    Newburyport Park Inspections

    Revised October 2013

    270 Water Street

    Safety Issues Other repairs and/or cosmetics Actions taken

    Several dead shrubs need to be replaced Unused gate post left by National Grid

    contractor should be removed Some grassy areas sparse and in need of

    improvement

    IMPROVEMENTS NEEDS

    A professional landscaping contract keeps the park looking

    generally well-kept, though some grass areas (below) are

    sparse and in need of improvement.

    An unused gate post left by

    National Grids contractor

    needs to be removed.

    Several dead shrubs resulting from lack of irrigation need to

    be replaced.

  • 7/27/2019 Fall 2013 Parks Inspection Report

    2/13

    Newburyport Parks Inspections, Fall 2013, Page 2

    ATKINSON COMMON

    Safety Issues Other repairs and/or cosmetics Actions taken

    Piles of brush along border with LowerAtkinson present fire hazard

    Some trees present a safety hazard topedestrians

    Trees need maintenance program to keepthem healthy and to avoid safety hazards

    related to untended deadwood

    Granite bollard broken

    Rules signage needs replacing Dumping a problem along Chase Street

    entry area & behind Plummer Ave

    residences encroaching on park

    Lily Ponds need new curbing and sealant toprevent leaks

    Resurfaced tennis courts Working with DPW to remove brush piles CPA funding secured to address safety

    issues with trees

    Parks Commission reviewing rules signagein all parks before repairing then willreplace sign

    Repaired Plummer Ave entrance damageand connector driveway to Lower Atkinson

    Coordinating with Planning Director to dealwith encroachment on park by neighbors.

    Refinished Civil War Memorial tablets andreconstructed memorial plaza with brick

    and granite pavers.

    IMPROVEMENTSBEFORE AFTER

    Tennis courts were resurfaced and newly striped with the inclusion of Under10 lines.

    Tarnished Civil War Memorial tablets were refinished and the deteriorating memorial plaza was reconstructed

    with brick and granite pavers and dedicated in May 2013.

  • 7/27/2019 Fall 2013 Parks Inspection Report

    3/13

    Newburyport Parks Inspections, Fall 2013, Page 3

    ATWOOD PARK

    Safety Issues Other repairs and/or cosmetics Actions taken

    Chain link fence rusted & detached Ditch & cracks in tennis court area

    Tennis net missing & posts broken Cracks in asphalt of basketball court Brick wall broken in three places; brick

    needs re-pointing

    Benches need sanding, sealing Brick bench broken, needs 6 new bricks Graffiti on basketball backboard

    Coordinated sponsorship program withOpportunity Works & Hennessey

    Landscaping to maintain the park weekly;

    lawn quality has improved; trees have been

    mulched

    Secured CPA funding & seeking Morrillfunding to carry out phased improvement

    project

    NEEDS

    Drawing above depicts planned improvements at Atwood Park. The former tennis court will receive a new asphalt surface to

    provide a safe place for kids to ride bikes, scooters, etc.; the colored circles represent an area where a bike riding track will be

    painted; new planting bed with street trees line the edge of School Street; new fencing will be installed; and a concrete table

    tennis unit would be placed where the originally planned bocce court is pictured above. Since this drawing was done, the

    bocce court was removed from the plan due to maintenance concerns and additional, ornamental fencing was added between

    the play area and the School Street planting bed.

  • 7/27/2019 Fall 2013 Parks Inspection Report

    4/13

    Newburyport Parks Inspections, Fall 2013, Page 4

    AYERS PLAYGROUND

    Safety Issues Other repairs and/or cosmetics Actions taken

    Basketball court needs repaving &relining

    Track ride handle missing Decals peeling off of alphabet toy Walkway, cobble plaza and play area

    weedy

    One bench needs painting Signpost needs painting

    New safety surfacing installed Spring toys replaced New landscape ties installed Touched up paint on play structures

    and benches; removed graffiti fromslides

    Installed new basketball nets

    Asphalt basketball court and play area is in need ofresurfacing and re-lining.

    Replacement

    of broken

    swing toys

    and new

    safety

    surfacing are

    among

    multiplesafety and

    other deferred

    maintenance

    issues

    addressed at

    Ayers

    Playground.

