REV DESCRIPTION DR CHDATE
LONDON LEEDS CARDIFF NEWCASTLE BRISTOL GLASGOW ABERYSTWYTH NEWTOWN BRADFORD MANCHESTER LOUGHBOROUGH
darnton 3BCLIENT
PROJECT
DRAWING
SCALE @ A3 DRAWN CHECKED
CREATION DATE
DARNTONB3 DRAWING NO.
REVISION
P R O J E C T N O -C O M P A N Y - Z O N E - L E V E L - T Y P E - R O L E - N U M B E R
--
--
--
- - -
- -
DB3 A
LOUGHBOROUGHSuite C, Loughborough Technology Centre, Epinal Way,
Loughborough, Leicestershire LE11 3GET: 01509 610510 www.darntonb3.com
COPYRIGHT: ALL RIGHTS RESERVED.
THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGSPREPARED BY CONSULTANTS AND SUB-CONTRACTORS.
DO NOT SCALE FROM THIS DRAWING. WORK ONLY TO THE PRINTED DIMENSIONS.
THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS ISSUED FORCONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ARCHITECT OR REPRESENTATIVES THEREOF.
c
A R C H I T E C T U R E
B1
B3 ARCHITECTS WORK TO A MANAGEMENT SYSTEM WHICH IS APPROVED TO ISO-9001 BY
QMS CERTIFICATE NUMBER QMS-GB18714
GF DW 0591470
10/06/2016
Fairfields School, Trinity Ave,NN2 6JN
Paul Atkins, Northamptonshire County Council
OS Site map
Model Name/s :-N:\Projects\09000\91470 Fairfields School\DESIGN DATA\3 InProgress\91470 Fairfields mk12.pln
CG
Planning
MC
MURRAY A
VENUE
TRINITY AVENUE
MURRAY
AVENUE
DARDIS CLOSE
KINGSLEY GARDENS
MethodistHomestead
LB
BM87.46m
87.0m
91.0m
Tennis Courts
84.7m
39
35
33
3638
17
27
BethonyHomestead
School
30
20
37
47
59
22 12
2
42
19
132
122
21a2325
27
33
13
20
44
52
19
19a21
30
25
31
142
55
24
42
3
1
18
5
1
55a
4
1
71
57
69
59
41
76
144BethanyHomestead
2221 to 1817
732
12
Fairfields School
NursingHome
95 to
8
14
29
31
13
5
28
Chapel
23
71a
13 11
3
75
73
Fairfi
elds
N
0.-
Existing Site plan1:1250
1:1250
REV DESCRIPTION DR CHDATE
LONDON LEEDS CARDIFF NEWCASTLE BRISTOL GLASGOW ABERYSTWYTH NEWTOWN BRADFORD MANCHESTER LOUGHBOROUGH
darnton 3BCLIENT
PROJECT
DRAWING
SCALE @ A3 DRAWN CHECKED
CREATION DATE
DARNTONB3 DRAWING NO.
REVISION
P R O J E C T N O -C O M P A N Y - Z O N E - L E V E L - T Y P E - R O L E - N U M B E R
--
--
--
- - -
- -
DB3 A
LOUGHBOROUGHSuite C, Loughborough Technology Centre, Epinal Way,
Loughborough, Leicestershire LE11 3GET: 01509 610510 www.darntonb3.com
COPYRIGHT: ALL RIGHTS RESERVED.
THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGSPREPARED BY CONSULTANTS AND SUB-CONTRACTORS.
DO NOT SCALE FROM THIS DRAWING. WORK ONLY TO THE PRINTED DIMENSIONS.
THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS ISSUED FORCONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ARCHITECT OR REPRESENTATIVES THEREOF.
