Planito p ® 1 8 Planitop ® 18 Fast-setting, flowable one-component repair mortar DESCRIPTION Planitop 18 is a one-component, shrinkage-compensated, fast-setting, cementitious repair mortar that is suited for all interior/exterior horizontal concrete repairs, including bridge deck overlays, parking garage floor repairs and various horizontal DOT concrete repairs. USES Use for horizontal structural concrete repairs and restoration from 1/2" (12 mm) up to a thickness of 2" (5 cm). Planitop 18 can be placed in large quantities in horizontal applications and is suited for precast, cast-in-place, post-tensioned or prestressed concrete repair. Use for the renovation and resurfacing of concrete structures such as airport runways, balconies, bridge decks, concrete pavement, manufacturing floors, parking decks, tunnels and warehouse floors. Use for the renovation of concrete surfaces subject to extreme exposure and heavy vehicular traffic, including roads, ramps, industrial floors, piers, sidewalks and canals. Use where turnaround time is at a premium, as Planitop 18 is open to vehicular traffic within 1 hour of application. RECOMMENDED SUBSTRATES Properly prepared masonry and concrete at least 28 days old, stable and free of hydrostatic pressure Contact MAPEI’s Technical Services Department for installation recommendations regarding substrates and conditions not listed. TECHNICAL NOTES Planitop 18 is rapid-setting, providing excellent compressive and flexural strength. Planitop 18 also provides higher resistance to abrasion than ordinary repair mortars. Planitop 18 requires only the addition of water and is premeasured for easy field use and control. Planitop 18 can be placed easily using either a screed or trowel and then can be finished easily. Planitop 18 adheres well to old concrete surfaces and has good resistance to freeze/thaw conditions and de-icing salts. Before application of Planitop 18, mechanically roughen, saturate surface-dry (SSD) and scrub-coat the concrete surface to ensure a secure bond. Use reinforcement bars for added strength as needed. Applications: Interior and Exterior – Horizontal Mix with Water Mixing Time Trowel Water Cleanup Comes in a Bag ®

Fast-setting, flowable one-component repair mortar

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Fast-setting, flowable one-component repair mortar

Planitop® 18

Planitop

® 18

Fast-setting, flowable one-component repair mortar

DESCRIPTIONPlanitop 18 is a one-component, shrinkage-compensated, fast-setting, cementitious repair mortar that is suited for all interior/exterior horizontal concrete repairs, including bridge deck overlays, parking garage floor repairs and various horizontal DOT concrete repairs.

USES• Use for horizontal structural concrete repairs and restoration from 1/2"

(12 mm) up to a thickness of 2" (5 cm). Planitop 18 can be placed in large quantities in horizontal applications and is suited for precast, cast-in-place, post-tensioned or prestressed concrete repair.

• Use for the renovation and resurfacing of concrete structures such as airport runways, balconies, bridge decks, concrete pavement, manufacturing floors, parking decks, tunnels and warehouse floors.

• Use for the renovation of concrete surfaces subject to extreme exposure and heavy vehicular traffic, including roads, ramps, industrial floors, piers, sidewalks and canals.

• Use where turnaround time is at a premium, as Planitop 18 is open to vehicular traffic within 1 hour of application.

RECOMMENDED SUBSTRATES• Properly prepared masonry and concrete at least 28 days old, stable and

free of hydrostatic pressure

Contact MAPEI’s Technical Services Department for installation recommendations regarding substrates and conditions not listed.

TECHNICAL NOTES• Planitop 18 is rapid-setting, providing excellent compressive and flexural

strength. Planitop 18 also provides higher resistance to abrasion than ordinary repair mortars.

• Planitop 18 requires only the addition of water and is premeasured for easy field use and control.

• Planitop 18 can be placed easily using either a screed or trowel and then can be finished easily.

• Planitop 18 adheres well to old concrete surfaces and has good resistance to freeze/thaw conditions and de-icing salts. Before application of Planitop 18, mechanically roughen, saturate surface-dry (SSD) and scrub-coat the concrete surface to ensure a secure bond. Use reinforcement bars for added strength as needed.

Applications: Interior and Exterior – Horizontal

Mix with Water Mixing Time

Trowel Water Cleanup Comes in a Bag

® ™

Page 2: Fast-setting, flowable one-component repair mortar

Planitop® 18

Planitop® 18

• Planitop 18 is a flowable mortar that can be extended up to 80% by weight with selected aggregate for deeper applications.