    BEFORE

    AFTER

    IMPROVEMENTS NEEDS

    Some portions of the climbing structure have been touched

    up but more touching up remains.

  • 7/27/2019 Fall 2013 Parks Inspection Report

    5/13

    Newburyport Parks Inspections, Fall 2013, Page 5

    BARTLET MALL/FROG POND

    Safety Issues Other repairs and/or cosmetics Actions taken

    Water quality poor; potentiallyhazardous to people and pets

    Deadwood hanging over picnic tablesat Auburn Street end of park

    Need new swing mats and mat underspinning component on play

    structure

    Landscape ties need replacing Bolt remaining from missing bench

    needs to be cut off

    Basketball area needs re-paving Play lot weedy Picnic tables need paint touch up

    (black) Weedy around bike racks Small water bubbler broken Fence along High Street could use

    painting

    Track ride has mildew, needs cleaning Street trees along Pond St. need

    pruning

    Repaired all lighting Replaced swing chains Under-surface aerators installed in

    pond to increase dissolved oxygen Installing new piping to increase

    volume of water flow in fountain

    Writing RFP to determine bestapproach for pond cleanup

    Weeds controlled on High Streetpromenade

    Contracted for weed control on allwalkways.

    Asked Tree Warden to addressdeadwood in willow

    IMPROVEMENTS NEEDS

    A basketball court

    which doubles as

    winter parking is in

    serious need of

    resurfacing and

    restriping.

    In addition to getting the fountain flowing again, four

    underwater aerators were installed with the aim of increasing

    dissolved oxygen levels in the pond to improve water quality.

    Work continues to improve volume of flow in the central

    fountain.

    Retaining edge

    around swings is

    rotting and has

    exposed spikes.

    Swing mats are

    deteriorated and

    need re lacement.

  • 7/27/2019 Fall 2013 Parks Inspection Report

    6/13

    Newburyport Parks Inspections, Fall 2013, Page 6

    BROWN SQUARE

    Safety Issues Other repairs and/or cosmetics Actions taken

    Paint on sign post peeling Interpretive sign panels delaminating

    Working with sign company to replaceinterpretive panels that are

    delaminating

    CASHMAN PARK

    Safety Issues Other repairs and/or cosmetics Actions taken

    Granite benches unstable due to erosion Walkway from Merrimack St. to river

    badly cracked

    Cashman lawn sparse, needs re-seeding Cracks & puddles on basketball court One seahorse spring toy missing Bolts need tightening on Tot Lot

    climbing structure

    Dog bubbler not working

    Replaced spiral slide Installed new safety surfacing Re-welded mast on central ship climbing

    structure

    Installed swing mats

    New safety surfacing, along with swing mats have been

    installed.

    IMPROVEMENTS NEEDS

    While many landscape ties were replaced, further

    work needs to be done to address rotting ties.

    While many landscape tie

    were replaced, further wo

    needs to be done to addre

  • 7/27/2019 Fall 2013 Parks Inspection Report

    7/13

    Newburyport Parks Inspections, Fall 2013, Page 7

    CLIPPER CITY RAIL TRAIL

    Safety Issues Other repairs and/or cosmetics Actions taken

    Several trees with deadwood andone dead tree needs removal

    near waterfront

    Low Street slope needs weeding Graffiti an ongoing problem: under Gillis

    Bridge; on trash can near waterfront;

    under High Street bridge; electrical

    bunker; bench just south of Low Street Grass couches dilapidated, need

    removal

    Need mulch around all benches Shrubs near Parker St need pruning of

    deadwood

    Large limb to be removed north oflabyrinth peace offering sculpture

    Peace offering sculpture needs washing,waxing, buffing

    Mural needs washing Interpretive panels delaminating Low Street spur path garden needs

    renovating

    Will He needs repair Invasives need removal

    Coordinated ongoing volunteer work onberry labyrinth, geometric gardens and

    Washington Street gateway gardens.