c
A R C H I T E C T U R E
B1
B3 ARCHITECTS WORK TO A MANAGEMENT SYSTEM WHICH IS APPROVED TO ISO-9001 BY
QMS CERTIFICATE NUMBER QMS-GB18714
GF DW 0791470
10/06/2016
Fairfields School, Trinity Ave,NN2 6JN
Paul Atkins, Northamptonshire County Council
Block plan
Model Name/s :-N:\Projects\09000\91470 Fairfields School\DESIGN DATA\3 InProgress\91470 Fairfields mk12.pln
CG
Planning
MC
MURRAY A
VENUE
TRINITY AVENUE
MURRAY
AVENUE
DARDIS CLOSE
BM87.46m
87.0m
Tennis Courts
84.7m
39
3638
17
27
BethonyHomestead
School
30
20
37
47
59
22 12
2
142
55
42
3
1
55a
4
1
71
57
69
59
41
76
144
BethanyHomestead
2221 to 1817
32
12
Fairfields School
NursingHome
95 to
8
14
5
28
Chapel
71a
13 11
3
75
73
Fairfi
elds
86,7
63
72,83
569,59
8
99,758
101,366
106,126
115,
161
108,
985
87,92
6
86,714
97,050
79,993
0.-
Block plan1:1250
1:1250
REV DESCRIPTION DR CHDATE
LON
DO
NLE
ED
SC
AR
DIFF
NE
WC
AS
TLEB
RIS
TOL
GLA
SG
OW
AB
ER
YSTW
YTHN
EW
TOW
NB
RA
DFO
RD
MA
NC
HE
STE
RLO
UG
HB
OR
OU
GH
darnton 3BCLIENT
PROJECT
DRAWING
SCALE @ A1 DRAWN CHECKED
CREATION DATE
DARNTONB3 DRAWING NO.
REVISION
P R O J E C T N O -COMPANY - Z O N E - LEVEL - T Y P E - R O L E - N U M B E R
--
--
--
- - -
- -
DB3 A
LOUGHBOROUGHSuite C, Loughborough Technology Centre, Epinal Way,
Loughborough, Leicestershire LE11 3GET: 01509 610510 www.darntonb3.com
COPYRIGHT: ALL RIGHTS RESERVED.
THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGSPREPARED BY CONSULTANTS AND SUB-CONTRACTORS.
DO NOT SCALE FROM THIS DRAWING. WORK ONLY TO THE PRINTED DIMENSIONS.
THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS ISSUED FORCONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ARCHITECT OR REPRESENTATIVES THEREOF.
c
A R C H I T E C T U R E
B1
B3 ARCHITECTS WORK TO A MANAGEMENT SYSTEM WHICH IS APPROVED TO ISO-9001 BYQMS CERTIFICATE NUMBER QMS-GB18714
GF DW 20191470
10/06/2016
Fairfields School, Trinity Ave,NN2 6JN
Paul Atkins, Northamptonshire County Council
Proposed Elevations
Model Name/s :-N:\Projects\09000\91470 Fairfields School\DESIGN DATA\3 InProgress\91470 Fairfields mk12.pln
CG
Planning
MC
4075
20,150 200
1,320 20,150
4075
12,000
4075
0 5 10 metres
Extension Area 210 m2
W
Sill 900
1,50
01,
790
W
Sill 900
1,50
01,
790
W
Sill 900
1,50
01,
790
W
Sill
900
1,500900
W
Sill 900
1,50
089
0
W
Sill 900
1,50
089
0
ED
2,40
03,
365
W
Sill
900
1,500900
W
Sill
900
1,500900
ED
2,4003,340
W
Sill 900
1,50
01,
790
W
Sill 900
1,50
01,
790
W
Sill 900
1,50
01,
790
D
2,1001,500
D
2,10
01,
035
W
Sill
900
1,5001,457
D
2,1001,035
D
2,10
01,
035
D00
9
2,1001,035
D010
2,10
01,
035
D
2,10
01,
500
E1 E1
E2 E2
E3
E3
E4
E5
S1
S1
S2
Extension Area 57 m2 22 m2
Teaching wall
wash up sink and storage
Shower trolley / changing bed
Changing area with bench, hoist and hygiene point
Childrens supplies Full height cupboards
Low heightWC cubicals
Ceiling hoist H track
Extend office approximately 30m
Group room
New Fence
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
0 5 10 metres
E1-
E1 Building Elevation1:50
E2-
E2 Building Elevation1:50
E3-
E3 Building Elevation1:50
0.-
Key1:100
-91470 Fairfields view 2
-91470 Fairfields view 3
-91470 Fairfields view 1
1:50
REV DESCRIPTION DR CHDATE
LON
DO
NLE
ED
SC
AR
DIFF
NE
WC
AS
TLEB
RIS
TOL
GLA
SG
OW
AB
ER
YSTW
YTHN
EW
TOW
NB
RA
DFO
RD
MA
NC
HE
STE
RLO
UG
HB
OR
OU
GH
darnton 3BCLIENT
PROJECT
DRAWING
SCALE @ A1 DRAWN CHECKED
CREATION DATE
DARNTONB3 DRAWING NO.