• Planitop 18 has low chloride permeability, which helps to protect embedded steel against corrosion.

• Planitop 18 can only be used between 45°F and 95°F (7°C and 35°C).

INSTRUCTIONS

1. Surface Preparation

1.1 All substrates must be structurally sound, stable and solid.

1.2 Thoroughly clean the surface of any substance that could interfere with the bond of the installation material, including dirt, paint, tar, asphalt, wax, oil, grease, latex compounds, form release agents, laitance, loose toppings, foreign substances and any other residues.

1.3 Concrete surfaces must be mechanically profiled and prepared by shotblasting, sandblasting, waterjetting, scarifying or other engineer-approved methods to achieve a +/- 1/8" (3 mm) profile. Reference ICRI CSP Standards 7 to 9 for acceptable profile height.

1.4 Concrete substrate and ambient room temperatures must be between 45°F and 95°F (7°C and 35°C) before application. Maintain temperatures within this range for at least 12 hours after the installation of Planitop 18.

1.5 Do not apply over standing water or wet surfaces.

2. Mixing

2.1 Into a clean mixing container, pour the required amount of cool, clean potable water for desired application method. (For troweling, combine 3 U.S. qts. [2,84 L] of water per 50-lb. [22,7-kg] bag).

2.2 Slowly add Planitop 18 to water while mixing, using a low-speed mixer. Mix for 1 to 2 minutes, removing any unmixed powder, and remix for another 1 to 2 minutes to a smooth, homogenous consistency.

2.3 For extended mix, add up to 80% by weight (40 lbs. [18,1 kg]) of washed, clean, saturated surface-dry (SSD) 3/8" (10 mm) graded aggregate per 50-lb. (22,7-kg) bag.

2.4 Do not overmix. Overmixing or moving the mixer up and down during the mixing process could cause air entrapment, which could shorten pot life.

2.5 Do not mix more material than can be applied within a 15-minute period.

3. Application

3.1 Planitop 18 is applied with a trowel, without formwork, on horizontal surfaces. The maximum thickness per coat is 2" (5 cm).

3.2 When encountering exposed reinforcing steel bars, clean bars and coat with Planibond 3C to protect against corrosion and to improve adhesion (see the respective Technical Data Sheet for details).

3.3 For large repair areas, use Mapecem ® 102 or Mapecem 202 (see respective Technical Data Sheet for details). For application thicknesses less than 1/2" (12 mm), use Mapecem 101 (see Technical Data Sheet for details).

3.4 Planitop 18 has a pot life of about 15 minutes at 73°F (23°C). Place material within its pot life. Application times will vary depending on climatic conditions.

4. Curing

4.1 During curing, protect Planitop 18 from excessive heat or draft conditions, which could cause cracking.

4.2 Mist-spray the surface with water as soon as possible during the first 24 hours of damp curing. Alternatively, use damp burlap, white polyethylene sheet or MAPEI’s Planicure ® 65 white liquid curing compound (see Technical Data Sheet for details). Do not use a solvent-based curing compound.

5. Cleaning

Wash hands and tools promptly with water before material hardens. Cured material must be mechanically removed.

Page 3: Fast-setting, flowable one-component repair mortar

TECHNICAL DATA (based on 73°F [23°C] and 50% relative humidity)

Physical state ....................................................................................................PowderColor .................................................................................................................GrayShelf life ...........................................................................................................1 year in original bag, in dry, heated and covered placeMaximum aggregate size ..................................................................................3/32" (2,5 mm)Flammability ..................................................................................................... Flame spread: 0

Fuel contribution: 0 Smoke development: 0

Health and safety ............................................................................................... Consult the Material Safety Data Sheet (MSDS) for safe-handling instructions.

Planitop 18 (mixed)Color .................................................................................................................GrayMixing ratio ......................................................................................................Trowel: 3 U.S. qts. (2,84 L) per 50-lb. (22,7-kg) bagConsistency of mix ...........................................................................................Flowable mortarFlow – ASTM C230 ..........................................................................................120%pH .....................................................................................................................12.8Application temperature range ......................................................................... 45°F to 95°F (7°C to 35°C)Pot life ..............................................................................................................15 minutesInitial set ...........................................................................................................17 minutesFinal set ............................................................................................................25 minutesThickness per lift ...............................................................................................1/2" to 2" (12 mm to 5 cm)