    Volunteer dog waste pickup ongoing; Repaired Parker Street crossing light Renovated Parker Street gateway garden

    using volunteers

    Increased maintenance of WashingtonStreet gateway dog refuse receptacle to

    reduce odors

    Increased management of dog wastecleanup

    Contacted sign maker about replacinginterpretive panels

    Asked Green Artist League to removeunkempt plantings south of Haleys

    access path

    INN STREET PLAYGROUND/MARKET LANDING/BULLNOSE

    Safety Issues Other repairs and/or cosmetics Actions taken

    Missing steering wheel on play structure Park perimeter looks barren, needs

    landscaping

    Benches on Bullnose could userefinishing

    New landscaping mulchpurchased and installed by DPS

    Coordinating design forlandscaping perimeter of play

    area

    JASON SAWYER PLAYGROUND

    Safety Issues Other repairs and/or cosmetics Actions taken

    Broken game table Chess boards rusting Pavilion posts rusting, support beams

    corroded, need to replace or remove

    Basketball backboard needs replacing Paint needs touching up: track ride,

    hand rails, green bar over slide

    Need snow fence behind climbing net

    Basketball backboard replaced Installed new swing mats Parks Commission directed removal of

    pavilion structure

    Basketball backboard and hoop was replaced with a new,

    weatherproof model. Pavilion supports are corroded beyond repair.

    IMPROVEMENTS NEEDSBEFORE AFTER

  • 7/27/2019 Fall 2013 Parks Inspection Report

    8/13

    Newburyport Parks Inspections, Fall 2013, Page 8

    JOPPA PARK

    Safety Issues Other repairs and/or cosmetics Actions taken

    New sink holes in walkway byseawall, walkway needs to be

    replaced

    Grass showing weeds and bare spots Benches need replacement Rose hedge needs weeding and mulch Central garden needs renovation Water Street sidewalk in poor condition

    Working with State Dept of Fish andGame to replace boat ramp

    Funding approved by CPC for creation ofinterpretive panels

    Partial funding approved for benches,bench plazas through Mayor Gayden W.

    Morrill Charitable Foundation and CPA

    Three dead rosebushes replaced underwarranty

    Asked DPS to patch sinkholes

    MARCHS HILL

    Safety Issues Other repairs and/or cosmetics Actions taken

    Stair landings falling apart; stairs ahazard

    Basketball court cracked Needs two new basketball rims & one

    net

    Signpost needs painting

    Consulting with Planning Office aboutreconfiguration of park entrance in

    conjunction with Rail Trail extension

    project

    DPS installed partial hand rail on left ofstairs

    Left: Staircase partially repaired

    with additional handrail installed.

    Stair landing still in disrepair.

    Plans for Clipper City Rail Trail will

    reconfigure park entry, and install

    a new, granite staircase.

    Above Left: Joppa Park walkway is prone to sinkholes and needs to be replaced. Above right: benches are old & damaged and need repair

    and/or replacing.

    NEEDS

  • 7/27/2019 Fall 2013 Parks Inspection Report

    9/13

    Newburyport Parks Inspections, Fall 2013, Page 9

    MOSELEY WOODS

    Safety Issues Other repairs and/or cosmetics Actions taken

    Needs more wood fiber safetysurfacing around all play structures

    Steering wheel needs tightening Stone wall damaged Erosion problems along waterfront

    pathways

    Lawn being used to stage equipmentfrom Round-A-Bout project

    Broken split rails on trail near Pavilion Stove pipe should be removed or

    planted to discourage use as a grill

    under pine trees

    Picnic table top Trex boards warped Touch up paint needed on central play

    structure

    Invasive vines damaging trees onproperty line with Swindlehurst

    property

    Additional wood fiber safety surfacingbeing installed

    Consulting with round-a-bout contractorre: lawn repair-improvement

    Added Gladiator dog refuse receptacleand contracted with Doody Calls to

    maintain it to reduce litter issues

    IMPROVEMENTS NEEDS

    An old grill base encourages use of

    fire where fires are prohibited.

    Synthetic planks on one of the

    pavilion picnic tables are warped,

    need replacing.

    Portions of the central climbing

    structure need touch up paint.

    Additional wood fiber safety

    surfacing is needed around all play

    structures.

    Several split rails need to be

    replaced.

    To reduce a litter problem in the park, an additional dog waste

    receptacle was installed and is being maintained as part of the citys

    contract with Doody Calls.