REVISION
P R O J E C T N O -COMPANY - Z O N E - LEVEL - T Y P E - R O L E - N U M B E R
--
--
--
- - -
- -
DB3 A
LOUGHBOROUGHSuite C, Loughborough Technology Centre, Epinal Way,
Loughborough, Leicestershire LE11 3GET: 01509 610510 www.darntonb3.com
COPYRIGHT: ALL RIGHTS RESERVED.
THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGSPREPARED BY CONSULTANTS AND SUB-CONTRACTORS.
DO NOT SCALE FROM THIS DRAWING. WORK ONLY TO THE PRINTED DIMENSIONS.
THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS ISSUED FORCONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ARCHITECT OR REPRESENTATIVES THEREOF.
c
A R C H I T E C T U R E
B1
B3 ARCHITECTS WORK TO A MANAGEMENT SYSTEM WHICH IS APPROVED TO ISO-9001 BYQMS CERTIFICATE NUMBER QMS-GB18714
GF DW 20291470
10/06/2016
Fairfields School, Trinity Ave,NN2 6JN
Paul Atkins, Northamptonshire County Council
Proposed elevations (Entrance)
Model Name/s :-N:\Projects\09000\91470 Fairfields School\DESIGN DATA\3 InProgress\91470 Fairfields mk12.pln
CG
Planning
MC
4075
4,9404,9408,135
3250
11,900
4075
2,330
3250
0 5 10 metres Extension Area 210 m2
52 m2
Extension Area 36 m2
W
Sill 900
1,50
089
0
W
Sill 900
1,50
089
0
ED
2,40
03,
365
W
Sill
900
1,500900
W
Sill
900
1,500900
ED
2,4003,340
W
Sill 900
1,50
01,
790
W
Sill 900
1,50
01,
457
W
Sill 900
1,50
01,
457
ED
2,40
03,
340
W
Sill
900
1,5001,457
W
Sill
900
1,5001,457
W
Sill
900
1,5001,500
W
Sill
900
1,5001,500
W
Sill
900
1,5001,500
ED
2,4001,810
D
2,10
01,
800
E1
E2
E3
E3
E4 E4
E5
E5
E6
E6
E7
E7
S1
S1
S2 S2
Extension Area 57 m2
Teaching wall
wash up sink and storage
Changing bed
Hoist track
Extend office approximately 30mForm secure lobby
Remove external wallRemove external wall
Redecorate andfit new vinyl useas sensoryroom
Decorate and fitnew vinyl use asequipmentstorage area
Curtain
Staff handwash
Childrens supplies high level shelving
New Fence
Existing canopy to be cut short
Childrenssupplies Full
heightcupboards
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
E5-
E5 Building Elevation1:50
E6-
E6 Building Elevation1:50
E7-
E7 Building Elevation1:50
-91470 Fairfields view 2
-91470 Fairfields view 1
E4-
E4 Building Elevation1:50 0.
-Key
1:150
1:50
REV DESCRIPTION DR CHDATE
LONDON LEEDS CARDIFF NEWCASTLE BRISTOL GLASGOW ABERYSTWYTH NEWTOWN BRADFORD MANCHESTER LOUGHBOROUGH
darnton 3BCLIENT
PROJECT
DRAWING
SCALE @ A3 DRAWN CHECKED
CREATION DATE
DARNTONB3 DRAWING NO.
REVISION
P R O J E C T N O -C O M P A N Y - Z O N E - L E V E L - T Y P E - R O L E - N U M B E R
--
--
--
- - -
- -
DB3 A
LOUGHBOROUGHSuite C, Loughborough Technology Centre, Epinal Way,
Loughborough, Leicestershire LE11 3GET: 01509 610510 www.darntonb3.com
COPYRIGHT: ALL RIGHTS RESERVED.
THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGSPREPARED BY CONSULTANTS AND SUB-CONTRACTORS.
DO NOT SCALE FROM THIS DRAWING. WORK ONLY TO THE PRINTED DIMENSIONS.
THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS ISSUED FORCONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ARCHITECT OR REPRESENTATIVES THEREOF.
c
A R C H I T E C T U R E
B1
B3 ARCHITECTS WORK TO A MANAGEMENT SYSTEM WHICH IS APPROVED TO ISO-9001 BY
QMS CERTIFICATE NUMBER QMS-GB18714
GF DW 30091470
10/06/2016
Fairfields School, Trinity Ave,NN2 6JN
Paul Atkins, Northamptonshire County Council
Section
Model Name/s :-N:\Projects\09000\91470 Fairfields School\DESIGN DATA\3 InProgress\91470 Fairfields mk12.pln
CG
Planning
MC
2,79
5
8,570
OfficeLobby
S1-
Building Section1:50
S2-
Building Section1:50
1:50
REV DESCRIPTION DR CHDATE
LON
DO
NLE
ED
SC
AR
DIFF
NE
WC
AS
TLEB
RIS
TOL
GLA
SG
OW
AB
ER
YSTW
YTHN
EW
TOW
NB
RA
DFO
RD
MA
NC
HE
STE
RLO
UG
HB
OR
OU
GH
darnton 3BCLIENT
PROJECT
DRAWING
SCALE @ A0 DRAWN CHECKED
CREATION DATE
DARNTONB3 DRAWING NO.
REVISION
P R O J E C T N O -COMPANY- Z O N E - LEVEL - T Y P E - R O L E - N U M B E R
--
--
--
- - -
- -
DB3 A
LOUGHBOROUGHSuite C, Loughborough Technology Centre, Epinal Way,
Loughborough, Leicestershire LE11 3GET: 01509 610510 www.darntonb3.com
COPYRIGHT: ALL RIGHTS RESERVED.
THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGSPREPARED BY CONSULTANTS AND SUB-CONTRACTORS.
DO NOT SCALE FROM THIS DRAWING. WORK ONLY TO THE PRINTED DIMENSIONS.
THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS ISSUED FORCONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ARCHITECT OR REPRESENTATIVES THEREOF.
c
A R C H I T E C T U R E
B1
B3 ARCHITECTS WORK TO A MANAGEMENT SYSTEM WHICH IS APPROVED TO ISO-9001 BYQMS CERTIFICATE NUMBER QMS-GB18714
DWGF 50091470
10/06/2016
Fairfields School, Trinity Ave,NN2 6JN
Paul Atkins, Northamptonshire County Council
Water&Drainage
Model Name/s :-N:\Projects\09000\91470 Fairfields School\DESIGN DATA\3 InProgress\91470 Fairfields mk12.pln
CG
Planning
MC
Extension Area 210 m2
Extension Area 36 m2
School
Fairf
ields School
Fairfields
W
Sill 900
1,50
01,
790
W
Sill 900
1,50
01,
790
W
Sill 900
1,50
01,
790
W
Sill
900
1,500900
W
Sill 900
1,50
089
0
W
Sill 900
1,50
089
0
ED
2,40
03,
365
W
Sill
900
1,500900
W
Sill
900
1,500900
ED
2,4003,340
W
Sill 900
1,50
01,
790
W
Sill 900
1,50
01,
790
W
Sill 900
1,50
01,
790
D
2,1001,500
D
2,10
01,
035
W
Sill 900
1,50
01,
457
W
Sill 900
1,50
01,
457
ED
2,40
03,
340
W
Sill
900
1,5001,457
W
Sill
900
1,5001,457
W
Sill
900
1,5001,500
D
2,1001,035
ED 001
2,10
01,
035
D
2,10
01,
035
D00
9
2,1001,035
D010
2,10
01,
035
D00
7
2,1001,035
D00
8
2,1001,035
D01
1
2,1001,035
D01
3
2,1001,035
D004
2,10
01,
830
D01
2
2,1001,035
D01
4
2,1001,035
D
2,10
01,
500
W
Sill
900
1,5001,500
W
Sill
900
1,5001,500
ED
2,4001,810
D00
6
2,1001,035
D005
2,10
01,
035
D
2,10
01,
800
WC
2,10
075
0
WC
2,10
075
0
WC
2,10
075
0
D00
3
2,1001,000
D001
2,10
01,
035
WW
D
Extension Area 57 m2
Teaching wall
wash up sink and storage
Shower trolley / changing bed
Changing area with bench, hoist and hygiene point
Childrens supplies Full height cupboards
Inward opening door to beagreed with building controland will require and accesspolicy
Low heightWC cubicals
Low height WC cubicals
Inward opening door to beagreed with building controland will require and access
policy
Doc M Acc WC
Changing bed
Ceiling hoist H track