Compressive strength – ASTM C109 (CAN/CSA-A5)1 hour ..........................................................................................................> 2,500 psi (17,2 MPa)2 hours ........................................................................................................> 5,500 psi (37,9 MPa)24 hours ......................................................................................................> 7,800 psi (53,8 MPa)7 days ..........................................................................................................> 8,000 psi (55,2 MPa)28 days ........................................................................................................> 9,400 psi (64,8 MPa)

Compressive strength – ASTM C39 (CAN/CSA-A23.2-9C) with 60% extension (pea gravel)1 hour ..........................................................................................................> 2,500 psi (17,2 MPa)24 hours .....................................................................................................> 6,450 psi (44,5 MPa)28 days ........................................................................................................> 9,200 psi (63,4 MPa)

Flexural strength – ASTM C348 (CAN/CSA-A23.2-8C)1 day ............................................................................................................> 900 psi (6,21 MPa)7 days ..........................................................................................................> 1,100 psi (7,59 MPa)28 days ........................................................................................................> 1,480 psi (10,2 MPa)

Modulus of elasticity – ASTM C46928 days ........................................................................................................> 3.71 x 106 psi (25,6 GPa)

Slant/shear bond strength – ASTM C882 (modified)1 day ..............................................................................................................> 2,400 psi (16,6 MPa)7 days .............................................................................................................> 2,500 psi (17,2 MPa)28 days ...........................................................................................................> 3,000 psi (20,7 MPa)

Pull-out strength (rupture of concrete substrate) (CAN/CSA-A23.2-6B)3 days ..........................................................................................................> 150 psi (1,03 MPa)7 days ..........................................................................................................> 261 psi (1,8 MPa)28 days ........................................................................................................> 320 psi (2,21 MPa)

Volume change – ASTM C157 (modified)28 days, dry-cured ......................................................................................-0.047%28 days, wet-cured .......................................................................................+0.075%

Abrasion resistance – ASTM D4060After 7 days, Taber H22-500 g, 700 cycles ...................................................3.25 g

Freeze/thaw resistance – ASTM C666-A (CAN/CSA A23.2-9B)300 cycles ....................................................................................................Good – 90% durability factor500 cycles ....................................................................................................Good – 86% durability factor

Resistance to de-icing salts – ASTM C672 (CAN/CSA A23.2-16C) ..................Good – 1 rating, very slight scaling

Permeability to chlorides – ASTM C1202 (AASHTO T277) ...............................Good – 450 coulombs (very low)

PACKAGING Bag: 50 lbs. (22,7 kg)

COVERAGE/THICKNESS* (per 50-lb. [22,7-kg] bag)

1/2" (12 mm) = 9.8 sq. ft. (0,91 m2)1" (2,5 cm) = 4.9 sq. ft. (0,45 m2)2" (5 cm) = 2.45 sq. ft. (0,23 m2)

* Coverage/thickness data are for estimating purposes only. Actual job-site coverages may vary according to substrate conditions, type of equipment and applications methods used.

Planitop® 18

Planitop® 18

Page 4: Fast-setting, flowable one-component repair mortar

Planitop® 18

Planitop® 18

NOTICEBefore using, user shall determine the suitability of the product for its intended use and user alone assumes all risks and liability whatsoever in connection therewith. ANY CLAIM SHALL BE DEEMED WAIVED UNLESS MADE IN WRITING TO US WITHIN FIFTEEN (15) DAYS FROM DATE IT WAS, OR REASONABLY SHOULD HAVE BEEN, DISCOVERED.

MAPEI

Headquarters of the Americas1144 East Newport Center Drive Deerfield Beach, Florida 33442 Phone: 1-888-US-MAPEI (1-888-876-2734) Fax: (954) 246-8800

Customer Service1-800-42-MAPEI (1-800-426-2734)

Technical Services1-800-992-6273 (U.S. and Puerto Rico) 1-800-361-9309 (Canada)

Additional InformationWebsite: www.mapei.com

MAPEI – USAFt. Lauderdale, Florida Fredericksburg, Virginia Garland, Texas San Bernardino, California South River, New Jersey Tempe, Arizona West Chicago, Illinois

MAPEI – CanadaLaval, Quebec Delta, British Columbia Brampton, Ontario

MAPEI – ArgentinaBuenos Aires

MAPEI – Puerto RicoDorado

MAPEI – VenezuelaCaracas, Ref. J-30312350-3

For the most current product data, visit www.mapei.com. PR4271 P18D_C07Evp

© 2007 MAPEI Corporation. All Rights Reserved.Printed in the USA