  • 7/27/2019 Fall 2013 Parks Inspection Report

    10/13

    Newburyport Parks Inspections, Fall 2013, Page 10

    PERKINS PARK

    Safety Issues Other repairs and/or cosmetics Actions taken

    Equipment replacements needed toreplace: two spring toys; ship; fire truck

    Playground grass areas needsreplacement, fertilizing and maintenance

    Ball field grass slope needs repair Too much signage is an eyesore Lichen on benches. Park sign rotting, needs replacement Cracked swing chains on tire swing Tire swing support beam needs repainting Graffiti on port-o-potty shed; consider

    securing shed with doors

    Repaired & re-shingled sandboxstructure, and wooden entrance

    structure; added new sand

    Installed new slides Installed new play wood fiber safety

    surfacing

    Installed new play sand

    IMPROVEMENTS NEEDSBEFORE AFTER

    The declining sand box structure and park entrance cupola were shored

    up, given new decking and new shake shingle roofs.

    Old, damaged

    slides were

    replaced.

    Missing play structures (right) and

    ragged landscaping gives the park

    an un-cared for look.

    Chain link fence is bulging and

    needs re-fastening.

    Tire swing chains are cracked

    and need replacing.

    Tire swing

    support

    beam is

    rusted and

    needs

    painting.

  • 7/27/2019 Fall 2013 Parks Inspection Report

    11/13

    Newburyport Parks Inspections, Fall 2013, Page 11

    SKATE PARK

    Safety Issues Other repairs and/or cosmetics Actions taken

    Chunks of concrete are chipped fromunder the coping; normal wear and

    tear

    Youth Services applied annual sealantYouth Services called for volunteers to

    repair concrete under coping

    THREE ROADS

    Safety Issues Other repairs and/or cosmetics Actions taken

    Twigs and brush need to be raked Water trough needs painting Trees and bushes could use mulch to

    make the park look more well-kept

    TRACY SQUARE

    Safety Issues Other repairs and/or cosmetics Actions taken

    Benches need refinishing Entrance garden beds needs mulch Leaves need to be raked

    NEEDS

    Park needs some TLC to look well-kept: benches need refinishing; leaves need to be raked; entrance garden beds needs mulching, possibly re-

    landscaping.

    NEEDS

    Chunks of concrete have been broken

    away from under the coping, or upper

    metal edge, of some of the bowls.

    Here the damage can be seen at thefar side of the small bowl in the

    foreground. This is normal wear and

    tear which Youth Services repairs

    every couple of years.

  • 7/27/2019 Fall 2013 Parks Inspection Report

    12/13

    Newburyport Parks Inspections, Fall 2013, Page 12

    WOODMAN PARK

    Safety Issues Other repairs and/or cosmetics Actions taken

    Basketball court cracked Climbing structures need touch up

    (red & tan, steering wheels,

    handrails, steps)

    Climbing structures and picnic tablesmildewed

    Trash cans look dilapidated Baseball infield overgrown Nu-oak benches need cleaning One sound tube broken off Ruts in parking lot Landscaping ties around parking lot

    rotted

    Installed new wood fiber safety surfacing Installed swing mats to reduce wear of

    wood fiber safety surfacing

    Partially cleaned climbing structures Partially touched up paint on climbing

    structures

    Coordinating with neighbors to volunteerlabor

    Coordinating with Pioneer League toimprove ball field

    Removed used pile of backstop fencing Replaced broken swing seat Tightened handles on play structure Replaced basketball rim

    IMPROVEMENTS NEEDS

    Playground safety surfacing was replenished to improve safety and

    mulch spread around trees and parking lot to make the park look

    well-kept.

    One sound tube is

    broken off. Photo on

    left shows what it

    should look like. On

    right is what remains

    of the damaged play

    piece.

    Landscaping ties that

    border the parking lot are

    rotted, need replacement.

    Some portions of the climbing structures

    have been repainted, but many

    components still need touch up paint.

    While the outfield,

    used as a soccer

    field, is in good

    shape, this ballfield

    needs a backstop

    and fencing and the

    infield needs to be

    repaired and

    maintained.

  • 7/27/2019 Fall 2013 Parks Inspection Report

    13/13