Ceiling hoist H track
Ceiling hoist H track
Childrens supplies Full height cupboards
Commercial washers and dryers(footprints from MAG equipment)
Stainless steelDouble sink unitwith pre wash head
COSH compliantstorage units
New linen racking
New flooring and ceiling finisheswalls to be reskimed and painted
Walls to be clading inwhiterock and welded to
new flooring
New safety floor and and ceiling.Walls to be re painted
Childrenssupplies Full
heightcupboards
Uni sex WC block
Low level sink vanity unit
Low level sink vanity unit
Block up existing door
Install new door
Block up existing door
Changing bed
Hoist track
Remove doors
Remove doors
Add in new doors
Extend office approximately 30mForm secure lobby
Remove external wallRemove external wall
Rehome officeinto extension
Rehome officeinto extension
Add new doorWORKS BY
COUNCILFACILITIES
OUTSIDECONTRACT
Allow for installation of Gabionbaskets comprising of 1m x 1m
x 2m and 0.5m x0.5m x 2mInstallation approximately 46m
long and comprising of 23baskets of each size
Link to playground
Redecorate andfit new carpet-use as familyroom
Remove existing internal wallsreplace floor and make good
ceiling and re paint for use as astore area
New flooring and ceilingrepaint for re use as new
classroomNew Hygiene room
enlarge existingdoorway make
good to both sides
Block up existing door
Block up existing door
Add in new door
Form new Hygiene Room
Redecorate andfit new vinyl useas sensoryroom
Decorate and fitnew vinyl use asequipmentstorage area
Group room
Curtain
Staff handwash
Low level sink vanity unit
Uni sex WC block
Childrens supplies high level shelving
New Fence
Existing canopy to be cut short
Full height stud walls
WC cubicalsLow level partitions
WC cubicalsLow level partitions
Staff WC block
Childrenssupplies Full
heightcupboards
Block up existing door
Shower panel
Low heightWC cubicals
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated Classroom to have head
boards and disused gas linesremoved and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
FMH (ex)
FMH (ex)
FMH (relocated)
FMH (relocated)
FMH
FMH (ex)
FMH (ex)FMH (relocated)
FMH (ex)
SWMH (ex)
SWMH (ex)
SWMH
SWMH (ex)
SWMH
SWMH (ex)
SWMH (ex)
SWMH (ex)
SWMH (ex)
SWMH (relocated)
SVP
FMH (ex)
connection tothe sewer
FMH (ex)
connection tothe sewer
0 5 10 metres
D002
2,10
01,
035
0.-
Water&Drainage1:100
1:100
REV DESCRIPTION DR CHDATE
LON
DO
NLE
ED
SC
AR
DIFF
NE
WC
AS
TLEB
RIS
TOL
GLA
SG
OW
AB
ER
YSTW
YTHN
EW
TOW
NB
RA
DFO
RD
MA
NC
HE
STE
RLO
UG
HB
OR
OU
GH
darnton 3BCLIENT
PROJECT
DRAWING
SCALE @ A0 DRAWN CHECKED
CREATION DATE
DARNTONB3 DRAWING NO.
REVISION
P R O J E C T N O -COMPANY- Z O N E - LEVEL - T Y P E - R O L E - N U M B E R
--
--
--
- - -
- -
DB3 A
LOUGHBOROUGHSuite C, Loughborough Technology Centre, Epinal Way,
Loughborough, Leicestershire LE11 3GET: 01509 610510 www.darntonb3.com
COPYRIGHT: ALL RIGHTS RESERVED.
THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGSPREPARED BY CONSULTANTS AND SUB-CONTRACTORS.
DO NOT SCALE FROM THIS DRAWING. WORK ONLY TO THE PRINTED DIMENSIONS.
THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS ISSUED FORCONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ARCHITECT OR REPRESENTATIVES THEREOF.
