MICROGRAVITY 4 5

NOTE 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

This procedure is only needed in the event that the tonopen has been inadvertently placed in the calibration mode

1. Unstow:

Med Locker Nitrile Gloves (blue, non-latex) (MAK) (MF57E) MF57G Tonopen (Tonopen Kit)

2. Inflate nitrile glove like a balloon by blowing into the glove and tying off the wrist opening

3. Place tip cover on tip of Tonopen 4. Power ON Tonopen by depressing Tonopen actuating button (black

button) for 3 seconds and release. ‘CAL’ will appear on display for one second, then single dashed line (- - - -) appears.

5. While holding inflated glove in one hand and Tonopen (with tip cover in

place) in the other, depress Tonopen actuating button twice in rapid succession

6. When ‘CAL’ appears on the display, hold the Tonopen steady until the

display reads ‘-UP-’

7. Quickly push in and hold the top of the Tonopen (with tip cover in place) approximately 1 inch into the inflated glove until a faint “beep” is heard

a. If the display reads ‘Good’, Tonopen is ready for use b. If the display reads ‘bAd’, then repeat steps 5-7

END OF PAGE 1 OF 1, MSG 131 37