c
A R C H I T E C T U R E
B1
B3 ARCHITECTS WORK TO A MANAGEMENT SYSTEM WHICH IS APPROVED TO ISO-9001 BYQMS CERTIFICATE NUMBER QMS-GB18714
DWGF 75C91470
10/06/2016
Fairfields School, Trinity Ave,NN2 6JN
Paul Atkins, Northamptonshire County Council
Ground floor proposed plan
Model Name/s :-N:\Projects\09000\91470 Fairfields School\DESIGN DATA\3 InProgress\91470 Fairfields mk12.pln
CG
Planning
MC
Extension Area 210 m2
24 m2
16 m2
52 m2
Extension Area 36 m2
28 m2
15 m2
13 m2
School
Fairf
ields School
Fairfields
W
Sill 900
1,50
01,
790
W
Sill 900
1,50
01,
790
W
Sill 900
1,50
01,
790
W
Sill
900
1,500900
W
Sill 900
1,50
089
0
W
Sill 900
1,50
089
0
ED
2,40
03,
365
W
Sill
900
1,500900
W
Sill
900
1,500900
ED
2,4003,340
W
Sill 900
1,50
01,
790
W
Sill 900
1,50
01,
790
W
Sill 900
1,50
01,
790
D
2,1001,500
D
2,10
01,
035
W
Sill 900
1,50
01,
457
W
Sill 900
1,50
01,
457
ED
2,40
03,
340
W
Sill
900
1,5001,457
W
Sill
900
1,5001,457
W
Sill
900
1,5001,500
D
2,1001,035
ED 001
2,10
01,
035
D
2,10
01,
035
D00
9
2,1001,035
D010
2,10
01,
035
D00
7
2,1001,035
D00
8
2,1001,035
D01
1
2,1001,035
D01
3
2,1001,035
D004
2,10
01,
830
D01
2
2,1001,035
D01
4
2,1001,035
D
2,10
01,
500
W
Sill
900
1,5001,500
W
Sill
900
1,5001,500
ED
2,4001,810
D00
6
2,1001,035
D005
2,10
01,
035
D
2,10
01,
800
WC
2,10
075
0
WC
2,10
075
0
WC
2,10
075
0
D00
3
2,1001,000
D001
2,10
01,
035
WW
D
E1 E1
E2 E2
E3
E3
E4 E4
E5
E5
E6
E6
E7
E7
S1
S1
S2 S2
13 m2
9 m2Re surface area 469 m2
Extension Area 57 m2 22 m2
47 m214 m2
48 m2
18 m2
24 m2
Teaching wall
wash up sink and storage
Shower trolley / changing bed
Changing area with bench, hoist and hygiene point
Childrens supplies Full height cupboards
Inward opening door to beagreed with building controland will require and accesspolicy
Low heightWC cubicals
Low height WC cubicals
Inward opening door to beagreed with building controland will require and access
policy
Doc M Acc WC
Changing bed
Ceiling hoist H track
Ceiling hoist H track
Ceiling hoist H track
Childrens supplies Full height cupboards
Commercial washers and dryers(footprints from MAG equipment)
Stainless steelDouble sink unitwith pre wash head
COSH compliantstorage units
New linen racking
New flooring and ceiling finisheswalls to be reskimed and painted
Walls to be clading inwhiterock and welded to
new flooring
New safety floor and and ceiling.Walls to be re painted
Childrenssupplies Full
heightcupboards
Uni sex WC block
Low level sink vanity unit
Low level sink vanity unit
Block up existing door
Install new door
Block up existing door
Changing bed
Hoist track
Remove doors
Remove doors
Add in new doors
Extend office approximately 30mForm secure lobby
Remove external wallRemove external wall
Rehome officeinto extension
Rehome officeinto extension
Add new doorWORKS BY
COUNCILFACILITIES
OUTSIDECONTRACT
Allow for installation of Gabionbaskets comprising of 1m x 1m
x 2m and 0.5m x0.5m x 2mInstallation approximately 46m
long and comprising of 23baskets of each size
Link to playground
Redecorate andfit new carpet-use as familyroom
Remove existing internal wallsreplace floor and make good
ceiling and re paint for use as astore area
New flooring and ceilingrepaint for re use as new
classroomNew Hygiene room
enlarge existingdoorway make
good to both sides
Block up existing door
Block up existing door
Add in new door
Form new Hygiene Room
Redecorate andfit new vinyl useas sensoryroom
Decorate and fitnew vinyl use asequipmentstorage area
Group room
Curtain
Staff handwash
Low level sink vanity unit
Uni sex WC block
Childrens supplies high level shelving
New Fence
Existing canopy to be cut short
Full height stud walls
WC cubicalsLow level partitions
WC cubicalsLow level partitions
Staff WC block
Childrenssupplies Full
heightcupboards
Block up existing door
Shower panel
Low heightWC cubicals
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated Classroom to have head
boards and disused gas linesremoved and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
Classroom to have headboards and disused gas lines
removed and walls madegood and re decorated
0 5 10 metres
D002
2,10
01,
035
0.-
Proposed Ground Floor1:100
A 160610 Minor modifications in particular CG GS
1:100
A
on Title block and Toilets
05 OS Site map05 OS Site map
07 Block plan07 Block plan
201 Proposed Elevations201 Proposed Elevations
202 Proposed elevations (Entrance)202 Proposed elevations (Entrance)
300 Section300 Section
500 Water&Drainage500 Water&Drainage
75C Ground floor proposed plan(1)75C Ground floor proposed plan
7708 External ElevationsFull page photo